Loading...
HomeMy WebLinkAboutDUKE ENERGY -001883 -4/27/2011 CARMEL REDEVELOPMENT COMMISSION 001883 Duke Energy Check: 1883 PO Box 9001076 Date: 4/27/2011 Louisville, KY 40290-1076 Vendor: DUKE EN1 Prior Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paid 032911-6 40.68 40.68 0.00 0.00 40.68 7690-3672-02-8 final bill 40.68 40.68 0.00 0.00 40.68 • 73104aiwIwit!wegnAVIMP.9, • PI EASE REI URN 11*.TOP TORT ION WI FI.1 YOUR P I•AYMEN ** FINAL BILL ** Page 1 of 2 Lurie Galleries Duke Energy 1-800-774-1202 7690-3672-02-8 30 Main St W For Account Services,please contact Suite:2001 B& I Group at Ext 4444 Carmel IN 46032 Acourit Mall Paymerfls orma 0., PO Box 1326 Payments after Mar 29 not included Bill prepared on Mar 29,2011 Charlotte NC 28201-1326 Reading Date Meter Reading Actual Meter Number Frctm To Days Previous Present Multi Usage kW Elec 106960328 Nov 02 Dec 03 31 222 272 1 50 0.00 Usage- 50 kWh 0.00 kVar Amt Due- Previous Bill $837.15 Duke Energy- Rate LSNO $21.60 Canceled Charges: Current Electric Charges $21.60 Electric Charges 819.58cr • Balance Forward 17.57 Current Electric Charges 21.60 Taxes Taxes 1.51 Taxes $ 1.51 Current Amount Due PLEASE NOTE:This is your final bill for electric service at 30 MAIN ST W. Should payment of this bill by the due date present a problem,please call us at the number listed in the "For Inquiries Call"section of your bill. This bill reflects canceled and rebilled electric charges for prior months. C.t Director of Redevelopment 0 0 -a 0 `* FINAL BILL ** After Average Cost: $0.4320 per kWh Apr 20,2011 $40.68 $41.33 DukeEnergy® 2363-01-00-0000:32 -0001-0000376 Visit us at www.duke-erergy.corn INA.. DukeEnergy® ** FINAL BILL ** Page 2 of 2 Lurie Galleries • 30 Main St W 7690-3672-02-8 Suite:2001 Carmel IN 46032 Explanation of CurrentCharges Electric Duke Energy Meter- 106960328 Rate LSNO - Low Load Factor Sec Sry Multipliers 1 Connection Charge $ 15.00 kWh Usage- 50 Energy Charge Billed Kvar- 0.00 50 kWh @ $0.10788900 5.39 Power Factor- 85.7% Rider 60- Fuel Adjustment 50 kWh @ $0.01124600 0.56 Nov 02- Dec 03 Rider 61 -Coal Gasification Adj 31 Days 50 kWh @ $0.00369300 0.18 Rider 62- Pollution Cntl Adj 50 kWh @ $0.00383000 0.19 Rider 63- Emission Allowance 50 kWh @ $0.00086600 0104 Rider 66- DSM Ongoing 50 kWh @ $0.00021600 0.01 Rider 67-Cinergy Merger Credit 50 kWh @ $0.00037100cr 0.02cr Rider 68- Midwest Ind Sys Oper Adj 50 kWh @ $0.00076100 0.04 Rider 70- Summer Reliability Adj 50 kWh @ $0.00030100 0.02 Rider 71 -Clean Coal Adjustment 50 kWh @ $0.00385200 0.19 $21.60 Ttall Current Electric Ctares $21.60 :: Exptanation of Tars Taxes Indiana State Tax $ 1.51 $ 1.51 Total Taxes $1.51 kWh Electric Usage 50 40 30 20 — 10 Calculations based on most recent 12 month history Total Usage 167 Average Usage 14 MAR APR MAY JUN JUL AUG SEP OCT NOV DEG JAN FEB MAR Electric _ 5C "e E 47 C C C 50 a a O S m 0 Cr Co a -o a rDukeEnergy® 2353-o1-00-0000321-0002-0000377 visit us at www.duke-energy.com