Contract Change Order No- Smock Fansler Corporation City of Carmel Carmel Redevelopment Commission To: Smock Fansler Corporation Contract Change Order No: . 1 2910 W. Minnesota St. Date: December 3, 2001 Indianapolis,IN 46241 Project Name: City Center Streetscape City Req.No: City P.O. No: City P.O. Date: I. You are directed to make the following changes in this Contract. Under-cut and excavate additional earth to a depth suitable to build approach to Amli Complex off of City Center Drive. Place#2 and#53 stone with Geo-grid stabilizer and grade and compact as directed to achieve desired compaction results via proof roll. REASON FOR THIS ORDER: Under-cut, additional stone and Geo-grid necessary to alleviate unsuitable sub-grade conditions that existed in the approach area. The extra work and materials were required to achieve compaction requirements and result in a product within the City Right-of-Way that will be more durable and last longer than if done without this extra material. II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C.No.: N/A Other: Item Amount (+) or (-) Days 1. Undercut $6,203.13 0 The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 213,900.00 Contract Price will be increased/decreased by this Change Order $ 6,203.13 New Contract Price including this Change Order $ 220,103.13 Contract Time Prior to this Change Order N/A Days 12/31/2001 Completion date Net increased/decreased days resulting from this Change Order: 0 Days Current Contract Time including this Change Order: N/A Days, 12/31/2001 Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting form the performance of the changed work. The Above Changes Are The Above Changes Are Approved: Recommended: Accepted: CrossRoad Engineers, P.C. Smock Fansler Corp. Richard A. Roesch 3417 S. Sherman Dr. 2910 W. Minnesota St. Beech rov-,y A o?:01 / _ Indianapolis, IN 46241 Edmund Burke By: 1404' ,-/ 7' By: r : 24 4�r/1i Ronald E. Carter Phone: 780- 555 one: 248-8371 Date: 4,1, O ® Date: 12 -/o-o/ John R. Koven Luci Snyder Steve Engleking Attest: Diana Cordray, Clerk-Treasurer Date: `\ I NOV-3U-2UU1 h}l1 U1 29 Nil FAX NU' F. U2 M SFC Job# 0-1372 PROJECT. Carmel Sidewalks • Date: Nov 21, 2001 DESCRIPTION: Extra work charges at Drive Entrance-south side of City Center Drive into AMLJ project QTY UNITS: RATE EXTENSION LABOR: Working Foreman 1.0 Hrs $58.12 $58.12 Efc ui r ient Operator 7.00_Hrs $46.17 $323.19 Laborers Hrs $35.07 $0.00 Teamsters (truck driver)— Hrs $40.02 $0.00 Carnters Hrs $46.31, $0,00 • Cement Finishers _ (Hrs $40.06 $0.00 LABOR TOTAL $381,31 EQUIPMENT: dozer Hrs $47.00 $0.00 Triaxle truck Hrs $28.00 $0.00 Vib(Eit. Roder 3.5 Hrs $27.00 $94.50 Backhoe 580 3,5 Hrs _ $47.00 $164,50, Uniload, 1845 3.5 Hrs $36.50 $127.75 EQUIP TOTAL $386.75 MATERIAL: SUB-CONTRACTORS: TOTAL AMOUNT: $768.06 TOTAL FOR ALL 3 DAYS: $6,203.13 • . MOV-3U-�UU1 }•R1 U1:24 N11 1~AX HO, P. 0 SFC Job# 0••1372 PROJECT: Carmel Sidewalks Date: Nov 20, 2001 DESCRIPTION: Extra work charges at Drive Entrance-south side of City Center Drive into AMLI project • Q1Y' UNITS RATE EXTENSION LABOR: Working Foreman 1,0 Hrs r $58.12 $58.12 Equipment Operator 12.00 Hrs $46.17 _ $554,04 Equip Operator O.T. 2.00 Hrs $62.81 $125.62 Laborers 3.00 Hrs 535.07 5105.21 L8borerS O,T, r 1.00-Hrs $48.24 $45,24 Carpenters Hrs $46.31' $0,00 Cement Finishers Hrs $40.06, $0.00 LABOR TOTAL $891.23 • EQUIPMENT dozer His $47.00 $0.00 iTriaxle truck Hrs ( $28.00 $0.00: Vibrat. Roller _ 8-Hrs $27.00 $216.00 Backhoe 580 9 Hrs $47.00 $423.00 Uniload. 1845 5 Hrs $36.50 $182.50 EQUIP TOTAL. $821.50 MATERIAL: #2 Limestone 55.8 TONS $5.75 $320.85 #53 Limestone 74.56 TONS $5.75 $428.72 SUB-CONTRACTORS: 5 TRUCK LOADS HAULED OFF Tri-Axle Dump Truck 15 Hrs $59.40 $991.00 Dump Fees 5 EA $35.00 $175.00 TOTAL AMOUNT: $3,099.58 NOV-30-2001 Fk.1 01 :29 PM FAX N0. P. 04 SFC Job # 0-1372 PROJECT: Carmel Sidewalks Unto; Nov 19, 2001 DESCRIPTION; Extra work charges at Drive Entrance-south side of City Center Drive into AMLI project QTY UNITS' RATE EXTENSION' LABOR; Working Foreman 1.0 Hrs T $58.12 ` $58,12 Egli)hment Operator 4.00 Hrs $46.17 $184.66 Laborers 3.00 Hrs $35.07 $105.21 Teamsters (truck driver) Hrs , $40.02 $0.00 Carpenters 'Hrs $46.31 $0,00 Cement Finishers _ Hrs $40.06 $0,00 LABOR TOTAL $348.01 EQUIPMENT: dozer Hrs $47.00 $0.00 Triaxte truck Hrs $28.00 $0.001 Virrat. Roller 4'Hrs $27.00 $108.00 Beckhoe 580 6 Hrs $47.00 $376.00 Uniload. 1845_ ,Hrs $36.50 $0.00 EQUIP TOTAL $434.00 MATERIAL: #2 Limestone 36.24 TONS $5.75 $208.38 EA $0,00 SUB-CONTRACTORS: 9 TRUCK LOADS HAULED OFF Tri-Axle Dump Truck 16.5 Hrs $59.40 $980.10 Dump Fees 9 EA $35.00 $315.00 TOTAL AMOUNT: $2,335.49