HomeMy WebLinkAboutW.R. DUNKIN & SON, INC. - 1204 - 156,045.45 - 9/16/2010 CARMEL REDEVELOPMENT COMMISSION ri
0012 4
W R Dunkin & Son, Inc. Check: 1204
PO Box 2247 Date: 9/16/2010
Anderson, IN 46018 Vendor: DUNKINW1
Prior
Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paid
157,175.00 157,175.00 1,129.55 0 00 156,045.45
26A 35
Application 26A
157,175.00 157,175.00 1,129.55 0.00 156,045.45
X i#
62LTD CoinputerEase Poems Division (877)577-5791 I14505700
at
t A ®
Document 6702/CMar" - 1992
Application and Certificate for Payment Construction Manager-Adviser Edition
TO OWNER: Carmel Redevelopment PROJECT: Parcel 7A.#4050 Carmel APPLICATION NO:026 A Distribution to:
Commission Performing Arts OWNER:X
One Civic Square 777 3rd Ave.S.W. PERIOD TO:June 30,2010 CONSTRUCTION MANAGER:X
Cannel,IN 46032 Carmel,IN 46032 ARCHITECT:X
FROM W.R. Dunkin&Son,Inc. VIA CONSTRUCTION Shiel Sexton Co.. Inc. CONTRACT DATE:May 08.2008 CONTRACTOR:X
CONTRACTOR: PO Box 2247 MANAGER: PROJECT NOS:25310/2695-4050/2695 FIELD:
Anderson, IN 46018
OTHER:
CONTRACT FOR: BP-#4050 General Trades VIA ARCHITECT: CSO Architects
CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that to the bes tf the Contractor's knowledge, information and
belief the Work covered by this Application for • I I-• •as been completed in accordance with the
Application is made for payment,as shown below, in connection with the Contract. Contract Documents,that all amounts •r•• ..s-/aid by II Contractor for Work for which previous
Continuation Sheet,AIA Document 0703, is attached. Certificates for Payment WA IS . wtnents cived from the Owner, and that current
1.ORIGINAL CONTRACT SUM $ 9.966.300.00 Palm'• r• ' 'n'Wo due `
2.NET CHANGE BY CHANGE ORDERS $ -163,731.00 'ONTRA• * W �'' �N NC.
3.CONTRACT SUM TO DATE(Line I ±2) $ 9.802.569.00 B . ' -�/ Date: June 16.2010
4.TOTAL COMPLETED&STORED TO DATE(Column 0 on G703) $ 8.287.984.00 S to of: Indiana /„„--
5.RETAINAGE: County of:hfadisol
a. 5 %of Completed Work Subscribed and sworn to before
(Column E on 6703) $ 490,128.45 me 16th day of June r
b. ( %of S tored Material Notary ublic:Martha A.Carpenter . i,( a re,,iJ
(Column F on 0703) $ 0.00 My Commission expires:January 08,2017 //
Total Rctainage(Lines 5a+5b or Total in Column l of 0703) $ 490,128.45 CERTIFICATE FOR PAYMENT
6.TOTAL EARNED LESS RETAINAGE $ 7,797,g55,55 In accordance with the Contract Documents. based on on-site observations and the data comprising
(Line 4 Less Line 5 Total) this application,the Construction Manager and Architect certify to the Owner that to the best of their
7.LESS PREVIOUS CERTIFICATES FOR PAYMENT $ 7,641,810.10 knowledge,information and belief the Work has progressed as indicated,the quality of the Work is in
accordance with the Contract Documents.and the Contractor is entitled to payment of the AMOUNT
(Line 6 from prior Certificate) CERTIFIED.
8.CURRENT PAYMENT DUE $ 156.045.45 AMOUNT CERTIFIED $ 156,045.45
9.BALANCE TO FINISH,INCLUDING RETAINAGE (Attach explanation ifamo nt certified differs from the amount applied. Initial all figures on this
Application and on e Continuation Sheet that are chat o conform with the amount certified.)
(Line 3 less Line 6) $ 2,004,71 3.45 CONSTRUCTION M ER:
By: So:si �� ii- Date: 910 10
CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS ARCH! /�. /
Total changes approved in previous months by Owner $ 574,008.00$ 760,330.00 By: ' r Date: &( /3/,0
Total approved this Month $ 22.591.00$ 0.00 This Cenific. is not •gutiable. The AMOUNT CERTIFIED is payable only to the Contractor
TOTALS $ 596,599.00$ 760.330.00 named here' . Issu• e, payment and acceptance of payment are without prejudice to any rights of
the Owner Ir . rector trader this Contract.
NET CHANGES by Change Order $ 163,731.00
AIA Document G702/CMa"I—1992.Copyright 0 1992 by The American Institute of Architects.All rights reserved.WARNING:This AIA Document is protected by U.S.Copyright Law and International
Treaties.Unauthorized reproduction or distribution of this AIAe Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible
under the law.This document was produced by Alit software at 11:51:31 on 06/21/2010 under Order No.0168 4 20 7 39_1 which expires on 05/10/2011,and is not for resale.
User Notes: (1950512437)
PAID SEP 1 7 2010
*AILLV Document G703r" - 1992
Continuation Sheet
AIA Document, G702'5t-1992, Application and Certification for Payment, or G7361nt-2009, APPLICATION NO: 026
Project Application and Project Certificate for Payment,Construction Manager as Adviser Edition, APPLICATION DATE:06/16/2010
containing Contractor's signed certification is attached.
In tabulations below, amounts are in US dollars. PERIOD TO: 06/30/2010
Use Column I on Contracts where variable retainage for line items may apply. ARCHITECT'S PROJECT NO:25310
A B C D E F 0 H 1
WORK COMPLETED TOTAL
MATERIALS COMPLETED
BALANCE TO RETAINAGE
ITEM DESCRIPTION OF SCHEDULED FROM PRESENTLY
NO. WORK VALUE PREVIOUS AND STORED TO
( C) FINISH (IF VARIABLE
APPLICATION THIS PERIOD STORED DATE (C-G) RATE)
(NOT IN D OR L') (
(D+E) D+E+F)
PERFORMANCE
01010 BOND 106,000.00 106,000.00 0.00 0.00 106,000.00 100.00% 0.00 10,600.00
MOBILIZE/DEMOB
01015 ILIZE 29,000.00 15.000.00 800.00 0.00 15,800.00 54.48% 13,200.00 1,500.00
SUPERVISION/CO
01020 ORDINATION _ 361,000.00 330,000.00 6,200.00 0.00 336,200.00 93.13 % 24,800.00 _ 28,480.00
GENERAL
01025_CONDITIONS-M 380,000.00 343,300.00 _ 7.300.00 0.00 350,600.00 92.26% 29,400.00 27,000.00
GENERAL
01026 CONDITIONS-L 98,000.00 90,700.00 1,500.00 0.00 92,200.00 94.08% 5,800.00 7,000.00
GENERAL
01027 CONDITIONS-O 262,990.00 223,600.00 7,900.00 0.00 231,500_.00 88.03 % 31,490.00 0.00
ALLOWANCE-
STONE
140A0 WALKWAY 8,500.00 0.00 0.00 0.00 0.00 0.00% 8,500.00 0.00
ALLOWANCE-
TEMPORARY
140B0 HANDRAIL _ 38,000.00 31,198.00 0.00 0.00 31,198.00 82.10% 6.802.00 2,776.90
ALLOWANCE-
TEMPORARY
DOORS/FRAMES/H
14000 ARDWARE 10,000.00 5,972.00 0.00 0.00 5,972.00 59.72% 4,028.00 0.00
14000 ALLOWANCE:ICE 13,500.00 2.289.00 218.00 0.00 2.507.00 18.57% 10 993.00 207.10
ALLOWANCE-
140E0 SECURITY 31,000.00 0.00 3,391.00 0.00 3,391.00 10.94% 27,609.00 0.00
140F0 ALLOWANCE- 191,700.00 87,993.00 6,237.00 0.00 94,230.00 49.15% 97,470.00 3,987.90
AIA Document G703"-1992.Copyright C 1963, 1965, 1966.1967,1970,1978,1983 and 1992 by The American Institute of Architects.All rights reserved.WARNING:This AIAe Document is protected by
U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AlAe Document,or any portion of it,may result in severe civil and criminal penalties,and will be I
prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 11:45:12 on 06/21/2010 under Order No.0168420739_1 which expires on 05/10/2011,and is not for
resale.
User Notes: (1937329496)
A B C D E F G H 1
WORK COMPLETED TOTAL
MATERIALS COMPLETED BALANCE TO RETAINAGE
ITEM DESCRIPTION OF SCHEDULED FROM PRESENTLY
NO. WORK VALUE PREVIOUS AND STORED TO
(C_C) FINISH (IF VARIABLE
APPLICATION THIS PERIOD STORED DATE (C-G) RATE)
(D+E) (NOT IN D OR E) (D+E+F)
DUMPSTERS
ALLOWANCE-
TRAILER
140G0 CONNECTOR 34,000.00 32,800.00 442.00 0.00 33,242.00 97.77% 758.00 2,200.90
ALLOWANCE-
TRAILER
140H0 CLEANING 19,169.00 17,117.00 653.00 0.00 17,770.00 92.70% 1.399.00 1,066.10
ALLOWANCE-SITE
14010 SIGNAGE/SAFETY 22,000.00 1 1,62.3.00 0.00 0.00 11,623.00 52.83% 10,377.00 1,055.90
ALTO WANCE-
I40J0 GENERAL LABOR 320,000.00 288,249.00 693.00 0.00 288.942.00 90.29% 31,058.00 594.40
ALLOWANCE-
TEMPORARY
FENCE
140K0 MODIFICATIONS 5.000.00 4,008.00 0.00 0.00 4,008.00 80.16% 992.00 400.80
ALLOWANCE-42
140L0 OR#53 STONE 37,900.00 18,856.00 0.00 0.00 18,856.00 49.75% 19,044.00 1,885.60
ALLOWANCE-
WAREHOUSE
140M LEASE/LAY DOWN
0 /PARKING 500.000.00 500.000.00 0.00 0.00 500,000.00 100.00% 0.00 942.70
ALLOWANCE-
PA RKING LOT
INSTALL/MAINTAI
140N1 N 100,000.00 80,324.00 0.00 0.00 80,324.00 80.32% 19,676.00 5,532.40
ALLOWANCE-
MAINT.-OFF SITE
STAGING/PARKIN
140N2 G 35,000.00 12,968.00 2,649.00 0.00 15,617.00 44.62% 19,383.00 685.50
ALLOWANCE-
PARKING LOT
REMOVE/REFURBI
14000 SIi 100,000.00 2,745.00 0.00 0.00 2,745.00 2.75% 97,255.00 274.50
AIA Document G701 7"-1992.Copyright®1963, 1965,1966,1967,1970,1978,1983 and 1992 by The American Institute of Architects.All rights reserved.WARNING:This AlA°Document is protected by
U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AlA° Document,or any portion of it,may result in severe civil and criminal penalties,and will be 2
prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 11:45:12 on 06/21/2010 under Order No.016 84 207 3 9_1 which expires on 05/10/2011,and is not for
resale.
Usor Notes: (1937329496)
A B C D E F G H I
WORK COMPLETED TOTAL
MATERIALS COMPLETED BALANCE TO RETAINAGE
ITEM DESCRIPTION OF SCHEDULED FROM PRESENTLY
NO. WORK VALUE PREVIOUS THIS PERIOD STORED AND STORED TO
(G-C) FINISH (IF VARIABLE
APPLICATION , DATE (C-CO RATE)
(D+E) (NOT IN D OR E) (D+E+F)
ALLOWANCE-
HAUL/DISPOSE
UNSUITABLE
140P0 MATERIAL 25,000.00 14,794.00 0.00 0.00 14,794.00 59.18% 10,206.00 1,479.40
ALLOWANCE-6
OZ. GEOTECH
140QI FABRIC 4,700.00 3.207.00 0.00 0.00 3,207.00 68.23% 1,493.00 320.70
ALLOWANCE-
140Q2 TENSAR GEOGRID 8.500.00 0.00 0.00 0.00 0.00 0.00% 8,500.00 0.00
ALLOWANCE #2
14080 STONE 26,200.00 10.275.00 0.00 0.00 10,275.00 39.22% 15,925.00 1,027.50
ALLOWANCE-
CABLE PASS-
14050 THRU(FOE-1) 6,456.00 0.00 0.00 0.00 0.00 0.00% 6,456.00 0.00
ALLOWANCE-
CABLE PASS-
140T0 THRU(BOI-1) 5,165.00 0.00 0.00 0.00 0.00 0.00% 5,165.00 0.00
ALLOWANCE-
140U CABLE PASS-
O THRU(FLOOR) 17,217.00 0.00 0.00 0.00 0.00 0.00% 17,217.00 0.00
ALLOWANCE-
TEMPORARY
ELEVATOR
140V0 USAGE 200,000.00 65,835.00 15,252.00 0.00 81,087.00 40.54% 118.913.00 0.00
ALLOWANCE-
140W DONOR
0 RECOGNITION 100,000.00 100,000.00 0.00 0.00 100,000.00 100.00% 0.00 0.00
GENERAL
140X0 ALLOWANCE 400,000.00 310,621.00 7,768,00 0.00 318,389.00 79.60% 81,611.00 598.00
ALLOWANCE:AS-
140Y0 BUILD/CAD 5,000.00 4,242.00 0.00 0.00 4,242.00 84.84% 758.00 0.00
FIELD
01501 OFFICE/STORAGE 16.400.00 15.900.00 0.00 0.00 15,900.00 96.95 % 500.00 1,320.00
MA Document G7O3TM-1992.Copyright 01963.1965,1966,1967,1970,1978,1983 and 1992 by The American Institute of Architects.All rights reserved.WARNING:This AlAe Document is protected by
U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIAe Document,or any portion of it,may result in severe civil and criminal penalties,and will be 3
prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 11:45:12 on 06/21/2010 under Order No.0168420739_1 which expires on 05/10/2011.and is not for
resale.
User Notes: (1937329496)
A B C D E 1 F G H 1
WORK COMPLETED TOTAL
MATERIALS COMPLETED BALANCE TO RETAINAGE
ITEM DESCRIPTION OF SCHEDULED FROM PRESENTLY
PREVIOUS AND STORED TO FINISH (11'VARIABLE
NO. WORK VALUE 'I'I1IS PERIOD STORED DA9'F.. (G-C) (C-G) RATE
APPLICATION (NOT IN D OR E) )
(D+E) (D+E+F)
TRAILER-NI
FIELD
OFFICE/STORAGE
01502 TRAILER-I. 5,500.00 4,950.00 0.00 0.00 4,950.00 90.00% 550.00 405.00
TEMPORARY
TOILETS/WASHIN
01503 G STA'T'IONS-M 41.800.00 38,600.00 800.00 0.00 39,400.00 94.26% 2,400.00 2,860.00
TEMPORARY
TOILETS/WASHIN
01504 G STATIONS-L 7,600.00 6.950.00 150.00 0.00 7,100.00 93.42% 500.00 555.00
FIRE
PROTECTION/EME
01505 RG.STATIONS-M 19,300.00 19,300.00 0.00 0.00 19,300.00 100.00% 0.00 1,930.00
FIRE
PROTECTION/EME
01506 RG.STATIONS-L 4,000.00 3,500.00 100.00 0.00 3,600.00 90.00% 400.00 310.00
FURNISH/MA INTA
01507 IN TRASH CANS-NI 6.000.00 6,000.00 0.00 0.00 6,000.00 100.00% 0.00 600.00
FURNISWMAINTA
01508 IN TRASH CANS-L 40,000.00 33,800.00 1,200.00 0.00 35,000.00 87.50% 5,000.00 2,350.00
TEMPORARY
ROAD/MAINTENA
01510 NCE 148,000.00 141,500.00 2,000.00 0.00 143,500.00 96.96% 4,500.00 12,220.00
"1'ENIPORARY
FENCING-
REMOVE/RELOCA
01520 "1'E 15.800.00 15,800.00 0.00 0.00 15,800.00 100.00% 0.00 1,580.00
TEMPORARY
01521 FENCING-GATES 6,500.00 6,500.00 0.00 0.00 6,500.00 100.00% 0.00 650.00
TEMPORARY
FENCING-
01522 SCREENING 8,744.00 8,744.00 0.00 0.00 8,744.00 100.00% 0.00 874.40
AIA Document 67031°-1992.Copyright®1963,1965,1966, 1967,1970,1978,1983 and 1992 by The American Institute of Architects.All rights reserved.WARNING:This AlA° Document is protected by
U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIAe Document,or any portion of it,may result in severe civil and criminal penalties.and will be 4
prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 11:45:12 on 06/21/2010 under Order No.0166420739_1 which expires on 05110/2011,and is not for
resale.
User Notes: (1937329496)
•
A B C D I E F G H I
WORK COMPLETED TOTAL
MATERIALS COMPLETED BALANCE TO RETAINAGE
ITEM DESCRIPTION OF SCHEDULED FROM PRESENTLY °/s
NO. WORK VALUE PREVIOUS THIS PERIOD STORED AND STORED TO
(G_C) FINISH (IF VARIABLE
APPLICATION DATE (C-G) RATE)
(D+E) (NOT IN D OR E) (D1-E+F)
TEMPORARY
01523 BARRIERS-M 6,800.00 6,800.00 0.00 0.00 6,800.00 100.00% 0.00 680.00
TEMPORARY
01524 BARRIERS-L 7,500.00 7.500.00 0.00 0.00 7,500.00 100.00% 0.00 750.00
TEMPORARY
01530 ENCLOSURES-M 10.800.00 10,800.00 0.00 0.00 10.800.00 100.00% 0.00 1,050.00
TEMPORARY
01531 ENCLOSURES-L 14,000.00 14,000.00 0.00 0.00 14,000.00 100.00%I 0.00 1,360.00
SCAFFOLDING-
SET
UP/CONSUMABLE
01540 S 398,000.00 398,000.00 0.00 0.00 398,000.00 100.00°/d 0.00 37,620.00
SCAFFOLDING-
MONTHLY
RE'NT'AL/INSPECTI
01541 ONS 228,000.00 228,000.00 0.00 0.00 228,000.00 100.00% 0.00 10,450.00
SCAFFOLDING-
DISMANTLE/REM
01542 OVE 55,000.00 0.00 3,000.00 0.00 3,000.00 5.45% 52,000.00 0.00
STAIR TOWERS-
01543 SETUP 54,000.00 18.000.00 0.00 0.00 18,000.00 3333%. 36,000.00 1,800.00
STAIR TOWERS-
MONTHLY
01544 RENTAL 28.500.00 9,500.00 0.00 0.00 9,500.00 33.33% 19,000.00 350.00
STAIR TOWERS-
01545 DISMANTLE 6,700.00 0.00 0.00 0.00 0.00 0.00% 6,700.00 0.00
HOIST-EXTERIOR-
1546.1 'SET UP 14,300.00 _ 0.00 0.00 0.00 0.00 0.00% 14.300.00 0.00
HOIST-EXTERIOR-
RENTAL/OPERATI
1546.2 ON 139,040.00 0.00 0.00 0.00 0.00 0.00% 139,040.00 0.00
HOIST-EXTERIOR-
1546.3 DISMANTLE 8,000.00 0.00 0.00 0.00 0.00 0.00% 8,000.00 0.00
AlA Document 6703^'-1992.Copyright®1963,1965,1966.1967,1970,1978.1983 and 1992 by The American Institute of Architects.All rights reserved.WARNING:This AIA° Document is protected by
U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA° Document,or any portion of it,may result in severe civil and criminal penalties,and will be 5
prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 11:45:12 on 06/21/2010 under Order No.0166420739_1 which expires on 05/10/2011,and is not for
resale.
User Notes: (1937329496)
•
A B C D I E F G H I
WORK COMPLETED
-
MATERIALS COMPLETED BALANCE TO RETAINAGE
ITEM DESCRIPTION OF SCHEDULED FROM PRESENTLY
NO. WORK VALUE PREVIOUS THIS PERIOD STORED AND STORED TO FINISH (IF VARIABLE
(NOT IN
APPLICATION r ,D OR E) DATE (G_C) (C-G) RATE)
(D+E+F)
(D+E)
HOIST-STAIR2-SET
1547.1 UP 14,300.00 0.00 0.00 0.00 0.00 0.00% 14,300.00 0.00
HOIST-STAIR 2-
RENTAL/OPERATI
1547.2 ON 139,040.00 0.00 0.00 0.00 0.00 0.00% 139,040.00 0.00
HOIST-STAIR 2-
1547.3 DISMANTLE 8,000.00 0.00 0.00 0.00 0.00 0.00% 8,000.00 0.00
HOIST-ROOM 100-
1548.1 SET UP 95,000.00 95,000.00 0.00 0.00 95,000.00 100.00% 0.00 9,500.00
HOIST-ROOM 100-
RENTAI/OPERAATI
1548.2 ON 211,000.00 211,000.00 0.00 0.00 211,000.00 100.00% 0.00 16,975.00
HOIST-ROOM 100-
1548.3 DISMANTLE 2,500.00 0.00 0.00 0.00 0.00 0.00% 2,500.00 0.00
HOIST-
ALLOWANCE-SET
1549.1 UP 9,830.00 0.00 0.00 0.00 0.00 0.00% 9,830.00 0.00
HOIST-
ALLOWANCE-
RENTAL/OPERATI
1549.2 ON 97,500.00 0.00 20,971.00 0.00 20,971.00 21.51 % 76,529.00 0.00
HOIST-
ALLOWANCE-
1549.3 DISMANTLE 2.500.00 0.00 0.00 0.00 0.00 0.00% 2,500.00 0.00
01556 TRASH CHUTES-N1 52.000.00 50.000.00 750.00 0.00 50,750.00 97.60% 1,250.00 4,490.00
01557 TRASH CHUTES-L 58,000.00 52,300.00 2,000.00 0.00 54,300.00 93.62% 3,700.00 2,500.00
GENERAL CLEAN
01560 UP-N1 5.000.00 4,240.00 0.00 0.00 4,240.00 84.80% 760.00 314.00
GENERAL CLEAN
01561 UP-L 60,000.00 52,100.00 1,500.00 0.00 53,600.00 89.33% 6.400.00 3,560.00
01562 FINAL CLEANING 65,000.00 0.00 0.00 0.00 0.00 0.00% 65.000.00 0.00
02110 EXCAVATION/BA 12,019.00 12,019.00 0.00 0.00 12,019.00 100.00% 0.00 1,201.90
AIA Document G703'"-1992.Copyright®1963, 1965,1966,1967,1970,1978,1983 and 1992 by The American Institute of Architects.All rights reserved.WARNING:This AlA°Document is protected by
U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AlA° Document,or any portion of I.may result in severe civil and criminal penalties,and will be 6
prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 11:45:12 on 06/21/2010 under Order No.0168420739 1 which expires on 05/10/2011.and is not for
resale.
User Notes: (1937329496)
A 13 C D E F __ G H _ 1
WORK COMPLETED TOTAL
MATERIALS COMPLETED BALANCE TO RETAINAGE
ITEM DESCRIPTION OF SCHEDULED FROM PRESENTLY
NO. WORK VALUE PREVIOUS
THIS PERIOD STORED AND STOKED TO
(G 4"C) FINISH (IF VARIABLE
APPLICATION DATE (C-G) RATE)
(NOT IN D OR E)
(U+E) (D+E+F)
CKFILL-SUMPS-M
EXCAVATION/BA
CKFILL-SUMPS-L
02111 EQ 25,000.00 25,000.00 0.00 0.00 25,000.00 100.00% 0.00 2,500.00
02240 SHORING 209,800.00 209.800.00 0.00 0.00 209,800.00 100.00% 0.00 20,980.00
CAST IN PLACE
03301 CONCRETE-M 12,000.00 12,000.00 0.00 0.00 12,000.00 100.00% 0.00 1,000.00
CAST IN PLACE
03302 CONCETE-L 40,000.00 40,000.00 0.00 0.00 40,000.00 100.00% 0.00 3,500.00
PRECAST
PLANKS-12"
03410 HOLLOW CORE 161,000.00 161,000.00 0.00 0.00 161,000.00 100.00% 0.00 16,100.00
PRECAST
PLANKS-12"
03411 SOLID 898.000.00 898,000.00 0.00 0.00 898,000.00 100.00% 0.00 89,800.00
PRECAST
03412 PLANKS-6" SOLID 107,000.00 107,000.00 0.00 0.00 107,000.00 100.00% 0.00 10,700.00
PRECAST
03413 TRUCKING 82,000.00 82,000.00 0.00 0.00 82,000.00 100.00% 0.00 8,200.00
PRECAST
03414 ERECTION 186,000.00 186,000.00 0.00 0.00 186,000.00 100.00% 0.00 18,600.00
INTERIOR METAL
FABRICATIONS-
05504 SUBMITTALS 102,000.00 102,000.00 0.00 0.00 (02,000.00 100.00% 0.00 10,200.00
STEEL STAIRS
05505 WITH RAIL:M 179,000.00 179,000.00 0.00 0.00 179,000.00 100.00% 0.00 14,857.00
STEEL STAIRS
05506 WITH KAIL L 80,000.00 73,000.00 3,000.00 0.00 76,000.00 95.00% 4,000.00 6,600.00
05507 LADDERS-M 26,000.00 26,000.00 0,00 0.00 26,000.00 100.00% 0.00 2,600.00
05508 LADDERS-L 12,500.00 12,500.00 0.00 0.00 12,500.00 100.00% 0.00 1,220.00
CATWALK
05509 FRAMING-M 63,000.00 63,000.00 0.00 0.00 63,000.00 100.00% 0.00 6,300.00
AIA Document 0703TM-1992.Copyright®1963,1965,1966.1967,1970,1978,1983 and 1992 by The American Institute of Architects.All rights reserved.WARNING:This AbAe Document is protected by
U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AlAe Document,or any portion of it,may result in severe civil and criminal penalties,and will be 7
prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 11:45:12 on 06/21/2010 under Order No.016 84 207 3 9_1 which expires on 05/10/2011,and is not for
resale.
User Notes: (1937329496)
A B C D I E F G I-1 1
WORK COMPLETED 'DOTAL
MATERIALS COMPLETED BALANCE TO RETAINAGE
ITEM DESCRIPTION OF SCHEDULED FROM PRESENTLY AND STORED TO % hINISH (IF VARIABLE
NO. WORK VALUE PREVIOUS
mils PERIOD STORED DATE (G-C) (C G) RATE)
APPLICATION (NOT IN D OR E) (D+E+F)
(D+E)
CATWALK
05510 FRAMING-L 28,000.00 28,000.00 0.00 0.00 28.000.00 100.00% 0.00 1,710.00
MISCELLANEOUS
05511 METALS-61 441,000.00 441,000.00 0.00 0.00 441,000.00 100.00% 0.00 13,615.00
MISCELLANEOUS
05512 METALS-L 275.000.00 275,000.00 0.00 0.00 275,000.00 100.00% 0.00 8,094.30
INTERIOR ROUGH
06100 CARPENTRY-M 31,000.00 25,920.00 3,500.00 0.00 29,420.00 94.90% 1.580.00 372.00
INTERIOR ROUGH
06101 CARPENTRY-L 44.000.00 34,840.00 6,900.00 0.00 41,740.00 94.86% 2.260.00 484.00
FOUNDATION
WATERPROOFING
07110 -M 5,100.00 5,100.00 0.00 0.00 5,100.00 100.00% 0.00 510.00
FOUNDATION
WATERPROOFING
07111 -L 6.600.00 6,600.00 0.00 0.00 6.600.00 100.00% 0.00 660.00
07210 DUCT LINERS-M 97.000.00 97.000.00 0.00 0.00 97,000.00 100.00% 0.00 9,700.00
07211 DUCT LINERS-L 28,000.00 28,000.00 0.00 0.00 28,000.00 100.00% 0.00 1,120.00
07810 FIRESTOPPING-M 24.000.00 20,800.00 0.00 0.00 20,800.00 86.67% 3,200.00 1,680.00
07811 PIRESTOPPING-L 16.000.00 14,200.00 0.00 0.00 14,200.00 88.75% 1.800.00 1,220.00
JOINT SEALANTS-
07910 M 35,000.00 1 1,000.00 0.00 0.00 1 1,000.00 31.43% 24,000.00 0.00
JOINT SEALANTS-
0791 I L 80,000.00 26,000.00 0.00 0.00 26,000.00 32.50% 54,000.00 0.00
STEEL DOORS&
08110 FRAMES-M 0.00 0.00 0.00 0.00 0.00% 0.00
STEEL DOORS&
0811 1 FRAMES-L 0.00 0.00 0.00 0.00 0.00% 0.00
FLUSH WOOD
08140 DOORS-M 0.00 0.00 0.00 0.00 0.00% 0.00
FLUSH WOOD
08141 DOORS-L 0.00 0.00 0.00 0.00 0.00% 0.00
AIA Document G703' -1992.Copyright O 1963.1965.1966,1967,1970,1978,1983 and 1992 by The American Institute of Architects.All rights reserved.WARNING:This AIAe Document is protected by
U.B.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA Document,or any portion of it,may result in severe civil and criminal penalties,and will be 8
prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 11:45:12 on 06/21/2010 under Order No.016 84 20 73 9_1 which expires on 05/10/2011,and is not for
resale.
User Notes: (1937329496)
A B C D E F G F1 I
WORK COMPLETED TOTAL
MATERIALS COMPLE'T'ED BALANCE TO RETAINAGE
ITEM DESCRIPTION OF SCHEDULED FROM PRESENTLY
NO. WORK VALUE PREVIOUS 'flits PERIOD
STORED AND STORED TO (G+C) FINISH (IF VARIABLE
APPLICATION (NOT IN D OR 111) DATE (C-G) RATE)
(D+El (D4-E+F)
STILE&RAIL
08143 \VOOD DOORS-M 0.00 0.00 0.00 0.00 0.00% 0.00
STILE& RAIL
08144 WOOD DOORS-L 0.00 0.00 0.00 0.00 0.00% 0.00
SOUND CONTROL
DOORS&
08347 WINDOWS-M 0.00 0.00 0.00 0.00 0.00% 0.00
SOUND CONTROL
DOORS&
08348 WINDOWS-L 0.00 0.00 0.00 0.00 0.00% 0.00
OVER COILING
08355 DOORS-M 0.00 0.00 0.00 0.00 0.00% 0.00
OVERHEAR
08356 COILING DOORS-L 0.00 0.00 0.00 0.00 0.00% 0.00
ALIJM.FRAMED
ENTRANCES/STOR
08410 EFRONTS-M 0.00 0.00 0.00 0.00 0.00% 0.00
ALUM.FRAMED
ENTRANCES/STOR
08411 EFRONS-L 0.00 0.00 0.00 0.00 0.00% 0.00
INTERIOR ALUM.
DOORS &
08413 FRAMES-M 0.00 0.00 0.00 0.00 0.00% 0.00
INTERIOR ALUM.
DOORS&
08414 FRAMES-L 0.00 0.00 0.00 0.00 0.00% 0.00
REVOLVING
DOOR
08423 ENTRANCES-M 0.00 0.00 0.00 0.00 0.00% 0.00
REVOLVING
DOOR
08424 ENTRANCES-I, 0.00 0.00 0.00 0.00 0.00% 0.00
08440 GLAZED ALU.. 325,000.00 286,300.00 0.00 0.00 286,300.00 88.09% 38,700.00 11,375.00
AIA Document G703T"-1992.Copyright®1963, 1965,1966,1967.1970.1978.1983 and 1992 by The American Institute of Architects.All rights reserved.WARNING:This AIA° Document is protected by
U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AlA° Document,or any portion of it,may result in severe civil and criminal penalties,and will be 9
prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 11:45:12 on 06/21/2010 under Order No.0168420739_1 which expires on 05/10/2011.and is not for
resale.
User Notes: (1937329496)
A B C D E F G H I
WORK COMPLETED 'TOTAL
MATERIALS COMPLETED BALANCE TO RETAINAGE
ITEM DESCRIPTION OF SCHEDULED FROM PRESENTLY
NO. WORK VALUE PREVIOUS THIS PERIOD STORED AND STORED TO (G+C) FINISH (IF VARIABLE
APPLICATION (NOT IN D ORE) DATE (C-G) RATE)
(D+E) (D+E+F)
CURTAIN WALLS-
NI
GLAED ALUM.
CURTAIN WALLS-
08441 L 148,000.00 103.600.00 0.00 0.00 103,600.00 70.00% 44,400.00 0.00
08710 HARDWARE 525.000.00 517,000.00 8,000.00 0.00 525,000.00 100.00% 0.00 18,800.00
INTERIOR
08810 GLAZING-NI 11,000.00 5,520.00 5,480.00 0.00 11.000.00 100.00% 0.00 22.00
INTERIOR
08811 GLAZING-L 8,000.00 2,000.00 6,000.00 0.00 8.000.00 100.00% 0.00 0.00
FIRE PROTECTION
10440 SPECIALTIES-NI 7.580.00 0.00 7,580.00 0.00 7,580.00 100.00% 0.00 0.00
FIRE PROTECTION
10441 SPECIALTIES-L 1.800.00 0.00 0.00 0.00 0.00 0.00% 1,800.00 0.00
10450 KNOX BOX 650.00 0.00 650.00 0.00 650.00 100.00% 0.00 0.00
LOADING DOCK
11130 EQUIPMENT-M 18,500.00 16,475.00 0.00 0.00 16,475.00 89.05% 2,025.00 1,647.50
LOADING DOCK
11131 EQUIPMENT-L 3,800.00 2,200.00 0.00 0.00 2,200.00 57.89% 1,600.00 220.00
ELEC.TRACTION
ELEVATORS-
14210 ENGINEERING 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
ELEC.TRACTION
ELE V ATORS-
MATERIAIJEQUIP
14211 MENT 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
ELEC.TRACTION
14212 ELEVATORS-L 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
HYDRAULIC
ELEVATOR-
14241 ENGINEERING 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
14242 HYDRAULIC 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
AIA Document G703TM-1992.Copyright O 1963,1965,1966,1967,1970,1978,1983 and 1992 by The American Institute of Architects.All rights reserved.WARNING:This AIAe Document is protected by
U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AlAe Document,or any portion of It,may result in severe civil and criminal penalties,and will be 10
prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 11:45:12 on 06/21/2010 under Order No.0168420739_1 which expires on 05/10/2011,and is not for
resale.
User Notes: (1937329496)
A B C D I E F G H I
WORK COMPLETED MATERIALS IOIAL
BALANCE TO RETAINAGE
ITEM DESCRIPTION OF SCHEDULED FROM PRESENTLY COMPLETED
°/a
NO. WORK VALUE PREVIOUS THIS PERIOD STORED IA
AND STORED TO FINISH (IF VARBLE
APPLICATION DATE (0+C) (C-G) RATE)
(D+ E) (NOT IN 0 OR E) (D+E+F)
ELEVATOR-
MATERIAL/EQUIP
MENT _
HYDRAULIC
ELEVATOR-
14243 LABOR 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
WHEELCHAIR
LIFT-
MATERIAL/EQUIP
14421 MENT 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
WHEELCHAIR
14422 LIFT-PERMITS 0.00 0,00 0.00 0.00 0.00% 0.00 0.00
WHEELCHAIR
14423 LIFT-LABOR 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
CHANGE ORDER
1700] NO. 01 228,000.00 228,000.00 0.00 0.00 228,000.00 100.00% 0.00 450.00
CHANGE ORDER
17002 NO.02 9,031.00 9,031.00 0.00 0.00 9,031.00 100.00% 0.00 0.00
CHANGE ORDER
17003 NO. 03 2,196.00 2,196.00 0.00 0.00 2.196.00 100.00% 0.00 30.00
17000 CHANGE ORDER
4 NO.04 0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
17000 CHANGE ORDER
5 NO. 05 98,741.00 98,741.00 0.00 0.00 98,741.00 100.00% 0.00 9,874.]0
17000 CHANGE ORDER
6 NO. 06 17,527.00 17,527.00 0.00 0.00 17,527.00 100.00% 0.00 1,100.00
17000 CHANGE ORDER
7 NO. 07 11,292.00 11,292,00 0.00 0.00 11,292.00 100.00% 0.00 1,129.20
17000 CHANGE ORDER
8 NO. 08 44,936.00 44,936.00 0.00 0.00 44,936.00 100.00% 0.00 4,493.60
17000 CHANGE ORDER
9 NO. 09 14,683.00 14,683.00 0.00 0.00 14,683.00 100.00 % 0.00 0.00
MA Document G703re-1992.Copyright 01963, 1965,1966.1967.1970,1978.1983 and 1992 by The American Institute of Architects.All rights reserved.WARNING:This AlA®Document is protected by
U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA° Document,or any portion al it,may result in severe civil and criminal penalties,and will he 11
prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 11 45.12 on 06721/2010 under Order No.01 584 2 0 73 9_1 which expires co 05110/2011,and is not for
resale.
User Notes: (1937329496)
A B C D I E F G H 1
WORK COMPLETED TOTAL
MATERIALS COMPLETED BALANCE"1'O RETAINAGE
ITEM DESCRIPTION OF SCHEDULED FROM PRESENTLY
NO. WORK VALUE PREVIOUS AND STORED TO FINISH (IF VARIABLE
APPLICATION THIS PERIOD STORED DATE (G-C) (C-G) RATE)
(D+E) (NOT IN D OR E) (D+E+F)
17001 CHANGE ORDER
0 NO. 10 -760.330.00 -750.573.00 0.00 0.00 -750,573.00 98.72% -9,757.00 -38,016.50
17001 CHANGE ORDER
2 NO. 12 49,062.00 49,062.00 0.00 0.00 49,062.00 100.00% 0.00 2,453.10
17001 CHANGE ORDER
3 NO. 13 3,801.00 3.801.00 0.00 0.00 3,801.00 100.00% 0.00 190.05
17001 CHANGE ORDER
4 NO. 14 787.00 787.00 0.00 0.00 787.00 100.00% 0.00 39.35
17001 CHANGE ORDER
5 NO. 15 34,158.00 34,158.00 0.00 0.00 34,158.00 100.00% 0.00 1,707.90
17001 CHANGE ORDER
6 NO. 16 7.529.00 7.529.00 0.00 0.00 7.529.00 100.00% 0.00 376.45
17001 CHANGE ORDER
7 NO. 17 7,083.00 7,083.00 0.00 0.00 7,083.00 100.00% 0.00 354.15
17001 CHANGE ORDER
8 NO. 18 22,591.00 22,591.00 0.00 0.00 22,591.00 100.00% 0.00 1,129.55
17001 CHANGE ORDER
9 NO. 19 22,591.00 22,591.00 0.00 0.00 22,591.00 100.00% 0.00 1,129.55
17002 CHANGE ORDER
0 NO. 20 22,591.00 0.00 22,591.00 0.00 22,591.00 100.00% 0.00 1,12955
GRAND TOTAL $9,802,569.00 $8,130,809.00 $157,175.00 $0.00 $8,287,984.00 84.55% $1,514.585.00 $490,128.45
AIA Document G7031e-1992.Copyright O 1963, 1965,1966,1967,1970,1978,1983 and 1992 by The American Institute of Architects.All rights reserved.WARNING:This AIA Document is protected by
U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AlAe Document.or any portion of it,may result in severe civil and criminal penalties.and will be 12
prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 71:45:12 on 06/21/2010 under Order No.0168420739 1 which expires on 05/10/2011.and is not for
resale.
User Notes: (1937329496)