HomeMy WebLinkAboutPenn St Curb Cut and new driveway 7-11-2013
2013.00877
July 9, 2013
City of Carmel
Board of Public Works
One Civic Square
Carmel, Indiana 46032
Re: Proposed Pennsylvania Street Curb Cut
Carmel, Indiana
Dear Members of the Board of Public Works,
On behalf of our client, we respectfully request the approval of a new curb cut along Pennsylvania
Street. This proposed cut will be for the relocated driveway for the existing Wagner Reese Law Firm
located along Meridian Street.
As I am sure you are aware, the Indiana Department of Transportation is working on converting
many of the Meridian Street intersections into grade separated interchanges. As a part of this
conversion, many of the driveways currently located near Meridian Street are being closed. Our
client has received information from the State on the closure of their existing cut along Old Meridian
and they have a limited amount of time to get a new cut built so they can access their property and
continue to operate their business.
We have included an aerial photo indicating the existing and proposed cut locations and an exhibit
showing the cut along Pennsylvania Street. Plans have been submitted to the city showing the extent
of what is currently being proposed.
If you have any questions, please feel free to contact us at (317) 547-5580.
Very truly yours,
American Structurepoint, Inc.
William A. Butz, Jr., PE
Account Manager
Wa
g
n
e
r
Re
e
s
e
Cu
r
b
Cu
t
Ex
h
i
b
i
t
No
t
to
Sc
a
l
e
EX
I
S
T
I
N
G
CU
R
B
CU
T
(T
O
BE
CL
O
S
E
D
BY
IN
D
O
T
)
EX
I
S
T
I
N
G
BU
I
L
D
I
N
G
AN
D
PA
R
K
I
N
G
LO
T
PR
O
P
O
S
E
D
CU
R
B
CU
T
LO
C
A
T
I
O
N
MERIDIAN STREET
PENNSYLVANIA STREET
72
6
0
S
H
A
D
E
L
A
N
D
S
T
A
T
I
O
N
IN
D
I
A
N
A
P
O
L
I
S
,
I
N
4
6
2
5
6
-
3
9
5
7
TE
L
3
1
7
.
5
4
7
.
5
5
8
0
F
A
X
3
1
7
.
5
4
3
.
0
2
7
0
ww
w
.
s
t
r
u
c
t
u
r
e
p
o
i
n
t
.
c
o
m