HomeMy WebLinkAboutDUKE ENERGY -002160 -8/18/2011 Transmittal Sheet Page 1
Carmel Redevelopment Comm
Duke Energy Check: 2160
PO Box 1326 Date: 8/18/2011
Charlotte, NC 28201-1326 Vendor: DUKE EN1
Prior
Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paid
8.05-1 15.00 15.00 0.00 0.00 15.00
8030-3658-03-7 thru 8.04.11
8.05-3 15.00 15.00 0.00 0.00 15.00
7690-3672-03-6 thru 8.04.11
8.05-4 233.63 233.63 0.00 0.00 233.63
8690-3672-02-3 thru 8.04.11
08.05-2 188.59 188.59 0.00 0.00 188.59
9690-3672-02-9 thru 8.04.11
0805-5 33,305.93 33,305.93 0.00 0.00 33,305.93
1900-3694-02-2 thru 8.04.2011
33,758.15 33,758.15 0.00 0.00 33,758.15
PLEASE RETURN THE TOP PORTION WITH YOUR PAYMENT
-Page 1 of 1- --
City Of Carmel Duke Energy 1-800-774-1202 8030-3658-03-7
30 Main St W For Account Services,please contact
Suite:2000 B& I Group at Ext 4444
Carmel IN 46032
PO Box 1326 Payments after Aug 05 not included Bill prepared on Aug 05,2011
Charlotte NC 28201-1326 Last payment received Jul 25 Next meter reading Sep 02,2011
oath Date < > >>>`
Elec 106960329 Jul 06 Aug 04 29 1144 1144 1 0 0.00
Usage- 0 kWh 0.00 kVar Amt Due- Previous Bill $ 15.00
Duke Energy- Rate LSNO $ 15.00 Payment(s) Received 15.00cr
Current Electric Charges 15.00 Balance Forward 0.00
Current Electric Charges 15.00
Current Amount Due 15.00
9 398Ce70/9 -
a
0
J
(D
n
`G
n
tll
Q
N
U
(D
Aug 29,2011 $15.00
DukeEnergy® l■se-o1-o0-0001703-0001-0001816 visit us at www.duke-energy.com
PLEASE RETURN THE TOP PORTION WITH YOUR PAYMENT
-Page-1 of 2
lama liceAddress For In uki Cd! Account NUmbetr`.
City Of Carmel Duke Energy 1-800-774-1202 9690-3672-02-9
Crc For Account Services,please contact
30 Main St W B& I Group a1 Ext 4444
Suite:2003
Carmel IN 46032
Mail::Pa mentsT :<;::::::;:' ccount1bor at t
PO Box 1326 Payments after Aug 05 not included Bill prepared on Aug 05,2011
Charlotte NC 28201-1326 Last payment received Jul 25 Next meter reading Sep 02, 2011
Reading Date Meter Reading t ctisa
l Nurintrer Ta ......... prese>►t uit 1t�1 ge
Elec 106959592 Jul 06 Aug 04 29 74422 76057 1 1,635 622
Usage- 1,635 kWh 2.40 kVar Amt Due- Previous Bill $ 155.88
Duke Energy- Rate LSNO $ 188.59 Payment(s) Received 155.88cr
Current Electric Charges $188.59 Balance Forward 0.00
Current Electric Charges 188.59
g l yk&t) �� Current Amount Due $188.59
Lie
p\�U
a
Cf
D
a •
ro
Average Cost: $0.1153 per kWh Aug 29,2011 $188.59
DukeEnergy® 2456-01-00-0001937-0001-0002055 visit us at www.duke-energy.com
a DukeEnergy.
Page 2 of 2
::fij t?i .... -gi44W+ Ad T A i4 i f ltlflitl 3":::'.
City Of Carmel 30 Main St W 9690-3672-02-9
Crc Suite:2003
Carmel IN 46032
Electric Duke Energy
Meter- 106959592 Rate LSNO - Low Load Factor Sec Sry
Multipliers- 1 Connection Charge $ 15.00
kWh Usage- 1,635 Energy Charge
Demand Read- 06.22 300 kWh @ $0.10788900 32.37
Actual kW- 6.22 700 kWh @ $0.08688900 60.82
Billed Kvar- 2.40 182 kWh @ $0.07798900 14.19
Power Factor- 93.0% Load Factor-Next 110 Hrs Use
453 kWh @ $0.05158800 23.37
Jul 06-Aug 04 KVAR Charge
29 Days 2.40 Kvar @ $0.24000000 0.58
•Rider60-=Fuel Adjustment
1,635 kWh @ $0.01420700 23.23
Rider 61 -Coal Gasification Adj
1,635 kWh @ $0.00369300 6.04
Rider 62 - Pollution Cntl Adj
1,635 kWh @ $0.00349400 5.71
Rider 63 - Emission Allowance
1,635 kWh @ $0.00030300 0.50
Rider 66- DSM Ongoing
1,635 kWh @ $0.00021600 0.35
Rider 67 -Cinergy Merger Credit
1,635 kWh @ $0.00034100cr 0.56cr
Rider 68-Midwest Ind Sys Oper Adj
1,635 kWh @ $0.00068800 1.12
Rider 70 - Reliability Adjustment
1,635 kWh @ $0.00030400 0.50
Rider 71 -Clean Coal Adjustment
1,635 kWh @ $0.00328300 5.37 $ 188.59
::TQa1:.Gurrjecjic: r :;»
$188.59
kWh Electric Usage
10,00.
8,000
6,000
4,000
• • Y
Calculations based on most recent 12 month history
Total Usage 22,249
Average Usage 1,854
r -
AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL. AUG
Electric 1,066 907 700 606 1,278 5,374 2,821 4,133 1,512 931 1,155 1,197 1,635
S
a
0
S
n
C
n
0
a
m
a
m
CD
m
DukeEnergy® z4se-ul-ou-ooui3s7-ouu2-uaozosb visit us at www.duke-energy.com
PLEASE RETURN THE TOP PORTION WITH YOUR PAYMENT_
- - --- - Page 1 of 1-
me:I c ddrie�ss For tnqu rl � Account t1m
City Of Carmel Duke Energy 1-800-774-1202 7690-3672-03-6
30 Main St W For Account Services,please contact
Suite:2001 B& I Group at Ext 4444
Carmel IN 46032
PO Box 1326 Payments after Aug 05 not included Bill prepared on Aug 05, 2011
Charlotte NC 2820 1-1 326 Last payment received Jul 25 Next meter reading Sep 02,2011
eAt l � - floe r f3ea�im A u...
l4�etter' N1 l= ►s Prvlits Ctesenli # uflttst3 ....:
Elec 106960328 Jul 06 Aug 04 29 7450 7450 1 0 0.00
Usage- 0 kWh 0.00 kVar Amt Due- Previous Bill $ 15.00
Duke Energy- Rate LSNO $ 15.00 Payments) Received 15.00cr
Current Electric Charges 15.00 Balance Forward 0.00
Current Electric Charges 15.00
Current Amount Due $15.00
f,
0
CD
w
a
m
Aug 29,2011 $15.00
DukeEnergy® 2,156-01-00-0001702-0001-0001815 visit us at www.duke-energy.com
PLEASE RETURN THE TOP PORTION WITH YOUR PAYMENT
- -- Pagel o12.
[! tt# #,Address l�^or l ruche Cafl; ACIOUtT NuMb$#`:::
City Of Carmel Duke Energy 1-800-774-1202 8690-3672-02-3
Crc For Account Services,please contact
30 Main St W B&I Group at Ext 4444
Suite:2002
Carmel IN 46032
A a ::P xe€is T� lA caurttln# r1at€on
PO Box 1326 Payments after Aug 05 not included Bill prepared on Aug 05,2011
Charlotte NC 28201-1326 Last payment received Jul 25 Next meter reading Sep 02,2011
.:: �Sadr�i )3a#�► �e4er�eadtr€� Ac�iaf
:Meter` # ttlattf er t Days 1Prev€t s PraseOt Multr Usage kW
Elec 106959591 Jul 06 Aug 04 29 78315 80299 1 1,984 9.85
Usage- 1,984 kWh 1.60 kVar Amt Due- Previous Bill $225.00
Duke Energy- Rate LSNO $233.63 Payment(s) Received 225.00cr
Current Electric Charges $233.63 Balance Forward 0.00
Current Electric Charges 233.63
Current Amount Due $233.63
•
0 a
0
m
v
Average Cost: $0.1178 per kWh Aug 29,2011 $233.63
PDukeEnergy® 2456-0I-00-0001935-000I-0002051 , visit us at www.duke-energy.com
DukeEnergy®
Page 2 of 2
City Of Carmel 30 Main St W 8690-3672-02-3
Crc Suite:2002
Carmel IN 46032
Electric Duke Energy
Meter- 106959591 Rate LSNO - Low Load Factor Sec Sry
Multipliers- 1 Connection Charge $ 15.00
kWh Usage- 1,984 Energy Charge
Demand Read- 09.85 300 kWh @ $0.10788900 32.37
Actual kW- 9.85 700 kWh @ $0.08688900 60.82
Billed Kvar- 1.60 872 kWh @ $0.07798900 68.01
Power Factor- 98.6% Load Factor-Next 110 Hrs Use
112 kWh @ $0.05158800 5.78
Jul 06-Aug 04 KVAR Charge
29 Days 1.60 Kvar @ $0.24000000 0.38
-Rider-6W=Fuel Adjustment
1,984 kWh @ $0.01420700 28.19
Rider 61 -Coal Gasification Adj
1,984 kWh @ $0.00369300 7.33
Rider 62- Pollution Cntl Adj
1,984 kWh @ $0.00349400 6.93
Rider 63- Emission Allowance
1,984 kWh @ $0.00030300 0.60
Rider 66- DSM Ongoing
1,984 kWh @ $0.00021600 0.43
Rider 67-Cinergy Merger Credit
1,984 kWh @ $0.00034100cr 0.68cr
Rider 68- Midwest Ind Sys Oper Adj
1,984 kWh @ $0.00068800 1.36
Rider 70- Reliability Adjustment
1,984 kWh @ $0.00030400 0.60
Rider 71 -Clean Coal Adjustment
1,984 kWh @ $0.00328300 6.51 $233.63
Total un t EIe EiziC:; F r >: $233.63
kWh Electric Usage
3,000 -
2,400
1,800
12001 %i:,
800 UHT
• Y Y
Calculations based on most recent 12 month history
Total Usage 23,469
Average Usage 1,956
• AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
Electric 1,912 1,789 1,733 1,389 1,830 2,003 2,910 2,645 1,935 1,482 1,909 1,880 1,984
S
0
0.
0
m
0
C)
n
N
0
ro
-0
a 0
m
Duke.Energy® zase-ol-oo_000,ess-000z-000zosz visit us at www.duke-energy.corn
PLEASE RETURN THE TOP PORTION WITH YOUR PAYMENT
Page 1 of 2
•
•
t ali :7 #Ce::1 dd# ; .:.::. Pot lnquirl Call- Acsbttrst umb
City Of Carmel Duke Energy 1-800-774-1202 1900-3694-02-2
Energy Center For Account Services,please contact
891 3Rd Ave SW B& I Group at Ext 4444
Carmel IN 46032
'1#�a�#�'ae>et�s:T� A1�c�u�ct 1�1l+c�riti►st[tjn
PO Box 1326 Payments after Aug 05 not included Bill prepared on Aug 05, 2011
Charlotte NC 28201-1326 Last payment received Jul 25 Next meter reading Sep 02, 2011
,: �ac€i st#Bete till #er Re�ttfi t to
: � l�u� :� '1"><r f��rs:.:l�reatrls l�eseitit �Ilultr l:#sta
Elec 106943187 Jul 06 Aug 04 29 426,313
On Peak 808.00
Usage- 426,313 kWh 349.60 kVar Amt Due-Previous Bill $31,650.84
Duke Energy- Rate LSNO $33,305.93 Payment(s) Received 31,650.84cr
Current Electric Charges $33,305.93 Balance Forward 0.00
Current Electric Charges 33,305.93
Current Amount Due $33,305.93
A/1(6 0E-G.7/,DG
Q Q
n
a
Due D j0:.:111 {1t11 aula�t# ►t
Average Cost: $0.0781 per kWh Aug 29,2011 $33,305.93
DukeEnergy® 2456-01-00-0001933-0001-0002.047 visit us at www.duke-energy.com
t DukeEnergy®
Page 2 of 2
»;i1�� .::::::.:......::..:.:: .: ..: .fi�rVi�eA�dt• :> �:::::::PF��At��#!�t1tt"l#i�'��:<
City 01 Carmel 891 3Rd Ave SW . 1900-3694-02-2
Energy Center Carmel IN 46032
Electric Duke Energy
Meter- 106943187 Rate LSNO - Low Load Factor Sec Sry
kWh Usage- 426,313 Connection Charge $ 15.00
Actual kW- 808.00 Energy Charge
Actual kVa- 880.40 300 kWh @ $0.10788900 32.37
Billed Kvar- 349.60 700 kWh @ $0.08688900 60.82
Power Factor- 91.8% 1,500 kWh @ $0.07798900 116.98
151,020 kWh @ $0.05818900 8,787.70
Date of Peak 07/19/2011 Load Factor-Next 110 Hrs Use
Time of peak 14.00.00 88,880 kWh @ $0.05158800 4,585.14
Load Factor-Over 300 Hrs Use
Jul 06-Aug 04 183,913 kWh @ $0.04678900 8,605.11
29-Days KVAR Charge
349.60 Kvar @ $024000000 83.90
Rider 60- Fuel Adjustment
426,313 kWh @ $0.01420700 6,056.63
Rider 61 -Coal Gasification Adj
426,313 kWh @ $0.00369300 1,574.37
Rider 62- Pollution Cntl Adj
426,313 kWh @ $0.00349400 1,489.54
Rider 63 - Emission Allowance
426,313 kWh @ $0.00030300 129.17
Rider 66- DSM Ongoing
426,313 kWh @ $0.00021600 92.08
Rider 67 -Cinergy Merger Credit
426,313 kWh @ $0.00034100cr 145.37cr
Rider 68-Midwest Ind Sys Oper Adj
426,313 kWh @ $0.00068800 293.30
Rider 70- Reliability Adjustment
426,313 kWh @ $0.00030400 129.60
Rider 71 -Clean Coal Adjustment
426,313 kWh @ $0.00328300 1,399.59 $33,305.93
To#ature$alt!Eletxtc �e�e '.`';: $33,305.93
kWh Electric Usage
450,000
360,000_ •
270,000
•
180,000
90,000
0 M ' `
Calculations based on most recent 12 month history
Total Usage 2,377,309
Average Usage 198,109
AUG SEP OCT NOV. DEC JAN FEB MAR APR MAY' JUN JUL AUG
Q
Electric 270,220 235,272 189,870 140,795 128,518 49,878 99,136 106,331 113,996 194,847 294,010 398,343 426,313
0
to
0
0
iv
6
[U
o
0
DukeEnergy® zase- uouool3ss-o0oz-ouozoa6 visit us at www.duke-energy.com
• Prescribed by State Board of Accounts City Form No.201(Rev.1995)
ACCOUNTS PAYABLE VOUCHER
CITY OF CARMEL
An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee
DO ke yi r,,,z19 Purchase Order No.
Pe fox / 3 2 G Terms
C`ier.-/c MY .,, /"r/c 2 520%- /?2 Date Due
Invoice Invoice Description Amount
Date Number (or note attached invoice(s) or bill(s))
Er-51/ Y 0 7-1 8'x30-- 365 - 3-7 744,-6, y-'/-// /5:c17
-$-// YOS- z 26 h!'.-- 3672-02- 7 71,r',-d Y---171—/ 1k's- S9
E-5-4/ kO 5-3 7G 20 36 7.2- 5-6 //7--rd -•-/---// /S'-c2 °:
P-5 -f/ Blo 3--2j 26 3G '2--672—3 •l.^v 5-'--/ 233_ 3
V--oz f— r ,
E 't s
fir, ,:,.,} .i. 4
+ ',
i' 1, td
Total 3317 1 %S ±:
I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct an udit-. same in accordance L
with IC 5-11-10-1.6.
-Treasurer
VOUCHER NO. WARRANT NO.
ALLOWED 20
pvkr' IN SUM OF $
/ 2 . max /�2�
C4 //�,/(ic 2 c'/-/3.2�
$ 3375 ? /6
ON ACCOUNT OF APPROPRIATION FOR
/ 1 C7 33;305-93
X02 — S 3'I coa `fs2.2z
Board Members
PO#or INVOICE NO. ACC-Pt/TITLE AMOUNT hereby certify invoice(s),DEPT.# I hereb certi that the attached invoices , or
S-3s/&ile2 bill(s) is (are) true and correct and that the
4&z. SUS- 2 E3 Fay /(FMS materials or services itemized thereon for
�.31,Fa-rz) /SCY1 which charge is made were ordered and
—11 8 3 4 c227 2 3 3.6 3 received except
90 2_ 5=5 y�/GOkU 7 33.3D6-93
/5-2.o //
xec `LI erector
Cost distribution ledger classification if
Title
Cannel Redevelopment Commission
claim paid motor vehicle highway fund