Loading...
HomeMy WebLinkAbout035-97.erosion control� W W � H � _ � � � � � 0 15 30 60 7.� 2z.5 a:> SCALE: 1 "-- 30' ```,..�``�"�G � Hq - ,y��'y, r`�0Q-J����ST ERFOC�'F�g'yj No. 920299 � STATE OF � �y�� �NDIANP ���(� ����'''�� S/ON AL F-r ,°�. CERTIFIED BY: DATE / `" --` �/ l�/1 � PENNSYLVANIA STREET \\ � . :' � � ♦�l� ♦ / ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ a ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ � ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ a ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ a ♦ ♦ ♦ ♦ ♦ • ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ a ♦ a ♦ ♦ ♦ ♦ ♦ � . .. _ ..._ .... ....... .... . .._. .... _ _... j ♦ ♦ _....._.._......._.. ... .... __.... ._' _._' __.___ .... ___..... __._`.__ __._.__ ... __..__ ___ _.... ..... ...... _' ... ._ T. _. . _ __ ... .. .. _. . ... .. . ... ..._. , . _ . . .... . .. .. � ... _.. . . ; ♦ ♦ ♦ a ♦ '.........._ ............. .. .... .. ... _... .. . __._ .... .. . . _.,. ._ . . ♦ ♦ ♦ ♦ • � ..__._...... _...._._... � . ♦ ♦ ♦ ♦ � •f € ' :\ . ' j• REVISIONS 4/10/97 Q.A. REVISIONS ,( �'; ;,;� �� 1 j i i \ EFG .... . : ......... . ,. ......... ... . . .. .� j . . . . . . . . . . . . _._._._._ ..................._........____-- -_.,....................._.___....___......................__..... -...._ ---.___....__.._._---___ . . . \ �-� �' �-- .:.. -�� . ti .'.'.'.'.'.'.'.'.:.� : :.: :.:.:.:.:.:.:.: .'.'. .'.'.'.' �'.i,t.r�i',s.s.'�s.s.t�.',s.s.'.f..vi,' . '•:•� ��� ��..,,, 1 � � � 1 ,; " f ...___.. \ � ..� �III��� V/////////// E � i �° i �EQUIREMENTS FOR TRAFFIC ISLAND AREAS. I :................_ . ..i..........._ _ .. SET POSTS AND EXGVAiE A 4'X4' STEP i: TRENCN UPSLOPE FTtON AND N.ONC TME UNE OF f'OS?S. CTFP i• �..e� r y.er rr.rnv� ,n ����,r � ���tK r� �� 1HE WIRE FENCE AND EXTEND rt nrro TMe rr�NC►+. ���� , ►+oi+-wovEr+ cnr�►t FABRIC e�acv n+e e.._....._- --._ � SECTION SILT FENCE BARRIER INSTALLATION EC'Z NO SCALE REVISIONS PAUL I. CRIPE, INC. 7172 GRAHAM ROAD INDIANAPOLIS, INDIANA 46250 (317) 842-6777 A temporary seeding mixture shall �sed in the areas where stripping or fills have been graded shall�be used for silt \� ond erosion protection, or as shown on the rosion controi ��,, plan. After groding, all construction areas ar o be seeded. Sodding or matting shall be used on all swoles over 2% slope and embankments in excess of 4:1 slope, or as shown on the erosion control plan. 2. Sodding: Locally grown Blue�ass biend uniform in color, type, density.,and thickness. :, 3. Permanent Seeding: March 1 to May 15 ond August 10 to October 15. (Dates may vary at discretion of Landscape Architect depending on weother conditions.) A. Swales/Slopes: Blended mixture of seed sholl be applied at the rate of 110 pounds per acre. The mixture shall consist of 40# Mustang turf-type Tall Fescue, 30# Banff or Wabash Kentucky Bluegrass, 30# Fiesta Perennial Ryegrass and 10# Redtop Bentgrass. B. Graded Area Adjocent to Pavement: Blended mixture of seed sholl be opplied ot the rate of 90 pounds per acre. The mixture shall consist of 35# Mustang turf-type Tall Fescue, 30# Fiesta Perennial Ryegrass and 25# Banff or Wabash Kentucky Bluegrass. 4. Temporary Seeding: A. Moy 15 to August 15; 40#�acre Annuli Ryegrass. B, August 15 to November 15; 2 bushels/acre Rye (groin) or wheat C. Morch 1 to May 15; 3 bushels/acre Oats. 5. Fertilizer. Commercial analysis 12/12/12 applied at o rate of 600#/acre. Apply lime to raise PH to the level needed for species being seeded. Work fertilizer and lime into the soil to a depth of 2-3 inches. 6. All Hydroseeding shall be in accordance with the preceding requirements. e CIVIL ENGINEERING QUALITY ASSURANCE: e LAND SURVEYING - /������� • ARCHITECTURE h � LAND PLANNING DATE : �� ��_�? 7. Mulch: Straw to be used where application is made by hydraulic mulching at the rate of one ton per acre. Straw muich may be used and applied uniformly in a continuous blanket at the rate of 2 tons per acre within 24 hours after seeding. 8. Sediment Control Fabric: Fabric shall be non-woven construction composed of polypropylene and shall be ultraviolet stabilized. 9. If temporary seeding is estoblished prior to permanent seeding, the mulch may be eliminated except in "bare" areas. 10. If grading occurs during December, January, or February, no seeding to take place till spring planting time; however, it is imperative thot all sediment filters and traps are in place prior to buik earthmoving or clearing. 11. All areas along street (approximately 25 foot behind curb) shall be seeded with permanent seed mixture as soon os grade is established. Reseeding may be required after utility companies have installed their mains. 12. All lots�outlots where groding has occurred and no construction is expected to occur within 60 days, shall be filled with additional 3" topsoil and seeded with the temporary seeding process. 13. During dry weather, keep lawns watered with sprinklers or other approved methods, Reseed any areas not germinating or damaged at intervols os moy be required according to seasonal condition. Water gross and execute necessary weeding until acceptable and full stand of grass has been obtained. Upon acceptance by the Owner, the Owner shall assume maintenance of the Iawn areas. 14. All dates shown are nominal and may be varied with concurrence of the Engineer or the Local Soil Conservation Service Office. DATE: 04-07-97 SCALE: 1 "= 30' DRAWING TITLE: EROSION CONTROL PLAN �, DATE: 04-10-1991 TIME: 14: 40 FILE: 0: \199 %� '.'.< . • \• � /� . , .._. , ......... , � � c� . ..�•�o:� :'�� � •� •• USER: .., . ...' .. ' '+'�'� PERMANENT SEEDING WITH .....,.,. . . . . . HYDROSEEDING OR EQUIVALENT MULCH ... .'.... ���� SILT FENCE - DETAIL SHEET C203 DWG. TYPE MERIDIAN PENN PLAZA FILE NUMBER I SHEET: JOB NUMBER 970343-20000 C203