HomeMy WebLinkAboutSIGNATURE CONSTRUCTION, LLC- 186- 3/16/2011 Signature Construction, LLC Check: 186
720 3rd Ave., SW Date: 3/16/2011
Carmel, IN 46032 Vendor: SIGNATO1
Prior
Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paid
18 40,565.63 40,565.63 0.00 0.00 40,565.63
App 18 on parking garage
40,565.63 40,565.63 0.00 0.00 40,565.63
186
3/16/2011 ""'"""40,565.63
THE SUM OF FORTY THOUSAND FIVE HUNDRED SIXTY FIVE DOLLARS AND 63 CENTS'''.
Signature Construction, LLC
720 3rd Ave., SW
Carmel, IN 46032
Signature Construction, LLC Check: 186
720 3rd Ave., SW Date: 3/16/2011
Carmel, IN 46032 Vendor: SIGNATO1
Prior
Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paid
18 40,565.63 40,565.63 0.00 0.00 40,565.63
App 18 on parking garage
40,565.63 40,565.63 0.00 0.00 40,565.63
APPLICATION AND CERTIFICATION FOR PAYMENT AM DOCUMENT G702 PAGE ONE OF 2 PAGES2
TO OWNER CRC at City of Carmel PROJECT: 7C-3 VOG Parking Garage APPLICATION NO.Appticatiion S Is Distribution to:
Application# 18 Signature costs OWNER
Cannel Indiana 46052 ARCHITECT
PERIOD TO: 12/16/2010 X CONTRACTOR
FROM CONTRACTOR: VIA ARCHITECT: Pedcor Design
Signature Construction Services LLC
720 3rd Avenue S.W. PROJECT NOS:
Carmel, Indiana 46032
CONTRACT FOR: CONTRACT DATE:
CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge,
Application is made fur payment,as shown below,in colwection with the Contract, information and belief the Work covered by this Application for Payment has been
Continuation Sheet,AIA Document G703,is attached. completed in accordance with the Contract Documents,that all amounts have been paid by
the Contractor for Work for which previous Certificates for Payment were issued and
payments received from the Owner,and that current payment shown herein is now due.
L ORIGINAL CON TRACT SLIM $ 870.619.40
2, Net change by Change Orders $ 0.00 CONTRACTOR:
3, CONTRACT SUM TO DATE (Line 1 +2) $ 870,619.40 � � ��
4. TOTAL COMPLETED&STORED TO S 807,068-86
fly / Date: fo �7 fa
5, RETAINAGE: ihemas E tic ntz, President / j,
a. 0 %of Completed Work 5 0 Sub4cribed and sy om to before me this f day of l-�- �O _
(Column D+E on 0703)
b. %of Stored Material $ .+,,, wcf LINDAockCHANyN
-� - Hancock County
Ex Eft
(Column F on G703) %I:Commission Expires
Total Retainaee(Lines Sa+Sb or August 20,2011
Total in Column I of 0703) S 0.00 ARCHITECT'S CERTIFICATE FOR PAYMENT '° ` - °"°`-"
6. TOTAL EARNED LESS RETAINAGE S 807,068.86 In accordance with the Contract Documents,based on on-Se observations and the data
(Line 4 Less Line 5 Total) comprising the application,the Architect certifies to the Owner that to the best of the
7. LESS PREVIOUS CERTIFICATES FOR Architect's knowledge, infomiation and belief the Work has progressed as indicated,
PAYMENT(Line 6 from prior Cenifcate) $ 766,503.24 the quality of the Work is in accordance with the Contract Documents,and the Contractor
S. CURRENT PAYMENT DUE $ 40,565.63 is entitled to payment of the AMOUNT CERTIFIED,
9_ RALANCE TO FINISH, INCLUDING RETAINAGE $ 63,550.54 90���• (3
(Line 3 less Line 6) AMOUNT CERTIFIED $
CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS (Attach expkanalion ifamounr certified dffersfrom the amount applied initial aRfigures on this
•
Total changes approved Application and onthe Continuation Sheet that or changed to conform with the amount Cell flied.
hl previous months by Owner • tea.--✓1. r
_
total approved this Month Sy: . y Date: //ilk
TOTALS $0.00 $0.00 This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the
Contractor named herein_Issuance,payment and acceptance or pavnlent arc without
NET CFIANGFS by Change Order $0,00 prejudice to any rights of the Owner or Contractor under this Contract,
AiA DOCUMENT G702 APPLICATION AND CERTIFICATION FOR PAYMENT'1352 EDITION AIA 51592 THE AMERICAN INSTITUTE OF ARCHITECTS.1735 NEWYORK AVE.,M.W. WASHINGTON,DO 200e6-5202
Users may obtain validation of this document by requesting a completed AIA Document D401 - Certification of Document's Authenticity from the Licensee. n 1tl V V
J.
CONDITIONAL AFFIDAVIT AND WAIVER OF LIEN
STATE OF INDIANA )
COUNTY OF HAMILTOP )
Thomas E. Koontz being duly sworn states that he is the President of Signature
Construction, LLC having contract to furnish certain materials and /or labor as
follows: Construction Management Services for a project known as Village on the
Green Parcel 7c Parking Garage, located at Carmel, Indiana and owned by the
Carmel Redevelopment Commission and does state:
CONDITIONAL WAIVER:
that the balance due from the owner is the sum of forty thousand
five hundred sixty-five dollars and sixty-three cents($40,565.63) the
payment of which has been promised as the sole consideration for this Affidavit
and Conditional Waiver of Lien which is given to and for said amount, effective
upon receipt of such cash payment.
THEREFORE, the undersigned waives and releases unto the Owner of said premises any
and all line or claim whatsoever on the above-described property and improvements
thereon on account of labor or material or both, finished by the undersigned thereto, and
further certifies that no other party has any claim or right to a lien on account of any
work perform or material furnished to the undersigned for the said project, and within the
scope of this affidavit and waiver.
SIGNATURE CONSTRUCTION, LLC
(Thomas `/Koontz, President
Subscribed and sworn to before me this: /-7// 7///a
Notary Public° -64-s."-
;INCA BUCHANAN
Hancock County
r,Jy Commission Expires
August 20,2011
SIGNATURE CONSTRUCTION LLC
720 3rd Avenue, S. W.
Carmel, Indiana 46032
Application # 18
12/1.6/10
7C-3 VOG Parking Garage
Carmel , Indiana
WORE COMPLETED MATERIALS TOTAL BALANCE
ITEM DESCRIPTION OF SCHEDULED FROM PREVIOUS THIS PRESENTLY COMPLETED AND TO
NO. WORE VALUE APPLICATIONS PERIOD STORED STORED TO DATE % FINISH RETAINAGE
101 Pre-Construction Services 66,557.63 66,557. 63 0.00 0.00 66,557.63 100% 0.00 0-00
100 General Requirements:
Testing & Inspecting 66,271.98 46,185.37 6,850.00 0.00 53,035.37 80% 13,236.61 11.011
Project Management 47,629.00 28,487.50 2,634.12 0.00 31,121.62 65% 16,707.38 0.00
Site Supervision 181,987.31 169,566.43 12,420.88 0.00 181,987.31 100% 0.00 0.00
Site Safety Director 10,894.00 5,062.31 3,977.24 0.00 9,039.55 83% 1,854.45 0.00
Design Drawings 12,256.00 2,196. 92 61.20 0.00 2,258.12 18% 9,997.88 0.00
Temporary Electric 12,256.00 12,248.84 0.00 0.00 12,248.84 100% 7.16 0.00
Temp Fire Protection 1,838.00 0.00 0.00 0.00 0.00 0% 1,838.00 0.00
Temp Lighting 5,426.60 175.39 0.00 0.00 175,39 3% 5,251.21 0.00
Temp Water 1,843.82 145.39 0.00 0.00 145.39 8% 1,698.43 0.00
Sanitary Facilities 497.00 40.04 0.00 0.00 40.04 8% 456.96 0.00
Field Office 12,746.00 12,427. 64 218.22 0.00 12,645.66 99% 100.14 0.00
Temp Electric 2,451.19 2,451.19 0.00 0.00 2,451.19 100% 0.00 0.00
Office Supplies 2,451.00 2,351.41 0.00 0.00 2,351.41 96% 99.59 0.00
Temp Phone 4,657.00 504.23 256.07 0.00 760.30 16% 3,896.70 0.00
Temp Water 490.00 157.45 0.00 0.00 157.45 32% 332.55 0.00
Tools 5 Equipment 19,610,00 19,444.49 0.00 0.00 19,444.49 99% 165.51 0.00
Temp Fence 1,634,00 734.13 0.00 0.00 734.13 45% 899.87 0.00
Project Signage 1,225,00 593.00 0.00 0.00 593.00 48% 632.00 0.00
Field Eng Surveying 3,268,00 1,245.76 0.00 0.00 1,245.76 38% 2,022.24 0.00
Health & Safety 2,451.00 1,327.06 588.65 0.00 1,915.71 78% 535.29 0.00
Waste Disposal 10,725.23 7,478.75 3,098. 10 0.00 10,576.85 998 148.38 0.00
Egress Path 8,032.50 0.00 7,650.00 0.00 7,650.00 95% 382.50 0.00
Change Orders 5,074.95 0.00 2,403.97 0.00 2,403.97 0% 2,670.98 0.00
199 Construction Management Fee 388,146.19 387,122.31 407.18 0.00 387,529.48 100% 616.71 0.00
870,619.40 766,503.24 40,565.63 0.00 807,068.86 93% 63,550.54 0.00