HomeMy WebLinkAbout05070201-Sq. Ft. k. All sidewa ks and driveways
I Sewer and water lines, septic system, (tanks & fi ed system) and/or wel Iocat ons
m. Drainage flow arrows
n. Al drainage swa es and subsurface fac lities (retention / detention areas, etc,.)
o. Sump pu~r~p ~- Show sump pump pt(s) and discharge line locations
p, ,Geotherr~al heat pump discharge locations
*NOTE: If land is not Within a platted subdivisi°n~ a legal description is requ red,
FLIRTHER NOTES / NOTICES:
CARMEL ZONING ORDINANCE Z-289, SECTfON 29,04,02 (3): "The Director shall approve or deny the Improvement
Location Perm t within five (5) working days of the receipt of the written application form and accompanying
materials. The Improvement Location Permit shall ,~, issued when the proposed structure, improvement, or use and
its location conform in all respects to this ordinance.
IN ADDITION TO THE ABOVE-LISTED SUBMITTAL REQUIREMENTS. THE BUILDING INSPECTOR WILL BE PROVIDED
WITH ANYINFORMAT~ON RELAT[VE TO COMMITMENTS MADE INTHE ZONING PROCESS FORTHE PROPERTY
INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF
COMMUNTTY SERVICES ADMINISTRATIVE APPROVALS REQUIRED.
ADD~ONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF
THE SUBMTTTED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETA[L, TO INDICATE THE NATURE AND EXTENT
OF THE WORK PROPOSED AND TO DETERMINE COMpItANCE VVITH ALL APPLiCABLE CODES AND ORDINANCES.
SUBMTTTAL OFADDiT[ONALLY REQUESTED/REQUIRED INFORMAT[ON, AFTER THE INTT[AL SUBMITTAL, V~LL
EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW.
THE OFFICE OF BUILDING & ?ODE ENFORC.E, MENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON
CONSTRUCTIONPLANSASA'BONUSROOM'TOBEUN~ . . AB ! NFINI HEDSPACE. IFANAREASO
LABELED IS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS
DETERMINED THAT AN UNFINISHED, "BONUS ROOM" AREA IS TO BECOME A FINISHED AREA AFTER THE
ISSUANCE OF TH P ~ ~ THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING &
CODE ENFORCEMENT.
INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION, Beginning prior to obtaining
a building permit and/or proceeding With construction beyond the Stage of a required inspection without approval
constitutes Late Fee penalties, peI Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29,06.08,
DE ENFORCEMENT; CITY OF CARMEL. One Civic Sq.; C,ll'meJ, IN
the matters
mislead the Dept. of