HomeMy WebLinkAboutGIBRALTAR CONSTRUCTION CORP -001892 -5/9/2011 CARMEL•REDEVELOPMENT COMMISSION 001892
Gibraltar Construction Corp Check: 1892
2932 N. Webster Ave. Date: 5/9/2011
Indianapolis, IN 46219 Vendor: GIBR1
Prior
Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paid
8-1 a 93 160,760.00 160,760.00 16,076.00 0.00 144,684.00
Application 1 on Streetscape
160,760.00 160,760.00 16,076.00 0.00 144,684.00
•
=
IV i ar
A
- 1992
Application and Certificate for Payment Construction Manager-Adviser Edition
TO OWNER: PROJECT; APPLICATION NO: Distribution to
City of Carmel Canal Lofts Slreelsc ape-Parcel 47 1
One Civic Square PERIOD TO: 3123/11 OWNER in
Canal,IN 46032
CONSTRUCTION MANAGER 0
FROM CONTRACTOR: VIA CONSTRUCTION MANAGER: CONTRACT DATE: ARCHITECT 0
2932 Gibraltar Construction-Corp PROJECT NOS: 214111 1 f CONTRACTOR iI
2932 N.Webster Ave.
Indianapolis.IN 48219 VIA ARCHITECT: FIELD U
CONTRACT FOR: P CSOArchilects.Inc.
Parcel 47-Carmel Lefts Streetsc a 0
CONTRACTOR'S APPLICATION FOR PAYMENT ate undersigned Ctrntrautor ce ;Iles dun-ha the best of the Cerrttrat:toes knowledge,information and
Applicatinm.i.s made for payment,as shown below,in�i1ar97ee-til)19 with the Contract.
belief the Work covered by[4ia J pplimition for Payment has been completed in accordance with the
Contract Documents,that al ants have been paid by the Contractor for Work for which previous
(.oI lrtaatittn Sheet.ALA Document 0703,is attached. Certificates tear Payment t•-m issued and payments received from the Owner, and that current
1.ORIGINAL CONTRACT SUM y 1,373,700,fHt payment shown herein is n rd`d r e,
2.Net change by Change Orders $ 0.00 CONTRACTOR:Gibraltar;' '�{"�truction Corp
3.CONTRACT SUM TO DATE r,Line (±1 t S1.373,700.00 Icy'. � 1 Date: . may-//
4.TOTAL COMPLETED&STORED TO DATE(Column( on 0701 t $ 160,700,00 ' State nf: /s.,
.RETAINAGE Ctntnty of: .at* 1 1 `PEE BRIAN R. MCBRIDE
a. r�of Completed Work Subscribed and swc. t to hefar � Res. of Hancock Countlf
16.076.00 J Z•-/) :"
lCttEunw 0+E oil 0703) $ laic this a} of 1d�ef y7 My Comm. EaQ, 11-29-2017
b. 5t:of Stored Material Notary 1'17i-bite: 6 00)c Commission #611862
41`ulunut 1=on 071)31 $ My Commission expires: / :2-9-'77
Tcrttit Retirintige(Lines Si +5h to Tltul in t"olttmn I of MO), $ CERTIFICATE FOR PAYMENT
14468A.t In accordance with the Contract Documents. based on on-site observations and the data comprising
.
6.TOTAL EARNED LESS RETAINAGE $ this application.the Construction Manager and Architect certify to the Owner that to the hest of their
(Line 4 Less Line 5 Total) knowledge,information and belief the Work has progressed as indicated,the quality of the Work is in
7.LESS PREVIOUS CERTIFICATES FOR PAYMENT $ 0.00 accordance with the Contract Documents,.and the Contractor is entitled to payment of the AMOUNT
(Line CI from prior Cent Icatri CLit'I'H I D.
8.CURRENT PAYMENT DUE $ 144.694.00 G AMOUNT CERTIFIED • S
9,BALANCE TO FINISH,INCLUDING RETAINAGE
(Attach,e_vplurration r/',rrennrri certified r! eat(retire the atnreeem applied./rri.ial ail figurer air this
Aplplicsrtiem turd otr tIir'C,rntirrtrrtticnr Sheet that ore c'lrurn ln1 t+r conform with the clerrratittt certified.)
l Line 3 less Line+ii 5 1,229,016.00 CONSTRUCTION MANAGER: /�
Hy: Dan;: I" I{ 6 ,RV
CHArNGEORDERSUMMARY ADDITIONS DEDUCTIONS ` ARCHITECT' py t
Total changes approved in previous months by Owner ,$ ' $ U}•: ✓ / . Dine: a13(cif
T'otstt appcoti`edi this Month S $ This Certilic cis not negotiable. The AMOUNT CERTIFIED is payable only to the Cuutrttcttrr
TOTALS S $ twined herein_ Issuance,payment and acceptance of payment are without prejudice ku any rights of
NET t'I i;aNGi:ti icy Change Order_ c the Owner or Contractor under this Contract_
CAUTION:You should sign an original AIA Contract Document,on which this text app✓*ara In PIED.An originat'trsswres that changes wilt not be obscured, .
AIA Document etZ02,CRtp1+1-1992.Copyright r',1892 by To Anlirrlean htchInle of Architects.Ali rights rusnrvad.°NAANIN0:This AMA" f)acumont is protected by U.S.Copyright Law and Intarnalionel Treaties.
Unauthorized reproduction or wort-bait an of nibs ALA"Document,to nay porllari 01 It,natty reaull in aevune civil and criminal'penalties,and will be prosecuted to the maximum extent passible under the low.
Purchase to are purmllted to reproduce len rig])copies of title document when completed.To report copyright vloletIono of AIA Canteen Docurnanls,e-mail The Amer'een tns.elitte of Archi eels'teaai,e0UnCal,copyrighl@aio.org.
Director of Redevelopment IL{4(b c`r'I 7 13"7
CONTINUATION SHEET Page 2 of 3
APPLICATION AND CERTIFICATE FOR PAYMENT,containing Contractors signed Certification,is APPLICATION NO. - 1
attached. In tabulations below,amounts are stated to the nearest dollar, Use Column I on Contracts where APPLICATION DATE. 312312011
PERIOD TO: 3/2312011
variable retainage for line items may apply. ARCHITECTS PROJECT NO.
A B C D 1 E F G H I
WORK COMPLETED MATERIALS TOTAL
ITEM FROM PREVIOUS PRESENTLY COMPLETED AND % BALANCE TO RETAINAGE
NO. DESGRiPTION OF WORK SCHEDULES}VALUE', FINISH (IF VARIABLE
APPLICATION THIS PERIOD STORED(NOT IN STORED TO DATE (G!C)
(DoE) DORE) lD+E+F) (C-G) RATE)
i Allowance No.1-Base.Bid Contingency $5,000.00 $0.00 0% 5,000.00 -
2 Allowance No.2-Winter Conditions $30,000.00, $10,000.00, $10,000.00 33% 20,000.00 1,000.00
3 -Allowance No.3-Alternate 1 Conlin,ency $5,000.00 $0.00 0%- 5,000.00 -
4 Allowance No.4-Alternate 2 Contingency $5,000.00 $0.00 0% 5,000,00 -
5 Allowance No.5-Alternate 3 Contingency $5,000.00 _. $0.00 0% 5.000.00
6 Allowance No.6-Alternate 4 Contingency $5,000.00 $0.00_ 0% 5,000.00 -
7 Bond $18,500.00 $18,500.00_ $18,500.00 100% - 1,850,00
8 General Conditions $86,000.00 $9,460.00 $9,480.00 11% 78,540.00 946.00
I 9 Site Clearing/Selective Site Demo $29,200.00 $4,964.00 $4,964.00 17% 24,236.00 498.40
10 Earthwork $114,500.00 $19,465.00---- $19,485.00 17% 95,035.00 1,946.50
11 Stricture!Soil $7,800.00 $0:00 0% 7,800.00 -
12 Erosion/Sedimentation Control $500,00 - $500.00 $500.00 100% - 50.00
13 Water Distribution $48,200.00 $2,410.00 $27,676.00 $30,086.00 62% 18,114.00 3,008.60
14 Storm Drainage $139,700.00 $6,985.00 $25,146.00 $32,131.00 23% 107,569.00 3,213.10
15 Asphalt Paving $16,900.00 $0.00 0% 16,900.00 -
16 Cast-in-Place Concrete-Mt'l $7,750.00 $1,550.00 $1,550:00 20% 6,200.00 155.00
17 Cast-In-Place Concrete-Labor $6,350.00 $1,270.00 $1,270.00 20% 5,080.00 127.00
18 Trench Drains-Mt'I _ $7,500.00 $0.00 0% 7,500.00 -
19 Trench Drains-Labor $2,300.00 _ $0.00 0% 2,300.00 -
20 Concrete Paving $156,454.00 $17,210.00 $17,210.00 11% 139,244.00 1,721.00
21 Concrete Footing and Walls $43,900.00 $7,024.00 $6,500.00 $13,524.00 31% 30,376.00 1,352.40
22 Paving Joint Sealants _ $3,700.00 $0.00 0% 3,700.00 -
23 Unit Paver-Concrete _ $79,000.00 $0.00 0% 79,000.00 -
24 Permeable Unit Pavin• S stem-Concrete $65,000.00 $0.00 0% 65,000.00 -
25 Segmental Retaining Wall $25,000.00 $0.00 0% 25,000.00 -
•
CONTINUATION SHEET Page 3 of 3
APPLICATION AND CERTIFICATE FOR PAYMENT,containing Contractor's signed Certification,is APPLICATION NO : 1
attached. In tabulations below,amounts are stated to the nearest dollar, use Column I on Contracts where 'PLiCATION DATE: 3123/2011
variable retairrage for line items may apply, PERIOD TO: 3/23!2011
ARCHITECT'S PROJECT NO.:
D A B C D J E F G H 1
WORK COMPLETED MATERIALS
TOTAL COMPLETED BALANCE TO
ITEM DESCRIPTION OF WORK SCHEDULED VALUE FROM PREVIOUS PRESENTLY AND STORED TO FINISH RETAINAGE
N0. APPLICATION THISP€RKID STORED(NOT IN
DATE la+E+F) (Gig cI tc cl {€F VARIABLE RATE)
ID+EI DOREI
26 Bollards-Mt'I $5,050.00 $0.00 0% 5,050.00
27 Bollards-Labor $800:00 - $0.00 0% 800.00 -
28 Mason $9,000.00 $0.00 0% 9,000.00 -
29 Brick Masonry $7,000.00 $0.00 0% 7.000.00
30 Cast Stone - $7;000.00 $0.00 0% 7,000.00 -
31 Pipe&Tube Railings-Steel $49,500.00 $2,100.00 $2.100.00 4% 47,400.00 210.00
32 Water Repellants $700.00 $0.00 0% 700 -
33 Thermo.Iastic Membrane Wa - •roofin e $76,000.00 $0.00 0% 76,000 -
34 High Performance Pond Coatings $1,000.00 $0.00 0% 1,000 -
35- High Performance Coatings $1,000. 00 $0.00 - 0% 1.00D -
36 Post&Panel Signs $5,300 $0.00 0% 5,300 -
37 Fountain Structure-Mt'l $28,100 $0.00 0% 28.100 -
38 Fountain Structure-Labor $800 $0.00 0% 800 -
39 Fountain Plumbin. -Mt'I $12,000- $0.00 -
40 Fountain Plumbing-Labor $3,000 $0.00 0% 3,000 -
41 Electrical $223,000 - - $0.00 0% ` 223 000 -
42 Exterior Plants $8,200 - $0.00 0% 8.200 -
43 Tree Gates-Mt'I $9,846' $0.00 0% 9,846 -
44 Tree Gates-Labor $1,400. $0.00 0% 1,400 -
45 Bike Racks-MYI $900 ti - 0% 900
46 Bike Racks-Labor $600 _
47 'Planters-Mt'i $9,500 - 0% 9.500
48 Planters-Labor $750 - 0% 750
49
50
,- - - -
$1,373,700.00 $0.00 $101,438.00 $59,322.00 $160,760.00 12% $754,594.00 $16.076.00
ISA Form#I-402
AFFIDAVIT AND WAIVER OF LIEN
fl FINAL ►1 PARTIAL El PAYMENT TO FOLLOW •
State of Indiana, County of Marion,SS
Michael Smith being duly sworn state that he is the President of Gibraltar Construction Corp having contracted with the
Owner to furnish certain materials and 1 or labor for a project known as Carmet Arts District Lofts Streetscape,
Parcel 47 and owned by City of Carmel, Indiana.
and does hereby further state on behalf of the aforementioned contractor:
(PARTIAL WAIVER)that there is due from the Owner the sum of
One Hundred Forty Four Thousand Six Hundred Eighty Four and Nail DO Dollars ($144,684.00)
O receipt of which is hereby acknowledged;or
►.4 the payment of which has been promised as the sole consideration of this Affidavit and Partial Waiver of Lien
which is given solely with respect to said amount,and which waiver shall be effective only upon receipt of
payment thereof by the undersigned;
(FINAL WAIVER)that the final balance due from the Owner is the sum of
Dollars ( )
O receipt of which is hereby acknowledged;or
• the payment of which has been promised as the sol consideration for this Affidavit and Final Waiver
of Lien which shall become effective upon receipt o uch payment.
THERFORE,the undersigned waives and releases unto the r of said premises,any and all lien or claim whatsoever
on the above-described property and improvements ther ion unt of LABOR or material or both,furnished by the
undersigned thereto,subject to limitations of conditions , pre �d herein, if any;and further certifies that no other party
has any claim or right to a lien on account of any work or or material furnished to the undersigned for said project,
and within the scope of this affidavit and waiver.
i i
Gibraltar Construction Corp By /126 / Title President
Ir
WITNESS MY HAND AND NOTORIAL SEAL th' 24th day of March,2011,
r
(Notary Public)
C 1979 4M9'e4A SueCONfaACTORS ASSOCIATION IA1copooRs1FD ,r,2."r+.E BRIAN R. MCBRIDE s.,, ty�;
unauth**'io Rapraauaan P baaa ^ �n
Res. of Hancock Gouty
* My Comm. Exo. 11-29-2017
aver CorrYntssicin #611862