Loading...
HomeMy WebLinkAbout05070201-Sq. Ft. k. All sidewa ks and driveways I Sewer and water lines, septic system, (tanks & fi ed system) and/or wel Iocat ons m. Drainage flow arrows n. Al drainage swa es and subsurface fac lities (retention / detention areas, etc,.) o. Sump pu~r~p ~- Show sump pump pt(s) and discharge line locations p, ,Geotherr~al heat pump discharge locations *NOTE: If land is not Within a platted subdivisi°n~ a legal description is requ red, FLIRTHER NOTES / NOTICES: CARMEL ZONING ORDINANCE Z-289, SECTfON 29,04,02 (3): "The Director shall approve or deny the Improvement Location Perm t within five (5) working days of the receipt of the written application form and accompanying materials. The Improvement Location Permit shall ,~, issued when the proposed structure, improvement, or use and its location conform in all respects to this ordinance. IN ADDITION TO THE ABOVE-LISTED SUBMITTAL REQUIREMENTS. THE BUILDING INSPECTOR WILL BE PROVIDED WITH ANYINFORMAT~ON RELAT[VE TO COMMITMENTS MADE INTHE ZONING PROCESS FORTHE PROPERTY INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF COMMUNTTY SERVICES ADMINISTRATIVE APPROVALS REQUIRED. ADD~ONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF THE SUBMTTTED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETA[L, TO INDICATE THE NATURE AND EXTENT OF THE WORK PROPOSED AND TO DETERMINE COMpItANCE VVITH ALL APPLiCABLE CODES AND ORDINANCES. SUBMTTTAL OFADDiT[ONALLY REQUESTED/REQUIRED INFORMAT[ON, AFTER THE INTT[AL SUBMITTAL, V~LL EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW. THE OFFICE OF BUILDING & ?ODE ENFORC.E, MENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON CONSTRUCTIONPLANSASA'BONUSROOM'TOBEUN~ . . AB ! NFINI HEDSPACE. IFANAREASO LABELED IS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS DETERMINED THAT AN UNFINISHED, "BONUS ROOM" AREA IS TO BECOME A FINISHED AREA AFTER THE ISSUANCE OF TH P ~ ~ THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING & CODE ENFORCEMENT. INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION, Beginning prior to obtaining a building permit and/or proceeding With construction beyond the Stage of a required inspection without approval constitutes Late Fee penalties, peI Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29,06.08, DE ENFORCEMENT; CITY OF CARMEL. One Civic Sq.; C,ll'meJ, IN the matters mislead the Dept. of