Loading...
HomeMy WebLinkAbout14-L1_ASI #1.pdfDATEREVISION PROJECT NO: DATE: 13 7 9 5 S . M u r - L e n R d l O l a t h e , K a n s a s 6 6 0 6 2 l P 9 1 3 2 5 4 2 2 4 5 l F 9 1 3 2 5 4 2 2 9 5 Bic k f o r d o f C a r m e l , I n d i a n a Ca r m e l , I n d i a n a 4 6 0 3 3 SL-1203 December 12, 2012 58 2 9 1 1 6 t h S t r e e t E a s t Ci v i l E n g i n e e r : Cr o s s r o a d E n g i n e e r s , P . C . La n d s c a p e A r c h i t e c t : LO R A X D e s i g n St r u c t u r a l E n g i n e e r : Bo b D . C a m p b e l l & C o . ME P E n g i n e e r : Ku c i r e k E n g i n e e r i n g , I n c . PERMIT SET Ka z m a i e r & A s s o c i a t e s , L L C Ar c h i t e c t s 1Addendum #112/24/2012 2ASI #11/14/2013 1.THE LANDSCAPE CONTRACTOR SHALL READ ALL LANDSCAPE PLANS, SPECIFICATIONS AND VISIT THE PROJECT SITE TO BECOME FAMILIAR WITH EXISTING CONDITIONS PRIOR TO BIDDING THIS PROJECT. 2.ANY AND ALL QUESTIONS CONCERNING THE LANDSCAPE PLANS AND SPECIFICATIONS SHALL BE DIRECTED TO THE LANDSCAPE ARCHITECT. 3.THE LANDSCAPE CONTRACTOR IS TO VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES (INCLUDING THOSE INDICATED ON THE PLAN) PRIOR TO INSTALLATION OF PLANT MATERIAL. 4.THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR WATERING, MULCHING, AND OTHER REQUIREMENTS OF PLANT MATERIALS WHILE THEY ARE TEMPORARILY STORED ON OR OFF SITE. 5.THE LANDSCAPE CONTRACTOR SHALL COORDINATE LAYOUT OF PLANTING BEDS, PLANT MASSING, STAKED LOCATION OF TREES AND INSTALLATION OF PLANT MATERIAL WITH LANDSCAPE ARCHITECT PRIOR TO COMMENCEMENT OF WORK. 6.ALL PLANT MATERIAL (EXCEPT SHADE TREES) IS DELINEATED AT MATURE SIZE OF PLANT MATERIAL.  SHADE TREES ARE DELINEATED AT 85% OF ACTUAL MATURE SIZE. 7.ALL LANDSCAPE MATERIAL SHALL MEET THE AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1-CURRENT EDITION) PER THE AMERICAN ASSOCIATION OF NURSERYMEN. 8.PER OWNER'S DIRECTION, THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO INSPECT ALL PLANT MATERIAL AT THE NURSERY, PRIOR TO SELECTION OR DIGGING. 9.CONDUCT PLANTING UNDER FAVORABLE WEATHER CONDITIONS DURING EITHER THE SPRING PLANTING SEASON, MARCH 1 TO JUNE 1, OR THE FALL PLANTING SEASON, SEPTEMBER 30 UNTIL FREEZING OF THE GROUND.  DURING THE FALL PLANTING SEASON, CONIFEROUS MATERIAL PLANTING SHALL BE CONDUCTED AUGUST 15 TO OCTOBER 1.  DEVIATION FROM THE ABOVE PLANTING DATES WILL ONLY BE PERMITTED WITH APPROVAL IN WRITING BY THE LANDSCAPE ARCHITECT.   10.THE PLANTING SOIL MIXTURE FOR ALL TREE PLANTINGS SHALL INCLUDE SOIL EXCAVATED FROM THE HOLE. RATIO: 50% VIRGIN SOIL + 50% AMENDED TOP SOIL. 11.ROOT STIMULATOR SHALL BE APPLIED TO ALL PLANT MATERIALS WITH THE EXCEPTION OF LAWN AREAS.  APPLY AS PER THE MANUFACTURERS SPECIFICATIONS. 12.THE LANDSCAPE CONTRACTOR SHALL RESTORE FINISH GRADES IN ALL PLANTING AREAS (PER GRADING PLANS) WHICH MAY HAVE BEEN DISTURBED DURING PLANTING OPERATIONS. 13.ALL TREE SAUCERS AND PLANTING BEDS ARE TO BE MULCHED WITH A MINIMUM OF 3" DOUBLE-GROUND HARDWOOD MULCH (COLOR DYED DARK BROWN). LANDSCAPE CONTRACTOR TO PROVIDE MULCH SAMPLE TO LANDSCAPE ARCHITECT FOR REVIEW PRIOR TO INSTALLATION.  WHERE PLANTING BEDS ARE ADJACENT TO WALKS AND CURBS THE SOIL LEVEL SHALL BE 3" LOWER TO ALLOW FOR MULCH LAYER.  WHERE SOD IS INDICATED, ITS THICKNESS SHALL ALSO BE ACCOUNTED FOR SO THAT THE SOIL SURFACE IN THE SOD IS 1/2" BELOW THE HARDSCAPE SURFACE. GENERAL NOTESLANDSCAPE PLAN SCALE: 1"=20' N O R T H 0 SCALE: feet204060 1" = 20' 14.ALL SHRUB/PERENNIAL PLANTING BEDS SHALL BE TREATED WITH A PRE-EMERGENT HERBICIDE SUCH AS TREFLAN OR EQUAL.  APPLY PER MANUFACTURER'S SPECIFICATIONS.  THE PRE-EMERGENT SHALL NOT BE APPLIED UNTIL AFTER ALL PLANTING WITHIN THESE AREAS IS COMPLETE, BUT BEFORE THESE AREAS ARE MULCHED.  DO NOT DISTURB AREAS AFTER APPLICATION.  WATER IN AS DIRECTED. 15.MULCH, STAKES, GUY WIRE, PRE-EMERGENT HERBICIDES, ETC. SHALL BE SUBSIDIARY TO INDIVIDUAL PLANTS. 16.ALL SLOPES THAT EXCEED A 3:1 GRADE SHALL BE PROTECTED WITH AN EROSION CONTROL BLANKET WITH NORTH AMERICAN GREEN S150. INSTALL PER THE MANUFACTURER'S SPECIFICATIONS. 17.LABEL EACH TREE AND SHRUB WITH A SECURELY ATTACHED, WATERPROOF TAG BEARING LEGIBLE DESIGNATION OF BOTH BOTANICAL AND COMMON NAME. LABEL EACH ORNAMENTAL GRASS, GROUNDCOVER, PERENNIAL AND ANNUAL WITH THE LABEL PROVIDED BY THE ORIGINAL GROWER OF THE PLANT. LABELS SHALL NOT BE REMOVED UNTIL AFTER PROVISIONAL ACCEPTANCE BY LANDSCAPE ARCHITECT. 18.STAKES AND GUY WIRES SHALL BE REMOVED AT THE END OF ONE FULL GROWING SEASON. 19.LOOSEN SOIL FOR ALL PLANTING ISLANDS AND SHRUB/PERENNIAL BEDS TO A DEPTH OF 12".  ALL AREAS DENOTED AS SOD (LAWN AREAS) SHALL HAVE A 6" MINIMUM TOPSOIL LAYER.  TOPSOIL SHALL BE LAID IN 3" LIFTS.  IN AREAS WHERE CONSTRUCTION GRADING HAS NOT OCCURRED AND THE VIRGIN GRADES YET EXIST, THE TOPSOIL LAYER MAY NOT BE REQUIRED BASED ON THE DECISION OF THE LANDSCAPE ARCHITECT. 20.TOPSOIL SHALL BE FERTILE NATURAL TOPSOIL, TYPICAL OF THE LOCALITY, OBTAINED FROM WELL DRAINED AREAS.  STOCKPILED TOPSOIL MAY BE USED.  IT SHALL BE WITHOUT ADMIXTURE OF SUBSOIL OR SLAG AND SHALL BE FREE OF STONES, LUMPS, STICKS, PLANTS OR THEIR ROOTS, TOXIC SUBSTANCES OR OTHER EXTRANEOUS MATTER THAT MAY BE HARMFUL TO PLANT GROWTH OR WOULD INTERFERE WITH FUTURE MAINTENANCE.  TOPSOIL PH RANGE SHALL BE 5.5 TO 7.0. 21.THERE SHALL BE NO ADDITIONS, DELETIONS OR SUBSTITUTION OF PLANT MATERIAL SPECIES WITHOUT THE WRITTEN APPROVAL BY THE OWNER OR LANDSCAPE ARCHITECT.   ANY SUBSTITUTION THAT HAS NOT BEEN APPROVED SHALL BE REMOVED AND REPLACED WITH THE CORRECT PLANT AT LANDSCAPE CONTRACTOR'S EXPENSE. 22.IN THE CONDITION WHERE THE PLANT MATERIAL HAS BEEN SUPPLIED BY THE OWNER THROUGH A PLANT PROCUREMENT PROGRAM WITH A MYKE PRO 2-YEAR WARRANTY, THE LANDSCAPE CONTRACTOR'S WARRANTY OF PLANT MATERIAL SHALL BEGIN FROM THE TIME OF HANDLING PLANT MATERIAL AT TIME OF DELIVERY THROUGH INSTALLATION AND END AFTER SUBSTANTIAL COMPLETION AND FINAL PUNCH-LIST APPROVAL BY LANDSCAPE ARCHITECT. 23.THE LANDSCAPE CONTRACTOR WILL BE RESPONSIBLE FOR THE COLLECTION, REMOVAL, AND PROPER DISPOSAL OF ANY AND ALL DEBRIS GENERATED DURING THE INSTALLATION OF THE LANDSCAPE CONSTRUCTION. 24. ALL LANDSCAPE AREAS SHALL BE WATERED BY AN AUTOMATIC IRRIGATION SYSTEM (SEE SHEET L3). 25.COORDINATION WITH THE OWNER AND GENERAL CONTRACTOR FOR SLEEVE LOCATIONS AND TIMING OF SLEEVE INSTALLATION. ALL SLEEVING REQUIRED UNDER HARDSCAPE SURFACES FOR THE IRRIGATION SYSTEM SHALL BE THE RESPONSIBILITY OF THE IRRIGATION CONTRACTOR. 26.COORDINATE LANDSCAPE PLANTING WITH IRRIGATION CONTRACTOR. THE TREE PLANTINGS SHALL BE IN PLACE BEFORE IRRIGATION LINE ROUTING BEGINS. WATER TREES BY HAND UNTIL IRRIGATION SYSTEM IS FULLY FUNCTIONAL. SHRUBS AND PERENNIALS SHALL NOT BE INSTALLED UNTIL THE IRRIGATION SYSTEM IS FULLY FUNCTIONAL. THE IRRIGATION SYSTEM SHALL BE COMPLETE AND FULLY FUNCTIONAL IN ALL LAWN AREAS BEFORE SOD IS PLACED. NORTH BOUDARY TYPE ‘D’ BUFFER - 5 SHADE TREES, 5 ORNAMENTAL TREES, 27 SHRUBS/100LF 25 SHADE TREES, 25 ORNAMENTAL TREES, 135 SHRUBS REQUIRED EXISTING TREES SHALL SATISFY THE REQUIREMENT FOR 15 PROPOSED TREES, WITH EVERY 8” OF PRESERVED TREE CALIPER = 1 REQUIRED TREE EAST BOUDARY TYPE ‘C’ BUFFER - 3 SHADE TREES, 4 ORNAMENTAL TREES, 21 SHRUBS/100LF 19 SHADE TREES, 26 ORNAMENTAL TREES, 134 SHRUBS REQUIRED EXISTING TREES SHALL SATISFY THE REQUIREMENT FOR 35 PROPOSED TREES, WITH EVERY 8” OF PRESERVED TREE CALIPER = 1 REQUIRED TREE LANDSCAPE REQUIREMENTS PLANT SCHEDULE SOUTH BOUDARY TYPE ‘B’ BUFFER - 3 SHADE TREES, 3 ORNAMENTAL TREES, 15 SHRUBS/100LF 17 SHADE TREES, 17 ORNAMENTAL TREES, 84 SHRUBS REQUIRED EXISTING TREES SHALL SATISFY THE REQUIREMENT FOR 35 PROPOSED TREES, WITH EVERY 8” OF PRESERVED TREE CALIPER = 1 REQUIRED TREE WEST BOUDARY TYPE ‘B’ BUFFER - 3 SHADE TREES, 3 ORNAMENTAL TREES, 15 SHRUBS/100LF 19 SHADE TREES, 19 ORNAMENTAL TREES, 96 SHRUBS REQUIRED EXISTING TREES SHALL SATISFY THE REQUIREMENT FOR 30 PROPOSED TREES, WITH EVERY 8” OF PRESERVED TREE CALIPER = 1 REQUIRED TREE GENERAL NOTES 1. PER DISCUSSIONS WITH THE CITY, SHADE TREES SHALL BE USED IN PLACE OF ORNAMENTAL TREES IN CERTAIN AREAS. 2. DUE TO THE EXTENSIVE SIZE OF THE SITE, REQUIRED PLANTINGS HAVE BEEN PLACED NEAR THE BUILDING IN CERTAIN AREAS. TREE PRESERVATION PLAN SCALE: 1"=60' L1 LANDSCAPE PLAN LEGEND SOD TREES COMMON NAME / BOTANICAL NAME CONT CAL/SIZE ARRobin Hill Serviceberry / Amelanchier x grandiflora `Robin Hill`B & B2"Cal CGSlender Hinoki Cypress / Chamaecyparis obtusa `Gracilis`-7'-8' ht. CDCornelian Cherry Dogwood / Cornus masB & B2"Cal MPVelvet Pillar Crab Apple / Malus x `Velvet PillarB & B2"Cal PWWells Riverside Spruce / Picea omorika `Wells Riverside`-7`-8` ht. PBLondon Plane Tree / Platanus x acerifolia `Bloodgood`B & B2.5"Cal QBSwamp White Oak / Quercus bicolorB & B2.5"Cal UCFrontier Elm / Ulmus x `Frontier`B & B2.5"Cal ZGGreen Vase Zelkova / Zelkova serrata `Green Vase`B & B2.5"Cal SHRUBS COMMON NAME / BOTANICAL NAME CONT FBBlue Shadow Fothergilla / Fothergilla x `Blue Shadow`7 gal HMBlue Mammoth Hosta / Hosta x `Blue Mammoth`2 gal HWOakleaf Hydrangea / Hydrangea quercifolia `Pee Wee`5 gal ISInkberry / Ilex glabra `Shamrock`7 gal IAApollo Winterberry Holly / Ilex verticillata `Apollo`7 gal IRRed Sprite Winterberry / Ilex verticillata `Red Sprite`7 gal PNNorthwind Switch Grass / Panicum virgatum `North Wind`2 gal PSShenandoah Switch Grass / Panicum virgatum `Shenendoah`2 gal RAGro-Low Sumac / Rhus aromatica `Gro-Low`5 gal RRRed Drift Rose / Rosa x Red Drift5 gal SHRUBS COMMON NAME / BOTANICAL NAME CONT TW2Ward Yew / Taxus x media `Wardii`5 gal VWWinterthur Viburnum / Viburnum nudum `Winterthur`5 gal SHRUB AREAS COMMON NAME / BOTANICAL NAME CONT Purple-leaf Winter Creeper / Euonymus fortunei `Colorata`1 gal@ 20" oc Red Sentinel Astilbe / Astilbe x 'Red Sentinel'1 gal@ 24" oc *ALL TREES SHOWN ON ABOVE PLAN SHALL BE PRESERVED *SEE TREE PRESERVATION PLAN, THIS SHEET, FOR FULL EXTENTS OF SITE. SEED (ALL DISTURBED AREAS) NORTH AMERICAN GREEN JUTE MAT/WOVEN 18-24 MO. COORD. W/ CIVIL 1 3 SHRUB PLANTING1EVERGREEN TREE PLANTING 2 DECIDUOUS TREE PLANTING 12" MIN. 4 PERENNIAL PLANTING PERENNIAL PLANTING NOTES:1) BREAK UP EXISTING TOPSOIL TO A DEPTH OF 24" 2) PROVIDE NEW TOPSOIL TO A DEPTH OF 18" 3) THOROUGHLY MIX PEAT IN TOP 3-4" OF SOIL 4) DO NOT ALLOW PERENNIALS TO DRY OUT. KEEP MOIST AND PROTECTED FROM DAMAGE PRIOR TO PLANTING. 5) PLACE PLANT IN VERTICAL PLUMB POSITION 6) DIG HOLE AS DEEP AS INITIAL ROOT SYSTEM 7) BACKFILL w/ SOIL AND PACK FIRMLY BY HAND. ADD ROOT STIMULATOR PER MANUFACTURER'S RECOMMENDATIONS. WATER THOROUGHLY TO FINISH PACKING SOIL AROUND ROOTS. 8) APPLY 3" TH LAYER OF MULCH ON PERENNIAL PLANT BED, DO NOT COVER PLANTS FINISHED GRADE SPACING REQUIREMENT 3" TH LAYER MULCH REMOVE CONTAINER COMPACTED OR UNDISTURBED SOIL 5 SOD INSTALLATION UNDISTURBED SUBGRADE CULTIVATED SOIL6" MIN. FINISHED GRADE SOD INSTALLATION NOTES:1) FINISHED GRADES SHALL BE ACCURATE. 2) CULTIVATE ENTIRE AREA TO A MINIMUM 6" DEPTH. EXCEPTIONS TO AREAS MAY BE MADE IF TREE ROOTS ARE ENCOUNTERED WITHIN THE DRIPLINE OF EXISTING TREES. HAND RAKE SMOOTH. 3) ADD ADDITIVES (AS PER SOIL TEST RECOMMENDATIONS) AND TILL INTO SOIL. 4) LAY AND ROLL SOD. WATER THOROUGHLY. PVMT.NEW SOD AREA 20'' DIA. TREE) (20'-0'' FOR TREE PROTECTION FENCE (ORANGE POLYETHYLENE LAMINAR SAFETY NETTING DRIPLINEORANGE POLYETHYLENE LAMINAR SAFETY NETTING 5' 6 TREE PROTECTION DETAIL (LIMITS OF CRITICAL ROOT ZONE)RADIUS=1 FOOT PER INCH OF TRUNK DIAMETER DRIPLINE (VARIES) FENCE LOCATION 10' MAX 15" MAPLE 48"MAPLE 36" MAPLE24" HICKORY 24" MAPLE 60" OAK 48" MAPLE 26" MAPLE 36" MAPLE 26" MAPLE 36" MAPLE 26" MAPLE 18" TREE 8" TREE 8" TREE 36" OAK 12" SASAFRAS 40" OAK 32" MAPLE 30" MAPLE 24" MAPLE 36" MAPLE 28" MAPLE 24" MAPLE 24" HICKORY 15" TREE 18" TREE12"TREE 15" TREE18" TREE 14" TREE15" TREE (2) 30" WALNUT 2 ZG PROPOSED TREES NOT SHOWN ON LANDSCAPE PLAN, THIS SHEET. 28" MAPLE 22" MAPLE 34" OAK