Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
GIBRALTAR CONSTRUCTION CORP -002088 -7/25/2011
CAR(rEL REDEVELOPMENT COMMISSION 002088 Gibraltar Construction Corp Check: 2088 2932 N. Webster Ave. Date: 7/25/2011 Indianapolis, IN 46219 Vendor: GIBR1 Prior Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paid 8-3 93 353,727.00 353,727.00 0.00 0.00 340,186.60 App 3 on P47 Carmel Lofts 353,727.00 353,727.00 . 0.00. 0.00 340,186.60 . �� *� TM AIA Document G702/CMa - 1992 Application and Certificate for Payment Construction Manager-Adviser Edition TO OWNER: City of Carmel PROJECT: Carmel Lofts Streetscape Parcel 47 APPLICATION NO: 3 Distribution to: One Civic Square PERIOD TO: 5/30/11 OWNER ❑ . Carmel, IN 46032 CONSTRUCTION MANAGER ❑ FROM CONTRACTOR: Gibraltar Construction Corp VIA CONSTRUCTION MANAGER: CONTRACT DATE: 2/4/11 ARCHITECT ❑ 2932 N.Webster Ave. PROJECT NOS: / / CONTRACTOR ❑ Indianapolis,IN 46219 VIA ARCHITECT: FIELD ❑ CSO Architects,Inc. CONTRACT FOR: Parcel 47-Carmel Lofts Streetscape ❑ CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and Application is made for payment,as shown below,in connection with the Contract. belief the Work covered b thi: Application for Payment has been completed in accordance with the Continuation Sheet,AIA Document G703,is attached. Contract Documents,that dl a ounts have been paid by the Contractor for Work for which previous Certificates for Payment weri issued and payments received from the Owner, and that current 1.ORIGINAL CONTRACT SUM $ 1,373,700.00 payment shown herein i ow ifiue. 2. Net change by Change Orders $ 35,000.00 CONTRACTOR: Gibral"ii, •nstruction Corp 3.CONTRACT SUM TO DATE(Line I ±2) $ 1,408,700.00 By /%V Date: .....5%,i44-1/ 4.TOTAL COMPLETED&STORED TO DATE(Column G on G703) $ 922,673.00 State of::.— I�r1!,r 7 5.RETAINAGE: County of .6 , a. %of Completed Work Subscribed anti/rn o be' e `PEE BRIAN R. MCBRIDE (Column D+Eon G703) $ 70,435.00 me this day of/'i " ���, 2 �1� y `S Res. of Hancock County b. %of Stored Material Notary Pub' • - * * My Comm. Exp. -29-2017 (Column F on G703) $ My Commission expires:///Z�-- - • •••' '1111 - • :• Total Retainage(Lines 5a+5b or Total in Column I of 6703).. $ CERTIFICATE FOR PAYMENT 852,238.00 In accordance with the Contract Documents, based on on-site observations and the data comprising 6.TOTAL EARNED LESS RETAINAGE $ this application, the Construction Manager and Architect certify tb.the,Owner that to the best of their (Line 4 Less Line 5 Total) knowledge,information and belief the Work has progressed as-indicated,the quality of the Work is in 7.LESS PREVIOUS CERTIFICATES F.OR PAYMENT $ 512,051.40 accordance with the Contract Documents,and the Contractor is entitled to payment of the AMOUNT (Line 6 from prior Certificate) CERTIFIED. 8.CURRENT PAYMENT DUE $ 340,186.60 AMOUNT CERTIFIED $340,I cb4.4vv 9.BALANCE TO FINISH,INCLUDING RETAINAGE (Attach explanation if amount certified differs from the amount applied.Initial all figures on this 556,462.00 Application and on,he Continue Sheet that are changed to conform with the amount cert.ied.) (Line 3 less Line 6) $ CONSTRUCTIO ,.'rA∎ ,GE; By: i.. �I_U Date: .' / ADDITIONS DEDUCTIONS f ' CHANGE ORDER SUMMARY ARCHITECT O Ar !s, ." Total changes approved in previous months by Owner $ $ By: - i..11V Date: 34 Total approved this Month � 1 PP $ $ This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the Contractor TOTALS $ $ named herein. Issuance,payment and acceptance of payment are without prejudice to any rights of NET CHANGES by Change Order $ . the Owner or Contractor under this Contract. . Director of Redevelopment/G f i f o, C7� �/ CAUTION:You should sign an original AIA Contract Document,on which this text appears in RED.An original assures that changes will not be ob cured. AIA Document G702/CMaTM-1992.Copyright ©1992 by The American Institute of Architects.All rights reserved.WARNING:This AlA® Document is protected by U.S.Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten(10)copies of this document when completed.To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal counsel,copyright @aia.org. • p/%-,=4AIA Document G702/CMaTM — 1992 Instructions Application and Certificate for Payment Construction Manager-Adviser Edition A.General Information AIA Document G702/CMa,Application and Certificate for Payment,Construction Manager-Adviser Edition,is to be used in conjunction with AIA Document G703, Continuation Sheet.These documents are designed to be used on a Project where a Construction Manager is employed as an adviser to the Owner,but not as a constructor,and where multiple Contractors have direct Agreements with the Owner.Procedures for their use are covered in AIA Document A201/CMa,General Conditions of the Contract for Construction,Construction Manager-Adviser Edition, 1992 Edition. B.Reproductions This document is a copyrighted work and may not be reproduced or excerpted from without the express written permission of the AIA.There is no implied permission to reproduce this document,nor does membership in The American Institute of Architects confer any further rights to reproduce this document. The AIA hereby grants the purchaser a limited license to reproduce a maximum of ten copies of a completed G702/CMa,but only for use in connection with a particular project.The AIA will not permit reproduction outside of the limited license for reproduction granted above,except upon written request and receipt of written permission from the AIA. Rights to reproduce the document may vary for users of AIA software.Licensed AIA software users should consult the End User License Agreement(EULA). To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal counsel,copyright @aia.org. C.Completing the G702/CMa Form After the Contractor has completed AIA Document G703,Continuation Sheet,summary information should be transferred to AIA Document G702/CMa,Application and Certificate for Payment,Construction Manager-Adviser Edition. The Contractor should sign G702/CMa,have it notarized and submit it,together with G703,to the Construction Manager and Architect. The Construction Manager and Architect should review G702/CMa and G703 and,if they are acceptable,complete the Certificate for Payment on G702/CMa.The Construction Manager and Architect may certify a different amount than that applied for pursuant to Sections 9.5 and 9.6 of A201/CMa.They should then initial all figures on G702/CMa and G703 that have been changed to conform to the amount certified and attach an explanation.The completed G702/CMa and G703 should be forwarded to the Owner. D.Completing the G703 Form Heading:This information should be completed to be consistent with similar information on AIA Document G702/CMa,Application and Certificate for Payment, Construction Manager-Adviser Edition. Columns A,B&C:These columns should be completed by identifying the various portions of the Project and their scheduled value consistent with the schedule of values submitted to the Architect at the commencement of the Project or as subsequently adjusted.The breakdown may be by sections of the Work or by Subcontractors and should remain consistent throughout the Project.Multiple pages should be used when required. Column C should be subtotaled at the bottom when more than one page is used and totaled on the last page.Initially,this total should equal thetirj inal Contract Sum. The total of column C may be adjusted by Change Orders during the Project. Column D:Enter in this column the amount of completed work covered by the previous application(columns D&E from the previous application):.Values from column F (Materials Presently Stored)from the previous application should not be entered in this column. Column E:Enter here the value of Work completed at the time of this application,including the value of materials incorporated into the project which were listed on the previous application under Materials Presently Stored(column F). • Column F:Enter here the value of Materials Presently Stored for which payment is sought.The total of the column must be recalculated at the enclof each pay period. This value covers both materials newly stored for which payment is sought and materials previously stored which are not yet incorporated into the Project.Mere payment by the Owner for stored materials does not result in a deduction from this column.Only as materials are incorporated into the Project is their value deducted from this column and incorporated into column E(Work Completed-This Period). Column G:Enter here the total of columns D,E and F.Calculate the percentage completed by dividing column G by column C. Column H:Enter here the difference between column C(Scheduled Value)and column G(Total Completed nd St red to Date Column I:This column is normally used only for contracts where variable retainage is permitted on a line-ite basis It need noccpe corn leted on projects where a constant retainage is withheld from the overall contract amount. one t„ Change Orders:Although Change Orders could be incorporated by changing the schedule of values each ti e C anga.OrdeSs adcd to the Project,this is not normally done.Usually,Change Orders are listed separately,either on their own G703 form or at the ererif t -asi st %dulQfElim unt of the original contract adjusted by Change Orders is to be entered in the appropriate location on the G702/CMa form. j p cl C■' Construction Change Directives:Amounts not in dispute that have been included in Construction ChiEje irativ s sTio be incorp rated intone or more Change Orders.Amounts remaining in dispute should be dealt with according to Section 7.3 in A201/CMa. U C '' I' ' • E.Making Payment W ^` QC The Owner should make payment directly to the Contractor based on the amount certified by the Constructic# er emitted o AIA Document G702/CMa, Application and Certificate for Payment,Construction Manager-Adviser Edition.The completed form contairre , iri e anci.a of> e Contractor.Payment should not be made to any other party unless specifically indicated on G702/CMa. O, , of al Z. • Z m p cn 2 a > 0 �D❑ K AIA Document G702/CMa TM-1992.Copyright ©1992 by The American Institute of Architects.All rights reserved..WARNING:This AIA- Document is protected by U.S. Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AlA® Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.Purchasers are permitted to reproduce ten(10)copies of this document when completed. To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal counsel,copyright @aia.org. CONTINUATION SHEET Page 2of3 APPLICATION NO. : 3 APPLICATION AND CERTIFICATE FOR PAYMENT, containing Contractor's signed Certification, is APPLICATION DATE: 5/30/2011 attached. In tabulations below,amounts are stated to the nearest dollar. Use Column I on Contracts where PERIOD TO: 5/30/2011 variable retainage for line items may apply. ARCHITECT'S PROJECT NO. A B C D E F G H I WORK COMPLETED MATERIALS TOTAL ITEM FROM PREVIOUS PRESENTLY COMPLETED AND % BALANCE TO RETAINAGE NO. DESCRIPTION OF WORK SCHEDULED VALUE APPLICATION THIS PERIOD STORED(NOT IN STORED TO DATE (G/C) FINISH (IF VARIABLE (D+E) D OR E) (D+E+F) (C-G) RATE) 1 Allowance No. 1 -Base Bid Contingency $5,000.00 $0.00 0% 5,000.00 2 Allowance No. 2-Winter Conditions $30,000.00 $30,000.00 _ $30,000.00 100% - 3 Allowance No. 3-Alternate 1 Contingency $5,000.00 $0.00 0% 5,000.00 4 Allowance No. 4-Alternate 2 Contingency $5,000.00 $0.00 0% 5,000.00 5 Allowance No. 5-Alternate 3 Contingency $5,000.00 $0.00 0% 5,000.00 6 Allowance No. 6-Alternate 4 Contingency $5,000.00 $0.00 0% 5,000.00 7 Bond $18,500.00 $18,500.00 $18,500.00 100% - 8 General Conditions $86,000.00 $25,800.00 $34,400.00 $60,200.00 70% 25,800.00 9 Site Clearing/Selective Site Demo $29,200.00 $23,364.00 $5,836.00 $29,200.00 100% - 10 Earthwork $114,500.00 $34,350.00 $57,250.00 $91,600.00 80% 22,900.00 70,435.00 11 Stuctural Soil $7,800.00 $5,460.00 $5,460.00 70% 2,340.00 12 Erosion/Sedimentation Control $500.00 $500.00 $500.00 100% - 13 Water Distribution $48,200.00 $42,618.00 $4,618.00 $47,236.00 98% 964.00 14 Storm Drainage $139,700.00 $65,661.00 $53,086.00 $118,747.00 85% 20,953.00 15 Asphalt Paving $16,900.00 $5,915.00 $5,915.00 35% 10,985.00 16 Cast-in-Place Concrete-Mt'I $7,750.00 $4,262.00 $2,712.00 $6,974.00 90% 776.00 17 Cast-in-Place Concrete-Labor $6,350.00 $3,492.00 $2,222.00 $5,714.00 90% 636.00 18 Trench Drains-Mt'l $7,500.00 $7,500.00 $7,500.00 100% - 19 Trench Drains- Labor $2,300.00 $2,070.00 $230.00 $2,300.00 100% - 20 Concrete Paving $156,454.00 $25,033.00 $92,308.00 $117,341.00+ 75% 39,113.00 21 Concrete Footing and Walls $43,900.00 $43,900.00 $43,900.00 100% - 22 Paving Joint Sealants $3,700.00 $0.00 0% 3,700.00 23 Unit Paver-Concrete $79,000.00 $70,000.00 $3,950.00 $73,950.00 94% 5,050.00 24 Permeable Unit Paving System -Concrete $65,000.00 $48,750.00 $48,750.00 75% 16,250.00 25 Segmental Rataining Wall $25,000.00 $0.00 0% 25,000.00 CONTINUATION SHEET Page 3 of 3 APPLICATION AND CERTIFICATE FOR PAYMENT, containing Contractor's signed Certification, is APPLICATION NO. : 3 attached. In tabulations below, amounts are stated to the nearest dollar. Use Column I on Contracts where APPLICATION DATE: 5/30/2011 variable retainage for line items may apply. PERIOD TO: 5/30/2011 ARCHITECT'S PROJECT NO. : A B C D I E F G H I WORK COMPLETED MATERIALS ITEM FROM PREVIOUS PRESENTLY TOTAL COMPLETED % BALANCE TO RETAINAGE NO. DESCRIPTION OF WORK SCHEDULED VALUE APPLICATION THIS PERIOD STORED(NOT IN AND STORED TO (G/C) FINISH (IF VARIABLE RATE) (p+E) D OR E) DATE(D+E+F) (C-G) 26 Bollards- Mt'I $5,050.00 $3,000.00 $2,050.00 $5,050.00 100% - 27 Bollards- Labor $800.00 $40.00 $760.00 $800.00 100% - _ 28 Masonry $9,000.00 $9,000.00 $9,000.00 100% - 29 Brick Masonry $7,000.00 $3,500.00 $3,500.00 50% 3,500.00 30 Cast Stone $7,000.00 $350.00 $350.00 5% 6,650.00 31 Pipe&Tube Railings-Steel $49,500.00 $2,100.00 $7,920.00 $10,020.00 20% 39,480.00 32 Water Repellants $700.00 $0.00 0% 700 33 Thermoplastic Membrane Waterproofing $76,000.00 $3,800.00 _ $3,800.00 5% 72,200 34 High Performance Pond Coatings $1,000.00 $0.00 0% 1,000 35 High Performance Coatings $1,000.00 $0.00 0% 1,000 36 Post& Panel Signs $5,300 $0.00 0% 5,300 37 Fountain Structure-Mt'I _ $28,100 28,100 $28,100.00 100% - 38 Fountain Structure-Labor $800 $0.00 0% 800 39 Fountain Plumbing- Mt'I $12,000 $0.00 40 Fountain Plumbing- Labor $3,000 $0.00 0% 3,000 41 Electrical _ $223,000 75,000 22,300 $97,300.00 44% 125,700 42 Exterior Plants $8,200 $0.00 0% 8,200 43 Tree Gates- Mt'I $9,846 9,846 $9,846.00 100% - 44 Tree Gates- Labor _ $1,400 420 $420.00 30% 980 45 Bike Racks- Mt'I $900 - 0% 900 46 Bike Racks- Labor $600 47 Planters- Mt'I $9,500 5,700 5,700 60% 3,800 48 Planters- Labor $750 - 0% 750 49 Change Order#1 $35,000 35,000 35,000 100% - 50 $1,408,700.00 $568,946.00 $353,727.00 $0.00 $922,673.00 65% $199,467.00 $70,435.00 ISA Form#1-402 AFFIDAVIT AND WAIVER OF LIEN ❑ FINAL ® PARTIAL ® PAYMENT TO FOLLOW State of Indiana, County of Marion, SS Michael Smith being duly sworn state that he is the President of Gibraltar Construction Corp having contracted with the Owner to furnish certain materials and/or labor for a project known as Carmel Arts District Lofts Streetscape, Parcel 47 and owned by City of Carmel, Indiana. and does hereby further state on behalf of the aforementioned contractor: (PARTIAL WAIVER)that there is due from the Owner the sum of Three Hundred Forty Thousand One Hundred Eighty Six and 60/100 Dollars ($340,186.60) ❑ receipt of which is hereby acknowledged; or ® the payment of which has been promised as the sole consideration of this Affidavit and Partial Waiver of Lien which is given solely with respect to said amount, and which waiver shall be effective only upon receipt of payment thereof by the undersigned; (FINAL WAIVER)that the final balance due from the Owner is the sum of Dollars ( ) ❑ receipt of which is hereby acknowledged; or ❑ the payment of which has been promised as the sole consideration for this Affidavit and Final Waiver of Lien which shall become effective upon receipt of such payment. THERFORE, the undersigned waives and releases unto the • ner of said premises, any and all lien or claim whatsoever on the above-described property and improvements thereon a ount of LABOR or material or both, furnished by the undersigned thereto, subject to limitations of conditions pr-s.ed herein, if any; and further certifies that no other party has any claim or right to a lien on account of any work .:i o ed or material furnished to the undersigned for said project, and within the scope of this affidavit and waiver. Gibraltar Construction Corp By Title President -I, WITNESS MY HAND AND NOTORIAL SEAL, t 24th day of May, 2011. (Notary Public) a • ,=.ei BRIAN R. MCBRIDE c 1979 INDIANA SueCONTRacTOAS ASSOt1Altot4 1NCOMPORATEG Z Res, of Hancock County GSLutCOr•te4 R•W00ixelmn Or Ottilbt•d * * Rev tp 1 My Comm. Exp. 11-29-2017 o�0 Commission #611862