HomeMy WebLinkAboutI.W.P. INC.- 330- 8/11/2011 I. W. P. Inc. Check: 330
Date: 8/11/2011
Vendor: IWP INC
Prior
Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paid
9 68,706.00 68,706.00 0.00 0.00 68,706.00
App 9 on theater
68,706.00 68,706.00 0.00 0.00 68,706.00
330
8/11/2011 **********68,706.00
THE SUM OF SIXTY EIGHT THOUSAND SEVEN HUNDRED SIX DOLLARS AND NO CENTS **********
I. W. P. Inc.
I. W. P. Inc. Check: 330
Date: 8/11/2011
Vendor: IWP INC
Prior
Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paid
9 68,706.00 68,706.00 0.00 0.00 68,706.00
App 9 on theater
68,706.00 68,706.00 0.00 0.00 68,706.00
PAYMENT APPLICATION Page 1
TO: Carmel Theater Development Corporation, LLC PROJECT 605 APPLICATION# 9 Distribution to
1016 3rd Ave SW, Suite 200 R NAME AND VOTG-Parcel 7-C-1 Theater Building
p LOCATION: PERIOD THRU: 05/31/2011
❑OWNER
Carmel, IN 46032 jJ E D 3rd Ave PROJECT#s: 12012
Ol Carmel, IN 46032 ARCHITECT
FROM: I.W.P. Incorporated NA Y 2 a 2011 ARCHITECT: Pedcor Design Group DATE OF CONTRACT: 06/23/2010 ❑CONTRACTOR
P.O. Box 421219 335 City Center Drive El
Indianapolis, Indiana 46242-82$9 Carmel, IN 40632 El
FOR: MF, DW, Ins,AC
CONTRACTOR'S SUMMARY OF WORK Contractor's signature below is his assurance to Owner, concerning the payment herein applied for,
that: (1)the Work has been performed as required in the Contract Documents, (2)all sums previously
paid to Contractor under the Contract have been used to pay Contractor's costs for labor, materials
Application is made for payment as shown below. and other obligations under the Contract for Work previously paid for, and(3)Contractor is legally
Continuation Page is attached. entitled to this payment.
1. CONTRACT AMOUNT $638,420.00 CONTRACTO' ' Incor■ora"-d /
2. SUM OF ALL CHANGE ORDERS $190,485.00 By: �, Date: 05/19/2011
3. CURRENT CONTRACT AMOUNT (Line 1 +/- 2) $828,905.00 fr John ertile/Project Manager
State of: In. . a
4. TOTAL COMPLETED AND STORED $614,231.00
(Column G on Continuation Page) County of: Marion
5. RETAINAGE: Subscribed and sworn to before
a. 10.00% of Completed Work $61,423.00 me this 90_ day of /114.7 A p I f
(Columns D+E on Continuation Page)
b. 10.00% of Material Stored $0.00 Notary Public: Barbara Ware 11 /4_3fe�- __
—]
(Column F on Continuation Page)
Total Retainage(Line 5a+5b or
My Commission Expires: 12/19/2017
Column I on Continuation Page) $61,423.00 ARCHITECT'S CERTIFICATION
6. TOTAL COMPLETED AND STORED LESS RETAINAGE $552,808.00 Architect's signature below is his assurance to Owner, concerning the payment herein applied for,
(Line 4 minus Line 5 Total) that: (1)Architect has inspected the Work represented by this Application, (2)such Work has been
7. LESS PREVIOUS PAYMENT APPLICATIONS $484,102.00 completed to the extent indicated in this Application, and the quality of workmanship and materials
conforms with the Contract Documents, (3)this Application for Payment accurately states the amount
of Work completed and payment due therefor, and(4)Architect knows of no reason why payment
8. PAYMENT DUE $68,706.00 should not be made.
9. BALANCE TO COMPLETION CERTIFIED AMOUNa8-206— p\�Y
(Line 3 minus Line 6) $276,097.00 (If the certified amount is different from the payment due,you should attach an explanation. Initial all \
the figures that are changed to match the certified amount.)
SUMMARY OF CHANGE ORDERS_ ADDITIONS DEDUCTIONS .71.x/.,_ (,,-4J�
Total changes approved in ' T-„r
previous months $198,945.00 ($8,460.00)
Total approved this month $0.00 $0.00) By. Date: (//:///
TOTALS Neither this Application nor payment applied or herein is assignable or negotiable. Payment shall be
$198,945.00 ($8,460.00) made only to Contractor, and is without prejudice to any rights of Owner or Contractor under the
NET CHANGES $190,485.00 Contract Documents or otherwise.
PAYMENT APPLICATION Quantum Software Solutions, Inc. Document
CONTINUATION PAGE Page 2 of 5
PROJECT: 605 APPLICATION#: 9
VOTG-Parcel 7-C-1 Theater Building DATE OF APPLICATION: 05/17/2011
Payment Application containing Contractor's signature is attached. PERIOD THRU: 05/31/2011
PROJECT#s: 12012
A B C D I E F G H I
COMPLETED WORK STORED TOTAL % BALANCE
ITEM# WORK DESCRIPTION SCHEDULED AMOUNT AMOUNT MATERIALS COMPLETED AND COMP. TO RETAINAGE
AMOUNT PREVIOUS THIS PERIOD (NOT IN D OR E) STORED
(G/C) COMPLETION (If Variable)
PERIODS (D+E+ F) (C-G)
1 Exterior Metal Framing
109-9000 N Elevation Materials $48,940.00 $48,940.00 $0.00 $0.00 $48,940.00 100.00% $0.00
109-9001 N Elevation Labor $22,530.00 $22,530.00 $0.00 $0.00 $22,530.00 100.00% $0.00
109-9002 E Elevation Materials $19,850.00 $19,850.00 $0.00 $0.00 $19,850.00 100.00% $0.00
109-9003 E Elevation Labor $10,130.00 $10,130.00 $0.00 $0.00 $10,130.00 100.00% $0.00
109-9004 S Elevation Materials $23,650.00 $23,650.00 $0.00 $0.00 $23,650.00 100 00% $0.00
109-9005 S Elevation Labor $15,940.00 $15,940.00 $0.00 $0.00 $15,940.00 100.00% $0.00
109-9006 W Elevation Materials $47,080.00 $47,080.00 $0.00 $0.00 $47,080.00 100.00% $0.00
109-9007 W Elevation Labor $20,580.00 $20,580.00 $0.00 $0.00 $20,580.00 100.00% $0.00
109-9007a Gypsum Sheathing
109-9008 N Elevation Materials $6,900.00 $6,900.00 $0.00 $0.00 $6,900.00 100.00% $0.00
109-9009 N Elevation Labor $4,530.00 $4,530.00 $0.00 $0.00 $4,530.00 100.00% $0.00
109-9010 E Elevation Materials $7,600.00 $7,600.00 $0.00 $0.00 $7,600.00 100 00% $0.00
109-9011 E Elevation Labor $5,630.00 $5,630.00 $0.00 $0.00 $5,630.00 100.00% $0.00
109-9012 S Elevation Materials $8,320.00 $8,320.00 $0.00 $0.00 $8,320.00 100.00% $0.00
109-9013 S Elevation Labor $6,100.00 $6,100.00 $0.00 $0.00 $6,100.00 100.00% $0.00
SUB-TOTALS $247,780.00 $247,780.00 $0.00 $0.00 $247,780.00 100.00% $0.00
CONTINUATION PAGE Quantum Software Solutions, Inc. Document
CONTINUATION PAGE Page 3 of 5
PROJECT: 605 APPLICATION#: 9
VOTG-Parcel 7-C-1 Theater Building DATE OF APPLICATION: 05/17/2011
Payment Application containing Contractor's signature is attached. PERIOD THRU: 05/31/2011
PROJECT#s: 12012
A B C D I E F G H I
COMPLETED WORK STORED TOTAL % BALANCE
ITEM# WORK DESCRIPTION SCHEDULED AMOUNT AMOUNT MATERIALS COMPLETED AND COMP. TO RETAINAGE
AMOUNT PREVIOUS THIS PERIOD (NOT IN D OR E) STORED (G/C) COMPLETION Of Variable)
PERIODS (D+E+F) (C-G)
109-9014 W Elevation Materials I $7,200.00 $7,200.00 $0.00 $0.00 $7,200.00 100.00% $0.00
109-9015 W Elevation Labor $5,110.00 $5,110.00 $0.00 $0.00 $5,110.00 100.00% $0.00
109-9015a Batt Insulation
109-9016 Materials $26,880.00 $20,160.00 $5,376.00 $0.00 $25,536.00 9500% $1,344.00
109-9017 Labor $15,950.00 $11,963.00 $3,190.00 $0.00 $15,153.00 9500% $797.00
109-9017a Rough Carpentry
109-9018 Materials $16,430.00 $15,609.00 $0.00 $0.00 $15,609.00 95.00% $821.00
109-9019 Labor $11,790.00 $11,201.00 $0.00 $0.00 $11,201.00 95.00% $589.00
109-9019a Interior Metal Framing
109-9020 1st Floor Materials $22,310.00 , $21,195.00 $0.00 $0.00 $21,195.00 95.00% $1,115.00
109-9021 1st Floor Labor $32,410.00 $29,169.00 $1,621.00 $0.00 $30,790.00 95.00% $1,620.00
109-9022 2nd Floor Materials $5,440.00 $4,896.00 $544.00 $0.00 $5,440.00 100.00% $0.00
109-9023 2nd Floor Labor $10,510.00 $9,459.00 $1,051.00 $0.00 $10,510.00 100.00% $0.00
109-9024 3rd Floor Materials $3,740.00 $3,366.00 $374.00 $0.00 $3,740.00 100.00% $0.00
109-9025 3rd Floor Labor $3,780.00 $3,402.00 $378.00 $0.00 $3,780.00 100.00% $0.00
109-9025a Drywall
SUB-TOTALS $409,330.00 $390,510.00 $12,534.00 $0.00 $403,044.00 98.46% $6,286.00
CONTINUATION PAGE Quantum Software Solutions, Inc. Document
CONTINUATION PAGE Page 4 of 5
PROJECT: 605 APPLICATION#: 9
VOTG-Parcel 7-C-1 Theater Building DATE OF APPLICATION: 05/17/2011
Payment Application containing Contractor's signature is attached. PERIOD THRU: 05/31/2011
PROJECT#s: 12012
A B C D I E F G H I
COMPLETED WORK STORED TOTAL % BALANCE
ITEM# WORK DESCRIPTION SCHEDULED AMOUNT AMOUNT MATERIALS COMPLETED AND COMP. TO RETAINAGE
AMOUNT PREVIOUS THIS PERIOD (NOT IN D OR E) STORED I Variabe
(G/C) COMPLETION (f Variable)
PERIODS (D+E+F) (C-G)
109-9026 1st Floor Materials $26,010.00 `I $20,808.00 $3,902.00 $0.00 $24,710.00 95 00% $1,300.00
109-9027 1st Floor Labor $67,100.00 $36,905.00 $16,775 00 $0.00 $53,680.00 80 00% $13,420.00
109-9028 2nd Floor Materials $6,620.00 $5,958.00 $662.00 $0.00 $6,620.00 100,00% $0.00
109-9029 2nd Floor Labor $14,990.00 $10,493.00 $3,748.00 $0.00 $14,241.00 95.00°!° $749.00
109-9030 3rd Floor Materials $6,020.00 $5,418.00 $602.00 $0.00 $6,020.00 100.00% $0.00
109-9031 3rd Floor Labor $13,670.00 $8,202.00 $4,785.00 $0.00 $12,987.00 95.00% $683.00
109-9031a Acoustical Ceilings
109-9032 1st Floor Materials $8,790.00 $0.00 $3,516.00 $0.00 $3,516.00 40.00% $5,274.00
109-9033 1st Floor Labor $5,080.00 $0.00 $2,286.00 $0.00 $2,286.00 45.00% $2,794.00
109-9034 2nd Floor Materials $1,610.00 $0.00 $322.00 $0.00 $322.00 20 00% $1,288.00
109-9035 2nd Floor Labor $1,000.00 $0.00 $0.00 $0.00 $0.00 0 00% $1,000.00
109-9035a Install Metal Frames
109-9036 1st Floor Labor $3,450.00 $2,760.00 $0.00 $0.00 $2,760.00 I 80 00% $690.00
109-9037 2nd Floor Labor $610.00 $488.00 $122.00 $0.00 $610.00 100.00% $0.00
109-9038 3rd Floor Labor $540.00 $324.00 $216.00 $0.00 $540.00 100.00% $0.00
109-9039 Bonds $16,800.00 $16,800.00 $0.00 $0.00 $16,800.00 100.00% $0.00
SUB-TOTALS $581,620.00 $498,666.00 $49,470.00 $0.00 $548,136.00 9424% $33,484.00
CONTINUATION PAGE Quantum Software Solutions, Inc. Document
CONTINUATION PAGE Page 5 of 5
PROJECT: 605 APPLICATION#: 9
VOTG-Parcel 7-C-1 Theater Building DATE OF APPLICATION: 05/17/2011
Payment Application containing Contractors signature is attached. PERIOD THRU: 05/31/2011
PROJECT#s: 12012
A B C D I E F G H I
COMPLETED WORK STORED TOTAL % BALANCE
ITEM# WORK DESCRIPTION SCHEDULED AMOUNT AMOUNT MATERIALS COMPLETED AND COMP. TO RETAINAGE
AMOUNT
PREVIOUS THIS PERIOD (NOT IN D OR E) STORED (G/C) COMPLETION Of Variable)
PERIODS (D+E +F) (C-G)
109-9040 Temp Heat $6,800.00 I $6,800.00 I $0.00 $0.00 $6,800.00 1 100.00%I $0.00
109-9041 Allowance $50,000.00 $32,380.00 $17,620.00 $0.00 $50,000.00 100.00% $0.00
109-9042 CO#50-Tax Exemption ($8,460.00) ($8,460.00) $0.00 $0.00 ($8,460.00) 100.00% $0.00
109-9043 CO#75-PR#9 $28,350.00 $8,505.00 $5,670.00 $0.00 $14,175.00 50.00% $14,175.00
109-9044 CO#98-Sound Panels $158,720.00 $0.00 $0.00 $0.00 $0.00 0.00% $158,720.00
109-9045 CO#99-PR#17 $1,540.00 $0.00 $1,540.00 $0.00 $1,540.00 100.00% $0.00
109-9046 CO#100-PR#19 $620.00 $0.00 $620.00 $0.00 $620.00 100.00% $0.00
109-9047 CO#107-PR#30 $280.00 $0.00 $0.00 $0.00 $0.00 0 00% $280.00
109-9048 CO#110-PR#28 $1,850.00 $0.00 $0.00 $0.00 $0.00 000% $1,850.00
109-9049 CO#113-Extra Waterproofing $1,420.00 $0.00 $1,420.00 $0.00 $1,420.00 100.00% $0.00
109-9050 CO#117-PR#29 $410.00 $0.00 $0.00 $0.00 $0.00 0.00% $410.00
109-9051 CO#137-PR#31 $5,755.00 $0.00 $0.00 $0.00 $0.00 0.00% $5,755.00
TOTALS $828,905.00 $537,891.00 $76,340.00 $0.00 $614,231.00 74.10% $214,674.00
CONTINUATION PAGE Quantum Software Solutions, Inc. Document
G703 CONTINUATION SHEET Page 1 of 1
To: From: Project: Application No.: 9
Carmel Theater Development Corporation,LLC M.P.Incorporated VOTE-Parcel 7-C-1 Theather Building Application Date:
11711 N Pennsylvania St,Suite 200 Y.O.Box 421219 Bid Package#3G-Metal Stud,Drywall, Period To:
Carmel,Indiana 46032 Indianapolis,IN 46242-1219 Insulation,Blocking,Acoustical Ceilings Eng.Proj# 12012
A B C D I E F G II I
Work Completed Materials Total
Presently Completed Balance Retainage
Item Scheduled From Previous Stored and Stored 0/,, To If
# Description of Work Value Application This Period (Not in To Date (G/C) Finish Variable
D or E) (D+E+F) (C-G)
109-9041 Allowance-$50,000.00
1 CO#35-PR#10 2,870.00 2,870.00 11.00 0.00 2,870.00 100% 0.00 0.00
2 CO#37-PR#12 290.00 280.00 0.00 0.00 280.00 100% 0.00 0.00
3 CO#40-RFI#117 1,050.00 1,050.00 0.00 0.00 1,050.00 100% 0.00 0.00
4 CO#55-PR#14 1,980.00 1,980.00 0.00 0.00 1,980.00 100% 0.00 0.00
5 CO#75-PR#9 43,820.00 26,21(0.00 17,62(1.(10 0.00 43,820.00 100% 0.00 1,762.00
"Total: 5(1,0(10.00 17,620.00 0.00 5(1,000.00 100% 0.00 1,762.00
PRIME CONTRACTOR'S SWORN STATEMENT OF
INDEBTNESS &WAIVER OF LIEN
STATE OF Indiana
COUNTY OF Hamilton
et...c-41e Being duly sworn upon his/her oath disposes and
says that:
1. He/she is Praj4e" r(4 serting sole proprietor, partner or corporate office held, as the case maybe),
of IWP, Inc. hereafter called the "Prime Contractor". He/she is over the age of twenty-one. He/she is
authorized to make this affidavit on behalf of Prime Contractor.
2. Prime Contractor is the �t . �7�Q<< Prime Contractor for the construction of the development
known as VILLAGE ON THE GREEN — PARCEL 7C1 — THEATER BUILDING located in CARMEL
(City), INDIANA (state), hereafter referred to as the "Development", pursuant to the contract between the
Prime Contractor and CARMEL THEATER DEVELOPMENT CORPORATION, LLC., the Owner.
3. This affidavit is made for the express purpose of inducing and CARMEL THEATER DEVELOPMENT
CORPORATION, LLC., to make payment to Prime Contractor of the invoice submitted herewith for labor
and materials furnished pursuant to said Contractor. Upon receipt of said payment the Prime Contractor
hereby waives any lien rights to which Prime Contractor is entitled for labor or materials furnished for the
development to the date hereof.
4. Listed below are all suppliers or other persons who either has furnished or might furnish the Prime
Contractor with materials, appliances, machinery, fixtures or furnishing placed upon or installed on the
development. Mark (X) in the appropriate column for EACH supplier listed. Place an (X) in column: 1) If a
waiver of lien by supplier conditioned by payment of a specified amount is attached hereto. (In this case
also show the amount owed the supplier). 2.) If a FULL (final) lien release has been signed and delivered
to the Owner. 3.) If the initial delivery has not been made.
Supplier List(Add list if necessary 1. Amount Owed 2 3
t.f inroz-
#1 and 2 correspond to the same numbered choices on the waiver format. CARMEL THEATER
DEVELOPMENT CORPORATION, LLC.is hereby authorized to make payment to each such unpaid
creditor either directly or by check jointly payable to Prime Contractor and such creditor, as CARMEL
THEATER DEVELOPMENT CORPORATION, LLC. shall determine.
5. There are no bills, charges, costs or expenses for labor or material which could now or hereafter result
in lien being filed against the Development or a claim being asserted against the Owner except the
persons or businesses named in Paragraph 4 above.
IN WITNESS WHERE OF, affiant has signed this document on behalf of the Prime Contractor this 1 9
day of 11/47 , 20 tl
.. f)re .
`,A (Aut ' red '&•resentative of Prime Contractor, Title)
County of V"`ar;a.
State of
Subscribed and sworn to before me, a Notary Public in and for said County and State,
This q Y` Day of 14°7 , 20 I
(Notary Public)
(Printed Name)
My Commission Expires: /2—/q—/
NOTARY SEAL MUST APPEAR ON IS FORM.