Loading...
HomeMy WebLinkAbout31 E. MAIN STREET, LLC. -001895 -5/19/2011 CARMEL REDEVELOPMENT COMMISSION 001895 31 E. Main Street, LLC Check: 1895 31 East Main Street Date: 5/19/2011 Carmel, IN 46032 Vendor: 31E.MAIN Prior Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paic 1 81,686.90 81,686.90 0.00 0.00 81,686.9C reimbursement per agreement 81,686.90 81,686.90 0.00 0.00 81,686.90 11 E . ilectil ,rcf LLC 1/4., MAGDALENA & FERNANDO SEGOVIA Group Service Amount Complete Residential Consultants Construction Management&Oversight $ 2,400.00 Hoffinan Engineering Engineering Services --S--'18-,3-1-3-.14) Service Plus Heating&Air Conditioning,Inc. HVAC(heat/cool air) $ 18,760.00 Aabacus Plumbing Plumbing $ 9,000.00 Economy Plumbing Supply Co., Inc. Grease Trap $ 1,014.40 Heartwood Enterprises, Inc. Doors and doorways $ 9,891.32 Heartwood Enterprises, Inc. Windows $ 2,785.10 City of Carmel Permit $ 1,484.90 Best Equipment and Welding Inc. Steel Erection labor $ 7,000.00 Captiveaire Systems exhaust and hood $ 11,183.54 Cooper Concrete Construction 1 160 sf slab $ 5,300.00 Pro Waste Systems,LLC Dumpster $ 265.00 Southside Steel tube installation(hvac,exhaust?) $ 779.64 McAllister Installations LLC hood and exhaust installation $ 11,823.00 Total $ 100,000.00 i g ,513,/o 81) 686, 90 QUOTATION HEARTWOOD ENTERPRISES, INC. Quote Number: 10055 3317 West 96th St. Quote Date: Apr 1, 2011 Indianapolis, IN 46268 Page: 1 PHONE 317/872-0756 FAX 317/872-0720 Quoted To: Job Location: MIKE HICKS COMPLETE RESIDENTIAL CONSULTANTS Telephone#: 317-341-5201 Customer ID Good Thru Payment Terms Sales Rep MIKE HICKS 5/1/11 ADAM Quantity Item Description Unit Price Amount WINDOW REPLACEMENT: REMOVE&DISPOSE:Two(2)wood"picture"window sashes FURNISH & INSTALL: Two(2)wood double hung windows with new frames and aluminum clad exterior FEATURES: 1.)White Aluminum clad exterior with Auralast wood 2.)Double hung windows 3.)Natural interior finish 4.)4 9/16"jamb 5.)Chestnut bronze hardware 6.) Block&Tackle balance and tilt latch 7.) Low E with Argon glass 2.00 TOTAL: 1,392.55 2,785.10 "Heartwood not responsible for window frame and sash size matching existing exactly `Quote does not allow for painting or staining HEARTWOOD NOT RESPONSIBLE FOR ALARM/SENSOR FUNCTIONS. QUOTE Subtotal 2,785.10 Sale DOES NOT ALLOW FOR ANY UNFORESEEN DAMAGES. HEARTWOOD NOT TOTs Lax TOTAL 2,785.10 RESPONSIBLE FOR PAINT/WALLPAPER LINES. Start Date estimated at weeks from order date. Completion bate estimated at weeks after material received. Estimated Start/Completion dates may be altered by inclimate weather, material shortages/backlogs, &/or damaged or incorrect material. The above prices,specifications,and conditions are hereby accepted. 50%down/50%at completion of job. All past due accounts will be charged a 1.5%per month (18%annual) on any outstanding balance. In the event that heartwood enterprises, inc must pursue legal action to collect any amount due, it shall be entitled to recover court costs &any reasonable attorney/agent fees. $35.00 will be charged on all returned checks. Customer Signature/Date Sales Rep Signature/Date . ..,'1 ") „... ....Ji , , j.21 .,..,''. ..;:i■ 1'-'P ,. -.1 STATEMENT DATE TERMS ..', • ••A - z- V ''''Y 776...r.......0 _ 9,... ..,,c,,tr........1. • •;:4 . _ ---il i -1 IN ACCOUNT WITH ••.:t _,C9144775----"---- &--->t-,C.,ir IT'Ul • (7,--(7)/‘-'2:-- --- k- .• .. .., /(Y- 70>7 K:0' - i ' - e„...._cj/ . • ...14 ,.- 67 .- • ci 6 X • ..s • .:•, . .„:.1 ; .., //‘_(:) _/) A— /00—efe— rj...., • :.1 • A I .--1--- - / •.:::,A, ..-.,.:4 Pa.......A. 0.--0-0 e. . ..----- . 4 „..,. , ..1 -..si -..1 • 74 ...1. ,-------'---- ---n .„, ..A -....-:.' C 0 0 Pe IZ Con) C. RE rt, Co A) c-rtA c T 1 o NI ...:::d ' . ••.',',.,f6 ... . , ...,, CURRENT OVER 30 DAYS OVER 60 DAYS :-41 .•::: TOTAL AMOUNT • •:.4_ ..,.. _ 1 &;adams•DC5812 CITY OF CARMEL 5 ITEMS OF 5 PERMIT RECEIPT OPERATOR: edruley COPY # : 1 Sec: Twp:18 Rng:04 Sub:594 Blk:30 Lot:29 PARCEL ID • 1610300301004000 DATE ISSUED • 03/23/2011 RECEIPT # • BC000001271 REFERENCE ID # . . .C• 11030079 SITE ADDRESS • 31 E MAIN ST SUBDIVISION WARREN & PHELPS ADDITION CITY • CARMEL IMPACT AREA OWNER - SEGORIA, FERNANDO ADDRESS - 5418 CAYMAN DR. CITY/STATE/ZIP . . . : CARMEL, IN 46033 RECEIVED FROM • FERNANDO SEGOVIA CONTRACTOR • UNKNOWN ID-COMPRESI COMPANY • COMPLETE RESIDENTIAL CONSULTAN ADDRESS 5941 BUDD RUN CT CITY/STATE/ZIP . . . : INDIANAPOLIS, IN 46250 TELEPHONE • (317) 341-5201 FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL CIIC/O FLAT RATE 1.00 120.00 0.00 120.00 0.00 CIIREMOD SQUARE FEET 3, 552.00 1028 .90 0. 00 1028 . 90 0 .00 ICIIFINAL PER INSPECTIO 1.00 112.00 0. 00 112.00 0. 00 • ICIIFTSLB PER INSPECTIO 1.00 112 .00 0. 00 112. 00 0. 00 • ICIIROUGH PER INSPECTIO 1.00 112. 00 0. 00 112 .00 0.00 TOTAL PERMIT : 1484. 90 0.00 1484. 90 0. 00 • METHOD OF PAYMENT AMOUNT REFERENCE NUMBER • CHECK 1,484 .90 111 • TOTAL RECEIPT : 1,484 .90 • • • is PRO Waste Systems, LLC. Invoice , PO Box 2161 Indianapolis, IN 46206-2161 /� #j{ s.RD"h'AG'TF u3; Date Invoice 3/29/2011 PRO 19236 Bill To Project CRC 31 E.Main St.Carmel IN Ticket#29543 Cleanfill P.O. No. Terms C.O.D. Serviced Quantity Description Price Each Amount 3/29/2011 1 40 Yard S/W 265.00 265.00 0.00% 0.00 I ii Fax Number# Thank You For Choosing PRO Phone#317-8224776 317-822-4775 Waste Systems Total S265.00 ; _ ' S 3 gl3� 5 ip A EQUIPmEnT April 7, 2011 • Attn: Mike Hicks 1960 MIDWEST BLVD INDIANAPOLIS, IN 46214-2334 COMPLETE RESIDENTIAL CONSULTANTS Co. 317-271-8652 Indianapolis, IN 317-271-5879 FAX Re: Steel erection labor proposal Project: Sonata Restaurant build-out 31 East Main Street Carmel, IN 46032 Mr. Hicks, Pursuant to the above project, we are pleased to quote on-site erection of the structural steel package as shown on sheets S1 and S2. CRC is to provide the(7) MC and W beams as well as the 3" column cut to length. Best Equipment and Welding Inc., in addition to installation of the beams will provide misc. steel brackets/clips and hardware for attachment to the existing wood floor and ceiling structure. Our scope of work does not include any wood floor modification or cut-out. All demo, temporary shoring and required openings will be done by others with work areas clear and ready for steel installation when we arrive. Job total including shop fab of misc. bracketry, hardware, modifications to beams and on-site erection including lift equipment. Construction permits not included. Job duration to be approx. three days on-site and one day required for shop fabrication of misc. steel components. Customer agrees to pay for services in full immediately after completion of work. - LABOR TOTAL : NOT TO EXCEED $7000.00 Thank you for the opportunity to quote on this project. Please sign and return by e-mail a copy of this agreement. Signed omplete Re dential Consultants Glenn Fo Best Equipment and Welding Inc. 2\ �- . 'u64'` � �'-(0,4- LL`_ ^ - -,- VI 0-- 4EY Yo-1:\o7 `� ' ` [ ( |�� /` L /~ �}~\ �L� �— \\*��` c~'y SALES 0 R D E R 1201 36 40811 163/J �3�[����� � ���� ��-E�� � � ' - d d -��o � � {�X� \�.p�� ' \- (\J ���u/�{� �� 1910 BLUFF ROAD --` ---- INDlANAPOLIS, IN 46225 | Page # 1 317-972-1888 0. �CHEK BL HO CHECK SALES ' MIKE HICKS '�/ /'�' COMPLETE RESIDENTIAL CONSULT. � , 341-5201 -- SHIP VIA F.O. B. CUSTOMER P/D# QUOTE# TERMS DUE DATE ACK. DATE . DELIVERY —\, MIKE HICKS 040803 COD CHECK 4/08/11 4/08/11 � -- DESCRIPTION WEIGHT PRICE AMOUNT 1 TUBE 3" SO 1/4 WALL X 12' *" 10G 1 WF BEAM 12 X 26# X 13'8" 355 1 CHANNEL MC 18" X 42. 7# X 13' 11-1/2^ 596 1 CHANNEL MC 18" X 42. 7# X 8' 7" 366 1 CHANNEL MC 18" X 42, 7# X 6'2" 263 • ' 1 CHANNEL MC 18" X 42, 7# X 7' 8" 320 i 1 CHANNEL MC 18" X 42. 7# X 20'2" 861 ` | 1 CHANNEL MC 18" X 42- 7# X 19'6" 833 5614. 77 Ea. 5614. 77 | � I 37N0 / 5614 77 . i ! | Freight i | | Sales Tax N7 3�3 03 ' ^ take te Best Equipment + Welding ii 3700 6007. 8N ! • . | i ! ! | | RECEIVED Y-� ` _--"�c��_ � ��,---,�-----` ~-7------ | . - ' ' � i • •!et ! ii=+l fU' aaw.lnr , ®"""" �...� Now Shipping! tf f ,. • E br A i,q l,4 t44 ;°''3' t� Intelligent Controls plusTouch Screen Technology ' ro ;, 1f l Ask us about demand ventilation&greater energy savings .„Y Monday, April 04, 2011 Quote#: 1305503 SONATA To: From: Ship-To: Mike Hicks DAVE MILLER Jobsite Complete Residential Consultants CaptiveAire Systems Mhickscrcindv(cr�yahoo.com 23 BOULEVARD MOTIF, STE. 201 BROWNSBURG, IN 46112 Local: (317) 852-3770 Toll Free: (800) 863-4696 • Fax: (919)227-5929 • • reg56 @captiveaire.com CaptiveAire Systems proposes to furnish the following equipment. Production of listed items will commence upon receipt of an approved proposal,a purchase order,an approved submittal,and approved credit. EQUIPMENT Hood#1 5424ND-2-PSP-F- 12ft 0”Long Exhaust-Only Wall Canopy Hood with Front x1 Perforated Supply Plenum with Built-in 3"Back Standoff -430 SS Where Exposed x1 -Fire Cabinet on the Left Side(Additional charges may apply for cabinet if not x1 sold with fire system) -FILTER-20"tall x 16"wide Kleen-Gard Stainless Steel Baffle Filter with x4 Handles and Bottom Hanging Hook, UL Classified -FILTER-20"tall x 20"wide Kleen-Gard Stainless Steel Baffle Filter with x4 Handles and Bottom Hanging Hook, UL Classified -Incandescent Light Fixture-High Temp Assembly, Includes Clear Thermal and x4 Shock Resistant Globe(L55 Fixture), Bulbs By Others - EXHAUST RISER- Field Cut 10"X 28" x1 -SUPPLY RISER- 12"x 16"Supply Riser with Volume Dampers x3 - 1/2 Pint Grease Cup New Style, Flanged Slotted x2 -FIELD WRAPPER 11.00" High Front, Left, Right x1 -BACKSPLASH 80.00" High X 156.00" Long 430 SS x1 - RIGHT QUARTER END PANEL 23" Top Width, 0" Bottom Width, 23" x1 High 430 SS -LEFT QUARTER END PANEL 23" Top Width, 0" Bottom Width, 23" x1 High 430 SS -Electrical Package Installation in Utility Cabinet by Plant. x1 Hood#1 Total Price: $2,756.37 I �r Page 1 of 5 gi 8 8 tt 3 # Monday,April04,2011 Quote#:1305503 SONATA $ I #t t E f Y i t { Fire System#1 ANSUL-3.0/1.5 Ansul 4.5 gallon Fire System in Utility Cabinet(includes pre- x1 piped hood(s)with detection,tank(s), release mechanism,microswitches and pull station). Includes piping for hood: 1. -GAS VALVE-2"Mechanical Shutoff Valve (Ansul)(28-55610); SUPPLIED BY x1 DISTRIBUTOR Fire System#1 Total Price: $1,334.99 Fan#1 NCAI6FA-Exhaust Fan NCAI6FA Belt Drive Centrifugal Upblast Exhaust Fan with 18.75"wheel x1 Exhaust Fan handles 3000 CFM @-1.500"we ESP, Fan runs at 1198 RPM. Exhaust Motor. 1.500 HP,3 Phase 208 V,4.7 FLA.ODP(Open Drip Proof) -Grease Cup for kitchen-duty centrifugal exhaust fans, x1 Box Dimensions 15-3/4 L X 5-1/16 W X 3-3/4 H(18 GA.)(Includes Down Spout) -Curb CRB26.5x48E On Fan# 1 Flat Curb x1 -Hinged Base for Curb. Standard Hinge attached to curb. Used on Fans with x1 wheels 20 inches or smaller. 12 GA Galvanized. -Vented Base for Curb x1 Fan Total Price: $849.44 Fan#2 A1-D.250-G10 -Heater A1-D.250-G10 Direct Gas Fired Heated Make Up Air Unit with 10"Blower x1 Supply Fan handles 2400 CFM @ 0.750"we ESP, Fan runs at 1302 RPM. Heater supplies 173376 BTUs.70°F Temperature Rise. [Fuel: Natural Gas] Supply Motor: 1.500 HP,3 Phase 208 V,4.7 FLA,ODP(Open Drip Proof) Down Discharge-Air Flow Right-> Left -Sloped Filtered Intake for Size#1 Modular Heater. x1 21.813"Wide x 44.375" Long x 23.375"High. Includes 2"MV EZ Kleen Metal Mesh Filters. -RTC Solutions• 40-90°F Discharge Temp Control x1 -Gas Manifold for DF1 GM-BTU 0-550001 -7 in.w.c.- 14 in.w.c., No x1 Insurance Requirement(ANSI), BV250-66 - Gas Pressure Gauge, 0-35", 2.5" Diameter, 1/4"Thread Size x1 -Cooling Interlock Relay. 24VAC Coil. 120V Contacts. Locks out burner circuit xl when AC is energized. - Low Fire Start. Allows the burner circuit to energize when the modulation x1 control is in a low fire position. -Gas Pressure Gauge, -5 to+15 Inches Wc.,2.5"Diameter, 1/4"Thread Size x1 - Motorized Back Draft Damper 16"X 18"for Size 1 Standard& Modular Direct x1 Fired Heaters w/Extended Shaft, Standard Galvanized Construction, 3/4"Rear Flange, LF120S Actuator Included - Curb CRB21X71X2OINS Insulated On Fan #2 Flat Curb x1 Fan Total Price; $3,068.32 Electrical System#1 311110FP 3 Phase,W/1 Exhaust Fan, 1 Supply Fan, Exhaust in Fire, Fan x1 i [ Page 2 of 5 1 € Monday,April 04,2011 Quote#: 1305503 SONATA On/Off Thermostatically Controlled. Includes1 Duct Thermostat. -RTD CABLE- 18/3 AWG BROWN BROWN BLACK USED ON EMS and new x10 digital FP. Per Foot Price. Electrical System #1 Total Price: $645.56 To upgrade to EMS11102 Modulating Energy Management System add$1,107.42 The EMS effectively reduces exhaust and supply airflow rates,saving restaurant operators both energy and money year after year. Inverter Duty three-phase motors required! Subtotal: $8,654.68 Fire System Hookup: $1,380.00 Shipping: $417.23 Tax: $731.63 Total: USD$11,183.54 Page 3 of 5 QUOTATION FORM McAllister Installations LLC 10391 N 400 W Fountaintown IN 46130 317-835-7471 Cell 317-557-7088 Company Name: Sales Person: Mike Hicks Job Name: Sonata Restaurant Date: 4/4/2011 Install Hood hood supplied by others Install Ceiling Enclosure Install Stainless steel on wall stainless steel supplied by others Build and install Grease duct duct to be 16 GA welded complete Supply and install Hi-temp access doors per code Supply and install MUA duct duct to be 22 GA with flex connections Locate only 6 Floor penetrations floor penetrations by others Locate only 2-Roof curbs curbs supplied and installed by others Install 1 - Exhaust fan 1 - MUA fan fans supplied by others all electrical hook-ups by others Supply and install Fire barrier duct wrap thru floor 18" below to 18" above floor $11,823.00 Add Supply and install Complete exhaust Fire barrier duct wrap $ 1,800.00 Quote good for 30 days Permits and drawings not included This is only a Quotation, This Quotation is based on information given at this time. This Quote may be changed after job site inspection, or new information for installation. F'