HomeMy WebLinkAboutALT & WITZIG ENGINEERING, INC. -001707 -3/17/2011 ...,. viaL.ntuevELOPMENT COMMISSION 001707
Alt&Witzig Engineering, Inc. Check: 1707
4105 West 99th Street Date: 3/17/2011
Carmel, IN 46032 Vendor: ALT& W1
Prior
Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paic
111N0052 2,450.00 2,450.00 0.00 0.00 2,450.0(
P92 field and engineering
TD8004-1210 1,305.00 1,305.00 0.00 0.00 1,305.00
Professional servcies Dec 2010
3,755.00 3,755.00 0.00 0.00 3,755.00
I, .
Alt & Witzig Engineering, Inc.
4105 West 99th Street • Carmel, Indiana 46032
(317) 875-7000 • Fax (317) 876-3705
'C‘ 2
March 4,2011 1 Ct\
Carmel Redevelopment Commission
30 West Main Street, Suite 220
Cannel, Indiana 46032
Attn: Mr. Matthew D. Worthley
RE: Subsurface Investigation&
Geotec .cal Recommendations
Proposed 'arcel 92 ii evelopment
West Main an. Old Meridian Street
Cannel, Indiana
Alt &Witzig File: 111N0052
Include Invoice No. on Payment Page
***INVOICE ***
Alt&Witzig Field Services
(Mobilization&Drilling of Test Borings) $1,750.00
Alt&Witzig Engineering Services
(Including Lab Testing, Evaluations and Report) $ 700.00
TOTAL AMOUNT DUE $2,450.00
Please Refer to Invoice 11IN0052 and Remit to:
Alt&Witzig Engineering, Inc. /z ' Z 4105 W. 99th Street Director of Redevelopment f'{�j
Cannel, IN 46032 `L/-_._
Terms of Payment are NET 30 DAYS.
Balances over 30 days bear interest at 1-'/2%per month.
THANK YOU FOR YOUR BUSINESS!
Offices: Subsurface Investigation and Foundation Engineering
Cincinnati •Dayton,Ohio Construction Materials Testing and Inspection
Indianapolis •Evansville •Fort Wayne •Lafayette• South Bend•Terre Haute, Indiana Environmental Services
it
.A,:-, f.,, - . '-_, l.... . ,. L .__ i ry
•
. , IL 'I i 1 JAN 2 5 2011• Alt & Witzig Engineering, Inc.
. = 4105 West 99th Street • Carmel,Indiana 46032
7.%; '� (317) 875-7040 0 Fax (317) 870-0314 Invoice Number: TD8004-1210 .j
•V le Invoice Date: 01/21/11
Page#: 1
Carmel Redevelopment Commission
One Civic Square
Carmel, IN 46032
Attention:
For: 12/01/2010 to 12/31/2010
TD8004:Parcel 7A,Regional Performing Arts Center-Job#2695
Carmel, IN
Reg Reg OT OT Mile Unit
Date Tech. Service Description Hrs. Rate Hrs. Rate Miles Rate Quan. Cost Total
12/02/10 15 Senior Project Site Visit to Check 3.00 72.00 0.00 72.00 0 0.00 216.00
Manager Core Locations
12/06/10 15 Senior Project Core(6)3 8.00 72.00 0.00 72.00 0 0.00 576.00
Manager
12/06/10 15 Core Machine 1 45.00 45.00
12/06/10 15 Inches Drilled 32 2.00 64.00
12/06/10 2004 Senior Technician Coring 8.00 23.50 0.00 32.90 0 0.00 188.00
12/09/10 15 Senior Project Report for Coring 2.00 72.00 0.00 72.00 0 0.00 144.00
Manager Investigation
12/09/10 15 Concrete Core Cut/Cap/Break Cores 6 12.00 72.00
Total Amount Due: 1,305.00
Offices: Subsurface Investigation and Foundation Engineering
Cincinnati.Ohio•Louisville,Kentucky Construction Materials Testing and Inspection
Indianapolis•Evansville•Ft.Wayne•Lafayette•South Bend•Terre Haute,Indiana Environmental Services
February 25. 2011 V
Mr. Les Olds
Carmel Redevelopment Commission
One Civic Square
Carmel, IN 46032
RE: Carmel City Center Performing Arts Center
Shiel Sexton Project#2695
Alt& Witzig Invoice TD8004-1210
Dear Mr. Olds:
Based upon on-site observations and the data comprised in the billings, Shiel Sexton Company
(Construction Manager) certifies to the owner that, to the best of their knowledge, infoiivation
and belief, the Work has progressed as indicated, the quality of Work is in accordance with the
Contract Documents, and the Contractor is entitled to payment of the amount requested
($1,305.00).
Alt& Witzig Invoice $ 1,305.00
If you have any questions, please feel free to contact me.
Sincerely,
vab.'— /
David C. Burchard
cc: Don Cleveland
Mike Anderson
Tony Eisenhut
File