HomeMy WebLinkAbout79-96.161 2 3 BLOCKING FOR WATER MAINS 1. SCOPE OF WORK: M A. The work required under this section includes all cold water distribution lines, valves, hydrants, and related items including excavating and badkfilling necessary to complete the work shown on the drawings. The ends of water service Ines shall be tightly plugged or capped at the terminal points pending the connecting to all such lines of the building piping as specified in the plumbing specifications and architectural drawings. 2. MATERIALS: �® A. Cast Iron Pipe: Cast iron pipe shall meet AWWA Specification C -106 with push —on pints L meeting AWWA Specification C -111. Wall thickness shall be determined from Table 6.4 �:i�•� in AWWA C -106. Ductile iron pipe shall meet AWWA C -150 and C -151 Specifications. Pipe to be cement lines per AWWA C -104. B. Copper Tubing Shall be seamless, annealed copper tubing complying with Federal Specification WW—T -799. Fittings shall be wrought copper or cast bronze with solder ©O joints. Solder shall be of o composition recommended by the manufacturer of the fittings. C. Fire Hydrants: Shall comply with AWWA Specification C -502 and shall meet local standards and requirements, particularly as to nozzle diameters and threads, direction of opening and dimensions of operating and ouP nuts. Fire Hydrants shall have one pumper and two hose nozzles. A valve opening not less than 5 inches and a 6 inch inlet K connection. The length of the hydrant barrel shall be determined by the specified depth of cover over the pipe. D. Vdves: All valves and stops shall have ends suited or adapters shall be provided for the proper installation in the lines in which they are located. Valves shall meet local standards or in the absence of such standards, the following requirements: 1. Valves in cast iron pipe shall be iron body, bronze mounted, disc gate valves conforming to AWWA Specification C -500. They shall open in the some direction as those used in the local waterworks system. Valve stems shall terminate in 2 inch wrench nuts. Furnish two (2) keys. J 2. Valves in copper pipe shall be standard brass body, round —way, ground —key stops with T heads. Furnish two (2) keys. E Valve Boxes: Shall meet local standards or in the absence of such, shall comply with the following requirements: 1. For iron body valves, boxes shall be approved standard buffalo —type, cast iron, adjustable shaft boxes, having a minimum shaft diameter of 5-1/4 inches. 2. For brass body valves (stops) boxes shall be approved standard cast iron extension service boxes, having a minimum diameter of 2 -1/2 inches and having lid held in H place by a brass or bronze bolt. The castings shall be coated with two eats of coal —tar pitch varnish. Fumish two (2) keys for bolt in lids. F. Stops: Stop shall be those manufactured by Ford or Mueller Corporation with AWWA taper thread, and with upper compression type fitting on outlet, or equal. G. Blow —off Valves: Blow —off wives shall be those manufactured by Muller Corporation (H -10283 or H- 10291), or equal. H. Angle Valves: Angle valves at the end of water service stub are to be copper compression type fitting also, and are to be protected with plastic bag over the valve. I. Taps: 3/4" tops in lines smaller than 4 inches shall be only by tapped tee or tapping G saddle. Water service lines should be marked on curbs with a stamped "W ", placed while pouring curbs. 3. APPLICATION: A. Permits and Codes: The intent of this section is the specifications if that the contractor's bid on the work covered herein shall be based upon the drawings and specifications but that the work shall comply with all applicable codes and regulations. Contractor shall furnish all necessary bonds to get permits for cuts and connections. B. Existing Improvements: Maintain in operating condition all active utilities and sewers F and other pipe system that may be encountered. C. Trenching: Lay all pipe in open trenches, except when local authority gives written permission for tunneling. Provide a separate trench for the water line at least 10 feet horizontally from any sanitary sewer. In locations where separate trenches for sewer and water lines are impracticable, lay the water pipe on a slid shelf at least 18 inches above the top of the sewer. D. Width of Trench: Excavate trenches minimum of pipe diameter plus 120 . E E Sheeting and bracing Sheet and brace trenches as necessary to protect workmen and adjacent structures. All trenching shall comply with the Occupational Safety and Health Administration Standards. F. Water Removal: Keep trenches free from water while construction therein is in progress. Under no circumstances lay pipe or appurtenances in standing water. Conduct the discharge from trench dewatering to (wins or natural drainage charnels. G. Grading Trench Bottoms: The bottom quadrant of the pipe shall be fully and uniformly supported. The full load shall rest on the barrel of the pipe. The trench may be excavated to a depth of 4 inches or more below find grade with sand, crushed stone or gravel backfill to bring it bade to pipe laying grade. For a depth of at least D 12 inches above the top of the pipe backfill with earth or granular material free from large stones, roots or frozen dogs. Tamp this backfill thoroughly taking care not to disturb the pipe. Badkfill under walks, parking areas, driveways and streets with granular material only and tamp thoroughly, by approved methods. Trenches parallel to and within 10 feet of paved roadways shall be constructed the sane. H. Tests: Before joints are covered, fill the piping with water, opening hydrants or at least two hours at a pressure of 100 pounds per square inch. Inspect all joints for leakage and remedy any leaks. Upon completion of the water distribution mains, flush out the system until the water runs clear. As soon as the system has been flushed out it shall be sterilized in accordance with the requirements of City of Carmel. C I. If a horizontal distance of 10 feet cannot be maintained between the water line and and a sanitary sewer line, one of the following shall be done. a. Water line laid in o separate trench and 18" above sewer. b. Water line laid in some trench on a bench of undisturbed earth and sewer at least 18" below bottom of water line. Where water lines and sewers cross and the water line cannot be placed above the sewer with a minimum of 18' vertical clearance, the sewer must be LID B constructed of water works grade cost iron pipe with mechanical joints within CD 10 feet of the water line. N J. Utfitkes: It shall be the responsibility of each contractor to verify all existing utilities m and conditions pertaining to his phase of the work. It shall also be the contractors r responsibility to contact the owners of the various utilities before work is started The contractor shall notify in writing the owners or the engineer of any changes, errors or M omissions found on these plans on in the field before work is started or resumed. K. New Water Main Construction: Contractor to record dimension of each water stub and ,i valves from nearest fire hydrant measured along water main. The locations of hydrants A and water valves, along with any other construction changes are to be incorporated on "Record M the original construction drawings and Drawing' prints submitted to Engineer's Office as soon after completion of construction as possible. CD 3 O R IJ 1 2 3 4 1 5 1 6 4 5 O.D. OF — wATEBMAe! 8 7 1 8 `— DIG off EACIt JOINT. PIPE TO WT al RW MIN TYPICAL WATER MAIN INSTALLA110N RT11NG TO SUIT r� !i "ll�� ,, ,• — !e� wmrm MM ri a. TYPICAL CONNECTION TYPE Contractor shd submit in his bid the cost of PVC main as well as cast ion. The following specifications shah apply to the PVC application: PVC Water Main Pipe A. All pipe or fitting joints underground shd be push -an joint or rmedwical joint type as noted or equal. B. Pipe for water mains laid in the trenches shall be PVC (Polyvinyl Chloride) plailitic pressure Ripe olnich meets the requirements of ASTM D-1784 for PVC compamde and ASTM D-3139 for push -on joints The pipe band and boll shd be DR18 (dimension ratio). the pip• shah be rated for 150 pen water working preesure and meet d the reglik rents of AMA Standard C- 900: Pipe shd be Clan Corporation of Oak Brock. Minis Super Main 900 PVC pipe or equal Transitions from one pipe material to another shd be made wing manufacturers recommended fittings or go*.ets. C. Each length of pipe shd bear the name or trademark of the manufacturer, the location of the Oant and the dote of manufacture. Each length shall Rewiee be marked to designate the doss or strength of the pipe. The making shall be made on the exterior or interior of the pipe barrel . near the bell or groove and and shall be pkndyy Asbla Fittings and Specials A. All pipe fittings and specials for trench -lay main using PVC pipe shall be push -an joint ductile cast iron .with a premre rating of 350 psi and conform to ANSI/AWWA--a10/A21.10 and ANSI /AWWA- C111/A21.11 Standards. Fittings shd be Clow Corporation of Oak Brock, Minis Super Bel -rite fittings or equal. Fitting and Valve Encasement A. All iron fittings and valves shall be encased with a pdyethybne encasement of a minimum eight (8) m1 thidmess and conform to ANSI /AWWA— C105/A21.5. Polyethylene encasement shall be Clow Corporation of Oak Brook, Illinois or equal. 6 1 7 0 9 1 10 n?ICAL UTIUTY CROSSING mnNC m svkT —•� +� erg vim amavow FOR MOM UM IECHAWAL "n' r -- EXIm MA•I CONNECTION TO EXISTING MAIN - Pipe Tracing Tape A. All pipe shall be traced with *Terra Tape" by Reef Industries, Inc., P.O. Box 33248, Houston, Texas 77033 or equal. tape shall be *Detectable type Imprinted with 'Cation Buried Water Line Below'. Gate Valves A. All gate valves shall be iron body, bronze mounted, double disc, parallel seat type gate valves, conforming to AWWA Standard Specifications C500. They shall open in a counter clockwise direction. Valves placed in a valve box shall terminate in 2 inch square operating nut and have non — rising stems. One valve wrench shall be supplied to the Owner for this project. Gate valves shall be as made by Kennedy Valve Manufacturing Co., Inc., Elmira, New York, Mueller or equal. Valve Boxes A. Valve boxes shall be a three -piece cast iron type (base, center section, and sliding type adjustable extension) together with a "stay —put" cover marked "WATER'. The base shall be of the she recommended by the manufacturer far the she valve with which it is to be used. Wall thickness of the base and vertical sections shall not be less than 3/16 inch, and each valve box shall have a minimum shaft diameter of 5-1/4 inches. 8 1 9 1 10 1J TYPICAL SECTION - HYDRANT do MAIN LOCATION On= ►Aar MU NOT ace MM area N TIDE FAR n 1 • 11 1 r DEM PLAN SET TOP FUJ'"....,...,...,..... ,,...." ALVE Box 1 GATE VALVE AND BOX. VMM WV011 AM�T"MIX W A 4a• ORM PLAN SRANON_ auneoE iMR MINA Nor plat SIM NI= WW" N TASK FOR MCI a - Fare PUMe. PLAN 1 ts' XW sous Y• er ONM. wAMM 11* MW A OF SECMON "D —D" M TAlLE=rAW WM DOWNWARD BEND SECTION "C —C" NOM ALL OONWX SLOCpNO 10 OON W Or CLAM "r 00114 W POU M A001ST r M GOMM BLOCKING FOR -PLUGS & BEND-S—i BLOCKING FOR �® 000 ©© �:i�•� 0 ©O © ©O ire DETAIL — CONCRETE BLOCKING 11 1 12 1 13 1 14 1 15 Reddons GO%tT 1CRps /,. i s 920350 }4 �t7 STATE OF�cv s70MAL CERTIFIED BY er A. ke, TO O1w10 #01W Ol ll$ P ' ' ' 4 AND COW IS C1111=® Fh1t01 ARE 1M D0XK KMLM X PROPERTY Or SQe W on6eEwsrc OORPORATM AND ARE MY lt) K IlgD OR REPROOUCm N OW OR N PART, WNW M M11111 0016M OF SI:HMM DWNm" t 011111 An011. ©1996, Schneider Engineering Corporation r &1md*dq 'on 3020 North Post Road Engineering Indianapolis, Indiana Surveying 46226 -0068 Landscape Architecture 317- 898 -8282 GIS • US 317- 899 -8010 Fax Geology A Partnered Entity with Bohlen, Meier, Gibson a Assoelatee, tnoorpotated PM CF= Did MPMENT COMPANY UX PLUM CREEK NORTH SECTION 4 HAMQ.TON COUNTY, WIANA WATER DISTRIBUTION DETAILS Date Project No. Dmwn App 904.14 PRIG M L K J H C F E A C B Computer Files Sheet No. A J: \904\01GS\14\1= (C7®3