Loading...
HomeMy WebLinkAboutPOINTER SHEET METAL - 1011 - 26,422.00 - 8/2/2010 CA.RIVIEL'REDEVELOPMENT COMMISSION. 001011 Poynter Sheet Metal Check: 1011 8768 N State Rd 37 Date: 8/2/2010 Bloomington, IN 47404 Vendor POYNTERI Prior Invoice P.O. Num. Invoice Amt Balance Retention Discount Amt. Paid 22B 41 26,422 00 26;422.00 0.00 0:00 26,422.00 Application 228 26,422.00 26,422.00 0.00 0.00 26,422.00 x,„11--52LTQ Forms Division (877)577-5791 1N506700 APPLICATION AND CERTIFICATE FOR PAYMENT CONSTRUCTION MANAGER-ADVISER EDITION AIADOtTLIid ENT G702/C:Vla - PAGE OMEOP 4 PAGES 41 TO OWNER: PROJECT: I'2lreel 7.4. Rog:iotaf Performing APPLICATION NO: 22R Distribution to Cannel R.tleveIoptncnt Commission Arts Comer ft', One Civic Square E 'as: - PERIOD TO: 5/3I/10 CONSTRUCTION Cannel. IN 46032 2 MANAGER PROJLCFNO. 69�-4310 MANAGER f � FROM CONTRACTOR: VIA CONSTRUCTION MANAGER: Shier-Sexton C n a. . (PSM#14065) ARCHITECT POYNTER SHEET MEd AL ATTN:Lyoda Weaver.902_N. Capital Avenue. Indium Iis. IN 4%114 CONTRACT DATE: 04/18/08 nICONTRACTOR 8768 N. STATE RD. 3. VIA ARCHITECT: r\--":"‘'s �Q / B1 OOMiNGTON,IN 47464 ',yv. CONTRACT FOR: Bid Package kd310- HVAC Sheet Metal ;`„�% ��� CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Contractor certifies that so the best of the Contractors knowledge, Application is made for payment,as shown below,in connection with the Contract information and'beliel the Work covered by this Application for Payment has been Continuation Sheet, AlA Document 6703, is attached, completed in accordance with the Contract Documents,that all amounts have been paid be the Contractor for Work Oar which previous Certificates for Payment were issued and payments received loan the Owner,and that current payment shown herein is now due. I. ORIGINAL CONTRACT SUM S 2.340500,00 2. Net change by Change Orders S (87.239.00) CONTRACTOR: 3. CONTRACT SLIM TO DATE (Line 13 2) 5 2,1»,26 I OU 4_ TOTAL COMI'LETED& STORED TO DATE 5 2.i99.931,00 �1 ►QN� ������ (Column G on 6703) Bv: Date: 5. RETATNAGE: 5%of Contract Total Joseph Lt 1- , resident a_ 5 %of Ctsp4etedierk S I12,66300 State on h )IA County ot: IONROE n Twin I Twin D+ I:on(1703) Subscribed at . - fo a bere me h's y of & 020/0�0 T h. %of Stored Material S 0.00 Notary Public: TC7fum pi n F on C7037 My Commissio mares: c ug st_9.2 I Total Retainage(Lines 5a 4.Sb or Total in Column I of G703) S 1 12,663.00 ZERTIFICA 6. 'I't)TAI. EARNED I.f SS k IETAINAGE 2,087.268 01) in accordance with the Contract Documents_based on on-site observations and the data (Line 4 less Line a-I oral) S comprising this application,the Construction Manager and Architect certify to the 7, LESS PREVIOUS CER El FICA T IES FOR Owner that to the best of'their knowledge,information and belief the Work has PAYMENT(Line 6 from prior Certihcatel 5 2060.346.00 progressed as indicated.the quality of the Work is in accordance with the Contract 8 CURRENT PAYMENT DUE S 26.422_OU Documents,and the Contractor is entitled to payment of the AMOUNT CERTIFIER 9. BALANCE TO FINISH_ INCLUDfNG RETAIASACT S 165,993.00 q�� (I ine , less Linc 6) AMOUNT CI:RI IFIIED S '2t5, 47-12-- LHANt)L ORDER SUMMAR) AUDI I IONS Dk;DUC I IONS (.dnach e.rphmpl+ort rJ'rmrourtr err! ed rh//Ea`orrt f to arx)anr nppIf�//re hone,!all I plat ahangcs approved JIgures nn tins: if/ration and on the en twrin,r .beet Char clrongad to c:nnJia rn to the in previous months by Owner 557.761.:(0:511((:).:137, $17500200 &Rrlhrt cerr007ar Cot SIRE 7.1 —. :, 3 R. Total approved this Month 50. 50.00 By: ►i.•'4:cyrri�a. Dale: �7 4r�� TOTALS 587,761 5175.000,00 6y: �FflLr_ I Date: d cif co NET CHANGES by Change Order 239.00) This Ccrt'Hlcut'e IS not negotiable. The AMOUNT CFRTlFIFD is payahlc only to the Contractor named herein. Issuance,payment and acceptance of payment are without preindice to any rights of the Owner or Contractor trader this Contract /ME ILEA WEE I u glut.Ma-ANFUCn I!UN nNU VEr<IiE,LniiuN Nk NAr'MON I Cc)NSI HEILIWN M.9NnlaEH-rnvlaeH EUI1 keg runs EUU ION NN •el..N7 bIpO6TTh-r5.2 THE AMERICAN INSTITUTE OF ARCHITECTS,1745 NEW YORK WE N!f.'..WASHINGTON.DC 20005-5202 Users may obtain validation of this document by requesting of the license a completed AIA Document D401 -Certification of Document's Authenticity P A I D AUG - 4 2010 Poyn- $1e P"I et. ) al.cQ&9 - 4/3/0 CONTINUATION SHEET -4/A DOCUMENT 703 2 PAGE OF PAGES 4 AIA Ducunlcnt 07702.APPLICATION AND CERTIFICALION FOR PAYMENT,containing APPLICATION NO, 22R Coot icter's signed rerlificatirn is atwohed_ APPLTCA LION DATE'. 5/14/2010 In tabulations below,amounts are stated to the nearest dollar PS Al JOHP 14065 PERIOD 10'. 9/3 /7010 Use Column i 911 Contract;where snriahle wan noise Lu line items may appic_ NAME Carmel PAC CON 1 RACT NO 2699-4310 A B C I) I E P Cl H I I LINE DESCRIPTIONOEWORK SCHF.D1i4ED WORK COMP7Ji'I'ED MATERIALS TOTAL 14 HAI.ANCE RETAINAGE NO- V,V13E FROM PREVIOUS TINS PERIOD PRESENTIV COMPLETED 113-C) ID FINISH (IF VARIABLE APPLICATION STORED AND STORED IC-['J IIATEI II)-141 (NOT IN TO DAR I)OIl El I D-F-FI :°S., I GENERAL CONDITIONS 200,000.00 5300.000 co $'0 5200.000 000% 510.000 2 BOND & INSURANCE 45,000.00 544.000 SO SO 545.000 100% 52 250 3 MOBILIZATION 15,000.00 SI5,000 SO SO 513.000 100/ $750 4 ALLOWANCE NO 11 BP 4310 651.00 SO 50 SO 30 Oct', $631 SO 5 ALLOWANCE NO 16 CAD AS-BUILTS 10,000.00 S0 55,000 SO 55.000 50% 35,000 5250 6 DRAWINGSICOORDINATiON 80,000.00 S$0.000 50 S0 S30A00 100% 54.000 7 MECH BASEMENT LEVEL 3 MATERIAL 48,000.00 54.000 $0 SO 345.000 100% 51,400 9 LABOR 50,700.00 550193 50 SO 350.193 9a% 5907 32.510 ID LAGGING 7,000.00 37.000 $1 S0 57.000 10o% 5350 II BACKHOUSE 12 MATERIAL 56,000.00 556.000 80 50 3365100 100% 52 goo IS LABOR 59,000.00 559.000 $0 So 499000 100% 32.950 14 KITCHEN HOOD&DUCT 15 MATERIAL 15,400.00 515.400 SO 50 5154011 100% 3770 Ir LABOR 10,800.00 510.260 5540 50 510.800 100% 55-O I7 INSULATION 10,100.00 SSoso 52,020 50 510100 100s, $505 IS MECH RM 1 19 MATERIAL 50,400-00 550400 50 50 350,100 100% 522.520 20 LABOR 56,300 00 556.300 5o So 55■,300 100% 52.515 21 INSULATION 16,800.00 516.300 SO Si) 510500 100% 5540 22 MECH RM 2 23 MATERIAL 77000,00 577.000 50 50 $77,000 100% 53.530 24 LABOR 93,900.00 593,90u SC 50 593.,900 1001% 54.695 25 INSULATION 16,800.00 .53,350 53.360 Si 56,770 40% 510050 5336 26 MECH RM 3 27 MATERIAL 84.900,00 524900 SO 50 534,900 00% S-1.2-15 23 LABOR 94,500.00 5145110 30 SO 594,500 109% 54.725 29 INSULATION 16,800.00 Sk S0O SO So $16,50 100% SR40 30 PLENUM LEVEL 31 MATERIAL 45,100.00 $44,100 30 SO 549.100 11111% 51 1.155 32 LABOR 75,000.00 $75,000 SO $0 575.000 100% 53.750 33 LAGGING 13,000.00 $13.000 50 40 513000 100% 5690 34 ORCHESTRA HIGH LEVEL 35 MATERIAL 34,800-00 $346011 SC 50 534,6011 100% 51730 16 LABOR 35,400.00 333630 50 SO 533.630 113% 55 770 SI.o32 37 ORCHESTRA LOW LEVEL 35 MATERIAL 49,400.00 542400 50 SO 514400 100.4/ 51.470 39 LABOR 62,600.00 559,470 50 SO 554-70 95! 53.130 32 974 Pay n*r Shaf Me 'bCZ9s- Y3/0 CONTINUATION SHEET ,a/,A DOCUMENT G703 3 PAGE OF PAGES 4 AR Document 0702-API'LOCATIOiN AND CERTIFICATION FOR PAYMENT.containing APPLICATION NO 225 Contractors sicned eertit scat ion is attached. APPLICATION DALE, 5114;2010 In mbulotiens below,amounts urn sm @d lu 0mc nearest dollar_ I'Sv1 I0R9. 14065 I'EP.ION 1 0: 5/31/2010 Um Column 1 on Contracts where∎anublc relainase 1'or Ilnc Arms may apply. NAME : Carmel PAC CON FRACF NU, 2695-4 771.0 A B C P I F V 0 II I I.INC DESCRIPTION 0}609R3. )CHFt)1)41Th 9;OR006irl,ETF15 MATERIAL TOTAL ,o PALANCE RhiAINAGti NO VAI,IJP, FROM PREVIOUS THIS PERIOb PRESENTLY COMPLETED IG+C) TO FINISH HF VARIARI,E APPIJGXTION STORED AND STORED IC-CO RATIO II]-F,) NOT IN TO DATE IS OR L: 1D-F-FJ 3% 40 BOX TIER LEVEL 41 MATERIAL 70,000 0E1 570000 50 SO 570.000 10019 53.500 42 LABOR 100,300-00 S95,2115 50 50 595.255 95% 55915 52.764 43 LOW BALCONY LEVEL 44 MATERIAL 94,100.00 $94,100 56 SO 594.100 100% P.705 45 LABOR 55,300-00 581,035 50 50 551.055 95% 54.265 54.0522 46 HIGH BALCONY LEVEL 47 MATERIAL 35,400-00 $36AOO 50 SO 535.400 i 00% 51920 43 LABOR 50,200 00 $47,690 50 SO 547.690 95% 52.5 I0 52.395 49 ATTIC LEVEL +50 50 MATERIAL 41,600-00 $41,600 S0 $0 541600 100% 52.050 51 LABOR 44,700.00 542,463 So 50 542-165 95% 52.235 52.123 52 ATTIC LEVEL +61 53 MATERIAL 15,800.00 $L6,300 SO SO 516,300 100% 5540 54 LABOR 15,300.00 513,533 $1,630 SO 515035 95% 5313 3774 55 ATTIC LEVEL+65 36 MATERIAL 39,500.00 539,900 S0 50 539.500 100% 51,915 57 LABOR 37,900.00 526.930 59,475 50 536.005 93% S1.995 $1,800 58 ATTIC LEVEL.79-6 59 MATERIAL 6,700.60 56.700 50 S0 36.700 100% 5333 60 LABOR 5.200.00 55143 SO $0 55.147 99% 558 5257 4-A ALLOWANCE NC. 11 BP 4310(ASI-031) 7,322.00 57,521_ $0 $0 57,322 100% 5366 4-13 ALLOWANCE NO 11 BP 4310A-002 10.000.00 57.518 S0 $0 57.515 75% 51.452 575 4-C ALLOWANCE NO 11 BP 43108-002 4.798.00 54.793 50 50 S-4795 100% 5240 4-1) ALLOWANCE NO 11 BP 43105-003 1.534.00 51,324 30 S0 51.554 100% S77 4-E ALLOWANCE NO 11 BP 43105-004 27,142 00 527,142 50 SO 527,141 100% 31.357 4-F ALLOWANCE NO 11 BP 43105-005 9.625.00 59.625 50 50 579,625 100'4 $481 4-0 ALLOWANCE NO 11 BP 4310B-006 175,000.00 $175000 so SCi $175,000 100% 33.30 4-11 ALLOWANCE NO 11 BP 4310B-007 5413 00 5546 Si SO 5.546 300% 527 4-1 ALLOWANCE NO 11 BP 43108-008 10,933.00 5165 933 SO SO $10933 100% 5547 4-1 ALLOWANCE NO 11 BP 43105-009 12,449,00 512446 SO SO 512419 100% 5622 4-K ALLOWANCE NO 11 BP 4310B-010 530K 50 50 SO S0 0% 30 4-1_ ALLOWANCE NO 11 BP 43103-011 5,001,00 50 50 SO 50 0% SO 4-51 ALLOWANCE NO 11 BP 4310B-012 5'0 50 50 50 0% $0 +O ALLOWANCE NO 11 BP 43108-013 6,103.00 $0 $0 50 50 0'% 50 4-P ALLOWANCE NO 11 BP 43106-014 5,979.00 50 50 SO 50 0% 50 . CONTINUATION SHEET A1. DOCUMENTG7O3 4 PAGE OF PAGES 4 AIA Document(1702,APPLICATION AND CERTIFICATION FOR PAYMENT,containine APPLICATION NO: 22B Contractor's signed certification is attached. APPLICATION DATE: 5;14/2010 In tabulations below_amounts are stated to the nearest dollar. I'SM JO10: 14065 PERIOD 10: 5/3 1/2010 Use Column l on Contracts whew variable retainace for line items may apply. NAME: Carmel PAC CONTRACT NO: 2695-4 310 A H C D F. P _ G El I LIME DESCRIPTION OF WORK SCHEDULED WORK COMPLETED MATERIALS TOTAL .o BALANCE RETAINAGIE NO. VAI.DE FROM PREVIOUS THIS PERIOD PRESENTLY COMPLETED IC,-Ci TO FINISH OF VARIABLE APPLICATION STORED AND STORED 10-GI RATE) ID-El i NOT IN TO DATE D OR El 1 D-E+Fi _ 900 PENDING CHANGE ORDERS 901 CHANGE ORDER#1 38,542.00 538.542 SO SO $35,541 100% 51,927 902 CHANGE ORDER#2(RCP-10) 19,219.00 S1 y219 SO SO $19,219 100% S961 903 CHANGE ORDER#3 BP 43108-005 -175,000.00 ISI75.000■ SO SO (5175,0001 100% (55,7501 904 $0 e0 50 $0 SO 905 CHANGE ORDER#5 530.000 512.656 $4,397 $0 $17.053 575l, S12.917 5554 $'_.253,261 2,173.509 26,422 0 1,199.931 95% 53.330 112663 til t n e ,fir„, " SHEET METAL 1 • POYNTER SIIEE"1' METAL, INC. CONTRACTOR'S AFFIDAVIT AND WAIVER OF LIEN PARTIAL ( X) FINAL ( ) We, the undersigned, having been employed by CARMEL REDEVELOPMENT COMMISSION furnish labor and materials to do construction work on the premises known as PARCEL 7A, CARMEL REGIONAL PERFORMING ARTS CENTER hereby warrant that the premises of the above named job cannot he made subject to any valid lien by anyone who furnished material. supplies. labor or services to the undersigned fur use in the above named project for any labor. materials or supplies furnished or services performed through 05/31/111 to the extent that the undersigned has been paid as set forth herein. This waiver is given in order to induce payment in the amount of$26,422.00 and upon receipt of the amount due by the undersigned. this waiver as to the amount due becomes valid. enforceable and of full effect. Upon attachment of the canceled check and the legal description of the project. this waiver may he recorded by the Owner or mortgage holder(s) of the project. This Contractor's Affidavit and Waiver of Lien only applies to the extent paid. and does not apply to or cover retention. unresolved claims or unresolved changes, change orders or change requests. Given under our hand and seal this 24111 day of MAY, 211111 POYNTER SHEET METAL, INC. Signat e *3orized Representative Joseph II PRESIDENT Title of Authorized Representative STATE OF: Indiana 1 COUNTY OF: Monroe ) Subscribed and sworn to hefbre me this 24111 day of MAY, 211111 idLeef (Notary Public) Commission Expires: August 29, 2014 County of Residence: Morgan Proscribed by State Board of Accounts City Form No.201(Rev.1995) ACCOUNTS PAYABLE VOUCHER CITY OF CARMEL An invoice or bill to be properly itemized must show: kind of service, where performed, dates service rendered, by whom, rates per day, number of hours, rate per hour, number of units, price per unit, etc. Payee t PoY�/P° .54e-r-71 frro %/ Purchase Order No. 276 y N- 5474, /f0„/ 37 Terms +✓�oo.+/in�/G//, /ti �/��/Ui' Date Due Invoice Invoice Description Amount Date Number (or note attached invoice(s) or bill(s)) 519"//u 22.6 ,%,c/rqf oh 22e F7 2(, y22 .OD Total ,26/a2 0� I hereby certify that the attached invoice(s), or bill(s), is (are) true and correct and I have audited same in accordance with IC 5-11-10-1.6. , 20 Clerk-Treasurer VOUCHER NO. WARRANT NO. /40) '',i42/ ALLOWED 20 ,�j,�r/ IN SUM OF $ • J//�6 r� /✓. 54/- /�04- 5 7 !J/c '?iHSfon, //1/ '5'7yo r $ 2O/y.2.2 OC ON ACCOUNT OF APPROPRIATION FOR 992/W7, ?o7 Board Members PO4 or INVOICE NO. ACCT#/TITLE AMOUNT hereby certify invoice(s), DEPT.u I hereb certi that the attached invoices , or *402 22 6 i'/ o8o7 26y22 6o bill(s) is (are) true and correct and that the materials or services itemized thereon for which charge is made were ordered and received except G—y 20/6 Signature Director of Redevelopment Title Cost distribution ledger classification if claim paid motor vehicle highway fund