Loading...
HomeMy WebLinkAbout05080093-Sq. Ft. k. All s dewalks and driveways L Sewer and water ines, sept c system, (tanks & filed system) and/or well locations rn. Drainage flow arrows n. All drainage swales and subsurface facilities (retention / detention areas, etc..) o. Sump pu.mP -- Show sump pump pit(s) and discharge line locations p. ~Geotherr~ral heat pump discharge locations *NOTE: Zf land is not within a platted Subdivision~ a legal CARMEL ZONING ORDINANCE Z-289, SECT[ON 29.04.02 (3): The Director shall approve or deny the Improvement Location Permit within five (5) working days of the receipt of the written application form and accompanying materia s The Improvement Locat on Permit shall be issued when the proposed structure, improvement, or use and its location conform in all respects to this ordinance," L BE PROVIDED N THE ZONING PROCESS FOR THE PROPERTY PLAN COMHISION, BOARD OF ZONING APPEALS, AND/OR DEFT. OF OF THE WORK PROPOSED AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF ~D EXTENT CODES AND ORDINANCES, IBMITTAL, WILL SO L LABELED ACCORDINGLY. IF IT IS UPDATED AT THE OFF[CE OF BUILDING & ZSSUANCE SHOULD NOT BEGZN PRZOR TO THE HE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED, · r to obtaining