HomeMy WebLinkAbout02361.pdf BICKFORD OF CARMEL, IN 12/12/2012
TERMITE CONTROL 02361 - 1
SECTION 02361 - TERMITE CONTROL
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Soil treatment with termiticide as required by 2006 International Residential Code,
Section R320.1.1.
B. Related Sections:
1. Division 6 Section "Rough Carpentry" for wood preservative treatment by pressure
process.
2. Division 7 Section "Sheet Metal Flashing and Trim" for custom-fabricated, metal termite
shields.
1.3 SUBMITTALS
A. Product Data: For each type of termite control product.
1. Include the EPA-Registered Label for termiticide products.
B. Product Certificates: For termite control products, from manufacturer.
C. Soil Treatment Application Report: After application of termiticide is completed, submit report
for Owner's records and include the following:
1. Date and time of application.
2. Moisture content of soil before application.
3. Termiticide brand name and manufacturer.
4. Quantity of undiluted termiticide used.
5. Dilutions, methods, volumes used, and rates of application.
6. Areas of application.
7. Water source for application.
D. Warranties: Sample of special warranties.
1.4 QUALITY ASSURANCE
A. Regulatory Requirements: Formulate and apply termiticides and termiticide devices according
to the EPA-Registered Label.
BICKFORD OF CARMEL, IN 12/12/2012
TERMITE CONTROL 02361 - 2
B. Source Limitations: Obtain termite control products from single source from single
manufacturer.
C. Preinstallation Conference: Conduct conference at Project site.
1.5 PROJECT CONDITIONS
A. Environmental Limitations: To ensure penetration, do not treat soil that is water saturated or
frozen. Do not treat soil while precipitation is occurring. Comply with requirements of the EPA-
Registered Label and requirements of authorities having jurisdiction.
B. Coordinate soil treatment application with excavating, filling, grading, and concreting operations.
Treat soil under footings, grade beams, and ground-supported slabs before construction.
1.6 WARRANTY
A. Soil Treatment Special Warranty: Manufacturer's standard form, signed by Applicator and
Contractor, certifying that termite control work, consisting of applied soil termiticide treatment,
will prevent infestation of subterranean termites. If subterranean termite activity or damage is
discovered during warranty period, re-treat soil and repair or replace damage caused by termite
infestation.
1. Warranty Period: Five years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 SOIL TREATMENT
A. Termiticide: Provide an EPA-Registered termiticide, complying with requirements of authorities
having jurisdiction, in an aqueous solution formulated to prevent termite infestation. Provide
quantity required for application at the label volume and rate for the maximum termiticide
concentration allowed for each specific use, according to product's EPA-Registered Label.
1. Service Life of Treatment: Soil treatment termiticide that is effective for not less than five
years against infestation of subterranean termites.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Applicator present, for compliance with
requirements for moisture content of soil per termiticide label requirements, interfaces with
earthwork, slab and foundation work, landscaping, utility installation, and other conditions
affecting performance of termite control.
B. Proceed with application only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
BICKFORD OF CARMEL, IN 12/12/2012
TERMITE CONTROL 02361 - 3
A. General: Comply with the most stringent requirements of authorities having jurisdiction and with
manufacturer's written instructions for preparation before beginning application of termite control
treatment. Remove all extraneous sources of wood cellulose and other edible materials such
as wood debris, tree stumps and roots, stakes, formwork, and construction waste wood from
soil within and around foundations.
B. Soil Treatment Preparation: Remove foreign matter and impermeable soil materials that could
decrease treatment effectiveness on areas to be treated. Loosen, rake, and level soil to be
treated except previously compacted areas under slabs and footings. Termiticides may be
applied before placing compacted fill under slabs if recommended in writing by termiticide
manufacturer.
1. Fit filling hose connected to water source at the site with a backflow preventer, complying
with requirements of authorities having jurisdiction.
3.3 APPLICATION, GENERAL
A. General: Comply with the most stringent requirements of authorities having jurisdiction and with
manufacturer's EPA-Registered Label for products.
3.4 APPLYING SOIL TREATMENT
A. Application: Mix soil treatment termiticide solution to a uniform consistency. Provide quantity
required for application at the label volume and rate for the maximum specified concentration of
termiticide, according to manufacturer's EPA-Registered Label, to the following so that a
continuous horizontal and vertical termiticidal barrier or treated zone is established around and
under building construction. Distribute treatment evenly.
1. Slabs-on-Grade and Basement Slabs: Under ground-supported slab construction,
including footings, building slabs, and attached slabs as an overall treatment. Treat soil
materials before concrete footings and slabs are placed.
2. Foundations: Adjacent soil, including soil along the entire inside perimeter of foundation
walls; along both sides of interior partition walls; around plumbing pipes and electric
conduit penetrating the slab; around interior column footers, piers, and chimney bases;
and along the entire outside perimeter, from grade to bottom of footing. Avoid soil
washout around footings.
3. Penetrations: At expansion joints, control joints, and areas where slabs will be
penetrated.
B. Avoid disturbance of treated soil after application. Keep off treated areas until completely dry.
C. Protect termiticide solution, dispersed in treated soils and fills, from being diluted until ground-
supported slabs are installed. Use waterproof barrier according to EPA-Registered Label
instructions.
D. Post warning signs in areas of application.
E. Reapply soil treatment solution to areas disturbed by subsequent excavation, grading,
landscaping, or other construction activities following application.
END OF SECTION 02361