Loading...
HomeMy WebLinkAbout01100.pdf BICKFORD OF CARMEL, IN 12/12/2012 SUMMARY 01100 - 1 SECTION 01100 - SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes: 1. Project information. 2. Work covered by Contract Documents. 3. Work by Owner. 4. Access to site. 5. Specification and drawing conventions. B. Related Section: 1. Division 1 Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities. 1.3 PROJECT INFORMATION A. Project Identification: Bickford of Crown Point, IN. 1. Project Location: 5829 E. 116TH Street, Carmel, IN 46280. B. Owner: Summit Grove Senior Apartments, Limited Partnership. 1. Owner's Representative: Richard Eby 13795 MurLen Rd., Ste 301 Olathe, KS 66062 ph. (913) 782-3200 C. Architect: Kazmaier & Associates, LLC 1. Architect’s Representative: Jeff Kazmaier 13795 MurLen Rd., Ste 301 Olathe, KS 66062 ph. (913) 254-2245 D. Contractor: Charles Hall Construction has been engaged as Contractor for this Project. 1. Contractor’s Representative: Bill Henry 535 S.Plainfield Road, Suite A Willowbrook, IL 60527-7607 ph. (630) 794-9975 BICKFORD OF CARMEL, IN 12/12/2012 SUMMARY 01100 - 2 1.4 WORK COVERED BY CONTRACT DOCUMENTS A. The Work of the Project is defined by the Contract Documents and consists of the following: 1. 1-story, 36,000sf Assisted Living and Memory Care Facility with related sitework that includes surface parking, sidewalks, patios, and other site amenities. The building is classified as I-2, with Construction Type VA. The major building assemblies consist of concrete slab on grade with trench footings, wood stud load-bearing walls, and wood roof trusses. B. Type of Contract 1. Project will be constructed under a single prime contract. 1.5 ACCESS TO SITE A. General: Contractor shall have full use of Project site for construction operations during construction period. Contractor's use of Project site is limited only by Owner's right to perform work or to retain other contractors on portions of Project. B. General: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section. C. Use of Site: Limit use of Project site to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated. 1. Limits: Confine construction operations to the project site east of the existing church parking lot. Limit construction traffic on the existing drive and parking lot off Tudor Road to the southern 100’ of the existing parking lot. Site access off Independence Ave and construction traffic on the remaining church parking lot is prohibited. The grass area north of the existing parking lot can be made available for storage of topsoil, and construction storage and staging upon the coordination and approval of the Owner. 2. Driveways, Walkways and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. a. Schedule deliveries to minimize use of driveways and entrances by construction operations. b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site. 1.6 SPECIFICATION AND DRAWING CONVENTIONS A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows: 1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase. 2. Specification requirements are to be performed by Contractor unless specifically stated otherwise. BICKFORD OF CARMEL, IN 12/12/2012 SUMMARY 01100 - 3 B. Division 1 General Requirements: Requirements of Sections in Division 1 apply to the Work of all Sections in the Specifications. C. Drawing Coordination: Requirements for materials and products identified on the Drawings are described in detail in the Specifications. One or more of the following are used on the Drawings to identify materials and products: 1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections. 2. Abbreviations: Materials and products are identified by abbreviations published as part of the U.S. National CAD Standard and scheduled on Drawings. 3. Keynoting: Materials and products are identified by reference keynotes referencing Specification Section numbers found in this Project Manual. 1.7 MISCELLANEOUS PROVISIONS PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used) END OF SECTION 01100