HomeMy WebLinkAbout220696 06/04/2013 CITY OF CARMEL, INDIANA VENDOR: 354575 Page 1 of 1
ONE CIVIC SQUARE LS/OLDS CONSULTING LLC
CARMEL, INDIANA 46032 10907 FOREST LAKE COURT CHECK AMOUNT: $10,420.00
", oN INDIANAPOLIS IN 46278 CHECK NUMBER: 220696
CHECK DATE: 6/4/2013
DEPARTMENT ACCOUNT PO NUMBER INVOICE NUMBER AMOUNT DESCRIPTION
1801 4341999 53113 10, 420 . 00 OTHER PROFESSIONAL FE
MOLDS CONSULTING2 LLC
Invoice
City of Carmel
Carmel Redevelopment Department
30 West Main Street, Suite 220
Carmel, IN 46032
Regarding—redevelopment consultation and department oversight for the City of Carmel
Redevelopment Department, based on a consulting contract approved by the City of Carmel
Board of Public Works.
For the period April 25, 2013 thru May 30, 2013
Date Description Hours
04/25/13 ® Review construction files for construction of Reflecting 5.00
Pool to identify trade contractors for the precast stone
and poured concrete work
® Study the possible retrofit of Shapiro's building leaving
a reduced size footage restaurant and the balance as CRC
leased space
o E-mail responses and administration
04/29/13 • Preparation for Mayor's weekly meeting with attorneys, 2.00
City Department Directors and CRD staff to review
various CRC projects in City Center and Arts District
o Email responses and administration
04/30/13 a PEDCOR team meeting with PEDCOR Design, Signature 6.00
Construction, PEDCOR Design, attorneys and CRD staff
to review City Center projects for design and construction
10902 Forest Lake Court Indianapolis, IN 46278 T: 317.496.0379
E: Isolds @aol.com
• Mayor's weekly greeting with attorney, City Department
Directors and CRD staff to review various CRC projects
for schedule, design, and construction
• Job site inspection of limestone stairway with architect and
contractor to provide final "punch list" items before release
of final payments
e Review of final version of"Party'Time" site Rl"'P before release
for public advertising of proposed land sale for future
development
05/01/13 • Meeting with contractor Signature Construction, PEDCOR 7.00
Design, StructurePoint Engineers, and CRD staff to review
construction projects underway or planned
a Monthly meeting with Duke Energy staff and StructurePoint
Engineers to review long range CRC projects and Duke Energy
power needs as a result of long range projects
• Meeting with Steve Engleking and Dave Huffman over garage
expenses for Sofia Square for 2013 as submitted by the garage
management company
e Email responses and administration
05/06/13 • Job coordination meeting with Sheil Sexton on Palladium 6.00
steel retrofit to review schedule and prime contractors
scope of work
• Preparation of documents for Mayor's weekly meeting with
attorneys, City Department Directors and CRD staff to review
various CRC projects and long range planning
• Prepare study concept for reuse of Mohawk Place site for
mixed use office development encompassing the entire property
• Review of vendor pay requests for the CRD to be paid out
of the City 2013 budget
• E-mail responses and administration
05/07/13 • PEDCOR team meeting with PEDCOR Design, 6.00
Signature Construction, CRD staff and attorneys to review
City Center design and construction issues in City Center
• Mayor's weekly meeting with attorneys, CRC Staff and City
Department Directors to review CRC efforts in City Center
and Arts District
® Discussions with attorneys from Kreig-Devault on preparation
for mediation discussion to settle CRC complaint against
steel erector for Palladium
a E-mail responses and administration
05/O8/13 a Construction meeting with Signature Construction, PEDCOR 5.00
Design, StucturePoint and CRD Staff to review design and
construction of various PEDCOR projects
a Review of original documents to be transferred to the Clerk
Treasures office for various CRC
e Email responses and administration
05/09/13 a Meeting with John Duffy on Utility Department lease at 2.00
30 West Main Street and the estimated cost of construction
and the need to publicly advertise the project
e Email responses and administration
05/13/13 a Meeting with Mike Anderson on schedule of Palladium 6.00
roof retrofit and update of construction based on WPM
Engineer's direction
® Staff meeting to review CRC and Arts District programs
and financial restraints based on budget approved by
CC and CRC
e Review of Anderson/Birkla project construction staging
and impact on adjacent developer, Monon Trail and
south property owner
e Meeting with London Witte Group on CRD budget
expenses thru April 20, 2013 and changes necessary due
to actual costs and unforeseen items of concern
05/14/13 • Attend 4CDC monthly meeting to present status of projects 4.00
that 4CDC is funding for design and construction
e Prepare revised counter offer to exchange Chaos property
for land adjacent to existing buildings facing Main Street
in the Arts & Design District
a Authorized concrete contractor to cut out several of the
Reflecting Pool coping pieces for engineers to examine
concrete wall for damage prior to completion of bidding
documents
05/15/13 ® Construction meeting with Signature Construction, 6.00
PEDC®R Design, StructurePoint Engineers, and CRD
staff to review various design and construction issues
in City Center and Mid-Town
® Job site meeting at Reflecting Pool to examine areas where
sections of the coping were removed to see if there was
any damage or erosion
® Review of bidding documents for Reflecting Pool coping
replacement and public advertisement documents
® Email responses and administration
05/16/13 ® Discussion with Steve Engleking regarding servicing of 2.50
equipment at Energy Center and impact of Anderson/
Birkla project on west side to replace equipment in
service yard
e Respond to Walter P. Moore request to access attic space
to review certain existing steel details in coordination with
Sheil Sexton
® Email responses and administration
05/20/13 a On site meeting at Shapiro's building with owner and 6.00
appraisers to update existing property appraisals based
on current market conditions
a Meeting with Steve Engleking, Dave Huffman,
StructurePoint Engineers on Reflecting Pool repair and
replacement of coping reflected in construction bidding
documents
a Meeting with Energy Center expansion CM, Dave Ford of
REI Construction and City Department heads in resolving
final issues and "punch list" provided by engineers and
City Utilities
e Meeting with John Hart, developer and CRD staff to review
and discuss CRC request for proposal on development for
the "Party Time" site
® Email responses and administration
05/21/13 a Court mandated mediation of CRC claim against SS&E 8.00
steel fabricator on Palladium Dome issues
05/22/13 a Meeting with contractor Signature Construction, PEDC®R 5.50
Design, StructurePoint Engineers, and CRD staff to review
construction projects and design issues at City Center
e Report to Commissioners on results of 05/21/13 court ordered
mediation for CRC claims against SS&E steel fabricator for
Palladium Dome issues
e Review of existing damaged copings at Reflecting Pool to
determine quantity for temporary replacement until repair
work is bid and approved
e Email responses and administration
05/23/13 a Review of court order allowing Hagerman/Crider case 9.00
to be tried in Hamilton County court versus Ft. Wayne, IN
® Job site visit at Reflecting Pool with Dave Huffman and
StructurePoint Engineers to make coping pieces to be
removed and temporarily replaced with concrete fill until
final materials arrive
® Prepare documents and exhibits for monthly CRC
meeting and executive session
e Meeting with LWG, Mike Lee and CRD staff on invoices,
contracts, auditor questions and budget issues on Sofia
Square Garage
e Attend CRC monthly executive session
e Attend CRC monthly public meeting
05/28/13 ® Construction meeting with Signature Construction, 6.00
PEDC®R Design, StructurePoint Engineers, and CRD
staff to review various design and construction issues
in City Center and Mid-Town
e Review of financial transfers with Ben Roegger on funds
that need to be granted to the 4CDC and 4CDC payments
to cover Energy Center bond shortfall
• Meeting with Anderson/Birkla and CS® Architects to
review construction drawings for Parcel 7-C "The Mezz"
building projects to review schedule and access to site
• Email responses and administration
05/29/13 ® Construction coordination meeting with Signature 7.00
Construction, PEDCOR Design, StructurePoint Engineers,
and CRD staff to review status of Nash ]Building project
e Meeting with Bob Olson, engineer for Reflecting Pool
repairs bid documents to review specifications for public
bid and series of add alternates to meet budget guidelines
s Prepare draft of CRD budget for 2014 using formats
provided by City Department of Administration and
Human Resources
05/30/13 o Attend DCS public hearing for Director's approval on 4.00
Parcel #5 Nash Building and garage project per ordinance
• Meeting with partners of AMl rose Property Group about
the "Party Time" site RFP and the process for submitting
bid to buy the property
• Meeting with LWG and CRD staff to review invoices and
2014 budgeting issues prior to CC/CT workshops
TOTAL HOURS
103.00
103.00 Hours z $100.00 Hourly Rate = $ 10300.00
Additional Cell Phone Allowance = $120.00
TOTAL. DUE _ $ 10420.00
Prescribed by State Board of Accounts ACCOUNTS PAYABLE VOUCHER City Form No.201(Rev.1995)
CITY OF CARMEL
An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by
whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc.
Payee /I
Purchase Order No.
Terms
Date Due
Invoice Invoice Description Amount
Date Number (or note attached invoice(s) or bill(s))
5-31-(3 S311� Consa(�ih S r ' E e< c O'rec 1, l0 2 ,00
cf� C
Total Q q2 0 "
I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance
with IC 5-11-10-1.6.
20
Clerk-Treasurer
VOUCHER NO. WARRANT NO.
ALLOWED 20
L S (Olds (on 3a��lnq,, L-�� IN SUM OF $
ON ACCOUNT OF APPROPRIATION FOR
1901/431IR9�
Board Members
PO#or INVOICE NO. ACCT#/TITLE AMOUNT
DEPT.# I hereby certify that the attached invoice(s), or
190 53/1) 43q1999 bill(s) is (are) true and correct and that the
materials or services itemized thereon for
which charge is made were ordered and
received except
0 /3
ign` ure
Cost distribution ledger classification if Title
claim paid motor vehicle highway fund