Loading...
HomeMy WebLinkAboutSt. Mary and St. Mark Rev#3U 121 ft NOR NMI momiun NMI s� MII= IN ALUA I May 22, 2013 JAMES BRAINARD, MAYOR Mr. Greg Snelling, P.E. 13295 Illinois Street Suite 142 Carmel, IN 46032 RE: St. Mary and St. Marls Coptic Church, Review #3 Dear Mr. Snelling: The City received your updated construction plans and response letter on April 25, 2013, in response to the Engineering Department's comment letter dated March 25, 2013. We offer the following comments: CONSTRUCTION DRAWING REVIEW COMMENTS 1. Comment I of a letter dated March 25, 2013. Section 2.09 of Chapter 2, Article 1 of Chapter 10 of the Carmel City Code requires that all projects and Improvements or authorizations under the jurisdiction of the zoning ordinance that adjoin, include, are served by or affect existing streets bearing a designation on the Thoroughfare Plan shall conform to the requirements of the Thoroughfare Plan in regards to (1) the dedication of public Rights -of- way; (2) design and construction of the improvements indicated by the Thoroughfare Plan across the roadway frontage of the project; (3) Setback; and (4) any other affected development standards. Section 2.09 further states that the petitioner may elect to provide a monetary commitment equal to the value to otherwise design and construct the improvements indicated by the Thoroughfare Plan across the roadway frontage. The value of the commitment shall be equal to the difference in the value to otherwise design and construct the improvements indicated by the Thoroughfare Plan across the roadway frontage, minus the cost to design and construct those improvements indicated by the Thoroughfare Plan across the roadway frontage that will be installed by the petitioner. The values established above shall be approved by the department of Engineering. Section 2.09 further states that conformance with the Thoroughfare Plan as outlined above shall be in addition to any improvements deemed necessary by: (1) Chapter 5, Sections 5.03.05 and 5.05.02(3); (2) Statements per Chapter 24, Section 24.02(B)(5)(e); and (3) Other applicable standards. Our office will contact you to discuss this comment further. Please submit a cost estimate for the commitment to the Non - reverting Thoroughfare Fund, per your 5122113 phone conversation with Amanda Foley. 2. Comment 11 of a letter dated March 1, 2013 and Comment 6 of a letter dated March 25, 2013. Board of Public Works and Safety approval is required for the two curb cuts. The Department repeats this comment. Please proceed with submitting the curb cut requests for the curb cuts shown on the construction plans. 3. Comment 16 of a letter dated March I, 2013 and Comment 8 of a letter dated March 25, 2013. The northeast corner of the site cannot direct discharge to the right -of -way without being treated and detained. A variance is required for any direct stormwater discharges. At a minimum, the driveway runoff needs to be detained on -site. However, the Department will support a variance for the grassed areas to direct discharge to the right -of -way with no detention. It still appears that the north drive is direct discharging from the site through the existing yard inlet in the Shelborne Road right -of -way. Please verify this driveway is directed to the onsite storm sewer system and detention facility. 4. Comment 17 of a letter dated March 1, 2013 and Comment 9 of a letter dated March 25, 2013. Please label any offsite easements. Is an offsite easement required for the storm sewer DERNR`I:MEN -r OF ENGIN'URINiG ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.771.2441 FAN 317571.2439 E \1A11_ cnginccring6carmcl.in.gcry Mr. Greg Snelling, P.E. May 22, 2013 RE: St. Mary and St. Mark Coptic Church- Project Review #3 Page 2 of 2 outlet in Kendall Wood Subdivision? Does the storm sewer cross through a Tree Preservation Easement in Kendall Wood? Per City Code, no improvements are allowed within a Tree Preservation Easement, Since Kendall Wood has not been platted yet, it would be best to contact Kendall Wood's engineer and have him accommodate a break in the TPE on their site and provide a 30 -foot drainage easement for the Church's storm sewer connection. Please also contact Daren Mindham for his approval of any changes to Kendall Wood's TPE, Please send Stoeppelwerth a CAD file of the drainage easement for them to incorporate into the Kendall Wood final plat. 5. Comment 23 of a letter dated March 1, 2013 and Comment 11 of a letter dated March 25, 2013. 2.5 feet of minimum cover is required along the storm sewers. We will support a variance for the minimum pipe cover; however, a condition of the variance will be to upgrade to a higher class of pipe. Please submit a letter of request for the variance as such, Please verify with John Thomas that perforated pipe is necessary and required in this area (between structures 4 -7). 6. Please add a statement to the plans that the curb along Shelborne Road shall be removed to the nearest joint for the construction of the two proposed driveways. If you have questions, please contact me at 571 -2441, Sincerely, Gary R. une r., P.E. Assistant City Engineer Department of Engineering cc: Angelina Conn, Department of Community Services Rachel Boone, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Paul Arnone, Carmel Utilities Greg Hoyes, Hamilton County Surveyor's Office Greg Ilko, Crossroad Engineers, PC issvrappsluser datalz:lsharedlDevelopment Reviews\PROJREV 131St. Mary and St. Mark Coptic Church Review 93