HomeMy WebLinkAboutCHANCE BROS. MARBLE & TILE, I- 001332- 11/18/2010 • CARMEL REDEVELOPMENT COMMISSION 001332
Chance Bros. Marble & Tile, I Check: 1332
114 W McCarty St Date: 11/18/2010
Indianapolis, IN 46225 Vendor: CHANCE1
Prior
Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paid
six 61 9,500.00 9,500.00 0.00 0.00 9,500.00
Application six
9,500.00 9,500.00 0.00 0.00 9,500.00
�l Carmel Redevelopment Commission 00133.2
a a� t 30 West Main Street A REGIONS
Suite 220 20-1421n40 •
oLtm i Carmel. IN 46032
/STN��
1332
DATE AMOUNT
11/18/2010 9,500.00
PAY THE SUM OF NINE THOUSAND FIVE HUNDRED DOLLARS
TO THE
ORDER
DF Chance Bros. Marble & Tile, I
114 W McCarty St
Indianapolis, IN 46225
4QF.,,O
0003, 3320 I:07401423, 3i: 0087504L1L"
CARMEL REDEVELOPMENT COMMISSION 001332
Chance Bros. Marble & Tile, I Check: 1332
114 W McCarty St Date: 11/18/2010
Indianapolis, IN 46225 Vendor: CHANCE1
Prior
Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paid
six 61 9,500.00 9,500.00 0.00 0.00 9,500.00
Application six
9,500.00 9,500.00 0.00 0.00 9,500.00
- a
SAIA Document G702/CMaT" - 1992 6: 1
Application and Certificate for Payment Construction Manager-Adviser Edition
TO OWNER: T CONINi SSION APPLICATION NO: Distribution to:
CITY OF CARMEL- REDEVELOPMEN
1 CIVICSOUARE PERIOD TO: SIX OWNER ❑
CARMEL, IN 46032 CARMEL PERFORMING ARTS 09/15/10 CONSTRUCTION MANAGER ❑
FROM CONTRACTOR: VIA CONSTRUCTION MANAGER: CONTRACT DATE: CERAMIC TILE ARCHITECT ❑
Chance Bros. Marble&Tile, Inc. PROJECT NOS: I I CONTRACTOR ❑
114 W.McCarty St., VIA ARCHITECT: CSO ARCHETECTS
lanapolis, IN 46225 FIELD ❑
CONTRACT F�� ❑
CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and
Application is mode for payment as shown below. in connection with the Contract. belief the Work covered by this Application for Payment has been completed in accordance with the
Continuation Sheet, AIA Document C;703.is attached. Contract Documents, that all amounts have been paid by the Contractor for Work for which previous
221495.00 Certificates for Payment were issued and payments received from the Owner, and that current
1,ORIGINAL CONTRACT SUM • $-175 0:00— payment shown herein is ncruribm. Bros.Marble&Tile; Inc. 8/27/2010
2. Net change by Change Orders $—ggggg5 g0— CONT• . . =•: / .,
3.CONTRACT SUM TO DATE(Line I ±2) S By: / '"'<_
193995.00 e Date: ...
4,TOTAL COMPLETED&STORED TO DATE(Column G on 6703) $ Stine of Marion
5.RETAINAGE: - +."; ' �..a r ,t. `.
10 0 10199,75' County of:
a, /,of Completed AVOrk Subscribed an worn w hcfo e ' T '�. +u r-gc ,
(Column I)< Non G703) $ me this ] day
r �� f I AUGUST� " t 2010 c
b. -%of Stored Material "
l0 0.00 Notary Public: r c„aa �
(Column F on 6703) $ My Commission expires/HAI a .4 _ ; y 5 „c .,.` e
10199.75 •
Total Retuimtge(l_iues5a+sborTmal;ncoinsnnlofc7O3). $ CERTIFICATE FOR PAYM .
6.TOTAL EARNED LESS RETAINAGE $ 183795.25 In accordance with the Contact Documents. based of n-site observations .md'the data cmitprisin.,
this application. the Construction Manager and Architect certify to the Owner that in the best of their
(Line 4 Less Line 5 Total) knowledge. information and belief the Work has progressed as indicated,the quality of the Work is in
7.LESS PREVIOUS CERTIFICATES FOR PAYMENT S 174295.25 accordance with the Contract Documents,and the Contractor is entitled to payment of the AMOUNT
(Line 6 front prior Certificate) CERTIFIED. r Co
8.CURRENT PAYMENT DUE S 9500.00 AMOUNT CERTIFIED S ISM°�,�we---
9.BALANCE TO FINISH,INCLUDING RETAINAGE- (Attach e.rpinnnrion if amount certified differ. r•to the anmuat applied. Initial al!figures on this
20199.75 Applicmidn and on the Continuati I Sheet not ire changed to conform with the amount certified.)
(Line 3 less Line 6) S CONS RUCTION:I,N•a R: 7,.,
ADDITIONS DEDUCTIONS AR. I,1w.�� Date: ��w�/o
CHANCiE ORDER SUMMARY ADDITIONS ARCH ECT: W.
I
o.00 nsoo.00 fr9(11/
Total changes approved iii previous months by Owner 5 0.00 S 0.00 By: I Date:
Total approved this Month $ S This Certif ate is not tied.thable. The AMOUNT CERTIFIED is payable only to the Contractor
TOTALS $ 0.00 $ -1750(,00— named It ein. Issuance ayntent and acceptance of payment are without prejudice to any rights of
NET CHANGES by Change Order S —717500t0 the Owl •r or Cool" or tinder this Contract.
CAUTION: You should sign an original AIA Contract Document,on which this text appears in RED. An original assures that changes will not be obscured.
to AIA Document G702/CMa*a-1992.Copyright C 1992 by The American Institute of Architects.All rights reserved.WARNING:This AIA Document is protected by U.S.Copyright Law and International Treaties.
Unauthorized reproduction or distribution of this AIAO Document,or any portion of it,may result In severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.
Purchasers are permitted to reproduce ten(10)copies oI this document when completed.To report copyright violations of AIA Contract Documents,email The American Institute of Architects'legal counsel.copyright @aia.org.
t AlA Document G703TM - 1992
Continuation Sheet
ALA Document G7027"3,Application and Certification for Payment. APPLICATION NO:
containing Contractor's signed certification is attached. CARMEL PERFORMING ARTS SIX
In tabulations below,amounts are stated to the nearest dollar.
APPLICATION DATE: 8/27/2010
Use Column Ion.Contracts where variable retainage for line items may apply. PERIOD TO:
ARCHITECT'S PROJECT NO: 9/15/2010
A 13 C D E I F C I I I
WORK COMPLETED
TOTAL BALANCE
SCHEDULED COMIPLE'I'ED
ITEM DESCRIPTION OF WORK FROM PREVIOUS PRESENTLY % 'f0 RETAINAOE
VALUE APPLICATION THIS PERIOD STORED AND STORED
NO. TO DATE IC=CJ FINISH l'IJ'nuriaL(e rate)
(D+l:) (Not in Our Fl Q)+F+FI (C-GI
CERAMIC TILE
MOBILIZATION 500.00 500.00 0.00 0.00 ' 500.00 100% 0.00 25.00
BOND 1,800.00 1,800.00 0.00 0.00 1,800.00 100% 0.00 90.00
ALLOWANCE ii 2 20,000.00 10,000.00 0.00 0.00 10,000.00 50% 10,000.00 500.00
ALLOWANCE II 6 5,000.00 5,000.00 0.00 0.00 5,000.00 100% 0.00 250.00
C.O. it 1 (2,500.00) 0.00 (2,500.00) 0.00
(2s00.00) 100% 0.00 (125 00)
C.O. #2 (15,000.00) (15,000.00) 0.00 0.00 (15,000.00) 100% 0.00 (750.00)
C.O.a 3 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00
BASEMENT R.R.S.:
LABOR 3.800.00 3,800.00 0.00 0.00 3,800.00 100% 0.00 190.00
MATERIAL 5,900.00 5,900.00 0.00 0.00 5,900.00 100% 0.00 295.00
PLENUM RRS
LABOR 30.400.00 30,400.00 0.00 0.00 30,400.00 100% 0.00 1,520.00
MATERIAL 45,600.00 45,600,00 0.00 0.00 45,600.00 100% 0.00 2,280.00
NORTH BOX TIER
LABOR 17,600.00 17,600.00 0.00 0.00 17,600.00 100% 0.00 880.00
MATERIAL 26,400.00 26,400.00 0.00 0.00 26,400.00 100% 0.00 1,320.00
GItANI)TO'T'AL
;CAUTION:You should sign an original AIA Contract Document,on which this text appears in RED.An original assures that changes will not be obscured.
AtA Document G703 T"-1992.Copyright 0 1963, 1965, 1956,1967, 1970,1978,1983 and 1992 by The American Institute of Architects.All rights reserved.WARNING:This AIA°Document Is protected by U.S.Copyright
{� Law and International Treaties.Unauthorized reproduction or distribution of this AIAc'Document,or any portion of It,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent
possible under the law.Purchasers are permitted to reproduce ten(10)copies of this document when completed.To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal
counsel,copyright @aia.org.
A.
- „! A4 IA Document G703" - 1992
Continuation Sheet .
AIA Document G702TM'.Application and Certification for Payment. CARMEL PERFORMING ARTS APPLICATION NO: PG y 2
containing Contractor's signed certification is attached. APPLICATION DATE:
In tabulations below,amounts are slated 10 the nearest dollar. -
Use Column I on Contracts where variable retai nage for line items may apply. PERIOD TO:
ARCHITECT'S PROJECT NO:
A B C 0 E F G I I I
WORK CONIPLE1'ED 'IOTAI.
MATERIALS BALANCE
COMPLETED
ITEM DESCRIPTION OF\VOILA SCHEDULED FROM PREVIOUS PRESENTLY % TO RETAINAGE
NO. VALUE APPLICATION THIS PERIOD STORED AND 51'ORF,D (G-C) FINISH (If variable rate)
(Dr E) (Not in D or E) TO DATE (C-G)
(D+E tP)
NORTH ORCHESTRA LOW
LABOR 10,000.00 10,000.00 0.00 0.00 10,000.00 100% 0.00 500.00
MATERIAL 15,000.00 15,000.00 0.00 0.00 15,000.00 100% , 0.00 750.00
BALCONY HIGH
LABOR 16,000.00 4,000.00 12,000.00 0.00 16.000.00 100% 0.00 800.00
MATERIAL 23,495.00 23,495.00 0.00 0.00 23,495.00 100% 0.00 1,174.75
•
•
•
TOTAL GRAND TOTAL 203,995.00 184,495.00 9,500.00 0.00 193,995.00 95% 10,000.00 10,199.75
CAUTION:You should sign an original AIA Contract Document,on which this text appears in RED.An original assures that changes will not be obscured.
lr AIA Document G703 TN,-1992.Copyright®1963, 1965, 1966,1967, 1970.1978, 1983 and 1992 by The American Institute of Architects.All rights reserved.WARNING:This Ale Document is protected by U.S.Copyright
Law and International Treaties.Unauthorized reproduction or distribution of this AIAe Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent
possible under the law.Purchasers are permitted to reproduce ten(10)copies of this document when completed.To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal
counsel,copyright @aia.org.