HomeMy WebLinkAbout13070002 Landscaping Plan C200�
�
r
N
�
�
�
� o
3 N
�
� �
m T
N �
�t �
� �
r �
�
� o
3 n-
� �
X •>
I �
N �
� o
�
n o
¢
a� T
3 m
�
a �
i �
� �
� o
� �
r Q,
3
i�i v
a Q
X �
C�
� N
rn �
Q �
r
� �
Q -°
U
� �
I �
Q �°
Z �
� U
I �
� '>
U
I /
r �
a�
�
c� -
� �-
? U
� �
� �
�
0 0
�
o �
J �
M
� �
a Q o,
'-' c
a' � •�n
� � o
3 M �
�I ,n U
� o �
� � o
�
�, �? '�
°' o 0
� \_
� ��
oo��
�o��
i U %
o �
� � �, �
0 0
0
� a >, /
ozm�
����
._ � � .
o U
a�i ��w
o� o .,� o
o T �/
� J J C.�
/
�
`
�
(
�
i i
.......866...
���
� I
\ \
^ i � _ _ ��w ,
� �� ,._ _ B66 � �I �
`; GRASS I �. � I ��a
I I J �" �
� � � N ;'�� ° ' i
s.� � o l a �" � ��
� " � / � � I
m � ��,� , �
` 867.1 I �s' I � i ' �
=� �:r I , I ;� � � � I
-8si. � I � / � � � � I I ��
, ss�.o I � � � ,
ro �
��,� P�� � I �� � ' � I �
c�� / � �
M. . .+ . � � � I �
M.E.G.
� �/� ' ( ' �
67.00 � �,�� � � � � � �
� � ,,' �� � �l � l
1 �
/� � � � ' �
m
� � � � � °
- - - � 86� , P�i`' � � ( ' I
" �� � � I
BENCHMARK�� II
� � '�_�
GRADING PLAN
�I
EROSION & LANDSCAPE PLAN
.�
GRADING LEGEND
EXISTING
_ _ �4g
0
---- SD ----
�
�
CONTOUR LINE
SPOT ELEVATION
MATCH EXISTING GRADE
STORM CURB INLET
STORM SEWER
SPRINKLER CONTROL VALVE
TREE
TEMPORARY BENCHMARK:
THE BASIS OF ELEVATIONS HEREON IS NAVD 88.
HUB WITH TACK SEf - SEE DRAWING FOR LOCATION.
ELEVATION = 868.22'
EROSION LEGEND
INLET PROTECTION
CONSTRUCTION LIMITS
I ■�
� � � � �
PROPOSED
�-�49-�
53.0 OR �53.00
752.50
M.E.G.
ALL AR EAS THAT AR E LEFT
UNDISTURBED FOR 7 DAYS SHALL
RECEIVE SEED AND MULCH.
LANDSCAPE LEGEND
PROPOSED SHRUB
PROPOSED GRAVEL MULCH
(#8 WASHED STONE)
PROPOSED HARDWOOD MULCH
PROPOSED SOD
EXISTING CANOPY/ORNAMENTAL TREE
EXISTING EVERGREEN TREE
LANDSCAPE PLANT LIST
� �
0
�
�
�
'i�
KEY QTY. SCIENTIFIC NAME COMMON NAME SIZE CONDITION REMARKS
SHRUBS
TO 8 Taxus Fastigiata Irish Yew 5'-6� ht. B&B PLANT 4� O.C.
VR 4 Viburnum rhytidophyllum Leatherleaf Viburnum 30° ht. B&B PUWT 5' O.C.
NOTE: AUTOMATIC IRRIGATION
IS NOT REQUIRED.
GRADING NOTES
1. PROVIDE POSITIVE DRAINAGE IN ALL AREAS. PAVING CONTRACTOR SHALL TEST FOR ANY PONDING
CONDITIONS AFTER INSTALLATION AND CORRECT.
2. PROVIDE SMOOTH TRANSITION FROM NEW AREAS TO EXISTING FEATURES AS NECESSARY.
3. ALL AREAS WHERE PROPOSED ASPHALT PAVEMENT MEEfS THE EXISTING PAVEMENT THE EXISTING PAVEMENT
EDGE SHALL BE PROPERLY SEALED WITH A TACK COAT MATERIAL.
4. THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHILE EXCAVATING AROUND EXISTING TREES
SO NOT TO DISTURB AND TO MINIMIZE OR ELIMINATE DAMAGE TO ROOT SYSTEM.
5. THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING
UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTIUTY CONTRACTORS AND/OR UTILITY
COMPANIES SO NOT TO CAUSE DAMAGE.
6. THE EXCAVATING CONTRACTOR OR LANDSCAPING CONTRACTOR SHALL INSTALL THE FINISH GRADE AT 1/2"
BELOW PAVEMENTS WHEN SHEET DRAINAGE IS PROPOSED ACROSS THAT SEEDED AREA.
7. ALL AREAS WHERE THE EXISTING PAVEMENT OR PAVEMENTS ARE DAMAGED DURING CONSTRUCTION FROM
TRAFFIC BY THE GENERAL CONTRACTOR, SUBCONTRACTORS OR SUPPLIERS, SHALL BE RESURFACED OR
RECONSTRUCTED AT LEAST TO THEIR ORIGINAL CONDITION AFTER THE CONSTRUCTION WORK IS COMPLETED.
8. T.C. SHALL INDICATE THE ELEVATION THAT WATER WOULD ENTER A STRUCTURE WHEN STRUCTURE IS NOT A
CURB INLET. T.C. SHALL INDICATE TOP OF CURB WHEN STRUCTURE IS A CURB INLET.
EROSION NOTES
1. THE CONTRACTOR SHALL CONTROL WASTE, GARBAGE, DEBRIS, WASTEWATER, AND OTHER SUBSTANCES
ON THE SITE IN SUCH A WAY THAT THEY SHALL NOT BE TRANSPORTED FROM THE SITE BY THE
ACTION OF WINDS, STORMWATER RUNOFF, OR OTHER FORCES. PROPER DISPOSAL OR MANAGEMENT
OF ALL WASTES AND UNUSED BUILDING MATERIALS, APPROPRIATE TO THE NATURE OF THE WASTE
OR MATERIAL, IS REQUIRED.
2. PUBLIC OR PRIVATE ROADWAYS SHALL BE KEPT CLEARED OF ACCUMULATED SEDIMENT. BULK
CLEARING OF UMULATED SEDIMENT SHALL NOT INCLUDE FLUSHING THE ARFA WITH WATER. CLEARED
SEDIMENT SHALL BE RETURNED TO THE POINT OF LIKELY ORIGIN OR OTHER SUITABLE LOCATION.
3. THIS EROSION CONTROL PLAN SHALL BE IMPLEMENTED ON ALL DISTURBED AREAS WITHIN THE
CONSTRUCTION SITE. ALL MEASURES INVOLVING EROSION CONTROL PRACTICES SHALL BE INSTALLED
UNDER THE GUIDANCE OF QUALIFIED PERSONNEL EXPERIENCED IN EROSION CONTRO�, AND
FOLLOWING THE PLANS AND SPECIFICATIONS INCLUDED HEREIN.
4. ALL EROSION CONTROL PRACTICES SHALL BE IN ACCORDANCE WITH THE INDIANA STORM WATER
QUALITY MANUAL FROM THE INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT (IDEM).
5. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY BOONE COUNTY.
6. T.C. SHALL INDICATE THE ELEVATION THAT WATER WOULD ENTER A STRUCTURE WHEN STRUCTURE IS
NOT A CURB INLET. T.C. SHALL INDICATE TOP OF CURB WHEN STRUCTURE IS A CURB INLET.
SEEDBED PREPARATION FOR PERMANENT SEEDING:
1. TEST SOIL TO DETERMINE pH AND NUTRIENT LEVELS. (CONTACT YOUR COUNTY SWCD OR
COOPERATIVE EXTENSION OFFICE FOR ASSISTANCE AND ADDITIONAL SOILS INFORMATION)
2. IF SOIL pH IS UNSUITABLE FOR THE SPECIES TO BE SEEDED, APPLY LIME ACCORDING TO TEST
RECOMMENDATIONS.
3. FERTILIZE AS RECOMMENDED BY THE SOIL TEST. IF TESTING WAS NOT DONE, CONSIDER APPLYING
400-600 LBS./ACRE OF 12-12-12 ANALYSIS, OR EQUIVALENT, FERTILIZER.
4. APPLY TOPSOIL BACK ON COMMON AREAS AND OTHER AREAS WHERE POSSIBLE. TILL THE SOIL TO
OBTAIN A UNIFORM SEEDBED, WORKING THE FERTILIZER AND �IME INTO THE SOIL 2- 4 INCHES
DEEP WITH A DISC OR RAKE OPERATED ACROSS THE SLOPE.
MAINTENANCE SCHEDULE AND REQUIREMENTS:
1. CONTRACTOR SHALL NOTIFY THE ENGINEER/PROJECT MANAGER OF THE INDIVIDUAL WHO IS
RESPONSIBLE FOR THE ROUTINE DAILY INSPECTION/MAINTENANCE CHECKS OF ALL EROSION AND
SEDIMENT CONTROL MEASURES. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
CHECKED BY THE CONTRACTOR ON A DAILY BASIS DURING THE PERIOD OF CONSTRUCTION ACTIVITY,
AND AFTER EACH STORM EVENT.
2. AT THE COMPLETION OF CONSTRUCTION AND THE AREA STABILIZED, THE CONTRACTOR SHALL
REMOVE EROSION CONTROL MEASURES NO LONGER NEEDED IN A MANNER THAT MINIMIZES SITE
DISTURBANCE, AND SEED IMMEDIATELY OR COORDINATE THE TRANSFER OF MAINTENANCE
RESPONSIBILITIES, AS REQUIRED, WITH THE OWNER.
LANDSCAPE NOTES
1. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN ASSOCIATION OF NURSERYMEN,
ANSI Z60.1, CURRENT EDITION.
2. ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH THE CARMEL LANDSCAPE
ORDINANCE.
3. ALL PLANTED AREAS AND LANDSCAPE ISLANDS SHALL RECEIVE A 3" LAYER OF
SHREDDED HARDWOOD MULCH (EXCEPT RECYCLED TIRE RUBBER MULCH WHERE NOTED)
OVER A 4.1 OZ., WOVEN POLYPROPYLENE, NEEDLE-PUNCHED FABRIC, WEED BARRIER.
4. THE SIZES OF PLANT MATERIAL SHOWN IN THE PLANT CHART ARE THE MINIMUM
REQUIRED AT THE TIME OF PLANTING. CONTRACTOR TO PROVIDE INFORMATION AT TIME OF
BIDDING IF ALTERNATE MATERIALS ARE SUGGESTED.
5. ALL LANDSCAPE MATERIAL INSTALLED SHALL BE MAINTAINED BY THE LANDSCAPE
CONTRACTOR UNTIL FINAL ACCEPTANCE BY THE OWNER.
6. ALL DISTURBED AREAS NOT RECEIVING PLANTINGS (INCLUDING RIGHT-OF-WAYS) SHALL
RECEIVE EIGHT INCHES OF TOPSOIL, SOD, AND WATER UNTIL A HEALTHY STAND OF GRASS
IS ESTABUSHED.
nr�uvr w��a� a u��vrr.
Call before you dig.
� �
NORTH
0 20 40 60
GRAPHIC SCALE IN FEET
y ��
� �N
1���� u-
.:
.
t �
i� },
E
600 E. 96th Street, Suite 100
Indianapolis, IN 46240
317.808.6000 • 317.808.6797 (fic)
Consultant
WOOLPERT
7635 INTERACTIVE WAY \�/
SUITE 100
INDIANAPOLIS, IN 46278 ry O O L P E R T
317.299.7500
V J
�
Z
W
�
W
�
�
�
i.i
�
C�
Z
0
J
�
W
M
.
V
�
�
m
C�
Z
V J
�
O
L.�
U
Z
0
�
J
-
�
�
�
���� ��
w
�
�
Q
0
�
(..�..�
G
�
�
�
z
O
N
�
N
�
�
z
Q
0
z
w
�
�
U
z
Q
�
�
�..�..�
�
Q
U
�
0
Z
Q
J
�
Z
O
�
�
�
�.�..�
�
Z
0
�Q/
I..L-
V
ISSUANCES I
# Description
DRAWING INFORMATION
Scale: 1"=20'
Date: 07/09/13
Checked By: BJH
Drawn By: PJD
Duke Realty Job #:
A/E Job #:
DRAWING / SHEET TITLE
GRADING, EROSION &
LANDSCAPE PLAN
Date I