GENERAL NOTES:
1. All sonitory sewer construclion on Ih�s p�oject moy he of P V C sewer p�pe (SDR 26 or
SDR 35) conforming to A S T.A•I Speci(ication C- 700- 71 T At owner's option T�pe P
S.I�. polyvinyichloride sewer pipe ond I�ttings Ty�e t, Grnde conforming to
A.S T.M. Speci(icotions 0-303.4 or Acrylonitrile-Butod�ene-Sty.ene
(ABS) sewer pipe contorming to A S T M p-2680-79A m�y be substituted Joints
in oll pipe shnll contorm fo A S T M Spe�cifcation C- 425-71 Ali subsequent
A S T M revisions sha11 apply o� os sp!c�ti:d on plans
2. All storm sewers sholl be constructed with reinforced concrete pipe C;lass III
or os noted and conform to A.5.T.M. C-76 or latest revision. Ait monholes
shall be precast concrete construction in accordonce with State of indiana
Specifications and shall have Type "A" cast iron ring and cover.
3. Joints in sewer pipe shol� conform to A.S.T.M. Specificotion C-425 or latest
revision.
4. Sewer pipe shaU be bedded in accordance with detail shown. Sewer trenches
shall be kept free of all water. Do not allow water or mud to enter the
sewer.
5. All sanitary sewer lines upon completion will be required to pass a low
pressure oir test, unless otherwise directed by the City Engineer. Soid test
shall be conducted according to NCPI Standard Method, and sholl be witnessed
by the City Inspector. Infiltration under test shall not exceed 200 gallons
per inch of inside diometer of sewer pipe per mile of sewer in 24 hours and
inclusive of all appurtenances within the section being tested such os
manholes, house connections, etc.
6. All pipe or drainage structures in trenches under paved surfoces and within 10
feet of the pavement shall be backfilled with granular moterial and compacted
by approved methods.
7. No roof drains, footing drains and / or surface woter drains may be connected
to the sanitary sewer system, including temporary connections during
construction.
9. All lots ore to be served by 6" sanil��ry sewer pipe of P V C or
alternate material opproved by fhe City Enqineer These lolerals ore to be
corried opproximately t'o the property line, ond the location of their
termination indicated on lhe surfoce with o suitoble m�rker The wye is to
be tilted up ot 45 deqrees from the horizontol ond th? end plugged tight
with clay or plostic disc, capob�e o( withstonding a low pressure Air Test
without leokaqe. The loteral locotions �hould also be morked with red on the
curb. Mondrel lest i� reQuired on o11 main line sew�rs per Indio�a Stote
Boord o� Nealth.
9. Sewers crossing mains shall be laid to provide minimum distance of 18 inches
between the outside of the woter main ond the outside of the sewer. This sholl
be the case where the water main is either above or below the sewer. The
crossing shall be arranged so thot the sewer joints will be equidistant and as
far as possible from the water main joints. Where a woter main crosses under
a sewer, adequate structural support shall be provided for the sewer to
prevent damage to the water main. When it is impossible to obtain proper
horizontal and vertical separation as stipulated above, the sewer shall be
designed and constructed equal to water pipe and shall be pressure tested to
assure watertightness prior to bockfilling.
10. Water mains shail be of ductile iron Class 50 cement lined pipe, unless
otherwise noted in the plans or PVC of a type approved for water main
construction in Indiano.
A. Water lines shall be of ductile iron pipe, Class 50 cement
line water works grade.
B. Stop shall be those manufactured by Ford or Mueller Corporation with AWWA
taper thread, and with copper compression type fitting on outlet, or
equal.
C. 81ow-off valves shall be those manufactured by Mueller Corporation
(H010283 or H-10291), or equ�l.
D. Angle valves at the end of water service stub are to be copper compression
type fitting also, and are to be protected with plastic bay over the
valve.
E. 3/4" tops in lines smaller than 4 inches shall be only by tapped tee or
tapping saddle. Water service lines should be marked on curbs with blue
paint. (Sewer lateral locations - red).
11. All water mains to be pressure tested for leakage and sterilized in
accordance with directions from Carmei Water Deportment.
12. No traffic will be allowed on prepared subgrade prior to paving.
13. All street construction within the lines of dedicated right-of-way shall be
in accordance with the Specifications of City of Carmel.
14. Property line comers of street intersections are rounded by an arc having
a 15' radius. Property lines drawn hereon are carried to the P.I. of the
arc.
15. A temporary seeding mixture in the areas where stripping of fills have been
graded shall be seeded for silt and erosion protection. After grading all
construction areas are to be seeded as follows:
A. Swale seeding : Seed and fertilize within construction limits with 5#/acre
"Redtop° grass, 20#/ocre "Rye Grass", 20#/acre "Blue Grass", 25#/acre
"Tall Fescue° grass, and 600#/acre 12-12-12 fertilizer.
B. Cut/Fill Seeding Along Paved Areas: Seed and fertilize with 25#/acre "Tall
Fescue" grass, 20#/acre "Rye Grass", 15#/acre "Blue Grass" and 600#/acre
12-12-12 fertilizer.
16. The location of houses (depicted by rectangles) show the pad elevation and/or
outside grade. The finished floor elevation is 8 inches higher, more or less
than the outside grode.
17. It shall be the respansibility of each contractor to verify all existing
utilities and condition� pertaining to his phase of the work. It shall olso
be the contractors responsibility to contact the owners of the various
utilities before work is started. The contractor shall notify in writing the
owners ond/or the engineers of any changes, errors, or omissions found on
these plans or in the field before work is started or resumed.
18. All drainage pipe and ditch outfalis to receiving streams shail be
constructed in accordance with drawings, subject however, to any modification
required by the City of Carmel ot the time instaliation is completed and to
any adjustments needed for field conditions that could not be anticipated on
the design drawings.
- 19. Contractor to record dimensions measured along sewer line from nearest
manhole to each sanitary sewer laterol.
20. Contractor to record dimension of each water stub from nearest fire hydrant
measured along the water main.
21. The obove locations of laterols, along with any other construction changes
are to be incorporated on the original construction drawings ana record
drawings submitted to the City Engineer's Office as soon after completion of
construction as possible.
22. Contractor shall verify subsurface conditions prior to bidding.
23. "The engineer and/or owner disclaim any role in the construction meons and
methods associated with the project as set forth in these plans.'
—_�
I
� �
I
i �
i
i
�
� ,
V �i
I
�0 STR C � 0
�� O I
P A S
SECTO�I �OUR
�
�
�
n
¢
m
�
�
A
�O
�
�
� - -�
00
20 �+
___�___._ �-1F
I _N
0
AREA MAP
PREPARED �OR:
�.ANGSTON DEVE�OPMENT COMPANY
1132 S. Range �ine Rd.
Carmel, Indiana 46032
TE�EPHONE: (317) 846-7017
PREPAR� D BY:
WEIHE ENGINEERS, INC.
10505 NORTH CO��EGE AVENUE
INDIANAPOLIS, INDIANA 46280
TE�EPHCNE: (317) 846-6611
�,��� p�nd���
A��C stru���g��
Not ��r �on
ALLAN H. WEIHE-REG P. E. -lN �8827
�
�
�
�
�
�
�
�
a
■ u�
V��
a: �; F.,
z
Z W �w
� �Q
W Q�
_����
�Q wa
� � � V U
N aa �'�
�
W
W�
�
z�
�
��
� z�
� �
v� i
:� �
o`r'�
Z 0.��
a^o
z°oi
W °��
z m
�
w
7„c�
W a � �"
w�
_ `� � �
,
��G.
o °'
� c.> �
W �
z�
� �
0
�
0
■�e
�^
a� _ � z
N � m W (/7
� a Iw
�
�
�
�
�
�
�
� �
� �
�
� �rT,
^�
� �
�o
�
� ~
z � �
o �
�
4 � w
a � 0
¢
a �
w
a
a
SHEET N0.
O F �O
^
W
h
�
^
^