HomeMy WebLinkAboutCSO ARCHITECTS -001963 -6/15/2011 Transmittal Sheet Page 1
-, Carmel Redevelopment Comm
CSO Architects Check: 1963
PO Box 6069
Date: 6/15/2011
Dept. 94 Vendor: CSO ARC1
Indianapolis, IN 46206-6069
Prior
Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paid
371.25 371.25 371.25 0.00 0.00 371.25
P9-11 Main Theater
41985 168.75 168.75 0.00 0.00 168.75
P9-14 Office Building two
41986 1,316.25 1,316.25 0.00 0.00 1,316.25
Parcel 5B-Motor Court
41987 67.50 67.50 0.00 0.00 67.50
P78 3rd Ave SW/city Ctr S
41988 1,115.28 1,115.28 0.00 0.00 1,115.28
P 7B1-Village Green West
41989 750.97 750.97 0.00 0.00 750.97
P73 Parcel 5 Streetscape
41990 1,316.89 1,316.89 0.00 0.00 1,316.89
General CRC Matters
41991 438.75 438.75 0.00 0.00 438.75
P9-27 Mudbugs Patio
41994 997.84 997.84 0.00 0.00 997.84
Way Finding on P 5
41995 574.09 574.09 0.00 0.00 574.09
Utilities
41996 641.42 641.42 0.00 0.00 641.42
Parcel 5 Motor Court Masonry B
41997 951.85 951.85 0.00 0.00 951.85
Parcel 7A-City Center Streetsc
41998 650.10 650.10 0.00 0.00 650.10
Road Plans and Storm Water
42000 135.00 135.00 0.00 0.00 135.00
P9-15 Streetscape
42001 270.00 270.00 0.00 0.00 270.00
Carmel PAC 2005 Cafe Buildout
42002 1,015.05 1,015.05 0.00 0.00 1,015.05
P7B2-Amphitheater East
42004 45,992.09 45,992.09 0.00 0.00 45,992.09
Gallery Level Buildout
42005 1,248.75 1,248.75 0.00 0.00 1,248.75
Carmel PAC 2005 FF&E
58,021.83 58,021.83 0.00 0.00 58,021.83
1
CSO Architects Inc.
Carmel Redevelopment Commission - invoices Submitted for April 2011
Invoice No. Invoice Date Account No. Parcel/Description Invoice Amount
42005 4/29/2011 4460807 Carmel PAC 2005 FF&E $ 1,248.75
42001 4/29/2011 4460807 Carmel PAC 2005 Café Buildout $ 270.00
42004 4/29/2011 4460807 Gallery Level Buildout $ 15,740.59
42039 4/29/2011 4460807 Gallery Level Buildout $ 30,251.50
Total for April 2011 $ 47,510.84
Director of Redevelopment/ta0
6)
CSO Architects
April 29, 2011
Project No: 25310.3E
Invoice No: 42005
Don Cleveland
Carmel Redevelopment Commission
30 W. Main Street
Suite 220
Carmel, IN 46032
Project 25310.3E CARMEL PAC 2005 FF&E
For professional services rendered for the period March 26, 2011 to April 22, 2011 for the referenced
protect.
Phase P6CA CONSTRUCTION ADMINISTRATION
Professional Personnel
Hours Rate Amount
Bogan, Brandon 4/11/2011 1.00 135.00 135.00
Coordination.
Inchauste, Mary 4/4/2011 1.00 135.00 135.00
Onsite punch list review.
inchauste, Mary 4/7/2011 .50 135.00 67.50
Punch list.
Inchauste, Mary 4/14/2011 1.50 1.35.00 202.50
Mtg.
Inchauste, Mary 4/15/2011 1.50 135.00 202.50
Punch list-granite tops.
Inchauste, Mary 4/18/2011 .50 135.00 67.50
Punch list.
Robison, Randall 4/22/2011 4.00 105.00 420.00
Portable Bar Coordination.
TerHorst, Dawn 4/5/2011 .25 75.00 18.75
Tack Fabric selection.
Totals 10.25 1,248.75
Total Labor 1,248,75
Total this Phase $1,248.75
Total this Invoice $1,248.75
Billings to Date
Current Prior Total
Labor 1,248.75 333,252.50 334,501.25
Consultant 0.00 8,406.00 8,406.00
Expense 0.00 5,863.19 5,863.19
Unit 0.00 6,026.34 6,026.34
Totals 1,248.75 353,548.03 354,796.78
Please remit to: CSO Architects,PO Box 6069,Dept 94,Indianapolis,iN 46206-6069. Unpaid amounts over 30 days will be subject to 1
1/2%monthly interest charge.
7
CSC Architects
April 29, 2011
Project No: 25310.4E
Invoice No: 42001
Don Cleveland
Carmel Redevelopment Commission
30 W. Main Street
Suite 220
Carmel, IN 46032
Project 25310.4E CARMEL PAC 2005 CAFE BUILDOUT
For professional services rendered for the period March 26, 2011 to April 22, 2011 for the referenced
project.
Phase P6CA CONSTRUCTf ON ADMINISTRATION
Professional Personnel
Hours Rate Amount
Began, Brandon 4/12/2011 .50 135.00 67.50
Equipment Coordination.
Began, Brandon 4/13/2011 1.00 135.00 135.00
Onsite Reviews.
Inchauste, Mary 3/31/2011 .50 135.00 67.50
Equipment Coordination.
Totals 2.00 270,00
Total Labor 270.00
Total this Phase $270.00
Total this Invoice $270.00
Billings to Date
Current Prior Total
Labor 270.00 15,158.75 15,428.75
Consultant 0.00 6,744.50 6,744.50
Unit 0.00 105.28 105.28
Totals 270.00 22,008.53 22,278.53
Please remit to: CSOArchitects,PO Bax 6069,Dept 94,Indianapolis,IN 46206-6069. Urpaid amounts over 30 days will be subject to 1
1/2%monthly interest charge.
CSO Architects
April 29, 2011
Project No: 26102E
Invoice No: 42004
Don Cleveland
Carmel Redevelopment Commission
30 W. Main Street
Suite 220
Carmel, IN 46032
Project 28102E GALLERY LEVEL BUILDOUT
For professional services rendered for the period July 24,2010 to April 22,2011 for the referenced
Project.
Phase 03 Design Development
Professional Personnel
Hours Rate Amount
TerHorst, Dawn 8/30/2010 4.00 75.00 300.00
Finish sheet for pricing.
TerHorst, Dawn 8/31/2010 1.25 75.00 93.75
Finish samples.
TerHorst, Dawn 9/1/2010 .75 75.00 56.25
Finish samples.
TerHorst, Dawn 10/28/2010 .25 75.00 18.75
Tile size.
TerHorst, Dawn 10/29/2010 1.25 75.00 93.75
Site visit/material review.
TerHorst, Dawn 10/30/2010 .50 75.00 37,50
Finish selections.
TerHorst, Dawn 11/2/2010 1.00 75.00 75.00
Carpet samples.
TerHorst, Dawn 11/3/2010 .75 75.00 56.25
Finish selections.
TerHorst, Dawn 11/4/2010 2.75 75.00 206.25
Mtg. and finish selections/update dwgs.
TerHorst, Dawn 11/6/2010 .50 75.00 37.50
Furniture selections.
TerHorst, Dawn 11/8/2010 .50 75.00 37.50
Finish presentation set up for Brandon.
TerHorst, Dawn 11/9/2010 1,25 75.00 93.75
Finish plans/furniture selections.
TerHorst, Dawn 11/11/2010 4.50 75.00 337.50
Furniture selections/meeting/pricing.
TerHorst, Dawn 11/12/2010 .50 75.00 37.50
Pick-up finishes.
TerHorst, Dawn 11/15/2010 3.00 75.00 225.00
Finish sheet updates.
Please remit to: CSO Architects,PO Box 6069,Dept 94,Indianapolis,IN 46206-6069. Unpaid amounts over 30 days wit be subject to 1
1/2%monthly interest charge.
Project 28102E GALLERY LEVEL BUILDOUT Invoice 42004
TerHorst, Dawn 11/17/2010 8.00 75.00 600.00
RJE &OW visits to select FF&E/pricing follow-up.
TerHorst, Dawn 11/19/2010 .50 75.00 37.50
Furniture pricing.
TerHorst, Dawn 11/22/2010 2.00 75.00 150.00
Finish selections/fabrics initial selections/pricing.
TerHorst, Dawn 11/23/2010 7.75 75.00 581.25
Finish selection rntg. /final pricing.
TerHorst, Dawn 11/24/2010 3.00 75.00 225.00
Final furniture pricing/sheets.
TerHorst, Dawn 11/29/2010 3.00 75.00 225.00
Furniture/submittals.
TerHorst, Dawn 11/30/2010 1.50 75.00 112.50
Submittals/furniture order.
TerHorst, Dawn 12/1/2010 4.00 75,00 300.00
Furniture quote/fabric approvals/control book.
TerHorst, Dawn 12/3/2010 2.50 75.00 187.50
Final approval mtg.
TerHorst, Dawn 12/6/2010 2.50 75.00 187.50
Mtg. /furniture quote review.
TerHorst, Dawn 12/7/2010 .75 75.00 56.25
Final quote review.
TerHorst, Dawn 12/10/2010 1.00 75.00 75.00
Solid surface edge I control book.
TerHorst, Dawn 12/11/2010 2.00 75.00 150.00
Finish control book.
TerHorst, Dawn 12/13/2010 1.50 75.00 112.50
Finish control book/fabric re-selections.
TerHorst, Dawn 12/14/2010 .50 75.00 37.50
Laminate delay.
TerHorst, Dawn 12/18/2010 .25 75.00 18.75
Update on delayed furniture,
TerHorst, Dawn 12/19/2010 1.00 75.00 75.00
Control book.
TerHorst, Dawn 12/21/2010 1.00 75.00 75.00
Paint submittal.
TerHorst, Dawn 12/26/2010 1.00 75.00 75.00
Finish control book.
TerHorst, Dawn 12/28/2010 2.00 75.00 150.00
Paint submittal/site visit/dwg.
TerHorst, Dawn 12/30/2010 .75 75.00 56.25
Tile installation site visit.
TerHorst, Dawn 1/3/2011 1.50 75.00 112.50
Control book I wood control sample.
TerHorst, Dawn 1/4/2011 1.00 75.00 75.00
Control book updates.
TerHorst, Dawn 1/12/2011 1.75 75.00 131.25
Furniture delivery follow up I site visit.
TerHorst, Dawn 1/13/2011 1.00 75.00 75.00
Furniture update w/RJE.
TerHorst, Dawn 1/17/2011 .50 75.00 37.50
Furniture follow-up on delivery status.
Please remit to: CSO Architects,PO Box 6069,Dept 94,Indianapolis,IN 46206-6069. Unpaid amounts over 30 days will be subject to 1 Page 2
1/2%monthly interest charge.
Project 28102E GALLERY LEVEL BUILDOUT Invoice 42004
TerHorst, Dawn 1/18/2011 2.25 75.00 168,75
Furniture follow-up on delivery status.
TerHorst, Dawn 1/21/2011 2.00 75.00 150.00
Furniture installation set up/coordination w/RJE.
TerHorst. Dawn 1/24/2011 .50 75.00 37.50
Delivery coordination.
TerHorst, Dawn 1/25/2011 3.00 75.00 225.00
Furniture delivery/site visit/pricing follow-up.
TerHorst, Dawn 1/28/2011 2.00 75.00 150.00
Furniture installation.
TerHorst, Dawn 2/7/2011 .50 75.00 37.50
Furniture follow-up.
TerHorst, Dawn 3/30/2011 .25 75.00 18.75
RJE follow up questions.
TerHorst, Dawn 3/31/2011 .50 75.00 37.50
Credenza options.
Totals 86.00 6,450.00
Total Labor 6,450.00
Total this Phase $6,450.00
Phase 04 Construction Documents
Professional Personnel
Hours Rate Amount
Bogan, Brandon 8/16/2010 1.00 135.00 135.00
Drawing Reviews.
Sogan, Brandon 8/19/2010 3.00 135.00 405.00
Prep and finish mtg.
Began, Brandon 8/20/2010 1.00 135.00 135.00
Drawing Reviews.
Began, Brandon 8/27/2010 1.50 135.00 202.50
Drawing Coordination.
Bogan, Brandon 8/30/2010 1.00 135.00 135.00
Drawing Coordination.
Began, Brandon 8/31/2010 4.50 135.00 607.50
Drawing Coordination.
Began, Brandon 9/15/2010 1.00 135.00 135.00
Coordination.
Bogan, Brandon 9/17/2010 3.00 135.00 405.00
Door Hardware Coordination.
Lyons, Cynthia 8/4/2010 .25 75.00 18.75
MEP Coordination.
Lyons, Cynthia 8/6/2010 .50 75.00 37.50
MEP Coordination.
Lyons, Cynthia 9/9/2010 1.25 75.00 93.75
Prep for mtg.
Moriarity, Daniel 8/19/2010 1.00 195.00 195.00
Mtg.
Moriarity, Daniel 11/4/2010 1.00 195.00 195.00
Mtg. to review finishes and schedule.
Moriarity, Daniel 11/11/2010 1.00 195.00 195.00
Construction observation.
Moriarity, Daniel 11/30/2010 2.00 195.00 390.00
Please remit to: CSO Architects,PO Box 6069,Dept 94, Indianapolis,tN 46206-6069. Unpaid amounts over 30 days wit be subject to 1 Page 3
1/2%monthly interest charge.
Project 28102E GALLERY LEVEL BUILDOUT Invoice 42004
Mtg. onsite to review buildout.
TerHorst, Dawn 8/16/2010 .25 75.00 18.75
Finishes for build-out mtg. prep.
TerHorst, Dawn 8/18/2010 2.50 75.00 187.50
Select finishes for presentation.
TerHorst, Dawn 8/19/2010 1.75 75.00 131.25
Presentation.
TerHorst, Dawn 8/26/2010 2.00 75.00 150.00
Finishes for build-out.
Totals 29.50 3,772,50
Total Labor 3,772.50
Total this Phase $3,772.50
Phase 05 Bidding
Professional Personnel
Hours Rate Amount
Bogan, Brandon 9/20/2010 1.50 135.00 202.50
Bidder Coordination.
Bogan, Brandon 9/21/2010 1.00 135.00 135.00
Coordination.
Bogan, Brandon 9/22/2010 .50 135.00 67.50
Coordination.
Began, Brandon 9/27/2010 .50 135.00 67.50
Bid Questions.
Bogan, Brandon 9/30/2010 .50 135.00 67.50
Bid Questions.
Bogan, Brandon 10/1/2010 .50 135.00 67.50
Bid Questions.
Bogan, Brandon 10/4/2010 .50 135.00 67.50
Estimation coordination,
Totals 5.00 675,00
Total Labor 675.00
Total this Phase $675.00
Phase 06 Construction Administration
Professional Personnel
Hours Rate Amount
Bogan, Brandon 10/26/2010 1.00 135.00 135.00
Onsite Coordination.
Began, Brandon 11/1/2010 .50 135.00 67.50
Onsite Coordination.
Began, Brandon 11/4/2010 1.50 135.00 202.50
Mtg.
Began, Brandon 11/8/2010 1.00 135.00 135.00
Walk-thru,
Began, Brandon 11/11/2010 .50 135.00 67.50
Walk-thru.
Eagan, Brandon 11/22/2010 .50 135.00 67.50
Onsite Coordination.
Bogan, Brandon 11/23/2010 2.00 135.00 270.00
Onsite Coordination_
Please snit to: CSO Architects,PO Box 6069,Dept 94,Indianapolis,IN 46206-6069. Unpaid amounts over 30 days will be subject to 1 Page 4
1/2%monthly interest charge.
Project 28102E GALLERY LEVEL BUILDOUT Invoice 42004
Bogan, Brandon 11/26/2010 1.00 135.00 135.00
Onsite Coordination.
Bogan, Brandon 11/30/2010 1.00 135.00 135.00
Onsite Coordination.
Bogan, Brandon 12/1/2010 .50 135.00 67.50
Onsite Coordination.
Bogan, Brandon 1/11/2011 .50 135.00 67.50
Onsite Coordination.
Bogan, Brandon 1/28/2011 1.00 135.00 135.00
Site Review.
Bogan, Brandon 3/17/2011 1.00 135.00 135.00
Construction Review.
Robison, Randall 1/18/2011 1.00 105.00 105.00
Onsite Coordination.
Robison, Randall 1/19/2011 2.00 105.00 210.00
Onsite Coordination.
Robison, Randall 1/20/2011 4.00 105.00 420.00
Onsite Coordination.
Totals 19.00 2,355.00
Total Labor 2,355.00
Total this Phase $2,355.00
Phase 09 Reimbursable
Consultants
Reim. Consultants
819/2010 Illustrations by Bajor Archive Build Out 750.00
illustrations
12/10/2010 Cardosi Kiper Design Professional Fees 1,500.00
Group, Inc.
Total Consultants 2,250.00 2,250.00
Reimbursable Expenses
Travel 227.50
Total Reimbursables 227.50 227.50
Unit Billing
11 x 17 B/W COPIES .85
12x18 BONDS 2.60
18x24 BONDS 4.08
24x36 BONDS 1.02
36 x 48 BONDS 2.04
Total Units 10.59 10.59
Total this Phase $2,488.09
Total this Invoice $15,740.59
Billings to Date
Current Prior Total
Labor 13,252.50 41,787.50 55,040.00
Consultant 2,250.00 450.00 2,700.00
Expense 227.50 0.00 227.50
Unit 10.59 829.33 839.92
Please remit to: CSO Architects,Po Box 6069,Dept 94,Indianapolis,IN 4620&.8069. Unpaid amounts over 30 days will be subject to 1 Page 5
112%monthly interest charge.
Project 28902E GALLERY LEVEL BUILDOUT Invoice 42004
Totals 15,740.59 43,066.83 58,807.42
Please remit to: CSO Architects,PO Box 6069,Dept 94,Indianapolis, IN 46206-6069. Unpaid amounts over 30 days will be subject to 1 Page 6
1/2%monthly interest charge.
Unbilled Detail Tuesday,May 10,2011
9:16:56 AM
CSO ARCHITECTS,INC. As of 4/22/2011
Bitting Labor Code Employee/ Hours/ . Billing Billing
Status Date /Account Reference Description Units Rate Amount
Project Number.28102E GALLERY LEVEL BUILDOUT
Phase Number:09 Reimbursable
Consultants:
B 8/9/2010 515.00 55726 illustrations by Bajor Archive Build Out 750.00
Illustrations
B 12/10/2010 515.00 56989 Cardosi Kiper Design Group,Inc. Professional 1,500.00
Fees
Total for 2,250.00
Total Billable Consultants 2,250.00
Total Consultants 2,250.00
Expenses:
B 1213/2010 516.00 56942 Brandon Bogan 6.00
B 12/10/2010 516.00 56989 Cardosi Kiper Design Group,Inc. Mileage 177.00
B 1/3/2011 516.00 57171 Dawn TerHorst 21.00
B 1/3/2011 516.00 57172 Dawn TerHorst 23.50
Total for 227.60
Total Billable Expenses 227.50
Total Expenses 227.50
Units:
B 12/10/2010 BL2436 000000000027 8:1.0 BOND @ 1.02 1.00 1.02 1.02
B 12/10/2010 BL3648 000000000027 8:1.0 BOND @ 2.04 1.00 2.04 2.04
B 12/10/2010 COP11 000000000027 132.0 COPIES @ 0.17 2.00 .17 .34
B 9/10/2010 BL1218 000000000034 8:9.0 BONDS @ 0.26 9.00 .26 2.34
B 9/10/2010 BL1824 000000000034 B:8.0 BONDS @ 0.51 8.00 .51 4.08
B 9/10/2010 COP11 000000000034 B:1.0 COPY @ 0.17 1.00 ,17 .17
B 8/6/2010 COP11 000000000044 B:2.0 COPIES @ 0.17 2.00 .17 .34
B 10/29/2010 BL1218 000000000215 B:1.0 BOND @ 0.26 1.00 .26 .26
Total for 25.00 10.59
Total Billable Units 25.00 10.59
Total Units 25.00 10.59
Total for 09 25.00 2,488.09
•
S
illustrations
lb by
bajor
CPAC Feinstein Archive Build-Out July 5,2010
Carmel, Indiana 46032
•
•
hours@rate total
CPAC Feinstein Archive =ti° I•-Out
Schematic Design Presents .D.Drawings 30hrs @$25.00 $750.00
'"display room persp 'ves 1 i us 4,ratio rs
*build-out xOn ry
bv
j bajor
Sub-Total $750.00
Amount Due $750.00
Project Manager Use
Project# ZavlOZ.. ,
Project Name - t
Thank you.
Circle One
included in Fee 0• 'MOWS:,le
Mark Up? Yes ,
Remarks
Accounting Use
0/N Task Code 8/8
241 Cranston Avenue. Carmel, Indiana. 46032. Daniel.bajor @gmall.com
•
CARDOSI RIPER design group, inc.
•
INVOICE .
•
Invoice Date; November 19,2010 -
Invoice No 10045
Job No;
Job Name: Gallery Level Build-out
To: Den Morlarity
CSO Architects
2$0 East 96th Street
Suite 100
Indianapolis,IN 46240
Professional Fees: -
-Meeting and Walkthrough of Building,Sept.9
Total Professional Fees $ 1,500.00
Reimbursable'Expenses:
Automobile Mileage $ 177.00
Total Reimbursable Expenses $ 177.00
Total Due this Invoice: $ 1,677.00 V
Terms: Net 30 days,
2437 South Western Avenue P 773.523.9300 $Ioa
Chicago, Illinois 60608 P 773,523,93.05
www.ck-dg,coin
itz
CSO Architects Expense Report
ARCHITECTURE•INTERIOR DESIGN `
Name: Brandon Hogan Employee No.: 0719 Month: August-- Year: 2010
i t ?:i A 0Nd.��.. A wA 4 Y'4S^',; + I "'. r' i t »;t -vr
s.S .mac v n �,f u r t .�i, s? i 1Yry-. � � `� `��+� � .,. �, r��..: :w ia� �, M,
'`�•., da 1}' ' s va 7'.KF`:' ?-r�S'. �'' d7t s. -.4-,A-64-=-7-,r F 'i... � r�+ y ' N�}T°.,"'�,t�,�j�f* '+r.
,,. L ra1e: �Ea f14 r•Y:i4 s! , f 4'a 1 i M i�r 4 4Y C �." 11,'4
v �` a � a bh a a r sw` i4xr �5 ,t r�
,c:�� ,. +a 1? ) o+ { eat� .31atu P�.! G� Rstl�l n �i •p° .d' �r`� T 'Meat Yt � 'E :
�..3_t ,+0 �a ee leag # 6, a, ��Tul:.
11/15(10 25310 Palladium Site review with Bitten 6 $3.00 $3.00
11/16110 26237 REI Office Meeting 6 $3.00 . $3.00
11/17/10 25310 Palladium Meeting _ 6 $3.00 $3.00
11/18110 25310 CPA Office Meeting 6 $3.00 $3.00
11/22/10 25310 Palladium Meeting 6 $3.00 $3.00
91/23/10 25310 ,Palladium Meeting , $3.00 $300
_
11/24/10 25310 Palladium Meeting 6 $3.00 $3.00
N.
11/26/10 28102 Palladium _Site waikthrough 6 $3.00 - $3.00
11/30/10 28102 Palladium Side wafkthrovgh 6 _ $3.00 $3.00 )1C
12/01/10 25310 Palladium Meeting _ 6 $3.00 $3.00 `
12/02/10 25310 CPA Office Meeting ' 6 $3.00 $3.Q0
12/03/10 26203 Ball State Meeting 112 $56.00 $56,00
$0.00 $0.00
$0.00 $0.00
Purchase orders are required for all expenses other than parking/mlleage. No payment veil!be issued without proper receipts.
roar-07 Grand Toter ... 4.:4:t. 9,4
-------- &
CSO Architects . Expense Report
A R CI-11 TECTIALE•INTEEJOR DESIGN
Name: Dawn Ter I torst Employee No.: 0878 Month: oct-Nov.. Year .2010
.. . - - '.'''':1''''r..":''''r''';'!!',M—.^V*,',Ti 1.4.::?..?..4,-.T.P7'3i:c".L.0",;0::,,,,:,,,:,,,,•,;■.,:e,AL,",V-W4,,,it-,,J c=v,,R..1..,fae,..%9,,,v,cfai-atv4 ap..-arprwrs.?. -frAr...7=4,1;2. ffltrt,m,,Lrz,.,z.n.,!.,....
gtwle,
.;;,=.) .-. .:2:0-_,',5.-4;iikc,!;44-4.try,c,i '.;4'IlOWAlitf.:srv.,-.1Mt171. 'A::Y,,..4:1 igift 00*.A3 ,. AV'edPia:::
_ keic..,1i48:dt.;:-L.t:(46440,7r.`,,,,za:::),:g'.'••il:gu'2,.:kV , itl'aMetliJ ii 414E41 cfa.'"*%akmo nait itir NfailV ,71A.P1"Otiiir'-ti4
NW
10/20/10 6i,j WA Graphics Meeting at
2:1 eat- IMIIIpfflliIIIIIIIIIIIII
East $0.00 $5.39
-yaw
10/21/10 26088 -• .Simon Round Til.Mist'Review N.. R $13.
IIIIIIIIIIIIIIEJII 50 $13.50
' r 11 •umbus North HS-Review Furniture MI
10/27/10 10161 'Guild T'•
121 $60.50 $60.50
'..11111M
MariOtt Furniture MI
11/05/10 29030 Purdue Meeting 118 $59.00 $59.00
'ler
11/05110 29030 R 1.1111.11111111111111111111111111111111M1
Columbus North HS-
11/08/10 10160 one wa Office Furniture Review MIIIIIIMIIIIMIIM $30.50 ' $30.50
`111Pmir
-4Nor
11/08/10 101501 North to East Office Furniture Review IMIMIIIIIIIIIIIIMI $1.60 • $1.50
.....g."71 olumbus East to
11/08/10 104.0 CSO Orace Furniture Review IINIIIIIIIIIIIIIIMI $32.00 $32.00
I NIIIrl
Columbus Furniture
11/12/10 10160 GGE elections • 10 $5.00 $5.00
Indiana Design
enter- Review Furniture for IIIIIIIIIIIIIIIIIIIIIIII
11/12/1C. 29030 iSim.,-25.. Purdue $4.50 $4.50
"elia. Manion Furniture Select IIBIIIIIIIIIIIIIIIIIIIII
*.X."
11/16/10 -290301 Purdue Finishes E $59.00 $59.00
--
11/17/10 I SO te Officeworice Feinstein Fumiture lel .
2810, i o NE back to CSO Review $23,50 $2350
SO to North,North 111111111=11111111111 $64.00
11 8/10 101r/ o East,East to CSO FRIE Meet !s
% ..
'r111718/10 10160 gEggllMMIIIIIIUIEgIIIIIIIIINMIIIIIIII "°
i-
Columbus East Hs-
'--,\ 11/30/10 101 r 1 Round trip Review Office Furniture R $64.00 $500
1 imam 10160 Meal-Sub . Orrice Furniture Review $4.82 $0.00 $4.82
Purchase orders are required for all expenses other than parlong/m//eage. No payment will be Issued without proper mcelpts
...e
Mar-07
.'''
•,-
Grand Total
. . •
CO
CSO Architects Expense Report
ARCRITECIll ICE-INTERIOR DESIGN
Nome: Dawn'Ter MOM Employee No.: we Month: od..o.n. Year: . 1CrE0
-- —---- - -- --
TI aTiV,Ati,:iti, •riz' r4.4 atfeN'''1./'"Vito-'
f: •i - i.. ".: . . 7,4..4,.;• I I,',
gat ,*.•■•'. ''1;r IR A - i..f I'd . .f..It W f:-'i R;WWII 'b 5•0511faelnazo, .'.16‘
1=11° .'9°307Marimmimis'EgaarillialIMMIIIIIMIIIMINI $3.04/
raim-rd
121=0 i zw.,A RE-roilriv. 'FI=Vtereln IMMIIIIIIIMI 42 $21.00 IIIIIII 521.00
12106/10 25.310 SZERMIRMIIIIMMININI io sax R MN
ssoo
1=9110 25310.3 NE/111 R
IM' 1111111 10 $5.00 NM $5.00
M al'0 OCM MIENSIMIla R ME 13 $6.50 liffil
•Pr ri MI Ct"K I Lack MON11111.1111111.111 28 si.too 11.11 si4.oci .
'MEM .._.3 . MEN1111111111111111111111111131 3434 00 $04.00 i
, p.....-... _rt
lo North mute RRIIIIPIIIIIIIIIII
nrcri 0 MN Mil saw 1111 $3.00
12122110 ENSIMINNIMMIIIII t1301 WOO
111.1.1111111.11111 =Mil NM 6000 NM $0.00
1111111111111MMEMMINE SCk06 Mill $0.00
IMO 11.11.11111111111111111111111111111 $0.00 10.1X/
; 111111111 R MI MOO $0.00
111 IIIIIIIIIIMIMMIMIIIIIIIlli 8060
i .
'I I I 111 1 I 1 I I I 111 I I I II I I I I I I Ft 1111111.1 moo saw !
R MEI $0.00 MI 5600
. 111111111111111111111111111
S060 50.00 ,
IN.
r....)
MEI= R =Mill=
16,
11111 11111111111111111111
.•
IIII $0.00 IIIII MOO '
..7,- 111.11.1.11111.11111111111111M1111.1111111111111 MCO OM S0.00
.47, 1.1111.11.111111 11111111111111111.110.1 som ' $3.60
MI 1111111=1111111=11 so. NM
$0.00
Purchase cedeis are required tor NT expenses otaer Men otelderaolallea94/. No payment WV be/nu&*Mout proper reofiate.
. .3'.-
Mat-07 MN'rrit$M:i:
1 15'51
CSO Architects
April 29, 2011
Project No: 28102E
Invoice No: 42039
Don Cleveland
Carmel Redevelopment Commission
30 W. Main Street
Suite 220
Carmel, IN 46032
Project 28102E GALLERY LEVEL BUILDOUT
Description: Engineering Services
For professional services rendered for the_period July 24,2010 to April 22,2011 for the referenced
ro ect.
Consultants
Reim. Consultants
3/10/2011 L'Acquis Consulting 4.5 Hours 562.75
Engineers, LLC
4/22/2011 L'Acquis Consulting -8,600.00
Engineers, LLC
4/22/2011 L'Acquis Consulting 1.25 Hours 178.75
Engineers, LLC
4/22/2011 L'Acquis Consulting 141.25 Hours 16,402.50
Engineers, LLC
4/22/2011 L'Acquis Consulting 165.25 Hours 20,266.50
Engineers, LLC
4/22/2011 L'Acquis Consulting 6.50 Hours 816.50
Engineers, LLC
4/22/2011 L'Acquis Consulting 4.50 Hours 553.00
Engineers, LLC
4/22/2011 L'Acquis Consulting .50 Hour 71.50
Engineers, LLC
Total Consultants 30,251.50 30,251.50
Total this Invoice $30,251.50
Billings to Date
Current Prior Total
Labor 0.00 55,040.00 55,040.00
Consultant 30,251.50 2,700.00 . 32,951.50
Expense 0.00 227.50 227.50
Unit 0.00 839.92 839.92
Totals 30,251.50 58,807.42 89,058.92
Please remit to: CSO Architects,P4 Box 6069,Dept 94,Indianapolis,IN 46206-6069. Unpaid amounts over 30 days will be subject to
1 1/2%monthly interest charge.
Billed Detail Tuesday,May 10,2011
9:29:09 AM
CSO ARCHITECTS, INC. As of 4/22/2011
Billing Labor Code Employee/ Hours/ Billing Billing
, Status Date /Account Reference Description Units Rate Amount
Project Number:28102E GALLERY LEVEL BUILDOUT
Phase Number:09 Reimbursable
Consultants: -
B 3/10/2011 515.00 57848 L'Acquis Consulting Engineers,LW 4.5 Hours 562.75
B 4/22/2011 515.00 58274 L'Acquis Consulting Engineers,LW -8,600.00
B 4/22/2011 515.00 58275 L'Acquis Consulting Engineers,LLC 141.25 Hours 16,402.50
B 4/22/2011 515.00 58276 L'Acquis Consulting Engineers,LLC 165.25 Hours 20,266.50
B 4/22/2011 515.00 58277 L'Acquis Consulting Engineers,LLC 6.5D Hours 816.50
B 4/22/2011 515.00 58278 L'Acquis Consulting Engineers,LLC 4.50 Hours 553.00
B 4/22/2011 515.00 58279 L'Acquis Consulting Engineers,LLC 1.25 Hours 178.75
B 4/22/2011 515,00 58290 L'Acquis Consulting Engineers,LLC .50 Hour 71.50
Total for 30,251.50
Total Billable Consultants 30,251.50
Total Consultants 30,251.50
Total for 09 30,251.50
L'ACQUIS
CONSULTING ENGINEERS `.
P.O. Box 6069-Dept. 191
Indianapolis, Indiana 46206-6069
INVOICE January 17,2011
Invoice No: 005150.050-5247
Brandon Bogen
CSO Architects,Inc.
280 East 96th Street
Suite 200
Indianapolis, IN 46240
Project 005150.050 Carmel Regional Performing Arts Center-Gallery Level Buildout
Engineering Services_Billina Periczd December1.2010 to D cember 31.2010
Professional Personnel
Hours Rate Amount
Project Manager/Senior Engineer
Maue,Andre .75 143.00 107.25
Professional Engineer
Osipchuk,Oleg 1.75 130.00 227.50
Senior Engineering Designer
Butler,Timothy 114.00 0.00
Richey, Gerry 2.00 114.00 228,00
Totals 4.50 562.75
Total Labor 562.75
Total this Invoice $562.75
•
Prclect anage1re
Project# in
Project Name 0r111104
Circle One
Included in Fee OSi eimbUrsable
Mark lip? Yes/No
Remarks
Accounting Use
DIN Task Code. .. 8/S
TERMS:NET 30 DAYS.A FINANCE CHARGE IS COMPUTED ON A PERIODIC RATE OF 1.6%PER MONTH WHICH IS AN
ANNUAL PERCENTAGE RATE OF 18%ON ANY PREVIOUS BALANCE NOT PAID WITHIN 30 DAYS.
Billing Backup Monday,January 17, 2011
L`Acquls Consulting Engineers Invoice 5247 Dated 1/17111 2:32:20 PM
Project 005150.050 Cannel Regional Performing Arts Center-Gallery Level Buildout
Professional Personnel
Hours Rate Amount
Project Manager/Senior Engineer
008 Maue,Andre 12/2/10 .75 143.00 107.25
edit and send field report,review issues w/Oleg
Professional Engineer
011 Osipchuk, Oleg 1211/10 1.75 130.00 227.50 .
site visit
Senior Engineering Designer
003 Butler,Timothy 12/1110 2.00 114.00 228.00
Onwer revisions drawings upgrade
003 Butler, Timothy 12/1/10 3.00 114.00 342.00
Punch List/owner reivesion review
003 Butler,Timothy 12/15/10 -3.00 114.00 -342.00
003 Butler,Timothy 12/15/10 -2.00 114,00 -228.00
Onwer revisions drawings upgrade
013 Richey,Gerry 12/1/10 2.00 114.00 228.00
construction observation
Totals 4.50 582.75
Total Labor 562.75
Total this report $562.75
•
L/A r TI �t Project Man•g• Us
��JI Project 4 I
Ili-11
. `A
CONSULTING ENGINEERS ` Protect team• •/
Circle One Ara
P.O.Box 6069-Dept.191 Included in Fee OR 8;*inoursa,
Indianapolis,Indiana 46206-6069 Mark up? Ye s0
INVOICE August 9,2010 Remarks ~
Invoice No: 005150,050-441a
Brandon Bogen - V a
CSOArchitects,Inc. C4'
280 East 96th Street Accounting Use
Suite 200 011 'task Code.___ 8/s
Indianapolis, IN 46240
Project 005150.050 Carmel Regional Performing Arts Center-Gallery Level Bulidout
Enaineerina SerYices Bi�jng period February 26,2010 to June 30.201Q
Professional Personnel
Hours Rate Amount
Project Manager/Senior Engineer
Maue,Andre 10.50 143.00 1,501.50
Engineer
Osipchuk,Oleg 63.25 124.00 7,843.00
Senior Engineering Designer
Butler,Timothy 22,00 114.00 2,508.00
Ch&iand,Roger 22,00 114.00 2,508.00
Richey,Gerry 10.50 114.00 1,197.00
Engineering Technician
Renner,Matt 13.00 65.00 845.00
Totals 141.25 16,402.50
Total Labor 16,402.50
Total this Invoice $16,402.50
Outstanding Invoices
Number Date Balance
4163 4122110 -8,600.00'7k-
Total
-8,600.00
Billings to Date
Current Prior Total AIR Balance
Labor 16,402.50 0.00 16,402.50
Totals 16,402.50 0.00 16,402.50 7,802.50
EN-177717' 1.T.‘9. 222011
TERMS:NET 30 DAYS.A FINANCE CHARGE IS COMPUTED ON A PERIODIC RATE OF 1.5%PER MONTH WHICH IS AN
ANNUAL PERCENTAGE RATE OF 13 ON ANY PREVIOUS BALANCE NOT PAID WITHIN 30 DAYS.
Billing Backup Thursday,April25,2011
•
L`Acquis Consulting Engineers Invoice 4418 Dated 8/9/10 9:50:04 AM
Project 005150.050 Carmel Regional Performing Arts Center-Gallery Level Buildout
Professional Personnel
Hours Rate Amount
Project Manager/Senior Engineer
008 Maue,Andre 2/26/10 .25 143.00 35.75
discussion re:scope/fee
008 Maue,Andre 3/8/10 .50 143.00 71.50
kickoff at CSO
008 Maue,Andre 3/9/10 .50 143.00 71.50
meeting report,coordination of meth/plumb allowances for
BP#8 addendum
008 Maue,Andre 4/13/10 1.25 143.00 178.75
researching dehumidifiers,design layout w/Oleg
008 Maue,Andre 4/14/10 1,00 143.00 143.00
coord status: plumbing, lighting,power...email to CSO
w/questions
008 Maue,Andre 4/15/10 .50 143.00 71.50
review duct layout,VAV selections
008 Maue,Andre 4/16110 .50 143.00 71.50
reviewing layout w/Oleg
008 Maue,Andre 4/19/10 .75 143.00 107.25
Q&Aw/Brandon
008 Maue,Andre 4/20/10 .50 143.00 71,50
Q&A w/Brandon
008 Maue,Andre 4/23/10 .75 143.00 107.25
coordination
008 Maue,Andre 5/4/10 1.00 143.00 143.00
reviewing drawings
008 Maue,Andre 5/5/10 .50 143.00 71.50
reviewing drawings
008 Maue,Andre 6/3/10 1.00 143.00 143.00
reviewing documents,getting base for new layout
008 Maue,Andre 614110 .50 143.00 71.50
QC,issuing documents
008 Maue,Andre 6/30/10 1.00 143.00 143.00
reviewing Impact of proposed design changes
Engineer
011 Osipchuk,Oleg 4/6110 .50 124.00 62.00
new bases and sheet file
011 Osipchuk, Oleg 4/9/10 7.75 124.00 961.00
Creating bases,sheets,reading reference material
011 Osipchuk,Oleg 4/12/10 2.50 124.00 310.00
design
011 Osipchuk,Oleg 4/13/10 6.50 124.00 806.00
hvac discussion w/Andre. load,layout
01.1 Osipchuk, Oleg 4/14/10 3.50 124.00 434.00
duct routing
011 Osipchuk,Oleg 4/15/10 5.00 124,00 620.00
cad
Billing Backup Invoice 4418 Dated 819/10 Thursday,April 28,2011-9:50:04 AM
011 Osipchuk,Oleg 4/16/10 7.50 124.00 930,00
cad
011 Osipchuk,Oleg 4/17/10 4.00 124.00 496.00
duct layout
011 Osipchuk,Oleg 4119/10 3.00 124.00 372.00
duct layout
oil Osipchuk,Oleg 4/22110 2.50 124.00 310.00
cad
011 Osipchuk,Oleg 4/23110 5.00 124.00 620.00
New bases,adjustement
011 Osipchuk,Oleg 5/6/10 3.00 124.00 372.00
mark-ups
011 Osipchuk,Oleg 5/7/10 3.50 124.00 434.00
cad
011 Osipchuk,Oleg 5/7/10 2.50 ' 124.00 310.00
cad
011 Osipchuk,Oleg . 6/2/10 1,50 124.00 186.00
cad
011 Osipchuk,Oleg 6/3/10 .50 124.00 62.00
new base
011 Osipchuk,Oleg 6/4/10 4.50 124.00 558.00
MEP dwg coordination(new ARCH base)
Senior Engineering Designer
003 Butler,Timothy 3/6/10 1.00 114.00 114.00
Feinstein kick-off meeting
003 Butler,Timothy 4/6/10 3.00 114.00 342.00
Feinstein lighting design
003 Butler,Timothy 4/7/10 7.00 114.00 798.00
Feinstein lighting design
003 Butler,Timothy 4/8/10 5.00 114.00 570.00
Feinstein lighting design
003 Butler,Timothy 4/23/10 4.00 114.00 456.00
Owner revisions
003 Butler,Timothy 5/6/10 2.00 114.00 228.00
Revisions per 5/6/10 mtg.w/Brandon
004 Challand,Roger 4/23/10 4.00 114.00 456.00 •
Elec design
004 Challand, Roger 4/26/10 5.00 114.00 570.00
Elec design
004 Challand, Roger 4/27/10 4.00 114,00 456.00
Elec design
004 . Challand,Roger 5/6/10 2.00 114.00 228.00
Mtg w/Arch
0p4 Challand,Roger 5110110 3.00 114.00 342.00
elec.design
004 Challand,Roger 6/3/10 4.00 114.00 456.00
Arch changes
013 Richey,Gerry 3/8/10 1.00 114.00 114,00
Kick off meeting with CSO
013 Richey,Gerry 4/9/10 2.00 114.00 228.00
cad •
Page 2
Billing Backup Invoice 4418 Dated 8!8110 Thursday,April 28,2011.9:50:04 AM
013 Richey,Gerry 4/20/10 1.00 114.00 114.00
cad
013 Richey, Gerry 4/23110 2.00 114.00 228.00
cad drafting
013 Richey,Gerry 4/26/10 2.00 114.00 228.00
cad
013 Richey,Gerry 6/4/10 2.50 114.00 285.00
Engineering and cad
Engineering Technician
023 Renner,Matt 4/9/10 2.00 65.00 130.00
Mark ups for Tim
023 Renner,Matt 4/12/10 2.00 65.00 130.00
Markups for Tim
023 Renner, Matt 4/23/10 3.00 65.00 195.00
Mark ups for Tim
023 Renner, Matt 4/26/10 2.00 65.00 130.00
Mark ups for Tim
023 Renner,Matt 4/27/10 1.00 65.00 65.00
Mark ups for Tim
023 Renner,Matt 5(7114 2.00 65.00 130.00
. Markups for Tim
023 Renner, Matt 6/4/10 1.00 65.00 65.00
Markup for Tim
Totals 141.25 16,402.50
Total Labor 16,402.50
Total this report $16,402.50
Page 3
L'AC UI S
CONSULTING ENGINEERS .
P.O.Box 6069-Dept. 191
Indianapolis,Indiana 46206-6069
INVOICE October 29,2010
Invoice No: 005150.050-5090
Brandon Bogen
CSO Architects,Inc,
280 East 96th Street
Suite 200
Indianapolis,IN 46240
Project 005150.050 Cannel Regional Performing Arts Center-Gallery Level Buildout
Enalneering Services slllilz4 Period July 6.2010 to August 30. 2010
Professional Personnel
Hours Rate Amount
Project Manager/Senior Engineer
Maue,Andre 8.00 143.00 1,144.00
Professional Engineer
Oslpchuk,Oleg 74.75 130.00 9,717.50
Senior Engineering Designer
Butler,Timothy 27.00 114.00 3,078.00
Challand, Roger 42.00 114.00 4,788.00
Richey, Gerry 13.50 114.00 1,539.00
Totals 16525 20,266.50
Total Labor 20,266.50
Total this Invoice $20,266.50
F!nrc•r.11tan;: eri.lse
r,raCr.1 r
r3oind Nig L' I
C chi One
Ir c:,�:E1J in Fee OR i eiI (, P
P.
,,rte
erk Up? YesC
kpprnvrd
r ouri:rn Use !!
(1 Rd Task Cone
TERMS:NET 30 DAYS.A FINANCE CHARGE IS COMPUTED ON A PERIODIC RATE OF 1.5%PER MONTH WHICH IS AN
ANNUAL PERCENTAGE RATE OF 16%ON ANY PREVIOUS BALANCE NOT PAID WITHIN 30 DAYS.
Billing Backup Tuesday,March 29,2011
L'Acquis Consulting Engineers Invoice 5090 Dated 10129/10 2:54:21 PM
Project' 005150.050 Cannel Regional Performing Arts Center-Gallery Level Buildout
Professional Personnel
Hours Rate Amount
Project Manager/Senior Engineer
008 Maue,Andre 7/6/10 2.00 143.00 286.00
mtg re:requirements...incl travel time
008 Maue,Andre 7/6/10 .50 143.00 71.50
further research re:current standards for archive
environments
008 Maue,Andre 7/7/10 1.00 143.0D 143.00
further research re:current standards for archive '
environments
008 Maue,Andre 8/2/10 .75 143.00 107.25
notes and direction to team per conversation w/CSO
008 Maue,Andre 8/4/10 .50 143.00 71.50
updated bases,coordination
008 Maue,Andre 8/16/10 .50 143.00 71.50
review mach design
008 Maue,Andre 8/17/10 1.00 143.00 i43.00
correspondence w1 CSO re:ceiling coordination, lighting,
existing obstructions
008 Maue,Andre 8/17/10 .75 143.00 107.25
in-house coord mtg
008 Maue,Andre 8/19/10 .75 143.00 107.25
review mach design,seeking commercial-grade equipment
008 Maue,Andre 8/23/10 .25 143.00 35.75
progress set to CSO
Professional Engineer
011 Osipchuk, Oleg 8/4/10 2.00 130.00 260.00
redesign
011 Osipchuk, Oleg 8/5/10 6.00 130.00 780.00
cad
011 Osipchuk, Oleg 8/6/10 1.00 130.00 130.00
cad
011 Osipchuk, Oleg 8/7/10 3.50 130,00 455.00
new layout design
011 Osipchuk,Oleg 8/9/10 1.50 130.00 195.00 '
piping
011 Osipchuk,Oleg 8/10/10 6,00 130.00 780.00
re-design
011 Osipchuk,Oleg 8/11/10 2.00 130.00 260.00
re-design
0i1 Osipchuk,Oleg 8/12/10 7.00 130.00 910.00
re-design
011 Osipchuk,Oleg 8/16/10 2.00 130.00 260.00
cad
011 Osipchuk,Oleg 8/16/10 2.00 130.00 260.00
spec
r
ENT-1717.37-3 i r)? 2 2 2115
•
Billing Backup invoice 5090 Dated 10/29110 Tuesday,March 29, 2011-2:54:21 PM
011 Osipchuk,Oleg 8/17/10 2.50 130.00 325.00
spec
011 Osipchuk, Oleg 8/17/10 .75 130,00 97.50
team meeting
411 Osipchuk,Oleg 8/18/10 6.00 130.00 780.00
spec
011 Osipchuk, Oleg 8/19110 2.00 130.00 260.00
cad
011 Osipchuk, Oleg 8/19/10 4.00 130.00 520.00
spec
011 Osipchuk,Oleg 8/20/10 2.00 130.00 260.00
footer'for spec
011 Osipchuk,Oleg 8/20/10 2.50 130.00 325.00
new bases
011 Osipchuk, Oleg 8/23/10 3.00 130.00 390.00
new bases adj,electrical coordination, PDF for pricing set
Q11 Osipchuk,Oleg 8/24/10 8.00 130.00 1,040.00
new bases adj,electrical coordination, PDF for pricing set •
011 Osipchuk, Oleg 8/25/10 5.50 130.00 716.00
100%CD PDF
oil Osipchuk,Oleg 8/27/10 5.50 130.00 715.00
Reflecting ceiling/lighting/piping coordination
Senior Engineering Designer
003 Butler,Timothy 8/17110 3.00 114.00 342.00
Lighting redesign for arch revisions
003 Butler,Timothy 8/19/10 9.00 114.00 1,026.00
Lighting redisign for arch revisions
003 Butler,Timothy 8/20/10 6.00 114.00 684.00
Lighting design for arch revisions
003 Butler,Timothy 8/23/10 2.00 114.00 228.00
Architectural revisions
003 Butler,Timothy 8/25/10 3.00 114.00 342,00
Architectural revisions
003 Butler,Timothy 8/26/10 1.00 114.00 114.00
Architectural revisions
003 Butler,Timothy 8/27/10 3.00 114,00 342.00
Architectural revisions
004 Chaliand, Roger 8/9/10 7,00 114.00 798.00
elec redesign
004 Challand, Roger 8/10/10 ' 5.00 114.00 570.00
Elec redesign
004 Challand, Roger 8/11/10 2.00 114.00 228.00
elec redesign
004 Challand,Roger 8/12/10 1.00 114.00 114.00
Elec redesign
Q04 Challand,Roger 8/13/10 2.00 114.00 228.00
Elec redesign
Q04 Challand, Roger 8/16/10 2.00 114.00 228.00
elec redesign
D44 Challand, Roger 6/19/10 2,00 114.00 228.00
elec redesign •
i � � 2 c'
Page 2 Ali'l'�.IL'Sk_`_G ,' i) r*.,
Billing Backup Invoice 5090 Dated 10129/10 Tuesday,March 29,2011-2:54:21 PM
004 Challand, Roger 8/20/10 1.00 114.00 114.00 M
elec redesign
004 Challand, Roger 8/23/10 3.00 114.00 342.00
elec redesign
004 Challand, Roger 8/24/10 1.00 114.00 114.00
Glee spec
004 Challand, Roger 8/25110 3.00 114.00 342.00
elec spec
Q44 Challand, Roger 8/25/10 1,00 114.00 114.00
elec redesign
004 Challand,Roger 8/26/10 1.00 114.00 114.00
elec redesign
004 Challand, Roger 8/26/10 2.00 114.00 228.00
elec spec
004 Challand,Roger 8/27110 8.00 114.00 912.00
elec redesign
004 Challand, Roger 8/30/10 1.00 114.00 114.00
elec redesign
013 Richey, Gerry 8/5/10 6.50 114.00 741.00
cad
Q13 Richey, Gerry 816/10 5.00 114.00 570.00
cad
013 Richey,Gerry 8/17/10 2.00 114.00 228.00
cadd
Totals 165.25 20,266.50
Total Labor 20,266.50
Total this report $20,266.50
Page 3
L'AC I
CONSULTING ENGINEERS
P.O.Box 6069-Dept. 191
Indianapolis,Indiana 46206-6069
INVOICE December 16,2010
Invoice No: 005150.050-5229
Brandon Bogen
CSO Architects, fnc.
280 East 96th Street
Suite 200
Indianapolis, IN 46240
Project 005150.050 Carmel Regional Performing Arts Center-Gallery Level Bulidout
Enaineerinq Services BIIIIna Period November 1.2010 to November 0.2010
Professional Personnel
Hours Rate Amount
Project Manager/Senior Engineer
Maue,Andre 1.50 143.00 214.50
Professional Engineer
Osipchuk, Oleg 2.00 130.00 260.00
Senior Engineering Designer
Butler,Timothy 3.00 114.00 342.00
Tatals 6.50 816.50
Total Labor 816.50
Total this Invoice $616.50
Flojeci Manager Use
nI oject# AV-%
Cowie One fP./
rr-;I.itier.l in Fee OR kei ,hUrsal,-
Marl:.alp? Yes
3 e.1I14✓sS
IA' VPi-
.J-nOr!i fit,Use •
1.-1 • iesl•Cccle� s.S
'" ' ~ A DR 2 2 2011
j
TERMS:NET 30 DAYS.A FINANCE CHARGE Is COMPUTED ON A PERIODIC RATE OF 1.6%PER MONTH WHICH IS AN
ANNUAL PERCENTAGE RATE OF 18%ON ANY PREVIOUS BALANCE NOT PAID WITHIN 30 DAYS.
Billing Backup Tuesday,March29,2011
L'Acquis Consulting Engineers Invoice 5229 Dated 12116/10 2:55:45 PM
Project 005150.050 Carmel Regional Performing Arts Center-Gallery Level Buildout
Professional Personnel
Hours Rate Amount
Project Manager/Senior Engineer
008 Maue,Andre 1118/10 .26 143.00 35.75
review submittals w/Oleg
008 Maue,Andre 11/15/10 .50 143.00 71.50
VAV submittal
008 Maue,Andre 11/22110 .75 143.00 107.25
RFI's, submittals
Professional Engineer
011 Osipchuk,Oleg 11/9/10 1.50 130.00 195.00
Submittal
011 Osipchuk,Oleg 11/22/10 .50 130.00 65.00
submittal
Senior Engineering Designer
003 Butler,Timothy 11/1/10 1.00 114,00 114:00
RFO#FS-007
003 Sutler,Timothy 11/5/10 2.00 114.00 228.00
Shop drawing review
Totals 6.50 816.50
Tote/Labor 816.50
Total this report $816.50
ENS
CONSULTING ENGINEERS
•
P.O.Box 6069-Dept. 191
Indianapolis,Indiana 46206-6069
INVOICE
February 23,2011
invoice No: 005150.050-5337
Brandon Bogan
CSO Architects, Inc.
8831 Keystone Crossing
Indianapolis, IN 46240
Project 005150.050 Carmel Regional Performing Arts Center-Gallery Level Buildout
Engineering Services 3J111Rg PeriocLJanuaty 1.2011 to Jmujary 31.2011
Professional Personnel
Hours Rate Amount
Professional Engineer
Osipchuk,Oleg 2.50 130.00 325.00
Senior Engineering Designer _
Butler,Timothy 2.00 114.00 228.00
Totals 4.50 553.00
Total Labor 553.00
Total this Invoice $553.00
FraiectManager Use
Piriect4� ..�, r• O
Ficiect Name Circle One i/r
it c:ut din Fen OR mbursalh.e
Up? Ye. or
r�cmarks �'
ApproaJ
'c.ct:ntng Use
r< leak Cede B!S
ApIR 22011
TERMS:NET 30 DAYS.A FINANCE CHARGE IS COMPUTED ON A PERIODIC RATE OF 1.5%PER MONTH WHICH IS AN
ANNUAL PERCENTAGE RATE OF 18%ON ANY PREVIOUS BALANCE NOT PAID WITHIN 30 DAYS.
Billing Backup Tuesday,March 28,2011
L'Acquis Consulting Engineers Invoice 5337 Dated 2123/11 2:56:31 PM
Project 005150.050 Carmel Regional Performing Arts Center-Gallery Level Buildout
Professional Personnel
Hours Rate Amount
Professional Engineer
011 Osipchuk,Oleg 1/7/11 2.50 130.00 325.00
punch-list,report
Senior Engineering Designer
003 Butler,Timothy 1/7/11 2.00 114.00 228.00
Above ceiling punch
Totals 4.50 553.00
Total Labor 553.00
Total this report $553.00
•
_L•.
L'ACQUIS •'Sy,c, n.
CONSULTING ENGINEERS ,--: - ..
P.O.Box 6069-Dept.191 .
Indianapolis,Indiana 46206-6069
INVOICE
March 24,2011
• invoice No: 005150.050-5435
Brandon Bogen
CSO Architects,Inc.
8831 Keystone Crossing
Indianapolis, IN 46240
Project 005150.050 Carmel Regional Performing Arts Center-Gallery Level Buildout
Engineering Services Billing PeriodFebruary 1.2011 to February 28.2011
Professional Personnel
Hours Rate Amount
Project Manager/Senior Engineer
Maus,Andre 1.25 143.00 178.75
Totals 1.25 178.75
Total Labor 178,75
Total this Invoice $178.75
ProjectManag Use
Project# )- f,D,! 3
Project Name WWI `-'
Circle One
included in Fee OR• naursa R e
Mark.Up? Yes(:),.
Remarks
- d
Accounting Use _,. - --;; { �� 2 2�"•
DIN Task Coda Bl5 �14 t -:
TERMS:NET 30 DAYS_A FINANCE CHARGE IS COMPUTED ON A PERIODIC RATE OF 1.5%PER MONTH WHICH IS AN
ANNUAL PERCENTAGE RATE OF 18%ON ANY PREVIOUS BALANCE NOT PAID WITHIN 30 DAYS.
Billing Backup Thursday,March 24, 2011
L'Acquls Consulting Engineers invoice 5435 Dated 3/24/11 9:00:27 AM
Project 005150.050 Carmel Regional Performing Arts Center-Gallery Level Buifdout
Professional Personnel
Hours Rate Amount
Project Manager/Senior Engineer
008 Maue,Andre 2/18/11 .50 143.00 71.50
reviewing documents re:tel/data scope
008 Maue,Andre 2/22111 .75 143.00 107.25
lighting layout for lay-In ceiling
Totals 1.25 178.75
Total Labor 178.75
Total this report $178.75
7'"
L'A�C UIS
CONSULTING ENGINEERS
P.O.Box 6069-Dept.191
Indianapolis,Indiana 46206-6069
INVOICE
April 19,2011
Invoice No: 005150.050-5501
Brandon Bogen
CSO Architects,Inc.
8831 Keystone Crossing
Indianapolis,IN 46240
Project 005150.050 Carmel Regional Performing Arts Center-Gallery Level Buildout
Engineering Services Billing Period March_l.2011 to March 31,2011
Professional Personnel
Hours Rate Amount
Project Manager/Senior Engineer
Maue,Andre .50 143.00 71.50
Totals .50 71,50
Total Labor 71.50
Total this Invoice $71.50
Project Ma .4. 13 .
'Project# a..
ProlectName✓ J rsld_
Circle One rii,1 O
Included in Fee OR Re, able
Mark Up? Ye""---
Remarks
ro d
Accounting Use
DIN as Code ti/S
TERMS:NET 30 DAYS.A FINANCE CHARGE IS COMPUTED ON A PERIODIC RATE OF 1.5%PER MONTH WHICH IS AN
ANNUAL PERCENTAGE RATE OF 18%ON ANY PREVIOUS BALANCE NOT PAID WITHIN 30 DAYS.
Billing Backup Tuesday,April 19,2011
L'Acquis Consulting Engineers Invoice 5501 Dated 4/19111 12:49:09 PM
Protect 005150.050 Carmel Regional Performing Arts Center-Gallery Lever Buiidout
Professional Personnel
Hours Rate Amount
Project Manager/Senior Engineer
008 Maue,Andre 3/31/11 .50 143.00 71.50
questions re:voice/data Jacks,conduit,cables
Totals .50 71.50
Total Labor 71.60
Total this report $71.50
CSO Architects Inc.
Carmel Redevelopment Commission - Invoices Submitted for April 2011
Invoice No. Invoice Date Account No. Parcel/Description Invoice Amount
41990 4/29/2011 8340200 CRC Matters $ 1,316.89
41996 4/29/2011 4460805 Parcel 5B - Motor Court Masonry Brick $ 641.42
41986 4/29/2011 4460805 Parcel 5B - Motor Court $ 1,316.25
41994 4/29/2011 4460805 Parcel 5-Way Finding $ 997.84
41997 4/29/2011 4460807 Parcel 7A- City Center Streetscape $ 951.85
41988 4/29/2011 4460807 Parcel 7B1 - Village Green West $ 1,115.28
42002 4/29/2011 4460807 Parcel 7B2 -Ampitheater East $ 1,015.05
41998 4/29/2011 4460847 Parcel 47 - Road Plans and Storm Water Detention $ 650.10
41995 4/29/2011 4460847 Parcel 47 - Utilities $ 574.09
41989 4/29/2011 4460873 Parcel 73- Parcel 5 Streetscape $ 750.97
41987 4/29/2011 4460878 Parcel 78 - 3rd Ave SW/City Center Dr $ 67.50
41992 4/29/2011 4460911 Parcel 9-11 Main Theater $ 371.25
41985 4/29/2011 4460914 Parcel 9-14 Office Building Two $ 168.75
42000 4/29/2011 4460915 Parcel 9-15 Streetscape $ 135.00
41991 4/29/2011 4460927 Parcel 9-27 Mudbugs Patio $ 438.75
Total for April 2011 $ 10,510.99
Director of Redevelopment/xy
%11---'
VJ
CSO Architects
April 29, 2011
Project No: 26163G
Invoice No: 41990
Don Cleveland
Carmel Redevelopment Commission
30 W. Main Street
Suite 220
Carmel, IN 46032
Project 26163G CRC MATTERS
For professional services rendered for the period March 26, 2011 to April 22,2011 for the referenced
project.
Professional Personnel
Hours Rate Amount
Olson, Robert 3/30/2011 1.25 135.00 168.75
Contact and discuss cable availability w/Duke Energy.
Olson, Robert 3/30/2011 .25 135.00 33.75
Discuss parking on Parcel 5 w/CRC and Pedcor.
Olson, Robert 3/30/2011 .25 135.00 33/5
Discussion over parking and drainage on Woods Wire w/CRC and
Pedcor.
Olson, Robert 3/30/2011 .25 135.00 33.75
Discussion over parking on Parcel 112.
Olson, Robert 3/31/2011 .25 135.00 33.75
Cable inform for Les.
Olson, Robert 4/6/2011 .50 135.00 67.50
Mtg. at Parcel 5 to review city sidewalk change by Signature
Construction.
Olson, Robert 4/6/2011 2.75 135.00 371.25
Mtg. w/CRC and Duke Energy reviewing all CRC projects past and
future.
Olson, Robert 4/13/2011 .75 135.00 101.25
Pictures of trees in downtown for Daren Mindham to verify if structure
stone is working with trees.
Olson, Robert 4/13/2011 1.50 135.00 202.50
Site observation taking pictures and taping site conditions.
Totals 7.75 1,046.25
Total Labor 1,046.25
Unit Billing
36 x 48 BONDS 2.04
11x17B/WCOPIES .17
36 x 48 COLOR PLOTS 252.00
8.5 x 11 B/W COPIES 13.43
CDROM 3.00
Total Units 270.64 270.64
Total this Invoice $1,316.89
Please remit to: CSO Architects,PO Box 6069,Dept 94,Indianapolis, IN 46206-6069. Unpaid amounts over 30 days will be subject to
1 1/2%monthly interest charge.
Project 26163G CRC MATTERS invoice 41990
Billings to Date
Current Prior Total
Labor 1,046.25 259,468.75 260,515.00
Consultant 0.00 3,197.88 3,197.88
Expense 0.00 3,437.26 3,437.26
Unit 270.64 9,492.04 9,762.68
Totals 1,316.89 275,595.93 276,912.82
Please remit to: CSO Architects,PO Box 6069,Dept 94,Indianapolis, IN 46206-6069. Unpaid amounts over 30 days will be subject to Page 2
1 1/2%monthly interest charge.
•
Billed Detail Friday,April 29,2011
10:13:22 AM
CSO ARCHITECTS,INC. As of 4/22/2011
Bluing Labor Code Employee/ Hours/ Billing Billing
Status Date /Account Reference Description Units Rate Amount
Project Number:26163G CRC MATTERS
Units:
B 4/1/2011 COP8.5 000000000010 B:6.0 COPIES @ 0.17 6.00 .17 1.02
B 4/8/2011 BL3648 000000000063 B:1.0 BOND @ 2.04 1,00 2.04 2,04
B 4/15/2011 CDROM 000000000083 B:1.0 CDROM @ 3.00 1.00 3.00 3.00
B 4/15/2011 COP11 000000000085 B:1.0 COPY @ 0.17 1.00 .17 .17
B 4/15/2011 COP8.5 000000000085 B:73.0 COPIES @ 0.17 73.00 .17 12.41
B 4/15/2011 CPL36 000000000085 B:5.0 PLOTS @ 50.40 5.00 50.40 252.00
Total for 87.00 270.64
Total Billable Units 87.00 270.64
Total Units 87.00 270.64
Total for RE 87.00 270.64
CSO Architects
April 29, 2011
Project No: 10187G
Invoice No: 41996
Don Cleveland
Carmel Redevelopment Commission
30 W. Main Street
Suite 220
Carmel, IN 46032
Project 10187G CCC-PARCEL 5 MOTOR COURT MASONRY BRICK
For professional services rendered for the period March 26,2011 to April 22, 2011 for the referenced
project.;
Phase 06 Construction Administration
Professional Personnel
Hours Rate Amount
Olson, Robert 3/31/2011 2.00 135.00 270.00
Coordinate payment request.
Olson, Robert 4/6/2011 .75 135.00 101.25
Progress mtg.
Olson, Robert 4/7/2011 2.00 135.00 270.00
Mtg. w/Pedcor over construction.
Totals 4.75 641.25
Total Labor 641.25
Total this Phase $641.25
Phase 09 Reimbursable
Unit Billing
8.5 x 11 B/W COPIES .17
Total Units .17 .17
Total this Phase $.17
Total this Invoice $641.42
Billings to Date
Current Prior Total
Labor 641.25 5,336.25 5,977.50
Expense 0.00 18.00 18.00
Unit .17 9.69 9.86
Totals 641.42 5,363.94 6,005.36
Please remit to: CSO Architects,PO Box 6069,Dept 94,Indianapolis,IN 46206-6069_ Unpaid amounts over 30 days will be subject to 1
1/2%monthly interest charge,
Billed Detail Friday,April 29,2011
10:24:41 AM
CSO ARCHITECTS, INC. As of 4/22/2011
Billing Labor Code Employee! Hours/ Billing Billing •
Status Date /Account Reference Description Units Rate Amount
Project Number:10187G CCC-PARCEL 5 MOTOR COURT MASONRY BRICK
Phase Number:09 Reimbursable
Units:
B 4/8/2011 COP8.5 000000000063 B:1.0 COPY @ 0.17 1,00 .17 .17
Total for 1.00 .17
Total Billable Units 1.00 .17
Total Units 1.00 .17
Total for 09 1.00 .17
•
CSO Architects
April 29, 2011
Project No: 27103G
Invoice No: 41986
Don Cleveland
Carmel Redevelopment Commission
30 W. Main Street
Suite 220
Carmel, IN 46032
Project 27103G CCC-PARCEL 5B - MOTOR COURT
For professional services rendered for the period March 26, 2011 to April 22, 2011 for the referenced
project.
Phase 06 CONST. ADMINISTRATION
Professional Personnel
Hours Rate Amount
Olson, Robert 3/29/2011 .75 135.00 101.25
Discussion regarding fountains on Motor Court.
Olson, Robert 3/31/2011 2.00 135.00 270.00
Coordinate payment request for P111.
Olson, Robert 4/6/2011 .75 135.00 101.25
Progress mtg.
Olson, Robert 4/13/2011 2.00 135.00 270.00
Coordinate w/City engineer, construct letter about winterizing
fountains and then coordinate w/street dept.
Olson, Robert 4/13/2011 .50 135.00 67.50
Review parking wlPedcor and CRC.
Olson, Robert 4/20/2011 1.75 135.00 236.25
Progress mtg. w/CRC and Pedcor.
Olson, Robert 4/22/2011 2.00 135.00 270.00
Mtg. w/Stutzman over design coordination.
Totals 9.75 1,316.25
Total Labor 1,316.25
Total this Phase $1,316.25
Total this Invoice $1,316.25
Billings to Date
Current Prior Total
Labor 1,316.25 30,890.00 32,206.25
Expense 0.00 73.60 73.60
Unit 0.00 4,023.01 4,023.01
Totals 1,316.25 34,986.61 36,302.86
Please remit to: CSO Architects, PO Box 6069,Dept 94, Indianapolis, IN 46206-6069. unpaid amounts over 30 days will be subject to 1
1/2%monthly interest charge.
•
6D
CSO Architects
April 29, 2011
Project No: 11052G
Invoice No: 41994
Don Cleveland
Carmel Redevelopment Commission
30 W. Main Street
Suite 220
Carmel, IN 46032
Project 11052G CCC-WAY FINDING ON PARCEL 5
For professional services rendered for the period April 01, 2011 to April 22, 2011 for the referenced
project.
Phase 04 Construction Documents
Professional Personnel
Hours Rate Amount
Sternberg, Paul 4/4/2011 5.00 105.00 525.00
Specifications.
Sternberg, Paul 4/5/2011 4.50 105.00 472.50
Specifications.
Totals 9.50 997.50
Total Labor 997.50
Total this Phase $997.50
Phase 09 Reimbursable
Unit Billing
11 x 17 B/W COPIES .34
Total Units .34 .34
Total this Phase $.34
Total this Invoice $997.84
Billings to Date
Current Prior Total
Labor 997.50 0.00 997.50
Unit .34 0.00 .34
Totals 997.84 0.00 997.84
Please remit to: CSO Architects. PO Box 6069, Dept 94, Indianapolis, IN 46206-6069. Unpaid amounts over 30 days will be subject to 1
1/2%monthly interest charge.
•
Billed Detail Friday,April 29,2011
10:22:05 AM
CSO ARCHITECTS,INC. As of 4/22/2011
Billing Labor Code Employee! Hours/ Billing Billing
Status Date /Account Reference Description Units Rate Amount
Project Number:11052G CCC-WAY FINDING ON PARCEL 5
Phase Number:09 Reimbursable
Units:
B 4!812011 COP11 000000000063 B:2.0 COPIES @ 0.17 2.00 .17 .34
Total for 2.00 .34
Total Billable Units 2.00 .34
• Total Units 2.00 .34
Total for 09 2.00 .34
VV
CSO Architects
April 29, 2011
Project No: 10145G
Invoice No: 41997
Don Cleveland
Carmel Redevelopment Commission
30 W. Main Street
Suite 220
Carmel, IN 46032
Project 10145G CCC-PARCEL 7A-CITY CENTER STREETSCAPE
For professional services rendered for the period March 26, 2011 to April 22, 2011 for the referenced
project.
Phase 06 Construction Administration
Professional Personnel
Hours Rate Amount
Olson, Robert 3/28/2011 3.00 135.00 405.00
Shop review and redesign of lime stone.
Olson, Robert 3/29/2011 .75 135.00 101.25
Progress mtg.
Olson, Robert 3/29/2011 .25 135.00 33.75
Review stone walls and shops.
Olson, Robert 3/31/2011 1.75 135.00 236.25
Coordinate payment request.
Olson, Robert 4/12/2011 .50 135.00 67.50
Progress mtg.
Olson, Robert 4/19/2011 .50 135.00 67.50
Progress mtg.
Totals 6.75 911.25
Total Labor 911.25
Total this Phase $911.25
Phase 09 Reimbursable
Unit Billing
11 x 17 B/W COPIES .34
8.5 x 11 B/W COPIES 19.04
11 x 17 COLOR COPIES 4.42
8.5 x 11 COLOR COPIES 16.80
Total Units • 40.60 40.60 -
Total this Phase $40.60
Total this Invoice $951.85
Billings to Date
Current Prior Total
Please remit to: CSO Architects,PO Box 6069,Dept 94, Indianapolis,IN 46206-6069. Unpaid amounts over 30 days will be subject to 1
1/2%monthly interest charge.
Project 10145G CCC-PARCEL 7A-CITY CENTER STREETSCAPE Invoice 41997
Labor 911.25 32,978.75 33,890.00
Consultant 0.00 390.00 390.00
Expense 0.00 -491.08 -491.08
Unit 40.60 679.24 719.84
Totals 951.85 33,556.91 34,508.76
Please remit to: DSO Architects, PO Box 6069, Dept 94, Indianapolis, IN 46206-6069. Unpaid amounts over 30 days will be subject to 1 Page 2
1/2%monthly interest charge.
I �
Billed Detail Friday,April 29,2011
10:27:09 AM
CSO ARCHITECTS, INC. As of 4/22/2011
Billing Labor Code Employee/ Hours/ Billing Billing
Status Date /Account Reference Description Units Rate Amount
Project Number:10145G CCC-PARCEL 7A-CITY CENTER STREETSCAPE
Phase Number:09 Reimbursable
Units:
B 4/1/2011 COL8.5 000000000010 B:4.0 COPIES @ 2.10 4.00 2.10 8.40
B 4/1/2011 COP11 000000000010 B:1.0 COPY @ 0.17 1.00 .17 .17
B 4/1/2011 COP8.5 000000000010 B:17.0 COPIES @ 0.17 17.00 .17 2.89
B 4/8/2011 COL11 000000000063 B:2.0 COPIES @ 2.21 2.00 2.21 4.42
B 4/8/2011 COP8.5 000000000063 B:29.0 COPIES @ 0.17 29.00 .17 4.93
B 4/15/2011 COL8.5 000000000085 B:4.0 COPIES @ 2.10 4.00 2.10 8.40
B 4/15/2011 COP11 000000000085 B:1.0 COPY @ 0.17 1.00 .17 .17
B 4/15/2011 COP8.5 000000000085 B:26.0 COPIES @ 0.17 26.00 .17 4.42
B 4/22/2011 COP8.5 000000000174 8:40.0 COPIES @ 0.17 40.00 .17 6.80
Total for 124.00 40.60
Total Billable Units 124.00 40.60
Total Units 124.00 40.60
Total for 09 124.00 40.60
CSO Architects
April 29, 2011
Project No: 26237G
Invoice No: 41988
Don Cleveland
Carmel Redevelopment Commission
30 W. Main Street
Suite 220
Carmel, IN 46032
Project 26237G CCC-PARCEL 7B1 -VILLAGE GREEN WEST
For professional services rendered for the period March 26, 2011 to April 22, 2011 for the referenced
project.
Phase 04 CONST. DOCUMENTS
Professional Personnel
Hours Rate Amount
Olson, Robert 4/5/2011 1.00 135.00 135.00
Shop dwg. review and approval for pavers.
Totals 1.00 135.00
Total Labor 135.00
Total this Phase $135.00
Phase 06 CONST. ADMINISTRATION
Professional Personnel
Hours Rate Amount
Bogan, Brandon 4/12/2011 1.00 135.00 135.00
OAC Mtg. and onsite review.
Olson, Robert 3/29/2011 1.50 135.00 202.50
Progress mtg.
Olson, Robert 4/12/2011 1.00 135.00 135.00
Coordinate Village Green signs.
Olson, Robert 4/12/2011 1.00 135.00 135.00
Progress mtg. for Parcel 73.
Olson, Robert 4/19/2011 1.00 135.00 135.00
Coordination.
Olson, Robert 4/19/2011 1.25 135.00 168.75
Progress mtg.
Olson, Robert 4/20/2011 .50 135.00 67.50
Coordination of water line.
Totals 7.25 978.75
Total Labor 978.75
Total this Phase $978.75
Phase 09 REIMBURSABLE
Unit Billing
Please remit to: CSO Architects,PO Box 6069,Dept 94, Indianapolis, IN 46206-6069. Unpaid amounts over 30 days will be subject to 1
1/2%monthly interest charge.
Project 26237G CCC-PARCEL 7B1 -VILLAGE GREEN WEST Invoice 41988
11 x 17 B/W COPIES 1.53
Total Units 1.53 1.53
Total this Phase $1.53
Total this Invoice $1,115.28
Billings to Date
Current Prior Total
Labor 1,113.75 114,027.50 115,141.25
Consultant 0.00 87,337.36 87,337.36
Expense 0.00 855.00 855.00
Unit 1.53 930.65 932.18
Totals 1,115.28 203,150.51 204,265.79
Please remit to: CSO Architects,PO Box 6069, Dept 94,Indianapolis,IN 46206-6069. Unpaid amounts over 30 days will be subject to 1 Page 2
1/2%monthly interest charge.
Billed Detail Friday,April 29,2011
10:02:34 AM
CSO ARCHITECTS,INC. As of 4/22/2011
Billing Labor Code Employee! Hours/ Billing Billing
Status Date /Account Reference Description Units Rate Amount
Project Number:26237G CCC-PARCEL 7B1 -VILLAGE GREEN WEST
Phase Number:09 REIMBURSABLE
Units:
B 4/1/2011 COP11 000000000010 B:2.0 COPIES @ 0.17 2.00 .17 .34
B 4/8/2011 COP11 000000000063 B:3.0 COPIES @ 0.17 3.00 .17 .51
B 4/22/2011 COP11 000000000174 B:4.0 COPIES @ 0.17 4.00 .17 .68
Total for 9.00 1.53
Total Billable Units 9.00 1.53
Total Units 9.00 1.53
Total for 09 9.00 1.53
C.9)
CSO Architects
April 29, 2011
Project No: 26238E
Invoice No: 42002
Don Cleveland
Carmel Redevelopment Commission
30 W. Main Street
Suite 220
Carmel, IN 46032
Project 26238E CCC-PARCEL 7B2 -AMPITHEATER EAST
For professional services rendered for the period March 26, 2011 to April 22, 2011 for the referenced
project.
Phase 05 BIDDING
Professional Personnel
Hours Rate Amount
Bogan, Brandon 3/31/2011 1.00 135.00 135.00
Site Coordination.
Bogan, Brandon 4/12/2011 1.00 135.00 135.00
Onsite Review.
Bogan, Brandon 4/19/2011 1.00 135.00 135.00
Site Clarifications.
Totals 3.00 405.00
Total Labor 405.00
Total this Phase $405.00
Phase 06 CONST. ADMINISTRATION
Professional Personnel
Hours Rate Amount
Olson, Robert 3/29/2011 .25 135.00 33.75
Changes to amphitheater review.
Olson, Robert 3/29/2011 .75 135.00 101.25
Discussion over decomposed granite.
Olson, Robert 3/29/2011 .25 135.00 33.75
Review invoices.
Olson, Robert 3/29/2011 .50 135.00 67.50
Shop dwg. review.
Olson, Robert 4/11/2011 1.25 135.00 168.75
Paver email response.
Olson, Robert 4/12/2011 .50 135.00 67.50
Coordination of paver size to use in what areas.
Olson, Robert 4/12/2011 1.00 135.00 135.00
Review sump pit and pump questions.
Totals 4.50 607.50
Total Labor 607.50
Please remit to: CSO Architects,PO Box 6069,Dept 94,Indianapolis, IN 46206-6069. Unpaid amounts over 30 days will be subject to 1
1/2%monthly interest charge.
Project 26238E CCC-PARCEL 782 -AMPITHEATER EAST Invoice 42002
Total this Phase $607.50
Phase 09 REIMBURSABLE
Unit Billing
8.5 x 11 B/W COPIES 2.04
11 x 17 B/W COPIES .51
Total Units 2.55 2.55
Total this Phase $2.55
Total this Invoice $1,015.05
Billings to Date
Current Prior Total
Labor 1,012.50 57,395.00 58,407.50
Consultant 0.00 25,599.00 25,599.00
Expense 0.00 606.00 606.00
Unit 2.55 436.59 439.14
Totals 1,015.05 84,036.59 85,051.64
Please remit to: CSO Architects,PO Box 6069,Dept 94,Indianapolis, IN 46206-6069. Unpaid amounts over 30 days will be subject to 1 Page 2
1/2%monthly interest charge.
Billed Detail Friday,April 29,2011
1:47:19 PM
CSO ARCHITECTS, INC. As of 4/22/2011
Billing Labor Code Employee/ Hours/ Billing Billing
Status Date /Account Reference Description Units Rate Amount
Project Number:26238E CCC-PARCEL 7B2-AMPITHEATER EAST
Phase Number:09 REIMBURSABLE
Units:
B 4/1/2011 COP8.5 000000000010 116.0 COPIES @ 0.17 6.00 .17 1.02
B 4/8/2011 COP8.5 000000000063 B:6.0 COPIES @ 0.17 6.00 .17 1.02
B 4/15/2011 COP11 000000000085 B:3.0 COPIES @ 0.17 3.00 .17 .51
Total for 15.00 2.55
Total Billable Units 15.00 2.55
Total Units 15.00 2.55
Total for 09 15.00 2.55
•
•
1.
Vd
CSO Architects
April 29, 2011
Project No: 10092.2G
Invoice No: 41998
Don Cleveland
Carmel Redevelopment Commission
30 W. Main Street
Suite 220
Carmel, IN 46032
Project 10092.2G CCC-PARCEL 47 - ROAD PLANS & STORM WATER
For professional services rendered for the period February 26, 2011 to April 22, 2011 for the referenced
project,
Phase 06 Construction Administration
Professional Personnel
Hours Rate Amount
Moody, Kirt 4/11/2011 3.00 125.00 375.00
Shop dwg. review.
Olson, Robert 3/31/2011 2.00 135.00 270.00
Coordinate of payment request.
Totals 5.00 645.00
Total Labor 645.00
Total this Phase $645.00
Phase 09 Reimbursable
Unit Billing
8.5x11 B/W COPIES 5.10
Total Units 5.10 5.10
Total this Phase $5.10
Total this Invoice $650.10
Billings to Date
Current Prior Total
Labor 645.00 12,943.75 13,588.75
Unit 5.10 253.30 258.40
Totals 650.10 13,197.05 13,847.15
Please remit to: CSO Architects,PO Box 6069,Dept 94,Indianapolis, IN 46206-6069. Unpaid amounts over 30 days will be subject to 1
1/2%monthly interest charge.
April 29,2011
Friday,A
Billed Detail 10:28:55 AM
CSO ARCHITECTS, INC. As of 4/22/2011
Billing Labor Code Employee/ Hours/ Billing Billing
Status Date /Account Reference Description Units Rate Amount
Project Number:10092.2G CCC-PARCEL 47-ROAD PLANS&STORM WATER
Phase Number.09 Reimbursable
Units:
B 4/15/2011 COP8.5 000000000085 B:30.0 COPIES @ 0.17 30.00 .17 5.10
Total for 30.00 5.10
Total Billable Units 30.00 5.10
Total Units 30.00 5.10
Total for 09 30.00 5.10
(9)
CSO Architects
April 29, 2011
Project No: 25363G
Invoice No: 41995
Don Cleveland
Carmel Redevelopment Commission
30 W. Main Street
Suite 220
Carmel, IN 46032
Project 25363G CCC-PARCEL 47 UTILITIES
For professional services rendered for the period March 26, 2011 to April 22, 2011 for the referenced
project.
Phase P6CA CONSTRUCTION ADMINISTRATION
Professional Personnel
Hours Rate Amount
Olson, Robert 3/29/2011 1.25 135.00 168.75
Coordination between city and contractor for water line installation.
Olson, Robert 4/5/2011 2.00 135.00 270.00
Coordination of water line connection and new route.
Olson, Robert 4/6/2011 1.00 135.00 135.00
Sketches for water line new route.
Totals 4.25 573.75
Total Labor 573.75
Total this Phase $573.75
Phase RE REIMBURSABLE
Unit Billing
8.5 x 11 B/W COPIES .34
Total Units .34 .34
Total this Phase $.34
Total this Invoice $574.09
Billings to Date
Current Prior Total
Labor 573.75 74,450.00 75,023.75
Expense 0.00 3,599.50 3,599.50
Unit .34 473.40 473.74
Totals 574.09 78,522.90 79,096.99
Please remit to: CSO Architects, PO Box 6069,Dept 94, Indianapolis, IN 46206-6069. Unpaid amounts over 30 days will be subject to 1
1/2%monthly interest charge.
Billed Detail Friday,April 29,2011
10:23:18 AM
CSO ARCHITECTS, INC. As of 4/22/2011
Billing Labor Code Employee/ Hours/ Billing Billing
Status Date /Account Reference Description Units Rate Amount
Project Number:25363G CCC-PARCEL 47 UTILITIES
Phase Number:RE REIMBURSABLE
Units:
B 4/15/2011 COP8.5 000000000085 B:2.0 COPIES @ 0.17 2.00 .17 .34
Total for 2.00 .34
Total Billable Units 2.00 .34
Total Units 2.00 .34
Total for RE 2.00 .34
r9
CSO Architects
April 29, 2011
Project No: 26225G
Invoice No: 41989
Don Cleveland
Carmel Redevelopment Commission
30 W. Main Street
Suite 220
Carmel, IN 46032
Project 26225G CCC-PARCEL 73 - PARCEL 5 STREETSCAPE
For professional services rendered for the period March 26, 2011 to April 22, 2011 for the referenced
project.
Phase 06 CONST. ADMINISTRATION
Professional Personnel
Hours Rate Amount
Olson, Robert 3/29/2011 .25 135.00 33.75
Discussion over urns/sculptures.
Olson, Robert 3/29/2011 2.00 135.00 270.00
Progress mtg.
Olson, Robert 3/29/2011 .25 135.00 33.75
Progress mtg. reviewing sculptures.
Olson, Robert 3/31/2011 1.50 135.00 202.50
Coordinate payment request.
Olson, Robert 4/13/2011 .50 135.00 67.50
Review construction progress.
Olson, Robert 4/19/2011 1.00 135.00 135.00
Progress mtg.
Totals 5.50 742.50
Total Labor 742.50
Total this Phase $742.50
Phase 09 REIMBURSABLE
Unit Billing
12 x 18 BONDS 7.28
24 x 36 BONDS 1.02
8.5 x 11 B/W COPIES .17
Total Units 8.47 8.47
Total this Phase $8.47
Total this Invoice $750.97
Billings to Date
Current Prior Total
Labor 742.50 169,145.00 169,887.50
Please remit to: CSO Architects, PO Box 6069,Dept 94, Indianapolis, IN 46206-6069. Urpaid amounts over 30 days will be subject to 1
1/2%monthly interest charge.
'11
Project 26225G CCC-PARCEL 73 - PARCEL 5 STREETSCAPE Invoice 41989
Consultant 0.00 2,362.50 2,362.50
Expense 0.00 195.80 195.80
Unit 8.47 647.80 656.27
Totals 750.97 172,351.10 173,102.07
Please remit to: CSO Architects,PO Box 6069,Dept 94, Indianapolis, IN 46206-6069. Unpaid amounts over 30 days will be subject to 1 Page 2
1/2%monthly interest charge.
fs
Billed Detail Friday,April 29,2011
10:11:11 AM
CSO ARCHITECTS, INC. As of 4/22/2011
Billing Labor Code Employee/ Hours/ Billing Billing
Status Date /Account Reference Description Units Rate Amount
Project Number:26225G CCC-PARCEL 73-PARCEL 5 STREETSCAPE
Phase Number:09 REIMBURSABLE
Units:
B 4/8/2011 BL1218 000000000062 8:28,0 BONDS @ 0.26 28.00 .26 7.28
B 4/8/2011 BL2436 000000000062 8:1.0 BOND @ 1.02 1.00 1.02 1.02
B 4/15/2011 COP8.5 000000000085 B:1.0 COPY @ 0.17 1.00 .17 .17
Total for 30.00 8.47
Total Billable Units 30.00 8.47
Total Units 30.00 8.47
Total for 09 30.00 8.47
CSO Architects
April 29, 2011
Project No: 27035G
Invoice No: 41987
Don Cleveland
Carmel Redevelopment Commission
30 W. Main Street
Suite 220
Carmel, IN 46032
Project 27035G CCC-PARCEL 78 -3RD AVENUE SW/CITY CTR S
For professional services rendered for the period March 29. 2011 to April 22, 2011 for the referenced
project.
Phase 06 CONST. ADMINISTRATION
Professional Personnel
Hours Rate Amount
Olson, Robert 3/29/2011 .50 135.00 67.50
3rd Avenue striping layout.
Totals .50 67.50
Total Labor 67.50
Total this Phase $67.50
Total this Invoice $67.50
Billings to Date
Current Prior Total
Labor 67.50 22,543.75 22,611.25
Consultant 0.00 10,500.00 10,500.00
Unit 0.00 19.20 19.20
Totals 67.50 33,062.95 33,130.45
Please remit to: CSO Architects,PO Sox 6069, Dept 94, Indianapolis,IN 46206-6069. Unpaid amounts over 30 days will be subject to 1
1/2%monthly interest charge.
Vd
CSO Architects
April 29, 2011
Project No: 29011G
Invoice No: 41992
Don Cleveland
Carmel Redevelopment Commission
30 W. Main Street
Suite 220
Carmel, IN 46032
Project 29011G CCC-PARCEL 9-11 MAIN THEATER
For professional services rendered for the period March 30, 2011 to April 22, 2011 for the referenced
proiect.
Phase 06 Construction Administration
Professional Personnel
Hours Rate Amount
Olson, Robert 3/30/2011 .75 135.00 101.25
Discussion over lighting w/CRC and Pedcor and travel.
Olson, Robert 3/30/2011 1.25 135.00 168.75
Search and send dwgs. of electrical plans per the request of Signature
Construction and Pedcor.
Olson, Robert 3/31/2011 .75 135.00 101.25
Contact L'acquis to review power source for extra lighting at theater.
Totals 2.75 371.25
Total Labor 371.25
Total this Phase $371.25
Total this Invoice $371.25
Billings to Date
Current Prior Total
Labor 371.25 17,478.75 17,850.00
Consultant 0.00 1,345.00 1,345.00
Unit 0.00 62.48 62.48
Totals 371.25 18,886.23 19,257.48
Please remit to: CSO Architects,PO Box 6069, Dept 94, Indianapolis,IN 46206-6069. Unpaid amounts over 30 days will be subject to 1
1/2%monthly interest charge.
/!
•
CSO Architects
April 29, 2011
Project No: 29014G
Invoice No: 41985
• Don Cleveland
Carmel Redevelopment Commission
30 W. Main Street
Suite 220
Carmel, IN 46032
Project 29014G CCC-PARCEL 9-14 OFFICE BUILDING TWO
For professional services rendered for the period February 26, 2011 to April 22, 2011 for the referenced
project.
Phase 06 Construction Administration
Professional Personnel
Hours Rate Amount
Olson, Robert 3130/2011 1.25 135.00 168.75
Send information to Mosson to complete survey.
Totals 1.25 168.75
Total Labor 168.75
Total this Phase $168.75
Total this Invoice $168.75
Billings to Date
Current Prior Total
Labor 168.75 506.25 675.00
Totals 168.75 506.25 675.00
Please remit to: CSO Architects, PO Box 6069,Dept 94,Indianapolis,IN 46206-6069. Unpaid amounts over 30 days will be subject to 1
1/2%monthly interest charge.
(9)
CSO Architects
April 29, 2011
Project No: 29015G
invoice No: 42000
Don Cleveland
Carmel Redevelopment Commission
30 W. Main Street
Suite 220
Carmel, IN 46032
Project 29015G CCC-PARCEL 9-15 STREETSCAPE
For professional services rendered for the period February 2612011 to April 22 2011 for the referenced
project.
Phase 04 Construction Documents
Professional Personnel
Hours Rate Amount
Olson, Robert 4/5/2011 1.00 135.00 135.00
Coordination of striping of 3rd Avenue SW.
Totals 1.00 135.00
Total Labor 135.00
Total this Phase $135.00
Total this Invoice $135.00
Billings to Date
Current Prior Total
Labor 135.00 1,738.75 1,873.75
Unit 0.00 2.04 2.04
Totals 135.00 1,740.79 1,875.79
Please remit to: CSO Architects, PO Box 6069,Dept 94, Indianapolis, IN 46206-6069. Unpaid amounts over 30 days will be subject to 1
112%monthly interest charge.
P
CSO Architects
April 29, 2011
Project No: 29116G
Invoice No: 41991
Don Cleveland
Carmel Redevelopment Commission
30 W. Main Street
Suite 220
Carmel, IN 46032
Project 29116G CCC-PARCEL 9-27 - MUDBUGS PATIO
For professional services rendered for the period April 01, 2011 to April 22, 2011 for the referenced
project.
Phase 06 Construction Administration
Professional Personnel
Hours Rate Amount
Olson, Robert 4/14/2011 3.25 135.00 438.75
Site report.
Totals 3.25 438.75
Total Labor 438.75
Total this Phase $438.75
Total this Invoice $438.75
Billings to Date
Current Prior Total
Labor 438.75 4,657.50 5,096.25
Expense 0.00 6.00 6.00
Unit 0.00 5.95 5.95
Totals 438.75 4,669.45 5,108.20
Please remit to: CSO Architects,PO Box 6069, Dept 94, Indianapolis, IN 46206-6069. Unpaid amounts over 30 days will be subject to 1
1/2%monthly interest charge.