HomeMy WebLinkAboutScope of Work BICKFORD OF CARMEL, IN 12/12/2012
GEOTECHNICAL REPORT 00901 - 1
SECTION 00901 – GEOTECHNICAL REPORT
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes the following:
1. Geotechnical Report, dated June 20, 2012, Proposed Assisted Living Facility, Carmel,
Indiana, Alt & Witzig File: 12IN0315.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
SUBSURFACE INVESTIGATION &
GEOTECHNICAL RECOMMENDATIONS
PROPOSED ASSISTED LIVING FACILITY
CARMEL, INDIANA
A&W PROJECT NO: 12IN0315
PREPARED BY:
ALT & WITZIG ENGINEERING, INC.
GEOTECHNICAL DIVISION
PREPARED FOR:
NHI-BICKFORD RE, LLC
C/O NATIONAL HEALTH INVESTORS, INC.
MURFREESBORO, TN
JUNE 20, 2012
June 20, 2012
NHI-BICKFORD RE, LLC
c/o National Health Investors, Inc.
222 Robert Rose Dr.
Murfreesboro, TN 37129
Attn: Mr. Richard Eby
RE: Subsurface Investigation &
Geotechnical Recommendations
Proposed Assisted Living Facility
Carmel, Indiana
Alt & Witzig File: 12IN0315
Dear Mr. Eby:
In compliance with your request, we have conducted a subsurface investigation and
geotechnical evaluation for the above referenced project. It is our pleasure to transmit herewith two (2)
copies of our report.
This report presents our investigation methods, field and laboratory results, and engineering
recommendations. The borings typically encountered medium stiff to stiff cohesive soils at the
anticipated bottom of footing elevation. Provided suitable site preparation measures are followed,
conventional foundations represent a feasible foundation type for this structure. Our recommendations,
including substantiating data, are presented herewith.
Often, because of design and construction details that occur on a project, questions arise
concerning the soil conditions. If we can give further service in these matters, please contact us at your
convenience.
Very truly yours,
ALT & WITZIG ENGINEERING, INC.
Kellen P. Heavin, P.E.
David C. Harness, P.E.
KPH:DCH/bkm
A lt & Witzig Engineering, Inc.
4105 West 99th Street • Carmel, Indiana 46032
(317) 875-7000 • Fax (317) 876-3705
Offices:
Cincinnati, Ohio • Dayton, Ohio
Indianapolis • Evansville • Ft. Wayne • Lafayette • South Bend • Terre Haute, Indiana
Subsurface Investigation and Foundation Engineering
Construction Materials Testing and Inspection
Environmental Services
TABLE OF CONTENTS
SECTION PAGE
INTRODUCTION ................................................................................................................................ 1
DESCRIPTION OF SITE ................................................................................................................... 2
FIELD INVESTIGATIONS ................................................................................................................. 4
LABORATORY INVESTIGATIONS ............................................................................................... 6
SUBSURFACE CONDITIONS ......................................................................................................... 7
PROJECT DISCUSSION AND RECOMMENDATIONS ................................................................ 9
CONSTRUCTION CONSIDERATIONS ........................................................................................ 14
SUMMARY ..................................................................................................................................... 16
APPENDIX
Recommended Specifications for Compacted Fills and Backfills
Site Location Map
Soil Survey Map of Hamilton County
Boring Location Plan
Records of Subsurface Exploration
General Notes
USGS “Design Maps” Summary Report
F:\Projects\12\12IN0315\Geo Good\12IN0315 Geotech Report.doc
1
Alt & Witzig File: 12IN0315
SSUUBBSSUURRFFAACCEE IINNVVEESSTTIIGGAATTIIOONN
AANNDD
GGEEOOTTEECCHHNNIICCAALL RREECCOOMMMMEENNDDAATTIIOONNSS
INTRODUCTION
This report presents the results of a subsurface investigation conducted for the assisted
living facility proposed for construction in Carmel, Indiana. This investigation was conducted
on behalf of Eby Realty Group located in Olathe Kansas. Authorization to perform this
investigation was in the form of a proposal prepared by Alt & Witzig Engineering, Inc. (A&W
Proposal 1205G017) that was accepted by Mr. Richard Eby with Eby Realty Group.
The scope of this investigation included a review of geological maps of the area; a
reconnaissance of the immediate site; a subsurface exploration; field and laboratory testing; and an
engineering analysis and evaluation of the encountered subsurface materials.
The purpose of this subsurface investigation was to determine the various soils profile
components, the engineering characteristics of the subsurface materials, and to provide criteria for
use by the design engineers and architects in preparing the foundation design for the proposed
facility.
The scope or purpose of this geotechnical investigation did not either specifically or by
implication provide an environmental assessment of the site.
2
Alt & Witzig File: 12IN0315
DESCRIPTION OF SITE
Site Location
The site of the proposed facility is located on the east side of Carmel, Indiana. More
specifically, the site is located on the south side of E 116th Street approximately 1,000 feet east of
the intersection with Hazel Dell Parkway. The site may be located using the Fishers, Indiana 7½
minute topographic map in the northeast quadrant of Section 4, Township 17 North, Range 4 East.
The relevant portion of this map is included in the Site Location Map provided in the Appendix.
Site Topography and Drainage
The ground surface at the site is high in the northwest corner of the site and slopes down to a
low area that covers approximately three-quarters (3/4) of the site. A levy is present along the
southern and eastern extents of the site. The relief across the site is approximately fourteen (14) feet
as estimated by the GIS Overlay drawing (Sheet 1 of 1) generated by Engineered Alternatives, Inc.
dated January 25, 2010. This relief corresponds to minimum and maximum elevations of 731.7 and
745.4 feet. The observed relief is believed to be partly attributable to previous earthmoving
operations. Ground cover at the time of boring operations consisted of grass and trees. Drainage of
the site is primarily over the ground surface to a detention pond that exists beyond the southern
boundary of the site.
Ground surface elevations at the specific boring locations were interpolated from the
aforementioned drawing provided to Alt & Witzig Engineering, Inc. by Eby Realty Group. All
depths referred to in this report and on the Records of Subsurface Exploration are taken from the
ground surface at the time of boring operations.
Current Land Usage
A house currently exists in the east-central portion of the proposed structure. The house is
one (1) story above grade and has large areas of pavement associated to the west of the structure. A
large, elevated, wooden deck is also present off the southern portion of the house. It is unknown if
the house has a basement. Markings for several underground utilities were observed in the area to
the south of the house. An aerial photograph of the site taken in 2010 is provided in Figure 1 on the
following page.
3
Alt & Witzig File: 12IN0315
Figure 1 – 2010 Aerial Photograph of Site
The surrounding area is mostly developed with the Mansion at Oak Hill banquet center
existing to the west and residences existing to the north, south, and east. Northern Beach, a private
park, exists in the eastern portion of the site. Overhead and underground utilities and paved
roadways also exist in close proximity to the site.
4
Alt & Witzig File: 12IN0315
FIELD INVESTIGATIONS
Scope
Field investigations to determine the engineering characteristics of the subsurface materials
included a reconnaissance of the project site, drilling twelve (12) exploratory test borings located as
shown on the enclosed Boring Location Plan, and performing standard penetration tests and
obtaining samples of the soil retained in the split-spoon sampler. The apparent groundwater level at
each boring location was also determined.
Drilling and Sampling Procedures
The soil borings were performed with an all terrain vehicle-mounted drilling rig equipped
with a rotary head. Conventional hollow-stem augers were used to advance the holes.
Representative samples were obtained employing split-spoon sampling procedures in accordance
with ASTM procedure D1586.
Field Tests and Measurements
Penetration tests. During the sampling procedure, standard penetration tests were performed
at regular intervals to obtain the standard penetration value of the soil. The standard penetration
value is defined as the number of blows of a 140-pound hammer, falling 30 inches, that is required
to advance the split-spoon sampler one (1) foot into the soil. The results of the standard penetration
tests indicate the relative density and comparative consistency of the soils, and thereby provide a
basis for estimating the relative strength and compressibility of the soil profile components.
Water level measurements. Water level observations were made during and upon
completion of the boring operations. These water level measurements were obtained by recording
the depth at which water was observed on the drilling rods, and by measuring the distance to the
surface of any groundwater observed after the removal of the hollow stem augers. These readings
are noted on the Records of Subsurface Exploration presented in the Appendix. In relatively
pervious soils such as sandy soils, the indicated depths are considered reliable groundwater levels.
In relatively impervious soils, the accurate determination of the groundwater elevation is not
possible after even several days of observation. It should be noted that the groundwater level
measurements recorded on the individual Records of Subsurface Exploration in the Appendix are
accurate for the specific dates in which the measurements were performed. It must be understood
5
Alt & Witzig File: 12IN0315
that the groundwater levels will fluctuate throughout the year. The records do not indicate these
fluctuations.
The borings were backfilled upon completion with bentonite chips in accordance with
Carmel, Indiana regulations.
Elevations
The ground surface elevations at the particular boring locations were interpolated from
the GIS Overlay drawing generated by Engineered Alternatives, Inc. All depths referenced in this
report are from the ground surface existing at the time of the boring operations.
6
Alt & Witzig File: 12IN0315
LABORATORY INVESTIGATIONS
In addition to the field investigations, a supplemental laboratory investigation was
conducted to ascertain additional pertinent engineering characteristics of the foundation materials
necessary in analyzing the behavior of the proposed transitional care facility. All phases of the
laboratory investigation were conducted in general accordance with applicable ASTM
specifications.
The laboratory-testing program included supplementary visual classification and water
content tests on several cohesive samples. Samples of the cohesive soil from the spoon-sampling
device were frequently tested in unconfined compression utilizing a calibrated spring testing
machine. A calibrated soil penetrometer was also used as an aid in estimating the unconfined
compressive strength of the soil. The values of the unconfined compressive strength as determined
on soil samples from the split-spoon sampling must be considered approximate. The manner in
which the samples were obtained provides a representative but somewhat disturbed sample.
7
Alt & Witzig File: 12IN0315
SUBSURFACE CONDITIONS
The types of foundation materials encountered have been visually classified and are
described in detail on the Records of Subsurface Exploration. The results of the field penetration
tests, strength tests, water level observations and laboratory water content are presented on the
Records of Subsurface Exploration in numerical form. Representative samples of the soils
encountered in the field were placed in sample jars and are now stored in our laboratory for further
analysis if desired. Unless notified to the contrary, all samples will be disposed of after two (2)
months.
Generalized Subsurface Soil Conditions
The following summarizes the general subsurface characteristics encountered during the
subsurface investigation. For a detailed description of the soil conditions at the particular boring
locations, please refer to the Records of Subsurface Exploration in the Appendix.
The borings typically encountered medium stiff to stiff sandy clay from beneath the topsoil
that covers the site to depths between five (5) and eight (8) feet. Underlying these cohesive soils,
the borings encountered medium dense to dense, dry, poorly graded sand that extended to the boring
termination depth, the greatest of which was sixteen (16) feet. However, the sand became saturated
near elevation 725 feet.
The borings performed on the levee, Borings B-11 and B-12, encountered fill materials
consisting of silty and sandy clays containing varying amounts of construction debris (asphalt
fragments) to the boring termination depth in boring B-12 and a depth of fifteen (15) feet in boring
B-11. Boring B-11 terminated in dry, poorly graded sand.
Groundwater
As previously mentioned, the sand generally exhibited a groundwater elevation of
approximately 725 feet.
The Soil Conservation Service map indicates that the natural soils at this site consist of
Genesee silt loam (Ge), Ockley silt loam (OcA), and Sloan silty clay loam (Sx) type soils. The
groundwater level for the Genesee and Ockley soil types typically remains at a depth greater than
six (6) feet throughout the year. These soil types account for approximately 63 percent of the
8
Alt & Witzig File: 12IN0315
project site and are located in the western half of the site. The Sloan type soils, however, are
capable of exhibiting a perched groundwater table up to the natural ground surface during the
wet portion of the year.
It should be noted that the groundwater level measurements recorded on the individual
Records of Subsurface Exploration in the Appendix are accurate for the specific dates in which
the measurements were taken. The exact location of the water table should be anticipated to
fluctuate somewhat depending upon normal seasonal variations in precipitation.
Seismic Site Classification
Based on information obtained in the subsurface investigation, as well as information
cataloged on the Indiana GIS, the site may be considered as a site class D in accordance with the
2006 Building Code guidelines. Spectral response values of 0.177 and 0.079 for SS and S1,
respectively, may also be considered.
9
Alt & Witzig File: 12IN0315
PROJECT DISCUSSION AND RECOMMENDATIONS
Project Description
Preliminary design plans indicate that the proposed assisted living facility is to be
constructed in the northwest corner of the site in Carmel, Indiana. The approximate size and
configuration of the proposed structure in relation to the boring locations is shown on the enclosed
Boring Location Plan.
The pad elevation for the structure was not available at the time of this report. However, it
is anticipated that the structure will be constructed at or near the elevation of the existing structure
(approximately 743.0 ft). Based on a review of the aforementioned topographic survey, the existing
elevations in the area of the building range from 745.5 to 732.5 feet. Therefore, the site is currently
two and one-half (2½) feet above to nine and one-half (9½) feet below proposed grade and will
require both cut and fill. It has been expressed that use of the material in the Northern Beach area is
desirable for use as fill to level the building pad.
Design details specify that the building will be a one (1) story structure. It is anticipated
that the structure will utilize conventional wood framing. It is also anticipated that the structure
will be without a basement with the ground floor constructed as a slab-on-grade. Based on
experience with similar structures, it is anticipated that structural loads for this building will be
transferred to the soils by conventional spread and continuous wall footings, if possible. Wall
loads between two (2) and three (3) kips per lineal foot and maximum column loads of 20 kips
were estimated for the purposes of this analysis.
Parking and drive facilities are also proposed for construction around the structure.
Site Preparation
As previously discussed, a house currently exists in the east-central portion of the proposed
structure. Access to this house was not granted as part of this investigation. As such, it is not
known if the house has a basement.
10
Alt & Witzig File: 12IN0315
Care must always be exercised when demolishing a structure. The existing building
foundations and the utilities associated with the existing structure should be completely removed
and the excavations properly backfilled and compacted with granular fill. If the structure has a
basement, it is recommended that the walls be completely removed and the floor slab broken up
such that water will not remain trapped on the floor slab. All voids created as a result of the
demolition of the existing structure should be backfilled with properly compacted granular fill. All
fill placed in these excavations should be compacted to 95 percent of the material’s maximum dry
density as determined by ASTM D1557 (Modified Proctor). At no time should new footings be
placed directly above the old footings or abandoned utilities.
The site will contain underground utilities such as sanitary sewers, electrical lines,
communication lines, gas lines, and buried downspouts. It is important that all underground utility
conduits and sewers either be removed and backfilled with structural fills or that all foundations
extend past the bottom of former utility trenches. It is recommended that a representative of Alt &
Witzig Engineering, Inc. be present during demolition and backfilling operations. Doing so will
reduce project delays due to confusion once the project moves into the construction phase.
After the existing building has been demolished and the site stripped, it is recommended that
the suitability of the shallow fill for support of floor slabs and pavement be evaluated by a proof-
roll. This proof-roll will assist in identifying the presence of soft soil at a shallow depth. Areas
failing this proof-roll must be undercut to firm soil, or to a maximum depth of two (2) feet. Grade
may be reestablished utilizing properly compacted granular fill. All fill placed in undercut areas
should be compacted to 95 percent of the material’s maximum dry density as determined by ASTM
D1557.
Though the anticipated structure will be relatively light, the fill itself will induce some
settlement of the natural soils in the southern and eastern extents of the building pad. It is
anticipated that a majority of this settlement will occur during construction. Since the amount of
fill to be placed varies across the site, differential settlement across the structure may occur if the
structure is constructed immediately following the placement of fill. If it is possible, it is
recommended that the earthmoving operations and the installation of drainage systems be
completed as early as possible and the site left to stabilize before resuming construction.
11
Alt & Witzig File: 12IN0315
To ensure that suitable compaction is achieved along the slope to the south and east of the
existing house, the earthwork contractor must follow proper benching techniques. Benches should
be of sufficient width to accommodate the required compaction equipment (minimum 10 feet).
Benching of natural slopes and existing embankment slopes should be performed in accordance
with Section 203.21 of the INDOT Standard Specifications.
The following foundation, floor slab, and pavement recommendations are provided
assuming these site preparation and evaluation techniques have been performed.
Geotechnical Recommendations
Provided the foundations are constructed on medium stiff natural soils or properly
compacted fill, net allowable bearing pressures of 3,000 and 2,400 psf are recommended for
dimensioning spread footings and continuous wall footings, respectively. It is recommended that a
representative of Alt & Witzig Engineering, Inc. inspect all foundation excavations prior to the
placement of concrete. In utilizing net allowable pressures for dimensioning footings, it is
necessary to consider only those loads applied above the finished floor elevation.
Using the above mentioned bearing pressures and recommendations, total settlements of less
than one (1) inch and differential settlements of one half (½) inch or less can be anticipated.
In order to alleviate the effects of seasonal variations in moisture content on the behavior
of the footings and eliminate the effects of frost action, all exterior foundations should be
founded a minimum of three (3) feet below the final grade. Interior footings may be founded at a
nominal depth provided suitable soils exist at the bottom of footing elevation.
Floor Slab Recommendations
It is typically desirable to place the floor slab as a slab-on-grade supported by the soil. In
the areas where the existing grade is above the final floor elevation, the building area should be
undercut and a granular material placed beneath the slab. In areas where the existing grade is
below the final floor elevation, a well-compacted structural fill will be necessary to raise the site
to the desired grade. After the building area has established at the proper elevation, a granular fill
should be placed immediately beneath all floor slabs.
12
Alt & Witzig File: 12IN0315
Prior to elevating the site, the existing subgrade soils must be proof-rolled with approved
equipment as previously discussed. It is recommended that a representative of Alt & Witzig
Engineering, Inc. be present to determine the exact depth of undercutting and to monitor
backfilling operations.
In order to properly support the footings and floor slab, it will be necessary that
controlled fill material be placed throughout the entire footprint of the building and beyond the
footprint. The horizontal distance that this controlled compaction is necessary will depend on the
depth of the fill material. It is recommended that the materials within the subgrade area be
compacted to a minimum density of 93% of maximum density in accordance with ASTM
D1557.
Pavement Recommendations
It is recommended that the suitability of the shallow fills for support of pavements be
evaluated with a proof-roll. Prior to placing fill material or crushed stone, the exposed subgrade
soils should be proof-rolled with approved equipment. This proof-roll will assist in identifying
soft soils within a shallow depth. Due to past earthmoving operations that have occurred at the
site, some softer fill material/disturbed soils should be anticipated. Where soft areas are
encountered, they should be undercut two (2) feet or to firm soil and grade reestablished with
properly compacted granular fill.
The recommendations provided below assume the subgrade passes a proof-roll or has been
treated to do so.
A CBR value of three (3) may be considered when evaluating the subgrade strength for
construction of parking and drive areas. It should be noted that the CBR value is a laboratory
determined relative strength value. The actual CBR value for the encountered soils will be
influenced by the time of construction as well as subgrade control methods implemented by the
contractor.
The strength of the subgrade soils at this site will depend upon several variables including
preparation and compaction. It is also important that all paved areas be designed to prevent water
from collecting or ponding immediately beneath the pavement. This can be done by sloping the
subgrade soils, providing the pavement areas with sufficient drainage ditches, and/or placing a
positive underdrain system two (2) to three (3) feet beneath the granular base course layer.
13
Alt & Witzig File: 12IN0315
General Pavement Recommendations
A minimum pavement section should be adequate for areas subjected only to light-duty
traffic. It is recommended that two (2) inches of asphalt binder and one (1) inch of asphalt surface
be placed over six (6) inches of a compacted crushed stone subbase. If deliveries, heavy truck
traffic, and/or multiple trash pick-ups per week will be allowed on the pavement, a thicker pavement
section may be necessary. An estimation of the frequency of this truck traffic would be necessary to
provide additional recommendations for this scenario.
Use of On-Site Material as Fill
The shallow soils in borings B-8 though B-12 typically consisted of silty and sandy clays.
These soils are suitable for use as structural fill provided they are properly moisture conditioned and
compacted. The moisture contents of these soils typically ranged between 13 and 23 percent. A
moisture density relationship was not performed on these materials. However, based on our
experience with similar soils, it is anticipated that these soils are slightly above the optimum
moisture content. Thus, some working and drying of the soils will be necessary in order to properly
use them as a structural fill.
The topsoil covering these soils is not suitable for use as a structural fill. Typically two (2)
to seven (7) inches of topsoil was encountered across this area of the site. However, boring B-10
encountered topsoil to a depth of approximately twenty (20) inches. It will be necessary to strip the
topsoil from the borrow areas prior to excavation of this material for fill.
14
Alt & Witzig File: 12IN0315
CONSTRUCTION CONSIDERATIONS
Site Preparation
Excessively organic topsoil and loose dumped fill materials will generally undergo high
volume changes that are detrimental to the behavior of pavements, floor slabs, structural fills, and
foundations placed upon them. Therefore, it is recommended that all loose materials be stripped
from the construction areas and wasted or stockpiled for later use. The topsoil was estimated to be
approximately two (2) to eight (8) inches thick across the site. Exceptions to this range have been
previously discussed. Due to past earthmoving operations that have occurred at the site, some
shallow disturbed soils will likely be encountered across the site. The depth and consistency of
these materials will vary across the site.
It should be noted that the soil borings only indicate the apparent topsoil thickness at the
specific locations. Borings do not indicate variations between selected locations. Thus, borings
only provide a general indication of the amount of stripping that will be necessary at this site. The
depth of stripping will also be influenced by the condition of the subgrade during earthmoving and
the equipment used during stripping operations. A representative of Alt & Witzig Engineering, Inc.
should determine the exact depth of stripping, in the field, at the time of the stripping operations.
It is recommended that after the above-mentioned stripping has been performed, the
exposed subgrade should be proof-rolled with approved equipment. This proof-rolling will assist in
identifying pockets of soft, unsuitable materials at a shallow depth. If pockets of unsuitable
materials are encountered, they should be stabilized as previously mentioned. It is recommended
that a representative of Alt & Witzig Engineering, Inc. be present for this phase of this project.
It should be noted that considerable heavy construction traffic over the exposed subgrade
might cause rutting and pumping. Caution should be exercised to direct construction traffic such
that the sub grade does not fail due to construction activities.
After the existing subgrade soils are excavated to design grade, proper control of subgrade
compaction and fill, and structural fill replacement should be maintained by a representative of Alt
& Witzig Engineering, Inc. as per the Recommended Specifications for Compacted Fills and
Backfills presented in the Appendix; thus minimizing volume changes and differential settlements
which are detrimental to behavior of shallow foundations, floor slabs and pavements.
15
Alt & Witzig File: 12IN0315
Groundwater
The groundwater level measurements obtained upon completion of boring operations
generally indicated a groundwater elevation of approximately 725 feet. Soil Conservation Service
data indicates the groundwater level at a majority of the site should remain at a depth greater than
six (6) feet throughout the year. However, depending upon the weather conditions while the
excavations are open, seepage from surface runoff may occur into shallow excavations. Therefore,
minor to moderate construction difficulties associated with groundwater infiltration should be
anticipated at this site. Since these foundation materials tend to soften when exposed to free water,
every effort should be made to keep the excavations dry should groundwater be encountered. A
gravity drainage system, sump pumps, or other conventional dewatering procedures should be
sufficient for this purpose in the shallow cohesive soils.
It is also recommended that all concrete for footings be placed the same day as the
excavation is made.
16
Alt & Witzig File: 12IN0315
SUMMARY
A subsurface exploration and engineering evaluation of the subsurface materials has been
conducted for the proposed assisted living facility in Carmel, Indiana.
The recommendations submitted herein are based on the available soil information and
provided as well as assumed design details. This summary is intended to draw attention to key
points in the report and is not intended to be all inclusive.
Site Preparation
A house currently exists in the east-central portion of the proposed structure. It is not known
if the house has a basement. At no time should new footings be placed directly above the old
footings or abandoned utilities.
To ensure that suitable compaction is achieved along the slope to the south and east of the
existing house, benching of natural slopes and existing embankment slopes should be performed in
accordance with Section 203.21 of the INDOT Standard Specifications.
Use of On-Site Material as Fill
The shallow soils in borings B-8 though B-12 are suitable for use as structural fill provided
they are properly moisture conditioned and compacted.
APPENDIX
RECOMMENDED SPECIFICATIONS FOR COMPACTED FILLS AND BACKFILLS
All fill shall be formed from material free of vegetable matter, rubbish, large rock, and other
deleterious material. Prior to placement of fill, a sample of the proposed fill material should be
submitted to the soils engineer for his approval. The fill material should be placed in layers not to
exceed eight (8) inches in loose thickness and should be sprinkled with water as required to secure
specified compactions. Each layer should be uniformly compacted by means of suitable equipment
of the type required by the materials composing the fill. Under no circumstances should a bulldozer
or similar tracked vehicles be used as compacting equipment. Material containing an excess of
water so the specified compaction limits cannot be attained should be spread and dried to a moisture
content that will permit proper compaction. All fill should be compacted to the specified percent of
the maximum density obtained in accordance with ASTM density Test D1557 (95 percent of
maximum dry density below the base of footing elevation, 93 percent of maximum dry density in
the floor slab and pavement areas). Should the results of the in-place density tests indicate that the
specified compaction limits are not obtained, the areas represented by such tests should be reworked
and retested as required until the specified limits are reached.
TABLE OF CONTENTS
SECTION PAGE
INTRODUCTION ................................................................................................................................ 1
DESCRIPTION OF SITE ................................................................................................................... 2
FIELD INVESTIGATIONS ................................................................................................................. 4
LABORATORY INVESTIGATIONS ............................................................................................... 6
SUBSURFACE CONDITIONS ......................................................................................................... 7
PROJECT DISCUSSION AND RECOMMENDATIONS ................................................................ 9
CONSTRUCTION CONSIDERATIONS ........................................................................................ 14
SUMMARY ..................................................................................................................................... 16
APPENDIX
Recommended Specifications for Compacted Fills and Backfills
Site Location Map
Soil Survey Map of Hamilton County
Boring Location Plan
Records of Subsurface Exploration
General Notes
USGS “Design Maps” Summary Report
F:\Projects\12\12IN0315\Geo Good\12IN0315 Geotech Report.doc
1
Alt & Witzig File: 12IN0315
SSUUBBSSUURRFFAACCEE IINNVVEESSTTIIGGAATTIIOONN
AANNDD
GGEEOOTTEECCHHNNIICCAALL RREECCOOMMMMEENNDDAATTIIOONNSS
INTRODUCTION
This report presents the results of a subsurface investigation conducted for the assisted
living facility proposed for construction in Carmel, Indiana. This investigation was conducted
on behalf of Eby Realty Group located in Olathe Kansas. Authorization to perform this
investigation was in the form of a proposal prepared by Alt & Witzig Engineering, Inc. (A&W
Proposal 1205G017) that was accepted by Mr. Richard Eby with Eby Realty Group.
The scope of this investigation included a review of geological maps of the area; a
reconnaissance of the immediate site; a subsurface exploration; field and laboratory testing; and an
engineering analysis and evaluation of the encountered subsurface materials.
The purpose of this subsurface investigation was to determine the various soils profile
components, the engineering characteristics of the subsurface materials, and to provide criteria for
use by the design engineers and architects in preparing the foundation design for the proposed
facility.
The scope or purpose of this geotechnical investigation did not either specifically or by
implication provide an environmental assessment of the site.
2
Alt & Witzig File: 12IN0315
DESCRIPTION OF SITE
Site Location
The site of the proposed facility is located on the east side of Carmel, Indiana. More
specifically, the site is located on the south side of E 116th Street approximately 1,000 feet east of
the intersection with Hazel Dell Parkway. The site may be located using the Fishers, Indiana 7½
minute topographic map in the northeast quadrant of Section 4, Township 17 North, Range 4 East.
The relevant portion of this map is included in the Site Location Map provided in the Appendix.
Site Topography and Drainage
The ground surface at the site is high in the northwest corner of the site and slopes down to a
low area that covers approximately three-quarters (3/4) of the site. A levy is present along the
southern and eastern extents of the site. The relief across the site is approximately fourteen (14) feet
as estimated by the GIS Overlay drawing (Sheet 1 of 1) generated by Engineered Alternatives, Inc.
dated January 25, 2010. This relief corresponds to minimum and maximum elevations of 731.7 and
745.4 feet. The observed relief is believed to be partly attributable to previous earthmoving
operations. Ground cover at the time of boring operations consisted of grass and trees. Drainage of
the site is primarily over the ground surface to a detention pond that exists beyond the southern
boundary of the site.
Ground surface elevations at the specific boring locations were interpolated from the
aforementioned drawing provided to Alt & Witzig Engineering, Inc. by Eby Realty Group. All
depths referred to in this report and on the Records of Subsurface Exploration are taken from the
ground surface at the time of boring operations.
Current Land Usage
A house currently exists in the east-central portion of the proposed structure. The house is
one (1) story above grade and has large areas of pavement associated to the west of the structure. A
large, elevated, wooden deck is also present off the southern portion of the house. It is unknown if
the house has a basement. Markings for several underground utilities were observed in the area to
the south of the house. An aerial photograph of the site taken in 2010 is provided in Figure 1 on the
following page.
3
Alt & Witzig File: 12IN0315
Figure 1 – 2010 Aerial Photograph of Site
The surrounding area is mostly developed with the Mansion at Oak Hill banquet center
existing to the west and residences existing to the north, south, and east. Northern Beach, a private
park, exists in the eastern portion of the site. Overhead and underground utilities and paved
roadways also exist in close proximity to the site.
4
Alt & Witzig File: 12IN0315
FIELD INVESTIGATIONS
Scope
Field investigations to determine the engineering characteristics of the subsurface materials
included a reconnaissance of the project site, drilling twelve (12) exploratory test borings located as
shown on the enclosed Boring Location Plan, and performing standard penetration tests and
obtaining samples of the soil retained in the split-spoon sampler. The apparent groundwater level at
each boring location was also determined.
Drilling and Sampling Procedures
The soil borings were performed with an all terrain vehicle-mounted drilling rig equipped
with a rotary head. Conventional hollow-stem augers were used to advance the holes.
Representative samples were obtained employing split-spoon sampling procedures in accordance
with ASTM procedure D1586.
Field Tests and Measurements
Penetration tests. During the sampling procedure, standard penetration tests were performed
at regular intervals to obtain the standard penetration value of the soil. The standard penetration
value is defined as the number of blows of a 140-pound hammer, falling 30 inches, that is required
to advance the split-spoon sampler one (1) foot into the soil. The results of the standard penetration
tests indicate the relative density and comparative consistency of the soils, and thereby provide a
basis for estimating the relative strength and compressibility of the soil profile components.
Water level measurements. Water level observations were made during and upon
completion of the boring operations. These water level measurements were obtained by recording
the depth at which water was observed on the drilling rods, and by measuring the distance to the
surface of any groundwater observed after the removal of the hollow stem augers. These readings
are noted on the Records of Subsurface Exploration presented in the Appendix. In relatively
pervious soils such as sandy soils, the indicated depths are considered reliable groundwater levels.
In relatively impervious soils, the accurate determination of the groundwater elevation is not
possible after even several days of observation. It should be noted that the groundwater level
measurements recorded on the individual Records of Subsurface Exploration in the Appendix are
accurate for the specific dates in which the measurements were performed. It must be understood
5
Alt & Witzig File: 12IN0315
that the groundwater levels will fluctuate throughout the year. The records do not indicate these
fluctuations.
The borings were backfilled upon completion with bentonite chips in accordance with
Carmel, Indiana regulations.
Elevations
The ground surface elevations at the particular boring locations were interpolated from
the GIS Overlay drawing generated by Engineered Alternatives, Inc. All depths referenced in this
report are from the ground surface existing at the time of the boring operations.
6
Alt & Witzig File: 12IN0315
LABORATORY INVESTIGATIONS
In addition to the field investigations, a supplemental laboratory investigation was
conducted to ascertain additional pertinent engineering characteristics of the foundation materials
necessary in analyzing the behavior of the proposed transitional care facility. All phases of the
laboratory investigation were conducted in general accordance with applicable ASTM
specifications.
The laboratory-testing program included supplementary visual classification and water
content tests on several cohesive samples. Samples of the cohesive soil from the spoon-sampling
device were frequently tested in unconfined compression utilizing a calibrated spring testing
machine. A calibrated soil penetrometer was also used as an aid in estimating the unconfined
compressive strength of the soil. The values of the unconfined compressive strength as determined
on soil samples from the split-spoon sampling must be considered approximate. The manner in
which the samples were obtained provides a representative but somewhat disturbed sample.
7
Alt & Witzig File: 12IN0315
SUBSURFACE CONDITIONS
The types of foundation materials encountered have been visually classified and are
described in detail on the Records of Subsurface Exploration. The results of the field penetration
tests, strength tests, water level observations and laboratory water content are presented on the
Records of Subsurface Exploration in numerical form. Representative samples of the soils
encountered in the field were placed in sample jars and are now stored in our laboratory for further
analysis if desired. Unless notified to the contrary, all samples will be disposed of after two (2)
months.
Generalized Subsurface Soil Conditions
The following summarizes the general subsurface characteristics encountered during the
subsurface investigation. For a detailed description of the soil conditions at the particular boring
locations, please refer to the Records of Subsurface Exploration in the Appendix.
The borings typically encountered medium stiff to stiff sandy clay from beneath the topsoil
that covers the site to depths between five (5) and eight (8) feet. Underlying these cohesive soils,
the borings encountered medium dense to dense, dry, poorly graded sand that extended to the boring
termination depth, the greatest of which was sixteen (16) feet. However, the sand became saturated
near elevation 725 feet.
The borings performed on the levee, Borings B-11 and B-12, encountered fill materials
consisting of silty and sandy clays containing varying amounts of construction debris (asphalt
fragments) to the boring termination depth in boring B-12 and a depth of fifteen (15) feet in boring
B-11. Boring B-11 terminated in dry, poorly graded sand.
Groundwater
As previously mentioned, the sand generally exhibited a groundwater elevation of
approximately 725 feet.
The Soil Conservation Service map indicates that the natural soils at this site consist of
Genesee silt loam (Ge), Ockley silt loam (OcA), and Sloan silty clay loam (Sx) type soils. The
groundwater level for the Genesee and Ockley soil types typically remains at a depth greater than
six (6) feet throughout the year. These soil types account for approximately 63 percent of the
8
Alt & Witzig File: 12IN0315
project site and are located in the western half of the site. The Sloan type soils, however, are
capable of exhibiting a perched groundwater table up to the natural ground surface during the
wet portion of the year.
It should be noted that the groundwater level measurements recorded on the individual
Records of Subsurface Exploration in the Appendix are accurate for the specific dates in which
the measurements were taken. The exact location of the water table should be anticipated to
fluctuate somewhat depending upon normal seasonal variations in precipitation.
Seismic Site Classification
Based on information obtained in the subsurface investigation, as well as information
cataloged on the Indiana GIS, the site may be considered as a site class D in accordance with the
2006 Building Code guidelines. Spectral response values of 0.177 and 0.079 for SS and S1,
respectively, may also be considered.
9
Alt & Witzig File: 12IN0315
PROJECT DISCUSSION AND RECOMMENDATIONS
Project Description
Preliminary design plans indicate that the proposed assisted living facility is to be
constructed in the northwest corner of the site in Carmel, Indiana. The approximate size and
configuration of the proposed structure in relation to the boring locations is shown on the enclosed
Boring Location Plan.
The pad elevation for the structure was not available at the time of this report. However, it
is anticipated that the structure will be constructed at or near the elevation of the existing structure
(approximately 743.0 ft). Based on a review of the aforementioned topographic survey, the existing
elevations in the area of the building range from 745.5 to 732.5 feet. Therefore, the site is currently
two and one-half (2½) feet above to nine and one-half (9½) feet below proposed grade and will
require both cut and fill. It has been expressed that use of the material in the Northern Beach area is
desirable for use as fill to level the building pad.
Design details specify that the building will be a one (1) story structure. It is anticipated
that the structure will utilize conventional wood framing. It is also anticipated that the structure
will be without a basement with the ground floor constructed as a slab-on-grade. Based on
experience with similar structures, it is anticipated that structural loads for this building will be
transferred to the soils by conventional spread and continuous wall footings, if possible. Wall
loads between two (2) and three (3) kips per lineal foot and maximum column loads of 20 kips
were estimated for the purposes of this analysis.
Parking and drive facilities are also proposed for construction around the structure.
Site Preparation
As previously discussed, a house currently exists in the east-central portion of the proposed
structure. Access to this house was not granted as part of this investigation. As such, it is not
known if the house has a basement.
10
Alt & Witzig File: 12IN0315
Care must always be exercised when demolishing a structure. The existing building
foundations and the utilities associated with the existing structure should be completely removed
and the excavations properly backfilled and compacted with granular fill. If the structure has a
basement, it is recommended that the walls be completely removed and the floor slab broken up
such that water will not remain trapped on the floor slab. All voids created as a result of the
demolition of the existing structure should be backfilled with properly compacted granular fill. All
fill placed in these excavations should be compacted to 95 percent of the material’s maximum dry
density as determined by ASTM D1557 (Modified Proctor). At no time should new footings be
placed directly above the old footings or abandoned utilities.
The site will contain underground utilities such as sanitary sewers, electrical lines,
communication lines, gas lines, and buried downspouts. It is important that all underground utility
conduits and sewers either be removed and backfilled with structural fills or that all foundations
extend past the bottom of former utility trenches. It is recommended that a representative of Alt &
Witzig Engineering, Inc. be present during demolition and backfilling operations. Doing so will
reduce project delays due to confusion once the project moves into the construction phase.
After the existing building has been demolished and the site stripped, it is recommended that
the suitability of the shallow fill for support of floor slabs and pavement be evaluated by a proof-
roll. This proof-roll will assist in identifying the presence of soft soil at a shallow depth. Areas
failing this proof-roll must be undercut to firm soil, or to a maximum depth of two (2) feet. Grade
may be reestablished utilizing properly compacted granular fill. All fill placed in undercut areas
should be compacted to 95 percent of the material’s maximum dry density as determined by ASTM
D1557.
Though the anticipated structure will be relatively light, the fill itself will induce some
settlement of the natural soils in the southern and eastern extents of the building pad. It is
anticipated that a majority of this settlement will occur during construction. Since the amount of
fill to be placed varies across the site, differential settlement across the structure may occur if the
structure is constructed immediately following the placement of fill. If it is possible, it is
recommended that the earthmoving operations and the installation of drainage systems be
completed as early as possible and the site left to stabilize before resuming construction.
11
Alt & Witzig File: 12IN0315
To ensure that suitable compaction is achieved along the slope to the south and east of the
existing house, the earthwork contractor must follow proper benching techniques. Benches should
be of sufficient width to accommodate the required compaction equipment (minimum 10 feet).
Benching of natural slopes and existing embankment slopes should be performed in accordance
with Section 203.21 of the INDOT Standard Specifications.
The following foundation, floor slab, and pavement recommendations are provided
assuming these site preparation and evaluation techniques have been performed.
Geotechnical Recommendations
Provided the foundations are constructed on medium stiff natural soils or properly
compacted fill, net allowable bearing pressures of 3,000 and 2,400 psf are recommended for
dimensioning spread footings and continuous wall footings, respectively. It is recommended that a
representative of Alt & Witzig Engineering, Inc. inspect all foundation excavations prior to the
placement of concrete. In utilizing net allowable pressures for dimensioning footings, it is
necessary to consider only those loads applied above the finished floor elevation.
Using the above mentioned bearing pressures and recommendations, total settlements of less
than one (1) inch and differential settlements of one half (½) inch or less can be anticipated.
In order to alleviate the effects of seasonal variations in moisture content on the behavior
of the footings and eliminate the effects of frost action, all exterior foundations should be
founded a minimum of three (3) feet below the final grade. Interior footings may be founded at a
nominal depth provided suitable soils exist at the bottom of footing elevation.
Floor Slab Recommendations
It is typically desirable to place the floor slab as a slab-on-grade supported by the soil. In
the areas where the existing grade is above the final floor elevation, the building area should be
undercut and a granular material placed beneath the slab. In areas where the existing grade is
below the final floor elevation, a well-compacted structural fill will be necessary to raise the site
to the desired grade. After the building area has established at the proper elevation, a granular fill
should be placed immediately beneath all floor slabs.
12
Alt & Witzig File: 12IN0315
Prior to elevating the site, the existing subgrade soils must be proof-rolled with approved
equipment as previously discussed. It is recommended that a representative of Alt & Witzig
Engineering, Inc. be present to determine the exact depth of undercutting and to monitor
backfilling operations.
In order to properly support the footings and floor slab, it will be necessary that
controlled fill material be placed throughout the entire footprint of the building and beyond the
footprint. The horizontal distance that this controlled compaction is necessary will depend on the
depth of the fill material. It is recommended that the materials within the subgrade area be
compacted to a minimum density of 93% of maximum density in accordance with ASTM
D1557.
Pavement Recommendations
It is recommended that the suitability of the shallow fills for support of pavements be
evaluated with a proof-roll. Prior to placing fill material or crushed stone, the exposed subgrade
soils should be proof-rolled with approved equipment. This proof-roll will assist in identifying
soft soils within a shallow depth. Due to past earthmoving operations that have occurred at the
site, some softer fill material/disturbed soils should be anticipated. Where soft areas are
encountered, they should be undercut two (2) feet or to firm soil and grade reestablished with
properly compacted granular fill.
The recommendations provided below assume the subgrade passes a proof-roll or has been
treated to do so.
A CBR value of three (3) may be considered when evaluating the subgrade strength for
construction of parking and drive areas. It should be noted that the CBR value is a laboratory
determined relative strength value. The actual CBR value for the encountered soils will be
influenced by the time of construction as well as subgrade control methods implemented by the
contractor.
The strength of the subgrade soils at this site will depend upon several variables including
preparation and compaction. It is also important that all paved areas be designed to prevent water
from collecting or ponding immediately beneath the pavement. This can be done by sloping the
subgrade soils, providing the pavement areas with sufficient drainage ditches, and/or placing a
positive underdrain system two (2) to three (3) feet beneath the granular base course layer.
13
Alt & Witzig File: 12IN0315
General Pavement Recommendations
A minimum pavement section should be adequate for areas subjected only to light-duty
traffic. It is recommended that two (2) inches of asphalt binder and one (1) inch of asphalt surface
be placed over six (6) inches of a compacted crushed stone subbase. If deliveries, heavy truck
traffic, and/or multiple trash pick-ups per week will be allowed on the pavement, a thicker pavement
section may be necessary. An estimation of the frequency of this truck traffic would be necessary to
provide additional recommendations for this scenario.
Use of On-Site Material as Fill
The shallow soils in borings B-8 though B-12 typically consisted of silty and sandy clays.
These soils are suitable for use as structural fill provided they are properly moisture conditioned and
compacted. The moisture contents of these soils typically ranged between 13 and 23 percent. A
moisture density relationship was not performed on these materials. However, based on our
experience with similar soils, it is anticipated that these soils are slightly above the optimum
moisture content. Thus, some working and drying of the soils will be necessary in order to properly
use them as a structural fill.
The topsoil covering these soils is not suitable for use as a structural fill. Typically two (2)
to seven (7) inches of topsoil was encountered across this area of the site. However, boring B-10
encountered topsoil to a depth of approximately twenty (20) inches. It will be necessary to strip the
topsoil from the borrow areas prior to excavation of this material for fill.
14
Alt & Witzig File: 12IN0315
CONSTRUCTION CONSIDERATIONS
Site Preparation
Excessively organic topsoil and loose dumped fill materials will generally undergo high
volume changes that are detrimental to the behavior of pavements, floor slabs, structural fills, and
foundations placed upon them. Therefore, it is recommended that all loose materials be stripped
from the construction areas and wasted or stockpiled for later use. The topsoil was estimated to be
approximately two (2) to eight (8) inches thick across the site. Exceptions to this range have been
previously discussed. Due to past earthmoving operations that have occurred at the site, some
shallow disturbed soils will likely be encountered across the site. The depth and consistency of
these materials will vary across the site.
It should be noted that the soil borings only indicate the apparent topsoil thickness at the
specific locations. Borings do not indicate variations between selected locations. Thus, borings
only provide a general indication of the amount of stripping that will be necessary at this site. The
depth of stripping will also be influenced by the condition of the subgrade during earthmoving and
the equipment used during stripping operations. A representative of Alt & Witzig Engineering, Inc.
should determine the exact depth of stripping, in the field, at the time of the stripping operations.
It is recommended that after the above-mentioned stripping has been performed, the
exposed subgrade should be proof-rolled with approved equipment. This proof-rolling will assist in
identifying pockets of soft, unsuitable materials at a shallow depth. If pockets of unsuitable
materials are encountered, they should be stabilized as previously mentioned. It is recommended
that a representative of Alt & Witzig Engineering, Inc. be present for this phase of this project.
It should be noted that considerable heavy construction traffic over the exposed subgrade
might cause rutting and pumping. Caution should be exercised to direct construction traffic such
that the sub grade does not fail due to construction activities.
After the existing subgrade soils are excavated to design grade, proper control of subgrade
compaction and fill, and structural fill replacement should be maintained by a representative of Alt
& Witzig Engineering, Inc. as per the Recommended Specifications for Compacted Fills and
Backfills presented in the Appendix; thus minimizing volume changes and differential settlements
which are detrimental to behavior of shallow foundations, floor slabs and pavements.
15
Alt & Witzig File: 12IN0315
Groundwater
The groundwater level measurements obtained upon completion of boring operations
generally indicated a groundwater elevation of approximately 725 feet. Soil Conservation Service
data indicates the groundwater level at a majority of the site should remain at a depth greater than
six (6) feet throughout the year. However, depending upon the weather conditions while the
excavations are open, seepage from surface runoff may occur into shallow excavations. Therefore,
minor to moderate construction difficulties associated with groundwater infiltration should be
anticipated at this site. Since these foundation materials tend to soften when exposed to free water,
every effort should be made to keep the excavations dry should groundwater be encountered. A
gravity drainage system, sump pumps, or other conventional dewatering procedures should be
sufficient for this purpose in the shallow cohesive soils.
It is also recommended that all concrete for footings be placed the same day as the
excavation is made.
16
Alt & Witzig File: 12IN0315
SUMMARY
A subsurface exploration and engineering evaluation of the subsurface materials has been
conducted for the proposed assisted living facility in Carmel, Indiana.
The recommendations submitted herein are based on the available soil information and
provided as well as assumed design details. This summary is intended to draw attention to key
points in the report and is not intended to be all inclusive.
Site Preparation
A house currently exists in the east-central portion of the proposed structure. It is not known
if the house has a basement. At no time should new footings be placed directly above the old
footings or abandoned utilities.
To ensure that suitable compaction is achieved along the slope to the south and east of the
existing house, benching of natural slopes and existing embankment slopes should be performed in
accordance with Section 203.21 of the INDOT Standard Specifications.
Use of On-Site Material as Fill
The shallow soils in borings B-8 though B-12 are suitable for use as structural fill provided
they are properly moisture conditioned and compacted.
APPENDIX
RECOMMENDED SPECIFICATIONS FOR COMPACTED FILLS AND BACKFILLS
All fill shall be formed from material free of vegetable matter, rubbish, large rock, and other
deleterious material. Prior to placement of fill, a sample of the proposed fill material should be
submitted to the soils engineer for his approval. The fill material should be placed in layers not to
exceed eight (8) inches in loose thickness and should be sprinkled with water as required to secure
specified compactions. Each layer should be uniformly compacted by means of suitable equipment
of the type required by the materials composing the fill. Under no circumstances should a bulldozer
or similar tracked vehicles be used as compacting equipment. Material containing an excess of
water so the specified compaction limits cannot be attained should be spread and dried to a moisture
content that will permit proper compaction. All fill should be compacted to the specified percent of
the maximum density obtained in accordance with ASTM density Test D1557 (95 percent of
maximum dry density below the base of footing elevation, 93 percent of maximum dry density in
the floor slab and pavement areas). Should the results of the in-place density tests indicate that the
specified compaction limits are not obtained, the areas represented by such tests should be reworked
and retested as required until the specified limits are reached.
Site Location
Scale: 1inch = 2,000 feet
SITE LOCATION MAP
Project Name:
Proposed Assisted Living Facility
Prepared By:
Alt & Witzig Engineering, Inc.
Prepared For:
NHI-Bickford RE. LLC
Project No:
12IN0315
Date:
05/12
N
!!!!!!!
!
!
!
!
!
!!!!!!!!!!!!!!!!!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
116th St
Ri
v
e
r
D
r
Trai
l
s
E
n
d
S
t
116th St
Ge
SxOcA
OcB2
Or
W
OcA
579300
579300
579370
579370
579440
579440
579510
579510
579580
579580
579650
579650
579720
579720
44
2
2
9
4
0
44
2
2
9
4
0
44
2
3
0
1
0
44
2
3
0
1
0
44
2
3
0
8
0
44
2
3
0
8
0
44
2
3
1
5
0
44
2
3
1
5
0
44
2
3
2
2
0
44
2
3
2
2
0
44
2
3
2
9
0
44
2
3
2
9
0
44
2
3
3
6
0
44
2
3
3
6
0
44
2
3
4
3
0
44
2
3
4
3
0
44
2
3
5
0
0
44
2
3
5
0
0
0 200 400 600100
Feet
0 50 100 15025
Meters±
39° 57' 29''
86
°
3
'
5
9
'
'
39° 57' 8''
86
°
3
'
5
9
'
'
39° 57' 8''
39° 57' 29''
86
°
4
'
1
9
'
'
86
°
4
'
1
9
'
'
Map Scale: 1:3,000 if printed on A size (8.5" x 11") sheet.
Soil Map—Hamilton County, Indiana
Natural ResourcesNatural ResourcesNatural ResourcesNatural Resources
Conservation ServiceConservation ServiceConservation ServiceConservation Service
Web Soil Survey
National Cooperative Soil Survey
6/18/2012
Page 1 of 3
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Units
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Gully
Short Steep Slope
Other
Political Features
Cities
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Map Scale: 1:3,000 if printed on A size (8.5" × 11") sheet.
The soil surveys that comprise your AOI were mapped at 1:15,840.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil line
placement. The maps do not show the small areas of contrasting
soils that could have been shown at a more detailed scale.
Please rely on the bar scale on each map sheet for accurate map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov
Coordinate System: UTM Zone 16N NAD83
This product is generated from the USDA-NRCS certified data as of
the version date(s) listed below.
Soil Survey Area: Hamilton County, Indiana
Survey Area Data: Version 12, Dec 10, 2011
Date(s) aerial images were photographed: 7/19/2003
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor shifting
of map unit boundaries may be evident.
Soil Map–Hamilton County, Indiana
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
6/18/2012
Page 2 of 3
Map Unit Legend
Hamilton County, Indiana (IN057)
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
Ge Genesee silt loam 7.8 45.8%
OcA Ockley silt loam, 0 to 2 percent slopes 2.9 17.0%
OcB2 Ockley silt loam, 2 to 6 percent slopes, eroded 1.0 6.1%
Or Orthents 0.2 1.0%
Sx Sloan silty clay loam, sandy substratum 5.0 29.6%
W Water 0.1 0.5%
Totals for Area of Interest 17.1 100.0%
Soil Map–Hamilton County, Indiana
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
6/18/2012
Page 3 of 3
741.9
737.0
726.5
0.6
5.5
16.0
15
13
28
30
33
15.24.0
Dark Brown Clayey SILT
(Topsoil)
Brown Sandy CLAY
Brown, Dry Poorly Graded SAND
End of Boring at 16 feet
1
2
3
4
5
SS
SS
SS
SS
SS
TEST DATA
Driller S. Gray CME 55 ATVRig Type
Qu
-
t
s
f
U
n
c
o
n
f
i
n
e
d
Co
m
p
r
e
s
s
i
v
e
S
t
r
e
n
g
t
h
Po
c
k
e
t
P
e
n
e
t
r
o
m
e
t
e
r
Groundwater Boring Method
- Pressed Shelby Tube
Sc
a
l
e
ST
CA
RC
CU
CT
St
a
n
d
a
r
d
P
e
n
e
t
r
a
t
i
o
n
CLIENT
CFA
Sa
m
p
l
e
r
G
r
a
p
h
i
c
s
Re
c
o
v
e
r
y
G
r
a
p
h
i
c
s
Gr
o
u
n
d
W
a
t
e
r
NHI-Bickford RE. LLC
ALT & WITZIG FILE #
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
%
Dr
y
U
n
i
t
W
e
i
g
h
t
(
p
c
f
)
PROJECT LOCATION
During Drilling- Driven Split Spoon
5
10
15
Dry ft.
DC
MD
Page of11
Alt & Witzig Engineering, Inc.
5/29/12
30
2
B-1
12IN0315
- Hollow Stem Augers
in.
STRATA
ELEV.
SOIL CLASSIFICATION
Sample Type
PROJECT NAME
St
r
a
t
a
Sa
m
p
l
e
No
.
in.
- Continuous Flight Augers
- Driving Casing
- Continuous Tube
SURFACE ELEVATION 742.5
140
BORING #
Te
s
t
,
N
-
b
l
o
w
s
/
f
o
o
t
RECORD OF SUBSURFACE EXPLORATION
DRILLING and SAMPLING INFORMATION
Date Started
PP
-
t
s
f
- Continuous Flight Auger
Re
m
a
r
k
s
Carmel, Indiana
5/29/12
HSA
De
p
t
h
De
p
t
h
SS
Date Completed
Boring Method
Hammer Wt.lbs.
Hammer Drop
Spoon Sampler OD
- Rock Core
- Cuttings
- Mud Drilling
At Completion
Sa
m
p
l
e
T
y
p
e
Dry ft.
Proposed Assisted Living Facility
HSA
Caved At Completion 7.0 ft.
741.9
737.0
726.5
0.6
5.5
16.0
12
11
34
35
27
16.94.0
Dark Brown Clayey SILT
(Topsoil)
Brown Silty CLAY with Sand
Brown, Dry Well Graded SAND
End of Boring at 16 feet
1
2
3
4
5
SS
SS
SS
SS
SS
TEST DATA
Driller S. Gray CME 55 ATVRig Type
Qu
-
t
s
f
U
n
c
o
n
f
i
n
e
d
Co
m
p
r
e
s
s
i
v
e
S
t
r
e
n
g
t
h
Po
c
k
e
t
P
e
n
e
t
r
o
m
e
t
e
r
Groundwater Boring Method
- Pressed Shelby Tube
Sc
a
l
e
ST
CA
RC
CU
CT
St
a
n
d
a
r
d
P
e
n
e
t
r
a
t
i
o
n
CLIENT
CFA
Sa
m
p
l
e
r
G
r
a
p
h
i
c
s
Re
c
o
v
e
r
y
G
r
a
p
h
i
c
s
Gr
o
u
n
d
W
a
t
e
r
NHI-Bickford RE. LLC
ALT & WITZIG FILE #
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
%
Dr
y
U
n
i
t
W
e
i
g
h
t
(
p
c
f
)
PROJECT LOCATION
During Drilling- Driven Split Spoon
5
10
15
Dry ft.
DC
MD
Page of11
Alt & Witzig Engineering, Inc.
5/29/12
30
2
B-2
12IN0315
- Hollow Stem Augers
in.
STRATA
ELEV.
SOIL CLASSIFICATION
Sample Type
PROJECT NAME
St
r
a
t
a
Sa
m
p
l
e
No
.
in.
- Continuous Flight Augers
- Driving Casing
- Continuous Tube
SURFACE ELEVATION 742.5
140
BORING #
Te
s
t
,
N
-
b
l
o
w
s
/
f
o
o
t
RECORD OF SUBSURFACE EXPLORATION
DRILLING and SAMPLING INFORMATION
Date Started
PP
-
t
s
f
- Continuous Flight Auger
Re
m
a
r
k
s
Carmel, Indiana
5/29/12
HSA
De
p
t
h
De
p
t
h
SS
Date Completed
Boring Method
Hammer Wt.lbs.
Hammer Drop
Spoon Sampler OD
- Rock Core
- Cuttings
- Mud Drilling
At Completion
Sa
m
p
l
e
T
y
p
e
Dry ft.
Proposed Assisted Living Facility
HSA
Caved At Completion 15.0 ft.
Driving on a Rock
742.6
738.0
736.0
734.5
727.0
0.4
5.0
7.0
8.5
16.0
4
31
50/5"
39
27
9.1
8.0
Dark Brown Clayey SILT
(Topsoil)
Brown Silty CLAY
Brown, Dry Poorly Graded SAND
Brown Silty CLAY with Gravel
Brown, Dry Poorly Graded SAND
End of Boring at 16 feet
1
2
3
4
5
SS
SS
SS
SS
SS
TEST DATA
Driller S. Gray D-50 Track ATVRig Type
Qu
-
t
s
f
U
n
c
o
n
f
i
n
e
d
Co
m
p
r
e
s
s
i
v
e
S
t
r
e
n
g
t
h
Po
c
k
e
t
P
e
n
e
t
r
o
m
e
t
e
r
Groundwater Boring Method
- Pressed Shelby Tube
Sc
a
l
e
ST
CA
RC
CU
CT
St
a
n
d
a
r
d
P
e
n
e
t
r
a
t
i
o
n
CLIENT
CFA
Sa
m
p
l
e
r
G
r
a
p
h
i
c
s
Re
c
o
v
e
r
y
G
r
a
p
h
i
c
s
Gr
o
u
n
d
W
a
t
e
r
NHI-Bickford RE. LLC
ALT & WITZIG FILE #
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
%
Dr
y
U
n
i
t
W
e
i
g
h
t
(
p
c
f
)
PROJECT LOCATION
During Drilling- Driven Split Spoon
5
10
15
Dry ft.
DC
MD
Page of11
Alt & Witzig Engineering, Inc.
6/1/12
30
2
B-3
12IN0315
- Hollow Stem Augers
in.
STRATA
ELEV.
SOIL CLASSIFICATION
Sample Type
PROJECT NAME
St
r
a
t
a
Sa
m
p
l
e
No
.
in.
- Continuous Flight Augers
- Driving Casing
- Continuous Tube
SURFACE ELEVATION 743.0
140
BORING #
Te
s
t
,
N
-
b
l
o
w
s
/
f
o
o
t
RECORD OF SUBSURFACE EXPLORATION
DRILLING and SAMPLING INFORMATION
Date Started
PP
-
t
s
f
- Continuous Flight Auger
Re
m
a
r
k
s
Carmel, Indiana
6/1/12
HSA
De
p
t
h
De
p
t
h
SS
Date Completed
Boring Method
Hammer Wt.lbs.
Hammer Drop
Spoon Sampler OD
- Rock Core
- Cuttings
- Mud Drilling
At Completion
Sa
m
p
l
e
T
y
p
e
Dry ft.
Proposed Assisted Living Facility
HSA
Caved At Completion 4.0 ft.
Driving on a Rock
741.4
733.5
725.5
0.1
8.0
16.0
10
5
29
33
37
16.73.5
Dark Brown Clayey SILT
(Topsoil)
Brown Sandy CLAY
Brown, Dry Well Graded SAND
End of Boring at 16 feet
1
2
3
4
5
SS
SS
SS
SS
SS
TEST DATA
Driller S. Gray CME 55 ATVRig Type
Qu
-
t
s
f
U
n
c
o
n
f
i
n
e
d
Co
m
p
r
e
s
s
i
v
e
S
t
r
e
n
g
t
h
Po
c
k
e
t
P
e
n
e
t
r
o
m
e
t
e
r
Groundwater Boring Method
- Pressed Shelby Tube
Sc
a
l
e
ST
CA
RC
CU
CT
St
a
n
d
a
r
d
P
e
n
e
t
r
a
t
i
o
n
CLIENT
CFA
Sa
m
p
l
e
r
G
r
a
p
h
i
c
s
Re
c
o
v
e
r
y
G
r
a
p
h
i
c
s
Gr
o
u
n
d
W
a
t
e
r
NHI-Bickford RE. LLC
ALT & WITZIG FILE #
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
%
Dr
y
U
n
i
t
W
e
i
g
h
t
(
p
c
f
)
PROJECT LOCATION
During Drilling- Driven Split Spoon
5
10
15
Dry ft.
DC
MD
Page of11
Alt & Witzig Engineering, Inc.
5/29/12
30
2
B-4
12IN0315
- Hollow Stem Augers
in.
STRATA
ELEV.
SOIL CLASSIFICATION
Sample Type
PROJECT NAME
St
r
a
t
a
Sa
m
p
l
e
No
.
in.
- Continuous Flight Augers
- Driving Casing
- Continuous Tube
SURFACE ELEVATION 741.5
140
BORING #
Te
s
t
,
N
-
b
l
o
w
s
/
f
o
o
t
RECORD OF SUBSURFACE EXPLORATION
DRILLING and SAMPLING INFORMATION
Date Started
PP
-
t
s
f
- Continuous Flight Auger
Re
m
a
r
k
s
Carmel, Indiana
5/29/12
HSA
De
p
t
h
De
p
t
h
SS
Date Completed
Boring Method
Hammer Wt.lbs.
Hammer Drop
Spoon Sampler OD
- Rock Core
- Cuttings
- Mud Drilling
At Completion
Sa
m
p
l
e
T
y
p
e
Dry ft.
Proposed Assisted Living Facility
HSA
Caved At Completion 9.5 ft.
2 Attempts, No
Recovery. Driving
on a rock.
739.6
734.5
725.0
724.0
0.4
5.5
15.0
16.0
5
26
15
28
26
3.8
Dark Brown Clayey SILT
(Topsoil)
Brown Sandy Silty CLAY
Brown, Dry Poorly Graded SAND
Brown, Wet Poorly Graded SAND
End of Boring at 16 feet
1
2
3
4
5
SS
SS
SS
SS
SS
TEST DATA
Driller S. Gray CME 55 ATVRig Type
Qu
-
t
s
f
U
n
c
o
n
f
i
n
e
d
Co
m
p
r
e
s
s
i
v
e
S
t
r
e
n
g
t
h
Po
c
k
e
t
P
e
n
e
t
r
o
m
e
t
e
r
Groundwater Boring Method
- Pressed Shelby Tube
Sc
a
l
e
ST
CA
RC
CU
CT
St
a
n
d
a
r
d
P
e
n
e
t
r
a
t
i
o
n
CLIENT
CFA
Sa
m
p
l
e
r
G
r
a
p
h
i
c
s
Re
c
o
v
e
r
y
G
r
a
p
h
i
c
s
Gr
o
u
n
d
W
a
t
e
r
NHI-Bickford RE. LLC
ALT & WITZIG FILE #
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
%
Dr
y
U
n
i
t
W
e
i
g
h
t
(
p
c
f
)
PROJECT LOCATION
During Drilling- Driven Split Spoon
5
10
15
14.5 ft.
DC
MD
Page of11
Alt & Witzig Engineering, Inc.
6/1/12
30
2
B-5
12IN0315
- Hollow Stem Augers
in.
STRATA
ELEV.
SOIL CLASSIFICATION
Sample Type
PROJECT NAME
St
r
a
t
a
Sa
m
p
l
e
No
.
in.
- Continuous Flight Augers
- Driving Casing
- Continuous Tube
SURFACE ELEVATION 740.0
140
BORING #
Te
s
t
,
N
-
b
l
o
w
s
/
f
o
o
t
RECORD OF SUBSURFACE EXPLORATION
DRILLING and SAMPLING INFORMATION
Date Started
PP
-
t
s
f
- Continuous Flight Auger
Re
m
a
r
k
s
Carmel, Indiana
6/1/12
HSA
De
p
t
h
De
p
t
h
SS
Date Completed
Boring Method
Hammer Wt.lbs.
Hammer Drop
Spoon Sampler OD
- Rock Core
- Cuttings
- Mud Drilling
At Completion
Sa
m
p
l
e
T
y
p
e
Dry ft.
Proposed Assisted Living Facility
HSA
Caved At Completion 4.0 ft.
738.8
738.4
733.5
725.5
723.0
0.2
0.6
5.5
13.5
16.0
14
11
34
22
11
18.5
15.1
3.5
2.0
Dark Brown Clayey SILT
(Topsoil)
Crushed Stone
Dark Brown Silty CLAY with Sand
Brown, Dry Poorly Graded SAND with Clay
Brown, Wet Poorly Graded SAND with Clay
End of Boring at 16 feet
1
2
3
4
5
SS
SS
SS
SS
SS
TEST DATA
Driller S. Gray D-50 Track ATVRig Type
Qu
-
t
s
f
U
n
c
o
n
f
i
n
e
d
Co
m
p
r
e
s
s
i
v
e
S
t
r
e
n
g
t
h
Po
c
k
e
t
P
e
n
e
t
r
o
m
e
t
e
r
Groundwater Boring Method
- Pressed Shelby Tube
Sc
a
l
e
ST
CA
RC
CU
CT
St
a
n
d
a
r
d
P
e
n
e
t
r
a
t
i
o
n
CLIENT
CFA
Sa
m
p
l
e
r
G
r
a
p
h
i
c
s
Re
c
o
v
e
r
y
G
r
a
p
h
i
c
s
Gr
o
u
n
d
W
a
t
e
r
NHI-Bickford RE. LLC
ALT & WITZIG FILE #
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
%
Dr
y
U
n
i
t
W
e
i
g
h
t
(
p
c
f
)
PROJECT LOCATION
During Drilling- Driven Split Spoon
5
10
15
13.0 ft.
DC
MD
Page of11
Alt & Witzig Engineering, Inc.
6/1/12
30
2
B-6
12IN0315
- Hollow Stem Augers
in.
STRATA
ELEV.
SOIL CLASSIFICATION
Sample Type
PROJECT NAME
St
r
a
t
a
Sa
m
p
l
e
No
.
in.
- Continuous Flight Augers
- Driving Casing
- Continuous Tube
SURFACE ELEVATION 739.0
140
BORING #
Te
s
t
,
N
-
b
l
o
w
s
/
f
o
o
t
RECORD OF SUBSURFACE EXPLORATION
DRILLING and SAMPLING INFORMATION
Date Started
PP
-
t
s
f
- Continuous Flight Auger
Re
m
a
r
k
s
Carmel, Indiana
6/1/12
HSA
De
p
t
h
De
p
t
h
SS
Date Completed
Boring Method
Hammer Wt.lbs.
Hammer Drop
Spoon Sampler OD
- Rock Core
- Cuttings
- Mud Drilling
At Completion
Sa
m
p
l
e
T
y
p
e
Dry ft.
Proposed Assisted Living Facility
HSA
Caved At Completion 6.0 ft.
731.8
725.5
716.5
0.7
7.0
16.0
14
16
16
14
25
15.5
17.5
4.5
Dark Brown Clayey SILT
(Topsoil)
Brown Silty CLAY wtih Sand and Roots
Brown, Wet Poorly Graded SAND
End of Boring at 16 feet
1
2
3
4
5
SS
SS
SS
SS
SS
TEST DATA
Driller S. Gray D-50 Track ATVRig Type
Qu
-
t
s
f
U
n
c
o
n
f
i
n
e
d
Co
m
p
r
e
s
s
i
v
e
S
t
r
e
n
g
t
h
Po
c
k
e
t
P
e
n
e
t
r
o
m
e
t
e
r
Groundwater Boring Method
- Pressed Shelby Tube
Sc
a
l
e
ST
CA
RC
CU
CT
St
a
n
d
a
r
d
P
e
n
e
t
r
a
t
i
o
n
CLIENT
CFA
Sa
m
p
l
e
r
G
r
a
p
h
i
c
s
Re
c
o
v
e
r
y
G
r
a
p
h
i
c
s
Gr
o
u
n
d
W
a
t
e
r
NHI-Bickford RE. LLC
ALT & WITZIG FILE #
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
%
Dr
y
U
n
i
t
W
e
i
g
h
t
(
p
c
f
)
PROJECT LOCATION
During Drilling- Driven Split Spoon
5
10
15
8.0 ft.
DC
MD
Page of11
Alt & Witzig Engineering, Inc.
6/1/12
30
2
B-7
12IN0315
- Hollow Stem Augers
in.
STRATA
ELEV.
SOIL CLASSIFICATION
Sample Type
PROJECT NAME
St
r
a
t
a
Sa
m
p
l
e
No
.
in.
- Continuous Flight Augers
- Driving Casing
- Continuous Tube
SURFACE ELEVATION 732.5
140
BORING #
Te
s
t
,
N
-
b
l
o
w
s
/
f
o
o
t
RECORD OF SUBSURFACE EXPLORATION
DRILLING and SAMPLING INFORMATION
Date Started
PP
-
t
s
f
- Continuous Flight Auger
Re
m
a
r
k
s
Carmel, Indiana
6/1/12
HSA
De
p
t
h
De
p
t
h
SS
Date Completed
Boring Method
Hammer Wt.lbs.
Hammer Drop
Spoon Sampler OD
- Rock Core
- Cuttings
- Mud Drilling
At Completion
Sa
m
p
l
e
T
y
p
e
Dry ft.
Proposed Assisted Living Facility
HSA
Caved At Completion 4.0 ft.
731.9
726.5
726.0
0.1
5.5
6.0
12
9
13.3
Dark Brown Clayey SILT
(Topsoil)
Brown Silty CLAY with Sand
Brown Poorly Graded SAND with Silt
End of Boring at 6 feet
1
2
SS
SS
TEST DATA
Driller S. Gray D-50 Track ATVRig Type
Qu
-
t
s
f
U
n
c
o
n
f
i
n
e
d
Co
m
p
r
e
s
s
i
v
e
S
t
r
e
n
g
t
h
Po
c
k
e
t
P
e
n
e
t
r
o
m
e
t
e
r
Groundwater Boring Method
- Pressed Shelby Tube
Sc
a
l
e
ST
CA
RC
CU
CT
St
a
n
d
a
r
d
P
e
n
e
t
r
a
t
i
o
n
CLIENT
CFA
Sa
m
p
l
e
r
G
r
a
p
h
i
c
s
Re
c
o
v
e
r
y
G
r
a
p
h
i
c
s
Gr
o
u
n
d
W
a
t
e
r
NHI-Bickford RE. LLC
ALT & WITZIG FILE #
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
%
Dr
y
U
n
i
t
W
e
i
g
h
t
(
p
c
f
)
PROJECT LOCATION
During Drilling- Driven Split Spoon
5
Dry ft.
DC
MD
Page of11
Alt & Witzig Engineering, Inc.
6/1/12
30
2
B-8
12IN0315
- Hollow Stem Augers
in.
STRATA
ELEV.
SOIL CLASSIFICATION
Sample Type
PROJECT NAME
St
r
a
t
a
Sa
m
p
l
e
No
.
in.
- Continuous Flight Augers
- Driving Casing
- Continuous Tube
SURFACE ELEVATION 732.0
140
BORING #
Te
s
t
,
N
-
b
l
o
w
s
/
f
o
o
t
RECORD OF SUBSURFACE EXPLORATION
DRILLING and SAMPLING INFORMATION
Date Started
PP
-
t
s
f
- Continuous Flight Auger
Re
m
a
r
k
s
Carmel, Indiana
6/1/12
HSA
De
p
t
h
De
p
t
h
SS
Date Completed
Boring Method
Hammer Wt.lbs.
Hammer Drop
Spoon Sampler OD
- Rock Core
- Cuttings
- Mud Drilling
At Completion
Sa
m
p
l
e
T
y
p
e
Dry ft.
Proposed Assisted Living Facility
HSA
Caved At Completion 2.0 ft.
731.5
726.0
0.5
6.0
10
7
22.6
15.7
2.8
1.8
Dark Brown Clayey SILT
(Topsoil)
Brown Silty CLAY with Sand
End of Boring at 6 feet
1
2
SS
SS
TEST DATA
Driller S. Gray D-50 Track ATVRig Type
Qu
-
t
s
f
U
n
c
o
n
f
i
n
e
d
Co
m
p
r
e
s
s
i
v
e
S
t
r
e
n
g
t
h
Po
c
k
e
t
P
e
n
e
t
r
o
m
e
t
e
r
Groundwater Boring Method
- Pressed Shelby Tube
Sc
a
l
e
ST
CA
RC
CU
CT
St
a
n
d
a
r
d
P
e
n
e
t
r
a
t
i
o
n
CLIENT
CFA
Sa
m
p
l
e
r
G
r
a
p
h
i
c
s
Re
c
o
v
e
r
y
G
r
a
p
h
i
c
s
Gr
o
u
n
d
W
a
t
e
r
NHI-Bickford RE. LLC
ALT & WITZIG FILE #
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
%
Dr
y
U
n
i
t
W
e
i
g
h
t
(
p
c
f
)
PROJECT LOCATION
During Drilling- Driven Split Spoon
5
Dry ft.
DC
MD
Page of11
Alt & Witzig Engineering, Inc.
6/1/12
30
2
B-9
12IN0315
- Hollow Stem Augers
in.
STRATA
ELEV.
SOIL CLASSIFICATION
Sample Type
PROJECT NAME
St
r
a
t
a
Sa
m
p
l
e
No
.
in.
- Continuous Flight Augers
- Driving Casing
- Continuous Tube
SURFACE ELEVATION 732.0
140
BORING #
Te
s
t
,
N
-
b
l
o
w
s
/
f
o
o
t
RECORD OF SUBSURFACE EXPLORATION
DRILLING and SAMPLING INFORMATION
Date Started
PP
-
t
s
f
- Continuous Flight Auger
Re
m
a
r
k
s
Carmel, Indiana
6/1/12
HSA
De
p
t
h
De
p
t
h
SS
Date Completed
Boring Method
Hammer Wt.lbs.
Hammer Drop
Spoon Sampler OD
- Rock Core
- Cuttings
- Mud Drilling
At Completion
Sa
m
p
l
e
T
y
p
e
Dry ft.
Proposed Assisted Living Facility
HSA
Caved At Completion 2.0 ft.
730.4
726.0
1.6
6.0
8
6
22.4
31.0
1.3
0.8
Dark Brown Clayey SILT
(Topsoil)
Dark Brown Silty CLAY
End of Boring at 6 feet
1
2
SS
SS
TEST DATA
Driller S. Gray D-50 Track ATVRig Type
Qu
-
t
s
f
U
n
c
o
n
f
i
n
e
d
Co
m
p
r
e
s
s
i
v
e
S
t
r
e
n
g
t
h
Po
c
k
e
t
P
e
n
e
t
r
o
m
e
t
e
r
Groundwater Boring Method
- Pressed Shelby Tube
Sc
a
l
e
ST
CA
RC
CU
CT
St
a
n
d
a
r
d
P
e
n
e
t
r
a
t
i
o
n
CLIENT
CFA
Sa
m
p
l
e
r
G
r
a
p
h
i
c
s
Re
c
o
v
e
r
y
G
r
a
p
h
i
c
s
Gr
o
u
n
d
W
a
t
e
r
NHI-Bickford RE. LLC
ALT & WITZIG FILE #
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
%
Dr
y
U
n
i
t
W
e
i
g
h
t
(
p
c
f
)
PROJECT LOCATION
During Drilling- Driven Split Spoon
5
Dry ft.
DC
MD
Page of11
Alt & Witzig Engineering, Inc.
6/1/12
30
2
B-10
12IN0315
- Hollow Stem Augers
in.
STRATA
ELEV.
SOIL CLASSIFICATION
Sample Type
PROJECT NAME
St
r
a
t
a
Sa
m
p
l
e
No
.
in.
- Continuous Flight Augers
- Driving Casing
- Continuous Tube
SURFACE ELEVATION 732.0
140
BORING #
Te
s
t
,
N
-
b
l
o
w
s
/
f
o
o
t
RECORD OF SUBSURFACE EXPLORATION
DRILLING and SAMPLING INFORMATION
Date Started
PP
-
t
s
f
- Continuous Flight Auger
Re
m
a
r
k
s
Carmel, Indiana
6/1/12
HSA
De
p
t
h
De
p
t
h
SS
Date Completed
Boring Method
Hammer Wt.lbs.
Hammer Drop
Spoon Sampler OD
- Rock Core
- Cuttings
- Mud Drilling
At Completion
Sa
m
p
l
e
T
y
p
e
Dry ft.
Proposed Assisted Living Facility
HSA
Caved At Completion 2.0 ft.
737.4
734.6
732.2
723.0
722.0
0.6
3.4
5.8
15.0
16.0
20
10
9
29
19
17.3
15.0
11.7
1.5
1.0
Dark Brown Clayey SILT
(Topsoil)
Brown Silty CLAY with Sand
(FILL)
Gray Silty CLAY with Sand
(FILL)
Gray Silty CLAY with Sand and Asphalt Fragments
(FILL)
Brown Poorly Graded SAND
End of Boring at 16 feet
1
1
2
3
4
SS
SS
SS
SS
SS
TEST DATA
Driller S. Gray D-50 Track ATVRig Type
Qu
-
t
s
f
U
n
c
o
n
f
i
n
e
d
Co
m
p
r
e
s
s
i
v
e
S
t
r
e
n
g
t
h
Po
c
k
e
t
P
e
n
e
t
r
o
m
e
t
e
r
Groundwater Boring Method
- Pressed Shelby Tube
Sc
a
l
e
ST
CA
RC
CU
CT
St
a
n
d
a
r
d
P
e
n
e
t
r
a
t
i
o
n
CLIENT
CFA
Sa
m
p
l
e
r
G
r
a
p
h
i
c
s
Re
c
o
v
e
r
y
G
r
a
p
h
i
c
s
Gr
o
u
n
d
W
a
t
e
r
NHI-Bickford RE. LLC
ALT & WITZIG FILE #
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
%
Dr
y
U
n
i
t
W
e
i
g
h
t
(
p
c
f
)
PROJECT LOCATION
During Drilling- Driven Split Spoon
5
10
15
Dry ft.
DC
MD
Page of11
Alt & Witzig Engineering, Inc.
6/1/12
30
2
B-11
12IN0315
- Hollow Stem Augers
in.
STRATA
ELEV.
SOIL CLASSIFICATION
Sample Type
PROJECT NAME
St
r
a
t
a
Sa
m
p
l
e
No
.
in.
- Continuous Flight Augers
- Driving Casing
- Continuous Tube
SURFACE ELEVATION 738.0
140
BORING #
Te
s
t
,
N
-
b
l
o
w
s
/
f
o
o
t
RECORD OF SUBSURFACE EXPLORATION
DRILLING and SAMPLING INFORMATION
Date Started
PP
-
t
s
f
- Continuous Flight Auger
Re
m
a
r
k
s
Carmel, Indiana
6/1/12
HSA
De
p
t
h
De
p
t
h
SS
Date Completed
Boring Method
Hammer Wt.lbs.
Hammer Drop
Spoon Sampler OD
- Rock Core
- Cuttings
- Mud Drilling
At Completion
Sa
m
p
l
e
T
y
p
e
Dry ft.
Proposed Assisted Living Facility
HSA
Caved At Completion 9.0 ft.
738.9
733.0
0.1
6.0
25
14
10.5
10.4
4.3
3.3
Dark Brown Clayey SILT
(Topsoil)
Brown Sandy Silty CLAY
(FILL)
End of Boring at 6 feet
1
2
SS
SS
TEST DATA
Driller S. Gray D-50 Track ATVRig Type
Qu
-
t
s
f
U
n
c
o
n
f
i
n
e
d
Co
m
p
r
e
s
s
i
v
e
S
t
r
e
n
g
t
h
Po
c
k
e
t
P
e
n
e
t
r
o
m
e
t
e
r
Groundwater Boring Method
- Pressed Shelby Tube
Sc
a
l
e
ST
CA
RC
CU
CT
St
a
n
d
a
r
d
P
e
n
e
t
r
a
t
i
o
n
CLIENT
CFA
Sa
m
p
l
e
r
G
r
a
p
h
i
c
s
Re
c
o
v
e
r
y
G
r
a
p
h
i
c
s
Gr
o
u
n
d
W
a
t
e
r
NHI-Bickford RE. LLC
ALT & WITZIG FILE #
Mo
i
s
t
u
r
e
C
o
n
t
e
n
t
%
Dr
y
U
n
i
t
W
e
i
g
h
t
(
p
c
f
)
PROJECT LOCATION
During Drilling- Driven Split Spoon
5
Dry ft.
DC
MD
Page of11
Alt & Witzig Engineering, Inc.
6/1/12
30
2
B-12
12IN0315
- Hollow Stem Augers
in.
STRATA
ELEV.
SOIL CLASSIFICATION
Sample Type
PROJECT NAME
St
r
a
t
a
Sa
m
p
l
e
No
.
in.
- Continuous Flight Augers
- Driving Casing
- Continuous Tube
SURFACE ELEVATION 739.0
140
BORING #
Te
s
t
,
N
-
b
l
o
w
s
/
f
o
o
t
RECORD OF SUBSURFACE EXPLORATION
DRILLING and SAMPLING INFORMATION
Date Started
PP
-
t
s
f
- Continuous Flight Auger
Re
m
a
r
k
s
Carmel, Indiana
6/1/12
HSA
De
p
t
h
De
p
t
h
SS
Date Completed
Boring Method
Hammer Wt.lbs.
Hammer Drop
Spoon Sampler OD
- Rock Core
- Cuttings
- Mud Drilling
At Completion
Sa
m
p
l
e
T
y
p
e
Dry ft.
Proposed Assisted Living Facility
HSA
Caved At Completion 3.0 ft.
Project: Proposed Assisted Living Facility
Location: Carmel, Indiana
Number: 12IN0315
MAT ERIAL GRAPHICS LEGEND
GENERAL NOTES
Apparent water level noted while drilling.
CL-ML: USCS Low Plasticity Silty
Clay
CLS: USCS Low Plasticity Sandy
Clay FILL: Fill (made ground)
SP: USCS Poorly-graded Sand SP-SC: USCS Poorly-graded
Sand with Clay
SP-SM: USCS Poorly-graded
Sand with Silt
SW: USCS Well-graded Sand TOPSOIL
Apparent water level noted upon completion.
Apparent water level noted upon delayed time.
SS: Split Spoon
SOIL PROPERTY SYMBOLS
Standard "N" penetration value. Blows per foot of a 140-lb hammer falling 30" on a 2" O.D. split-spoon.N:
PP:Pocket Penetrometer, tsf
LL:
Qu:Unconfined Compressive Strength, tsf
Plastic Limit, %PL:Liquid Limit, %PI:Plasticity Index, %
DRILLING AND SAMPLING SYMBOLS
SAMPLER SYMBOLS
RELATIVE DENSITY & CONSISTANCY CLASSIFICATION
(NON-COHESIVE SOILS)
TERM BLOWS PER FOOT
Very Loose
Loose
Medium Dense
Dense
Very Dense
0 - 5
6 - 10
11 - 30
31 - 50
>51
RELATIVE DENSITY & CONSISTANCY CLASSIFICATION
(COHESIVE SOILS)
TERM BLOWS PER FOOT
Very Soft
Soft
Medium Stiff
Stiff
Very Stiff
Hard
0 - 3
4 - 5
6 - 10
11 - 15
16 - 30
>31
GROUNDWATER SYMBOLS
GE
N
E
R
A
L
N
O
T
E
S
-
P
R
O
J
E
C
T
S
P
E
C
I
F
I
C
1
2
I
N
0
3
1
5
G
I
N
T
.
G
P
J
U
S
E
V
A
L
.
G
D
T
7
/
1
7
/
1
2
Alt & Witzig Engineering, Inc.
4105 West 99th St.
Carmel, IN 46032
Telephone: 317-875-7000
Fax: 317-876-3705
BICKFORD OF CARMEL, IN 12/12/2012
GEOTECHNICAL REPORT 00901 - 2
END OF SECTION 00901