Loading...
HomeMy WebLinkAbout29-96.40J LC") rn 01 V / m 0 v CU O cv z C O J M 0 Ln cNJ cn v Ln I1. i r� i r� STORM SEWER CONSTRUCTION I, Material Specifications: a. Reinforced Concrete Pipe (RCP) shall conform to ASTM C76 -70, Class Ili latest revision, Willi joints conforming to ASTh't C -443 latest revision. b. Corrugated Metal Pipe (CMP) shall he standard helical pile with a minimum thickness of 0.05 inches. CN1P shall only be used to extend existing CMP to the nearest proposed structure. C. All nlanhole� and inlets shall be precasl concrete conforming to AS "I'M C -479 latest revision. d. Castings shall conform to ASTM -48 latest revision. 2. Subsurface drains shall be 6- inches in diameter located directly below the pavement /curb joint and shall nm Continuously at a minimum 0.20°°f, slope along both sides of the street and shall he connected only into storm sewer structures. 1. There shall he a subsurface (train connection provided for each lot. r GENrRAL NOTES NOTE: III /-- STEEL FENCE POST TEMPORARY EXTENSION ABOVE CAP & TAPE GROUND TO BE REMOVED UPON CONNCETiON TO HOUSE. ALL MEASUREMENTS TO BE —7 MEASURED FROM BACK OF CURB. I 18- z a, PROPOSED GRADE r 12" MIN TYPICAL SSD LATERAL TO INDIVIDUAL LOTS ALONG STREETS NO SCALE I. It shall be the responsibility of the contractors to determine the location of existing underground utilities 24 hours prior to nny conOrtiction or excavating and maintain operating conditions of active utilities. 't'he engineer shall' not lie respotltible for Any damage caused by an erroneous location shown or by the omission of R utility location on these plans. Vie developer ihall be rtiponsihle for all approvals, permits do easements. APPROVED: 2. Conillrtiction of pfivnie driveways it not inchidrd in 11111 prnJert. 1. The contractor shall, Fit the direc lion of file developer, endeavor In rove and protect ail trees of value and worth which do not impair conitrnction of improvements as designed, In the event cut or fill excl edt 0.5 font over the roof nlren, the developer shall be consulted wills respect In protective menitires In lie taken, if any, to preserve such tr"i. 4. Remove lopsoil to n depth determined by the milt report from all street rights -or- w,iy and building pad great. 'roptoil shnll be slored at it location designated by the engineer. 5. The casting elevalions are set by plan. llnwever, the endings are In tie Rditived in the field by the engineer's representative, should R discrepancy occur between plan grade and existing grade. New manhole ring Find cover ihall be intInIled to establish grade. Maximum height of adjusting rings shall be 12- inches. 6. flack1ill Around All structures and all cuts under paved areas with grnnulAr material.. Trenches opening within S -feet of paved roadways shall he hnckfilled with granular material in accordance with Section 211. 13ackrill under sidewalks shall he grnnttlar, nnlemt the wFilkm Fire constructed n t.ninirnum of 6 tilonfht after hnck(ill has been in- place. 7. 1•he Contractor shall be responsible for verifying that all slate highways, city and county pernlils have heen obtained by the dr`velnprr prior to tlnrf of construction. S. The Contractor shall he required to furnish the developer's Fngineer wilt a set of prints, marked in red pencil, showing scttml sewer locAlion And invert, to include lateral location, depth Find length. such 'as- built' prints must he received by the Engineer before the final contract payment can tie atlllioriled. 'l-he sanitary sewer Internit and stubs fermination shall he indicated on the surface with a metal fence post met immediately ¢hove said termination point. 9. All tanilary sewer lines upon completion will he required to pass an infiltration weir teat Find n low pressure air lest, unless otherwise directed by file engineer. maid lest shall he conducted according In NUT Slindard Method, and shall he witnessed by nn engineer and a represenfntive of the C'lAy Waste district. 10. Deflection teat shall be performed tin all flexible' pipe Prier the final hackfill line been in -place at least .10 days. No pipe shall exceed A verlicnl deflection of 5 percent deflection lets results. (e The following Are considered no- flexible pipet: concrete pipe, ductile iron pipe and cnit iron pipe.) 'The deflection lest ihall he performed with n nine -point nlnndrel. Proving rings shell he avnilshle. 11, All mandrel telling shall be observed by n ProfeRmional Engineer for cerlificalinn and n reprerfentative or Isle Clay Waste i)ieirio. 12. The ends of Inlernit are in be phig?ed Bahl with a braced plastic disc or cap capnhle of willlslnnding a low pressure air lest wilhow leakage. 11. Redding for flexible pipe shill be No, 8 stone front 6 inches lielow the pi11e In 12- inchem above file pipe. Redding for rigid pilie shill tie No. A stone from 6- inches below- the pipe in the spring line of the pipe And front this point to 12- itichet shove on no Irsm IhAn 6- inches of stone hetldhio. 14. Water and fewer line crotsinps and separations Oinll he ill nceordnnce w1irh 'Ven Stales' Slnndvd.i. HAMILTON COUNTY SURVEYORS OFFICE REVISED: STANDARD PLAN 17-_q3. HAMILTON COLNTY SURVEYOR DATE rENCE POST *J r l' FENCE POST SwnLD BE BURIED 1' BELOW GR"D SURFACE. A COMPLETELY SEAL CASTING REARING SURFACE WITH 311 MIXTURE OF SAND AND PORTLAND CEMENT, MATCH CASTING OPENING C.I. MANHOLE FRAME at COVER B' B' SET ON KENT SEAL OR EQUAL 4. FINISH GRADE .. M PRECAST fS . �► .. '� CONCRETE 1b 1/2' MORTAR • -A VARIES .: t SLOPE P' TO ',, .• • CENTER ., ;!' : •. TOP VIEW a• owl a• MATCH CASTING OPENING SIDE VIEW Heavy Duty Total Weight 400 Pounds NOTE: ALL STRUCTURES GREATER THAN THREE FEET IN DEPTH MUST BE ACCESSIBLE AND HAVE STEPS. THE FIRST STEP FROM TOP OF CASTING TO BE THEN 24" MAX., THEN 16' ON— CENTER. SILT FENCE MATERIAL 6' -W / ORMIND SWAM '—ESILT FENCE MATERIAL simv K Bt1RI0 6' BELOW GROUND SURFACE. SILT FENCE DETAIL CNa SCALE) o _dvdl__ RIP —RAP i)FTAII. NOT -TO -SCALE 5' -0" 5' -0" Not recommended for bicycle traffic. For safety standards see pages 88 to 93. R- 3501 —N N.EENAH CURB INLET FRAME GRATE FOR SAG LOCATION 4. " f 27" a' 27" 4 4. S11RU��QETIKIT Ifor- ,o -s>�It PIPES WITH I SECTIONS SHALL C ANIMAL /CHILD tRD INSTALLED 2" dt 15" DIA. PIPES SHALL EQUIRE ONE (1) REBAR. 'IPES LARGER THAN 15" DIA. HALL REQUIRE ADDITIONAL EBARS. WIDTH OF OPENING 'ETWEEN BARS SHALL NOT XCEED 8*. ANIMAL /CHILD GUARD DETAIL NOT —TO —SCALE NOTE: ALL STRUCTURES GREATER THAN THREE FEET IN DEPTH USE KENT SEAL OR EQUAL MUST BE ACCESSIBLE AND BETWEEN RISER RINGS (T'I'P.) HAVE STEPS. THE FIRST STEP FROM TOP OF CASTING TO BE ADJUST TO GRADE W/ FILLER THEN 24" MAX., THEN 16" 'RINGS AS REQUIRED (MAX. 12') ON— CENTER. PRECAST REINFORCED CONC. MANHOLE CONE MEETING ASTM STANDARD C -478 \ MANHOLE SECTION JOINTS SHALL HAVE "0" RING GASKETS CAST ALUM. OR FIBERGLASS MANHOLE STEPS SET AT 18" O.C. STAGGERED. D C 0.30' C// ° ° fix //�" / 1� 4 0 24 it 4 9 -off a 49-011 30 it 41 -411 3611 51 -0f1 421f 51- 411 48'1 61 -01f 541f 0 0 0 0 '0 0 '0 0 '0 0 0 '0 '0 0 0 0 6" (MIN.) 0 o '0 0 '0 0 'o REDUCING T REQUIRED SSD MAIN 0 0 0 ' 0 'o + MIN. SLOPE 0.30' MIN. 4" SSD 3" 3" MIN. MIN. 12" MIN TYPICAL SSD LATERAL TO INDIVIDUAL LOTS ALONG STREETS NO SCALE I. It shall be the responsibility of the contractors to determine the location of existing underground utilities 24 hours prior to nny conOrtiction or excavating and maintain operating conditions of active utilities. 't'he engineer shall' not lie respotltible for Any damage caused by an erroneous location shown or by the omission of R utility location on these plans. Vie developer ihall be rtiponsihle for all approvals, permits do easements. APPROVED: 2. Conillrtiction of pfivnie driveways it not inchidrd in 11111 prnJert. 1. The contractor shall, Fit the direc lion of file developer, endeavor In rove and protect ail trees of value and worth which do not impair conitrnction of improvements as designed, In the event cut or fill excl edt 0.5 font over the roof nlren, the developer shall be consulted wills respect In protective menitires In lie taken, if any, to preserve such tr"i. 4. Remove lopsoil to n depth determined by the milt report from all street rights -or- w,iy and building pad great. 'roptoil shnll be slored at it location designated by the engineer. 5. The casting elevalions are set by plan. llnwever, the endings are In tie Rditived in the field by the engineer's representative, should R discrepancy occur between plan grade and existing grade. New manhole ring Find cover ihall be intInIled to establish grade. Maximum height of adjusting rings shall be 12- inches. 6. flack1ill Around All structures and all cuts under paved areas with grnnulAr material.. Trenches opening within S -feet of paved roadways shall he hnckfilled with granular material in accordance with Section 211. 13ackrill under sidewalks shall he grnnttlar, nnlemt the wFilkm Fire constructed n t.ninirnum of 6 tilonfht after hnck(ill has been in- place. 7. 1•he Contractor shall be responsible for verifying that all slate highways, city and county pernlils have heen obtained by the dr`velnprr prior to tlnrf of construction. S. The Contractor shall he required to furnish the developer's Fngineer wilt a set of prints, marked in red pencil, showing scttml sewer locAlion And invert, to include lateral location, depth Find length. such 'as- built' prints must he received by the Engineer before the final contract payment can tie atlllioriled. 'l-he sanitary sewer Internit and stubs fermination shall he indicated on the surface with a metal fence post met immediately ¢hove said termination point. 9. All tanilary sewer lines upon completion will he required to pass an infiltration weir teat Find n low pressure air lest, unless otherwise directed by file engineer. maid lest shall he conducted according In NUT Slindard Method, and shall he witnessed by nn engineer and a represenfntive of the C'lAy Waste district. 10. Deflection teat shall be performed tin all flexible' pipe Prier the final hackfill line been in -place at least .10 days. No pipe shall exceed A verlicnl deflection of 5 percent deflection lets results. (e The following Are considered no- flexible pipet: concrete pipe, ductile iron pipe and cnit iron pipe.) 'The deflection lest ihall he performed with n nine -point nlnndrel. Proving rings shell he avnilshle. 11, All mandrel telling shall be observed by n ProfeRmional Engineer for cerlificalinn and n reprerfentative or Isle Clay Waste i)ieirio. 12. The ends of Inlernit are in be phig?ed Bahl with a braced plastic disc or cap capnhle of willlslnnding a low pressure air lest wilhow leakage. 11. Redding for flexible pipe shill be No, 8 stone front 6 inches lielow the pi11e In 12- inchem above file pipe. Redding for rigid pilie shill tie No. A stone from 6- inches below- the pipe in the spring line of the pipe And front this point to 12- itichet shove on no Irsm IhAn 6- inches of stone hetldhio. 14. Water and fewer line crotsinps and separations Oinll he ill nceordnnce w1irh 'Ven Stales' Slnndvd.i. HAMILTON COUNTY SURVEYORS OFFICE REVISED: STANDARD PLAN 17-_q3. HAMILTON COLNTY SURVEYOR DATE rENCE POST *J r l' FENCE POST SwnLD BE BURIED 1' BELOW GR"D SURFACE. A COMPLETELY SEAL CASTING REARING SURFACE WITH 311 MIXTURE OF SAND AND PORTLAND CEMENT, MATCH CASTING OPENING C.I. MANHOLE FRAME at COVER B' B' SET ON KENT SEAL OR EQUAL 4. FINISH GRADE .. M PRECAST fS . �► .. '� CONCRETE 1b 1/2' MORTAR • -A VARIES .: t SLOPE P' TO ',, .• • CENTER ., ;!' : •. TOP VIEW a• owl a• MATCH CASTING OPENING SIDE VIEW Heavy Duty Total Weight 400 Pounds NOTE: ALL STRUCTURES GREATER THAN THREE FEET IN DEPTH MUST BE ACCESSIBLE AND HAVE STEPS. THE FIRST STEP FROM TOP OF CASTING TO BE THEN 24" MAX., THEN 16' ON— CENTER. SILT FENCE MATERIAL 6' -W / ORMIND SWAM '—ESILT FENCE MATERIAL simv K Bt1RI0 6' BELOW GROUND SURFACE. SILT FENCE DETAIL CNa SCALE) o _dvdl__ RIP —RAP i)FTAII. NOT -TO -SCALE 5' -0" 5' -0" Not recommended for bicycle traffic. For safety standards see pages 88 to 93. R- 3501 —N N.EENAH CURB INLET FRAME GRATE FOR SAG LOCATION 4. " f 27" a' 27" 4 4. S11RU��QETIKIT Ifor- ,o -s>�It PIPES WITH I SECTIONS SHALL C ANIMAL /CHILD tRD INSTALLED 2" dt 15" DIA. PIPES SHALL EQUIRE ONE (1) REBAR. 'IPES LARGER THAN 15" DIA. HALL REQUIRE ADDITIONAL EBARS. WIDTH OF OPENING 'ETWEEN BARS SHALL NOT XCEED 8*. ANIMAL /CHILD GUARD DETAIL NOT —TO —SCALE NOTE: ALL STRUCTURES GREATER THAN THREE FEET IN DEPTH USE KENT SEAL OR EQUAL MUST BE ACCESSIBLE AND BETWEEN RISER RINGS (T'I'P.) HAVE STEPS. THE FIRST STEP FROM TOP OF CASTING TO BE ADJUST TO GRADE W/ FILLER THEN 24" MAX., THEN 16" 'RINGS AS REQUIRED (MAX. 12') ON— CENTER. PRECAST REINFORCED CONC. MANHOLE CONE MEETING ASTM STANDARD C -478 \ MANHOLE SECTION JOINTS SHALL HAVE "0" RING GASKETS CAST ALUM. OR FIBERGLASS MANHOLE STEPS SET AT 18" O.C. STAGGERED. D C 0.30' C// 21 1� 4 0 24 it 4 9 -off 271f 49-011 30 it 41 -411 3611 51 -0f1 421f 51- 411 48'1 61 -01f 541f 6' -6" >- iM y O t11 S 0 tt7 �o tD CO W 3 31z Lo _ ALL LIFT HOLES ARE TO BE GROUTED SHUT. - CONCRETE BENCH WALL tD (CLASS "B ") to BASE SHALL BE PRECAST BOTH SHALL HAVE #4 BARS AT 12 O.C. EACH WAY �,��II/IIIIf1►f /fI' U W L GRANULAR LEVELING MATERIAL # S. Z REQUIRED FOR PRECAST BASE (n ''',''''''ff ►f 111111111,,,``, O a PRECAST REINFORCED CONC. MANHOLE FOR STORM SEWER NOT —TO —SCALE 147 21' • 36' I 11. MMMMO OR WW-RO"G �w 1�" O! R- 1 772 -C 1 R-1 772-cm 124 1/2 1 3LSS I VERTICAL BEARING SURFACE STORM MANHOLE DETAIL R- 1772 --C NOT —TO —SCALE 3 . • • a TO K • , , • , oot»t AND BURIED • ►.� r ioPS�as tots[ AMAIlL TO t LM ttnN rw WOO lROerON OONiM M•MDtET BY "OM AMERICAN GREEN OR APPROVED EQUAL TYPICAL SWALE DETAIL No ScAlz ' 23" 1 1/4" 20' 2 1/2" 1 1/2' 1 1/2" E ELJ Lil N I C THAN THREE FEET IN DEPTH MUST BE ACCESSIBLE AND HAVE STEPS. THE FIRST STEP FROM TOP OF CASTING TO BE THEN 24" MAX., THEN 16' ON— CENTER. 23" 33' DITCH GRATE CASTING SETTING DETAIL NEENAH R -4342 STOOL TYPE DITCH GRATE NOT To - trAt.0 W V) 0 Q J I W LLJ Z z W Z J V) Z 0 I 1 wt 00 X LL_ r` rn c� I 00 N O O 00 I M CT LO I ,,yam Vf VM 00 i Z Q W Z U — Q i I Q �. Z W 0 0 ,~^' CV V 1 Z WZ _0 � 0 U U D w Z � O U W S LLI I` M Q' Q U SHEET NO. 18 OF 19 *ff TS J08 No. - 195840