HomeMy WebLinkAboutSIGNATURE CONSTRUCTION, LLC- 001502- 12/17/2010 CARMEL REDEVELOPMENT COMMISSION 001502
Signature Construction, LW Check: 1502
720 3rd Ave., SW Date: 12/17/2010
Carmel, IN 46032 Vendor: SIGNATO1
Prior
Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paic
112 3,305.15 3,305.15 0.00 . 0.00 3,305.1E
P111 thru 10/2512010
111-12 8,208.60 8,208.60 0.00 0100 8,208.6C
P111 waterproofing
11,513.75 11,513.75 0.00 0.00 11,513.7E
fa'-.gnome` IOREDISACKGROUNDIANDICONTAINSIMULTIPLEZEOURIVATEATURESMSEEIBACK:FOR.DETAA:521MIZOMMIIIMIN
ZO
'S%c 6 sg °E'ici, Carmel Redevelopment Commission 001502
30 West Main Street A. REGIONS
Suite 220 - 2G-14211740
°sraY Carmel, IN 46032 •
• - 1502
DATE AMOUNT
12/17/2010 ******"****11,513.75
PAY THE SUM OF ELEVEN THOUSAND FIVE HUNDRED THIRTEEN DOLLARS AND 75 CENTS
TO THE
ORDER
OF Signature Construction, LLC
720 3rd Ave., SW ic 5E14N
•
Carmel, IN 46032
94,,,
•
11'00 & 50211' 1:07403' 2 / 3': 00875041 & &11'
CARMEL REDEVELOPMENT COMMISSION 001502
Signature Construction, LLC Check: 1502
720 3rd Ave., SW Date: 12/17/2010
Carmel, IN 46032 Vendor: SIGNATO1
Prior
Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paid
112 3,305.15 3,305.15 0.00 0.00 3,305.15
P111 thru 10/25/2010
111-12 8,208.60 8,208.60 _ 0.00 0.00 8,208.60
P111 waterproofing
11,513.75 11,513.75 0.00 0.00 11,513.75
V.tl:691 T11 en...nin..cam Grme n....e... rexn axx.cxoi u[ne'rnn
APPLICATION AND CERTIFICATION FOR PAYMENT AIA DOCUMENT G702 PAGE ONE OF 2 PAGES2
TO OWNER Carmel Theater Development Coin PROJECT: Cartel City PHI WaterprootinAPPLICATION NO Invoice H 12 I Distribution to: -
One Civic Square Smock Signature costs OWNER
Carmel Indiana 46032 „ARCHITECT
PERIOD TO: 11292010 X CONTRACTOR
FROM CONTRACTOR: VIA ARCHITECT: Pedcor Design
Signature Construction Services TLC
720 3rd Avenue S.W. PROJECT NOS:
Cannel,Indiana 46032
CONTRACT FOR: CONTRACT DATE:
CONTRACTOR'S APPLICATION FOR PAYMENT .11.e.undersigned Contractor certifies that to the best of the Contractor's knowledge,
Application is made for payment,as shown below,in connection with the Contract information and belief the Work Covered by this Application for Payment has been
Continuation Slices,ALA Document G703,is attached, completed in accordance with the Contract Documents,that all amounts have been paid by
the Contractor for Work for which previous Certificates for Payment were issued and
payments received from the Owner,and that current payment shown herein is now doe-
1. 011 IGINAI•CON'T'RACT(SUM $ 80,586.00
2. Net chance by Change Orders $ 090 CONTRACTOR_
3. CONTRACT SUM TO DATE(Line I+2) $ 8C,586.0C
4, '10'I AL COMPLETED K STORED TO $ 15,079.51 `I
By: , r. /_��� Date: //,�FLct
5. RETAINAC,L: I' mas E.154Intz,President /✓c'✓. ty .c. /
a. 0%of Completed Work 5 0 Subs(' bed ands m to before me this )" day of DLLtuihts 009
(Column D+ - •
Eon 6703) \\ - -_
LINDA BUCHANAN
b. %of Stored Material $ `¢ ..,„r '4 Hancock County
(Column F on 6703) s,&.L . My Commission Expires
Total Retainage(Lines 3a+5b or , :u9 „+,`-I • a t
Total in Column 1 of G703) S 0-00 ARCHITECT'S CERTIFICATE FOR PAY — -- - ..
6 TOTAI,EARNED LESS RE'I'AINAGE $ 15,079.51 in accordance with the Contract Documents,based on on-site observations and the data
(Line 4 Less l.,ine 5 Total) comprising the application,the Architect certifies to the Owner that to the best of the
7. LESS PREVIOUS CERTIFICATES FOR Architect's knowledge,information and belief the Work has progressed as indicated,
PAYMENT(Line 6 from prior Certificate) $ 6,870.91 the quality of the Work is in accordance with the Contract Documents,and the Contractor
S. CURREN I PAYMENT DUE $ .8,208 60 is entitled to payment of the AMOUNT CERTIFIED.
9- BALANCE TO FINISH,INCLUDING RETAINAGE $ 65,506 49
(Line 3 less Line 6) AMOUNT CERTIFIED $ 8,'-O 17,(v d -
CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS (Attach explanation ifumoun certified d&rsfronl the amount applied Initial atlfigurec on this
Total changes approved Application and(nlHe C- motion Sheet that are changed to conform with the amount cer4ficd.)
in previous months by Owner ARCH ITECE,
Total approved this Month _ By: e 4101/4.---- Date: Uf'sofin
TOTALS $000 $D 00 This Certificate is not negotiable. The AMOUNT CERTIFIED is payable only to the
Contractor named herein. Issuance,payment mu acceptance of payment arc without
NET CHANGES by Change Order I 50.00 prejudice to any rights of the Owner or Contractor under this Contract.
ATV,DOCUMENT G702 APPLICATION-NO CERTIFICATION FOR PAYMENT 1902 EDITION AIA 01992 THE AMERICAN INSTITJTS OF ARCHITECTS,1735 NEWYORKAVE.,NW,WASHINGTON.EC 209106-52•2
Users may obtain validation of this document by requesting a completed AIA Document D401 - Certification of Document's Authenticity from the Licensee.
Director of Redevelopment / Lig i B so 5
, 4
CONDITIONAL AFFIDAVIT AND WAIVER OF LIEN
STATE OF INDIANA
COUNTY OF HAMILTON )
Thomas E. Koontz being duly sworn states that he is the President of Signature
Construction, LLC having contract to furnish certain materials and / or labor as
follows: Construction Management Services for a project known as Carmel City
Center P111, located at Carmel, Indiana and owned by the
Carmel Redevelopment Commission and does state:
CONDITIONAL WAIVER:
that the balance due from the owner is the sum of eight thousand two hundred
eight dollars and sixty cents ($8,208.60) the payment of which has been
promised as the sole consideration for this Affidavit and Conditional Waiver
of Lien which is given to and for said amount, effective upon receipt of such
cash payment.
THEREFORE, the undersigned waives and releases unto the Owner of said premises any
and all line or claim whatsoever on the above-described property and improvements
thereon on account of labor or material or both, finished by the undersigned thereto, and
further certifies that no other party has any claim or right to a lien on account of any
work perform or material furnished to the undersigned for the said project, and within the
scope of this affidavit and waiver.
SIGNATURE CONSTRUCTION, LLC
T oma- . Koontz, President
Subscribed and sworn to before me this: 1-1a'✓ 143 J✓'e,
Notary Public:
'p��; LINDA BUCHANAN
: Hancock County
SEAL My Commission Expires
August 20,2011
" .
SIGNATURE CONSTRUCTION LLC
720 3rd Avenue, S. W.
Carmel, Indiana 46032
_ I I I I
Invoice # 12
11/29/10
Carmel City P111 Waterproofing-SMOCK
Carmel , Indiana
I I I I
Total Work RETAINAGE 1 BALANCE
Scheduled Completed WITHHELD PREVIOUS TOTAL COMPLETED TO
DESCRIPTION Value This period THIS PERIOD APPLICATIONS TO DATE 1 % FINISH
General Conditions: SMOCK FANSLER
Testing and Inspecting 0.00 0.00 0.00 0.00 0.00 0% 0.00
Project Management 0.00 0.00 0.00 0.00 0.00 0% 0.00
Site Supervision 40,293.00 0.00 0.00 0.00 0.00 0% 40,293.00
Site Safety Director 0.00 0.00 0.00 0.00 0.00 _ 0% 0.00
Design Drawings 0.00 0.00 0.00 0.00 0.00 0% 0.00
Temporary Electric 0.00 0.00 0.00 0.00 0.00 0% 0.00
Office Supplies 0.00 0.00 0.00 0.00 0.00 0% 0.00
Tools and Equipment 0.00 0.00 0.00 0.00 0.00 0% 0.00
Field Engineering and Surveying 0.00 0.00 0.00 0.00 0.00 0% 0.00
Construction Management Fee 40,293.00 8,208.60 0.00 6,870.91 _ 15,079.51 37% 25,213.49
80,586.00 8,208.60 0.00 6,870.91 15,079.51 19% 65,506.49
APPLICATION AND CERTIFICATION FOR PAYMENT ALel DOCUMENT G702 PAGE ONE OF 2 PAGES 2
TO OWNER Carmel Theater Development Com PROJECT: Cannel City I'I I I Waterproofing APPLICATION NO Invoice# I I I Distribution to:
•
One Civic Square Signature costs OWNER
Carmel Indiana 46032 L ARCHITECT
PERIOD TO: 10/25/2010 X CONTRACTOR
FROM CONTRACTOR: VIA ARCHITECT: Pedeor Design
Signature Construction Services LLC
720 3rd Avenue S.W. I'IUJJIiC'I'NOS:
Carmel,Indiana 46032
CONTRACT FOR: CONTRACT DATE:
CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge,
Application is made for payment,as shown below,in connection with the Contract. intonation and belief the Work covered by this Application for Payment has been
Continuation Sheet,AIA Document 0703,is attached. completed in accordance with the Contract Documents,that all amounts have been paid by
the Contractor for Work for which previous Certificates for Payment were issued and
payments received from the Owner,and that current payment shown herein is now due.
I. ORIGINAL CONTRACT SUM S 50,586.00
2. Net change by Change Orders 5 U.W CONT'RAC'TOR:
3. CONTRACT SUM TO DATE(Line 1+2) 5 su,a86.0u
4. I UI Al.COMPLETED k STORED TO S 6,870.91 Q
BY: ' . / ,�J Date: /lc Z_Y--- V
5. RETAINAGE: homas It ontz,President YJ— ory.De, o '
a. 0 %of Completed Work S 0 Sub toed and ow to hetore me this 2 day of A....,.b.. '
(Lolumn D+Eon G703) LINDA BUCHANAN
b. %of Stored Material 5 `?;cr ?"-
( nEon 0703) a%AL 'Cl Pty Commission Expires
I oral Ketamage tunes as*an or .< <^!` AI net on 2011
Total in Column I of G703) $ 0.00 ARCM! IELI SCtNIIFICAIt FOR PAYMLNI---- .o
6. TOTAL EARNED LESS RETAINAGE S b,8/U.91 In accordance with the Contract Documents,based on on-site observations and the data
(Line 4 less Line 5'Total) comprising the application,the Architect certifies to the Owner that to the hest of the
7. LESS PREVIOUS CERTIFICATES FOR Architect's knowledge,information and belief the Work has progressed as indicated,
PAYMENT(Line 6 from prior Certificate) 5 3,565.76 the quality of the Work is in accordance with the Contract Documents,and the Contractor
8. CURRENT PAYMENT DUE S i,30a_La is entitled to payment ofthc AMOUNT CERTIFIED,
9. BALANCE TO FINIS'',INCLUDING RETAINAGE S /D,/I).99
(Line 3 less Line 6) - AMOUNT CER'T'IFIED $ 3 0515
CHANGE ORDER S UNIMAK? AUDII IONS DriJUL I IONS (Attach eaplanalion if amount certified dii(Jersframthe annum applied.Initial a//figures on this
I otal changes approved dpplieation and ont ;nntinualion.5'heet shot are changed ro cor jure:with the mown certified.)
in previous months by Owner ARCHITECT' //////�/7
Total approved this Month By: .{..� "'� Date: 49/Z afip
TOTALS 50.00 50.00 This Canifieate is not negotiable. The AMOUNT CERTIFIED is payable only to the
L ontractor nameu nerem_Issuance,payment ano acceptance of payment are wlmout
NET CHANGES by Change Order $0.00 prejudice to any rights of the Owner or Contractor under this Contract.
AU DOCUMENT 0)02-APPLICATION AND CERTIFICATION FOR PAYMENT•1993 EDITION'AIA•e1992 THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE.,N.W..WASHINGTON,DC 20006.5293
Users may obtain validation of this document by requesting a completed AIA Document D401 -Certification of Document's Authenticity from the Licensee.
�� u 5
Director of Redevelopment/IM
flphi
SIGNATURE CONSTRUCTION LLC
720 3rd Avenue, S. W.
Carmel, Indiana 46032
l 1 I I I I I
Invoice # 11
10/25/10
Carmel City P111 Waterproofing-SMOCK
Carmel, Indiana
I I I 1 I
Total Work RETAINAGE 1 BALANCE
Scheduled Completed WITHHELD PREVIOUS TOTAL COMPLETED TO
DESCRIPTION Value This period THIS PERIOD APPLICATIONS TO DATE I % FINISH
General Conditions: SMOCK FANSLER
Testing and Inspecting 0.00 0.00 0.00 0.00 0.00 0% 0.00
Project Management _ 0.00 0.00 0.00 0.00 0.00 0% 0.00
Site Supervision 40,293.00 0.00 0.00 0.00 0.00 0% 40,293.00
Site Safety Director 0.00 0.00 0.00 0.00 0.00 0% 0.00
Design Drawings 0.00 0.00 0.00 0.00 0.00 0% 0.00
Temporary Electric 0.00 0.00 0.00 0.00 0.00 0% 0.00
Office Supplies 0.00 0.00 0.00 0.00 0.00 0% 0.00_
Tools and Equipment 0.00 0.00 0.00 0.00 0.00 0% 0.00
Field Engineering and Surveying 0.00 0.00 0.00 0.00 0.00 0% 0.00
Construction Management Fee 40,293.00 3,305.15 0.00 3,565.76 6,870.91 17% 33,422.09
80,586.00 3,305.15 0.00 3,565.76 6,870.91 94I 73,715.09
CONDITIONAL AFFIDAVIT AND WAIVER OF LIEN
STATE OF INDIANA )
COUNTY OF HAMILTON )
Thomas E. Koontz being duly sworn states that he is the President of Signature
Construction, LLC having contract to furnish certain materials and / or labor as
follows: Construction Management Services for a project known as Carmel City
Center Pill, located at Carmel, Indiana and owned by the
Carmel Redevelopment Commission and does state:
CONDITIONAL WAIVER:
that the balance due from the owner is the sum of three thousand three hundred
five dollars and fifteen cents ($3,305.15) the payment of which has been
promised as the sole consideration for this Affidavit and Conditional Waiver
of Lien which is given to and for said amount, effective upon receipt of such
cash payment.
THEREFORE, the undersigned waives and releases unto the Owner of said premises any
and all line or claim whatsoever on the above-described property and improvements
thereon on account of labor or material or both, finished by the undersigned thereto, and
further certifies that no other party has any claim or right to a lien on account of any
work perform or material furnished to the undersigned for the said project, and within the
scope of this affidavit and waiver.
SIGNATURE CONSTRUCTION, LLC
a /
omas V"oontz, •resident
�$ bscribed and sworn to before me this: __25 Qc Y . /"G
Notary Public:y a ,,Sletch.-----
"�'� e'...
LINDA BUCHANAN
o..a ': Hancock County
` "2a' _? My Commission Expires
":`.:.7 August 20,2011