HomeMy WebLinkAbout05080093-Sq. Ft. k. All s dewalks and driveways
L Sewer and water ines, sept c system, (tanks & filed system) and/or well locations
rn. Drainage flow arrows
n. All drainage swales and subsurface facilities (retention / detention areas, etc..)
o. Sump pu.mP -- Show sump pump pit(s) and discharge line locations
p. ~Geotherr~ral heat pump discharge locations
*NOTE: Zf land is not within a platted Subdivision~ a legal
CARMEL ZONING ORDINANCE Z-289, SECT[ON 29.04.02 (3): The Director shall approve or deny the Improvement
Location Permit within five (5) working days of the receipt of the written application form and accompanying
materia s The Improvement Locat on Permit shall be issued when the proposed structure, improvement, or use and
its location conform in all respects to this ordinance,"
L BE PROVIDED
N THE ZONING PROCESS FOR THE PROPERTY
PLAN COMHISION, BOARD OF ZONING APPEALS, AND/OR DEFT. OF
OF THE WORK PROPOSED
AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF
~D EXTENT
CODES AND ORDINANCES,
IBMITTAL, WILL
SO
L LABELED ACCORDINGLY. IF IT IS
UPDATED AT THE OFF[CE OF BUILDING &
ZSSUANCE
SHOULD NOT BEGZN PRZOR TO THE
HE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED,
· r to obtaining