Loading...
HomeMy WebLinkAboutC200 Erosion Control-C2010 0 U 0 W 0 L W O O N U N V) C 0 U E Q Q w i 0 0 O N N O 10 E N +, v) U) Q) N �'N O Q = N U W m z � U� �0 og on Pro POND - 900.70 = 905.19 = 906.65 2.= 908.01 In 3948 63 2.06 2.11 9 Pei 7 1 6 1 5 PHASE II EROSION CONTROL (AFTER MAJOR EARTH MOVING) 4 3 EX. POND 2 0 0 111 IIY J n � �\ C�8 00 If WDl W \ i \ �Q 4) N LLJ Q Q \ z � cn 3948 63 2.06 2.11 9 Pei 7 1 6 1 5 PHASE II EROSION CONTROL (AFTER MAJOR EARTH MOVING) 4 3 EX. POND 2 0 0 111 IIY - TEMPORARY SEEDING (USE PLANTING CHART) AT A MINIMUM, MULCH IS REQUIRED. • • • - SWALE CONSTRUCTION LIMITS - TREE PROTECTION FENCE - LOCATION WHERE STORMWATER LEAVES - EROSION CONTROL BLANKET (USE STAPLE PATTERN N.A.G. S75 IN SWALE, S150 ON LAKE SLOPES. BOTH AS SUPPLIED BY NORTH AMERICAN GREEN OR APPROVED EQUAL) SF - SILT FENCE In A VnTUQ0 1. EROSION CONTROL PLAN MEASURES MUST BE EXECUTED BEFORE ANY CONSTRUCTION COMMENCES. 2. THE SILT FENCE IS TO BE PLACED BEHIND THE CURB AS SOON AS THE CURBS ARE INSTALLED. 3. ALL S.S.D. SHALL BE SMOOTH BORE, DOUBLE WALLED PIPE. —WARNING — THIS PLAN TO BE USED FOR EROSION CONTROL PURPOSES ONLY. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR. rei —NOTE— THIS PLAN INDICATES EROSION CONTROL MEASURES REQUIRED AFTER SOIL STRIPPING AND PAD BUILDING HAS TAKEN PLACE. COORDINATE WITH DEVELOPER FOR MEASURES REQUIRED UNTIL PROPERTY TURNED OVER FOR DEVELOPMENT. COORDINATE WITH SOIL CONSERVATION DISTRICT REPRESENTATIVE FOR ANY OTHER MEASURES REQUIRED DUE TO SITE CONDITIONS. 7 on 5 4 SCALE: 1" = 50' 0 25 50 100 CONSTRUCTION PLANS —DATED 3 2 O LEGEND_ � - SILT FENCE BOX/ DANDY BAG OR APPROVED EQUAL 00 W - COCONUT MAT OR APPROVED EQUAL 4) N - CONCRETE WASHOUT Q 41 41 41 � � � 4f a%%4% - PERMANENT SEEDING (USE PLANTING CHART) AT A MINIMUM, MULCH .%%%% IS REQUIRED. - TEMPORARY SEEDING (USE PLANTING CHART) AT A MINIMUM, MULCH IS REQUIRED. • • • - SWALE CONSTRUCTION LIMITS - TREE PROTECTION FENCE - LOCATION WHERE STORMWATER LEAVES - EROSION CONTROL BLANKET (USE STAPLE PATTERN N.A.G. S75 IN SWALE, S150 ON LAKE SLOPES. BOTH AS SUPPLIED BY NORTH AMERICAN GREEN OR APPROVED EQUAL) SF - SILT FENCE In A VnTUQ0 1. EROSION CONTROL PLAN MEASURES MUST BE EXECUTED BEFORE ANY CONSTRUCTION COMMENCES. 2. THE SILT FENCE IS TO BE PLACED BEHIND THE CURB AS SOON AS THE CURBS ARE INSTALLED. 3. ALL S.S.D. SHALL BE SMOOTH BORE, DOUBLE WALLED PIPE. —WARNING — THIS PLAN TO BE USED FOR EROSION CONTROL PURPOSES ONLY. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR. rei —NOTE— THIS PLAN INDICATES EROSION CONTROL MEASURES REQUIRED AFTER SOIL STRIPPING AND PAD BUILDING HAS TAKEN PLACE. COORDINATE WITH DEVELOPER FOR MEASURES REQUIRED UNTIL PROPERTY TURNED OVER FOR DEVELOPMENT. COORDINATE WITH SOIL CONSERVATION DISTRICT REPRESENTATIVE FOR ANY OTHER MEASURES REQUIRED DUE TO SITE CONDITIONS. 7 on 5 4 SCALE: 1" = 50' 0 25 50 100 CONSTRUCTION PLANS —DATED 3 2 O � 00 W 4) N Q :3 Z :E m W Z U Q E, N O a� cd CU U cn 70 MEN Z w U) CU JW F-� 0 J J O w ap ,--q 00 \O W � O a0 QC" U • �--I • � j `O N M N W Z cd w 0 ' 00 00 QZ Z � O N W � �--+ r--� M 00 M cn w W � � o U Q Z W Z Z 0 O 'y W \\ , S HIE \ \� �•,. GIST .• ;�; �.% *� 2 33 *= .0 S OF 0 JAMES E. SHIELDS, JR P.E. 10201333 C 'C N 0 L A C :3 W :E m W Z U Q E, N o cn a� CU U cn 70 MEN Z w U) CU JW F-� 0 J J O w cn w W � � o U Q Z W Z Z 0 O 'y W \\ , S HIE \ \� �•,. GIST .• ;�; �.% *� 2 33 *= .0 S OF 0 JAMES E. SHIELDS, JR P.E. 10201333 0 L A U o r p Z U w m W w O N E, N o cn Q W W W Z w Z CU O O w F O W � O a0 QC" J 0 N W w 0 �4 d QZ � O N W � F C-0 N Q 00 con o w cn w W � � o U Q Z W Z Z 0 O 'y W \\ , S HIE \ \� �•,. GIST .• ;�; �.% *� 2 33 *= .0 S OF 0 JAMES E. SHIELDS, JR P.E. 10201333 0 U O 0 W � O w 0 �4 d QZ � con o w o Know what's below. o C111 before you dig. o Within Indiana Cal/ 817 800 - 382 -5544 a ►� �1 � o or U) � 24 Hours o Day, 7 Doys a Week. 0.' D SHEET N0. PER INDIANA STATE LAW IC 8 -1 -26. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORKING DAYS BEFORE COMMENCING WORK. 8/2 6/2 PROJECT N0. W12.0014 0