~1ay 3, 2005
EL
Mr. 1Y1ichael L. DeBoy
DeBoy Land Development Services, JAMES BRL\INARD, M~YOR
501 South 9th Street, Suite 100
Indianapolis, IN 46060
RE: Fineberg Group Retail Shops - Project Revie,v #2
Dear ~vlr. DeBoy:
o <ffJ 11J03 '7 JJP /~(,S
The City has received your dra\vings dated April 18, 2005 based upon the City revie\'l of October 19, 2004.
The comments from the City revie\v have been satisfactorily addressed \vith the follo\ving exceptions:
PROJECT COM~/IENTS-CONSTRUCTION PL~~S
14. None of the improvements that \vere constructed \vith our Carmel Drive Streetscape project,
particularly the brick pavers/stamped concrete at the Carmel Drive curb cut, are indicated on any
of the sheets. :NIodifications to the existing entrance on Cannel Drive \vill require construction to
the streetscape standards (concrete drive, pavers, etc.). The entrance off of Rangeline Road shall
be constructed \vith concrete. Please confim1 that the Department of Community Services has
approved the improvements indicated. They do not appear to be in keeping \'lith the existing
streetscape.
15. Please advise the Owners and Contractors involved in this project that the City of Carmel has a
strict ordinance regarding mud and other substances or debris deposited on City streets by
vehicles and equipment used in excavation, constnlction, demolition or oth~r\vise \vithin the City
Lin1its. Please add a note to the dra\ving that ~he Contractor shall clean Rangeline Road whenever
required to do so by the City of Cam1el. Thank you for adding the note to the erosion control
sheet. Please add to all sheets.
18. The note in large text that reads: "Storm Se\ver to Remain". Is this se\ver a public or private
se\ver? If the se\ver is public, the City requires a foot of cover from the top of the pipe to the
pavement subgrade. Please ensure that the grading plan provides for this requirement if the se\ver
is public. Thank you for providing the minin1um cover. Will the se\ver be private?
28. The details still did not copy \vell and are hard to read.
29. Comment on previous revie\v: "Please provide a traffic study, \vhich sho\vs that the impact the
proposed use \vill have on Rangeline Road and Cannel Drive traffic volumes and turning
movements." The City is \\rilling to accept a comparison of the proposed use to the old use.
Based on additional_review, the City provides additional comments:
1. All paving \vithin the existing and proposed Cityright-of-\vay shall confonn to the requirements
of the Departnlent of Engineering. Please add a note to the dra\vings that the Contractor shall
contact the Department of Engineering to schedule a pre-construction llleeting to review the
Departn1ent' 5 constnlction requirements, staff notification requirements, required inspections for
certain stages of the\vork and to revie\v the authority of the Departn1ent as it relates to \vork
\vithin the existing and proposed City right-of-\vay.
2. Please ensure details meet or exceed City standards for work in the City right-of-way. If not, City
details TI1USt be added and delineated on the plans.
3. Sheet 3, curb inlet stnlcture #773, add a note to change casting only.
4. Sheet 5: Is the keystone retaining \vall on the east side of the property able to be constructed so
close to the property line?. \ViII the constnlction/dishlrbed area extend beyond the property?
5. Sheet 6: There is a I5-inch pipe draining into a 12-inch pipe. \Ve assume the drainage
calculations den10nstrate that the 12-inch pipe is able to carry the \vater fron1 the new piping
systenl. Jio\\' far does the existing 12-inch pirJe continue? Even if the calculations demonstrate
DEPARTiVIENT OF ENGINEERING
ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439
E~/1AlL engineering@ci.carn1el.in~ us
"? .
the 12-inch pipe to structure 142 has capacity, what about farther downstream? Refer to October
19,2004 letter, item #23 which was not addressed on these plans. Due to the lack of drainage
calculations for the T AC review, the City did not conduct a complete review of the drainage
aspects of this project, including the provision of detention. The City standard is to provide
detention. As it is a standard, and due to the apparent dO\Vllstream system restrictions, the City
must request that detention be provided. Please refer to comments by Crossroad Engineers when
issued.
6. Sheet 9: Right-of-\vay pavement section must meet City standards. 1.5. inches HMA # 11 surface
on 2 inchesHMA #8 binder on 3 inches H~1A #5D base on 7 inches #53 stone on 4 inches #2
stone.
These comments repre~ent the Department of EngineeriI1g's. second review of the constnlction plans for
this project. We request that all responses to our comments be provided in writing. Failure to provide
\vritten responses may result in delay of the review process.
It is critical that this office be made aware of all modification made on the plans being re-submitted,
particularly if any such changes are considered "ne\v" or fall outside of our previous reviews. Please
provide revised plans indicating all revisions. Please notify us of any changes and specifically state any
changes, including changes resulting from Plan Commission, Special Studies or other committee meetings.
All bonds and performance guarantees (if required) must be posted prior to Engineering Department
approval. Also, Board of Public Works and Safety approval and any other governing agency approvals (if
required) must be obtained prior to Engineering Department approval.
The plans have been submitted to the City's consultant for drainage review. Comments from the drainage
review will be forwarded to your office when the review is complete
The Department of Engineering reserves the right to provide additional comments based on subsequent
reVIews.
~
If you have questions; please contact me at 571-2441.
cc: Jon Dobosiewicz, Department of Community Services'
John Duffy, Carmel Utilities
Greg Ilko, Crossroad Engineers
Paul Pace, Carmel Utilities
Paul Arnone, Cannel Utilities
Proj ect File
Engineering Department Review
S:\PROJREY04\FINEBERGRET AILSHOPS#2
0401 ()o 31 DP/kc>'-"~
Construction/Stormwater Pollution Prevention Plan
Technical Review and Comment (Form 1)
Project Name: ~itm~m~~s
Plan Submittal Date: 03/29/05 Hydrologic Unit Code:
Project Location Description: SE comer of Carmel Draive and Rangeline Road
Latitude and Longitude: Lat- 39-57'-40" N Long- 86-07'-35" W
Civil Section:
County: Hamilton
5120201090040
=
o
.""",
~ Project Owner Name: The Fineburg Group
E Contact:
~ Address: 116 East Carmel Drive
~
t) City: Carmel
Q)
.0 Phone:
~
~
31
18N
4E
State: IN
Zip: 46032
FAX:
E-Mail:
Plan Preparer Name: Stacey Hosler
Affiliation: DeBoy Land Development Services
Address: 501 S. 9th Street
City: Noblesville
Phone: 317-770-18Ql
FAX:
State: IN
317-770-1821
Zip: 46060
E-Mail:
Review Date: 04/12/05
=: Principal Plan Reviewer: John B. South P.E. CPESC
.~ Agency: Hamilton County Soil and Water Conservation District
Q)
~ Address: 1108 South 9th Street
; City: N oblesville
~ Phone: 317-773-2181
Assisted By:
FAX:
State: IN
317-776-1101
Zip: 46060
E-Mail: john-south@iaswcd.org
J PLAN IS ADEQlTAl'E: A comprehensive plan review has been completed and it has been determined that the
plan satisfies the minimum requirements and intent of 327 lAC 15-5.
o Please refer to additional information included on the following page(s).
o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NOI. NOI must also be sent to the SWCD,
o A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day
review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and
revisions to the plan may be required at that time to ad~ress deficiencies.
o Please refer to additional information included on the following page(s).
o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NO!. A NOI must also be sent to the
o PI.JA.N IS DEFICIENT: Significant deficiencies were identified during the plan review.
o Please refer to additional information included on the following page(s).
o DO NOT file a Notice of Intent for this project.
o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re-
submitted, and notification has been received that the minimum requirements have been satisfied.
Plan Revisions
Deficient Items should be or delivered to the Principal Plan ,Reviewer identified
in the Plan Review Section above.
DNR, Division of Soil Conservation
Page 1 of 1
Revised 12/09/03, Form 1
~(jtJ3
O'fo er() ()3 j ])P / 1tI)( 5
Constr'uction/Stormwater Pollution Prevention Plan
Technical Review and Comment (Form 1)
Project Name: Fineburg Retail Shops
Plan Submittal Date: 03/09/05 Hydrologic Unit Code:
Project Location Description: SE corner of Carmel Draive and Rangeline Road
Latitude and Longitude: Lat- 39-57'-40" N Long- 86-07'-35" W
Civil SW Section:
County: Hamilton
5120201090040
==
o
..
~ Project Owner Name:
E Contact:
.0
= Address: 116 East Carmel Drive
..
1j City: Carmel
~
.c Phone:
J-c
~
31
18N
4E
State: IN
Zip: 46032
FAX:
E-Mail:
Plan Preparer Name: Stacey Hosler
Affiliation: DeBoy Land Development Services
Address: 501 S. 9th Street
City: Noblesville
Phone: 317-770-1801
FAX:
State: IN
317-770-1821
Zip: 46060
E-Mail:
Review Date: 03/23/0~
=: Principal Plan Reviewer: John B. South P.E. CPESC
.~ Agency: Hamilton County Soil and Water Conservation District
~ .
~ Address: 1108 South 9th Street
; City: Noblesville
~ Phone: 317-773-2181
Assisted By:
FAX:
State: IN
317-776-1101
Zip: 46060
E-Mail: john-south@iaswcd.org
PLAN IS ADEQlTA'rE: A comprehensive plan review has been completed and it has been determined that the
plan satisfies the minimum requirements and intent of 327 lAC 15-5.
o Please refer to additional information included on the following page(s).
o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NO/. A NOI must also be sent to the SWCD,
o A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day
review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and
revisions to the plan may be required at that time to address deficiencies.
o Please refer to additional information included on the following page(s).
o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
DepartmentiJf Environmental Management. Construction" activities may begin 48 hours following the submittal of
the NOI A NO I must also be sent to the
o PI-IA.N IS DEFICIENT: Significant defi~iencies were identified during the plan review.
o Please refer to additional information included on the following page(s).
o DO NOT file a Notice of Intent for this project.
o D,O NOT commence land disturbing activities until all 4eficiencies are adequately addressed, the plan re-
submitted, and notification has been received that the minimum requirements have been satisfied.
Plan Revisions .
Deficient Items should be mailed or delivered to the Principal Plan Reviewer identified
in the Plan Review Section above.
DNR, Division of Soil Conservation
Page 1 of 1
Revised 12/09/03, Form 1
e
e
Babbitt, Pamela A
From:
Sent:
To:
Subject:
Dobosiewicz, Jon C
Friday, November 12, 2004 10:23 AM
Babbitt, Pamela A; 'E. Davis Coots (E-mail)'
RE: 1301 South Rangeline Road
Dave,
If we do not have these items by end of business today the item will be removed from the agenda.
Jon
-----Original Message-----
From: Babbitt, Pamela A
Sent: Friday, November 12, 2004 10:20 AM
To: E. Davis Coots (E-mail)
Cc: Dobosiewicz, Jon C
Subject: 1301 South Rangeline Road
Importance: High
Docket no. # 04090039 for the November 16, Public Hearing of the Carmel Plan Commission has items still
outstanding.
Docket Fee of $1,660.00 due as well as the printed Public Notice from the paper. Please submit these items to avoid
being tabled.
Thank you,
fP ~ ffiaiJutt
q)~. of q)ees
~~&~
~of~
efie~S~
~, 30L 46032
217-571-2417
217-571-2426.F
1
Babbitt, Pamela A
e
e
From:
Sent:
To:
Cc:
Subject:
Importance:
Babbitt, Pamela A
Friday, November 12, 2004 10:20 AM
E. Davis Coots (E-mail)
Dobosiewicz, JonC
1301 South Rangeline Road
High
Docket no.# 04090039 for the November 16, Public Hearing of the Carmel Plan Commission has items still outstanding.
Docket Fee of$1 ,660.00 due as well as the printed Public Notice from the paper. Please submit these items to avoid being
tabled.
Thank you,
fP amda, 03~
q)~ 4 q)t'~S
fP~&~
~o1~
t'fW ~ S~
~, 30t 46022
317-571-2417
317-571-2426 F
1
.
e
].Lt\l\1ES BRAINARD, MAYOR
Cr EL
October 19, 2004
Mr. Michael L. DeBoy
DeBoy Land Development Services, Inc.
501 South 9th Street, Suite 100
Indianapolis, IN 46060
RE: Fineberg Group Retail Shops - Project Revie\v #1
Dear Iv1r. DeBoy:
We have reviewed your submission for the October 20,2004 Technical Advisory Committee meeting. We
offer the following comments:
GENERt\L INFORMATION
1. The project site is located within current City of Carmel Corporate Limits.
2. Jurisdictions:
. Street and Right of Way - City of Carmel (Rangeline Road and Carmel Drive).
. Water - City of Carmel
. Sanitary Sewer - City of Carmel
. Stonn Sewer - City of Carmel
3. Board of Public Works and Safety Approval Requirements:
. Water and Sanitary Sewer Availability if applicable.
. Commercial Curb .Cut. We would recommend that this site request commercial curb cut re-
approval from the Board. It appears that the existing curb cuts will be modified. The request for
Board approval should include 8 ~" x 11" exhibits that will indicate the existing and proposed
curb cuts and all appropriate data and dimensions including \vidth, radii, etc. Please indicate all
existing and opposing driveways and their relationship to the proposed curb cuts for this
development.
. Temporary Construction Entrance (dedicated right of way only). Separate BPWS approval will be
required if this entrance is to be located anywhere other the site of the permanent curb cuts.
. Consent to' Encroach approvals for any permanent improvement to be installed within dedicated
easements and/or dedicated right of way. If an irrigation system is planned for this project,
additional Water Availability approval will be required from the Board and additional Water
Connection Fees \vill be due.
. Dedication of Right of Way (if applicable). Preferred dedication forms are available electronically
from this office.
I am enclosing a schedule for Board of Public \Vorks and Safety meeting dates and agenda deadlines
for your use. Please use the Engineering Department deadlines for submissions to the Board.
Any sublnission to the Board requires prior final approval by the Carnlel Clay Plan Coml1lission
and/or the Board of Zoning Appeals and conlpletion of review by the Technical Advisory
ConI nl ittee. All )vritten requests to be place 011 the Board's agenda nlust include.the appropriate
Docket NU111bers and the date (or dates) of appro val by the Plan Conlnlission and/or BZA.
4. Water and Sanitary Sewer Availability and Connection Fees:
'Vater and Sanitary Sewer Availability (acreage) Fees - We assume that this site and previous
development was served by and connected to Carmel Utilities. If this is the case, Availability or
DEPARTiYIEI\T OF ENGINEERING
ONE CMC SQUARE, CAR1\!lEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439
EivLl\lL e ngi n ee ri ng@)ci . carm el. in. us
e
e
Mr. Michael L. DeBoy
October 19,2004
Page 2
Acreage Fees would not be applicable for this development. Carmel Utilities will make this
determination.
'Vater and Sanitary Se,ver Connection Fees - Based upon the preliminary data provided on Sheet 4,
Site Geometries/Site Plan, the following Connection Fee calculations would apply to this project:
Restaurant - 165 seats @ 0.1 EDUs/seat = 16.5 EDUs
Office - 10,100 fe @ 0.5 EDUs/I000 ft2 = 5.05 EDUs
Total 21.55EDUs
Water Connection Fee - 21.55 ED Us @ $1,310.00IEDU = $ 28,231.00
Sanitary Sewer Connection Fee - 21.55 EDUs @ $ 795.001EDU = $ 17.132.00
Total 21.55 EDUs @ $2,105.00/EDU = $ 45,363.00
Contact Cannel Utilities regarding this issue. Current Connection Fees are $1,310.00 per EDU for
water and $795.00 per EDU for sanitary sewer. One EDU is based upon usage of300 gallons/day or
9,000 gallons/month.
5. TAC Revie\v/Drawings submitted for approval:
We request that all comments and comment letters generated by this office be answered in writing and
be accompanied by a dra\ving reflecting requested revisions. Final drawings will not be approved for
construction until all issues have been resolved. All Carmel Utility issues n1ust also re resolved. The
design engineer must certify all drawings submitted for final approval. This office will require a
minimum of five-sets (maximum of seven-sets) of approved drawings after all issues have been
resolved. The dra\vings will be stamped approved and signed by both the City Engineer and Director
Carmel Utilities. . The Developer/Owner \vill receive one-set which is to be maintained on the
construction site at all times. Carmel Utilities \vill receive two-sets. Our Construction Manager will
receive one-set and one-set will be maintained in the Department of Engineering. If more than the
minimum of five-sets are requested to be approved, the additional sets (maximum total oft\vo
additional) must be submitted with the five required sets.
6. Please be advised that any installation of signs, walls, irrigation systems, etc. within dedicated
easelnents and/or right of way will require Consent to Encroach approval.
7. Carmel Utilities does not subscribe to "Holey Moley" and should be contacted directly for all water
and sanitary sewer main locations.
8. Carmel Utilities will provide a separate review of this project for water and sanitary sewer issues.
9. I am including copies of the following with this correspondence:
. Commercial Project Approval Procedures.
. Permit Data, Contacts, etc.
. Commercial Permitting Procedures.
. Utility Fees
BONDING REQUIREMENTS
10. Upon initial review, it appears the following bonding requirements may apply to this project:
Performance GuaranteeslEngineer's Estimates
It does not appear that Performance Guarantees will be required for this project.
Street CutfRight of Way Permit and Bonding Requirements
Any work in the dedicated right of way of Rangeline Road and/or Carmel Drive will require a Right of
Way Permit and a License and Peront Bond. The bond amount will be determined by the number of
instances of work in the right of way @ $2,000.00 per instance. Open pavement cuts in dedicated
streets require approval by our Board of Public Works and Safety. It appears that there are at least
t\VO instances of work in the right of way indicated on the Den10lition and Site Plan, namely
construction delnolition activities associated with the existing/proposed curb cuts. Please contact our
Right of Way Manager, Fred Glaser, to arrange permitting and bonding.
- .
e
e
Mr. Michael L. DeBoy
October 19, 2004
Page 3
11. Has a drainage report been prepared for the project? Please share a copy with this office. vVe have
engaged Crossroad Engineers to review drainage plans and drainage calculations for all proj ects
submitted to this office for revie\v. We will share Crossroad's comments as they are received.
PROJECT COMMENTS-CONSTRUCTION PLA.NS
12. The location is not clear from the information provided on the Title Sheet. Please identify the east-
west street as Carmel Drive.
13. Please identify, label and dimension the existing right of way lines for Rangeline Road and for Carmel
Drive on this and all sheets. According to drawings in our files, the existing right of way for Carmel
Drive adjacent to this location is 40-feet half. The existing right of way for Rangeline Road adjacent
to this location is45- feet half.
14. None of the improvements that \vere constructed with our Carmel Drive Streetscape project,
particularly the brick pavers/stamped concrete at the Carmel Drive curb cut, are indicated on any of the
sheets. Modifications to the existing entrance on Carmel Drive will require construction to the
streetscape standards (concrete drive, pavers, etc.). The entrance off of Rangeline Road shall be
constructed \vith concrete. ADA ramps need to be provided at each entrance as grading dictates.
15. Please advise the Owners and Contractors involved in this project that the City of Carmel has a strict
ordinance regarding mud and other substances or debris deposited on City streets by vehicles and
equipment used in excavation, construction, demolition or otherwise within the City Limits. Please
add a note to the dra\ving that _the Contractor shall clean Rangeline Road whenever required to do so
by the City of Carmel.
16. It is apparent that both entrances are being modified as a part of this project. Board of Public Works
and Safety approval is required for this Work.
17. Assume "Williams Reality Fifty T\vo L.L.C." should instead be "Williams Realty Fifty T\vo L.L.C.".
18. The note in large text that reads: "Storm Se\ver to Remain". Is this sewer a public or private sewer? If
the se\ver is public, the City requires a foot of cover from the top of the pipe to the pavement subgrade.
Please ensure that the grading plan provides for this requirement if the sewer is public.
19. Rangeline Road and Carmel Drive are classified as Secondary Arterials on the City of Carmel 20- Year
Thoroughfare plans with a total right of way requirement of90-feet and a half right of way
requirement of 45-feet. It appears that existing right of way for Rangeline Road is in compliance with
the Thoroughfare Plan while Carmel Drive would require a dedication of an additional5-feet of right
of way to comply with our Thoroughfare Plan. The plans indicate a proposed 55-foot half right of way
for both Rangeline Road and for Carmel Drive. What is the reason for the additional right of way
dedication beyond our Thoroughfare Plan requirements? If the 55-foot right-of-way is to be provided
as a part of this project, please "clip" the right-of-way line at the existing comer cut.
20. Per the Alternative Transportation Plan, a 10-foot multi-use path is required on Rangeline Road. Please
work with DOCS to determine if the existing sidewalk is adequate for this portion of Rangeline Road.
21. Please confirm with the Surveyor's Office that the site does not fall in a restricted discharge watershed
that could warrant detention facilities.
22. Please indicate the FFE of the proposed buildings.
23. It is unclear from the drawings how the existing storm system functions. Please indicate the entire
system, the outf~ll or connection to the City's storm system and confirm pipe sizes between structures
are labeled correctly. Also, we could not find Structure 374 noted on the plans.
24. Please add contours, grade breaks and flow arrows to the grading plan. Also, pleas~ provide more spot
shots around the building, specifically along Rangeline Road and Carmel Drive.
25. This Department assumes you are seeking a variance for the 25-foot building setback.
26. Please translate the IOO-base elevation spot shots to the vertical datum shown for the majority of the
site.
27. If a valley is intended on the southern drive, draining to Structure 232, please indicate on the Plans.
28. The details did not copy well and are hard to read.
t"! . ,. 4,
e
eu
Mr. Michael L. DeBoy
October 19,2004
Page 4
29. Please provide a traffic study, \vhich sho\vs that the impact the proposed use will have on Rangeline
Road and Carmel Drive traffic volumes andtuming movements.
The above comments are based upon the Engineering Department's initial revie\v. Please provide our
office with a follow up letter regarding this review and revised plans, indicating all revisions. A second
review will focus only on detailed construction plans. It is critical that our office be made aware of all
modifications made on the plans being re-submitted,particularly if any such changes are considered "new"
or fall outside of our initial review. If you have questions, please contact me at 571-2441.
Enclosures
cc: Jon Dobosie\vicz, Department of Community Services (w.o. encl.)
John Duffy, Carmel Utilities (w.o. encl.)
Paul Pace, Carmel Utilities (w.o. encl.)
Jim Haag, Carmel Utilities (w.o. encl.)
Proj ect File
Engineering Department Review
S :\PROJREV04 \FINEBERGRET AILS HOPS
e
::::: .....;::.:::..~....: ':.;:' =:" .;. ..:.:.; .... ;', ;
e
.~. ..~...' . .;....~.. ,. '~':'.; ',':
......
.. ..0.
C&rmel 'ii~l~i'P&rtment
.... '.
.. . ... .. .. . . - .
.:..:::-.;..;',.:;:;';:. :;.:;::...::
J~!~. ~~~{~i'.~~~~t
C"'l ,.. .;w.. . a::.. .. ..........::.Af60F=f2
&Jrme:!,.:~..:'.::ii~:~~~~rAA..;)~ ~
October 19, 2004
Michael L. DeBoy
DeBoy Land Development Services, Inc.
501 South 9th Street
Noblesville, IN 46060
RE: The Fi'neberg Group Retail Shops
<\'\ ~ "p<. V\"'')
?~ '/
O~O~OD
Dear Mr. DeBoy
I have received and reviewed the information for.the above-referenced
project.
At the present time, I see nothing in the plans that would hamper law
enforcement efforts.
If we can be of any further assistance to you, please contact us.
Respectfully,
~j),-l.~.
Michael D. FOga~
Chief of Police
MDF:vb
cc: Dept. of Community Services
~!$
.....
(317) 571-2500
,_..::' .=::;=:::::.;.::-::::;::.;:::::;::=:::::. ::.,.;:
:;..::. .:.:::::::::::::.:;::::::=::::::::::::::;: ::....
A Nationally Accreditll:l~rcement Agency
Fax (317) 571-2512
OCT 14 '04 01:05PM
e
P. 1/1
e
\Xellt1' 11 C, f Joe' II ref I ,S II rl.ltyO,.
(l'li'Jl7t, (317) 77b-S'4~S
('Fax (j J 7) 77~:;-:l6J.'~
Sllit~ 188
()n~ J1iullil,c)/I Couot), Sqlln,.(~
.."Nol'''!$ViJ1(I, h1(!ial1f7 41.;c~6c'-.:zjjC)
October 14,2004
DeBoy Land Development Services, Ino,
ATTN: Mike DeBoy
501 South 9th Street, Suite 100
Noblesville, IN 46060
VIA FACSIMILE: 770-1821
Re: The Fineburg Group - Carmel
Dear Mr. DeBoy:
We have reviewed the construction plans submitted to the Hamilton County Surveyor's Office on
October 6~ 2004 for this project and ha.ve the following comments:
1. This proj ect falls within the jurisdiction of the City of Carmel.
2. This proposed project DOES NOT fall in a Carmel Watershed Protection Area.
3. This project does not fall in a regulated drain watershed and this office will have no
jurisdiction on this project.
4. Please direct all future storm sewer questions to the City of Carmel Engineering Department
5. Please note the additional comments may be warranted at a later date.
Should you have any questions! I can be reached at 317-776..8495.
Sincerely,
,7jJ1 6tbJ(/J
Greg Hoyes
Plan Reviewer
Cc: Jon Dobosiewicz - Carmel DOCD
John South -liCSWCD
Dick Hill - Carmel Engineering
e
e
. Babbitt, Pamela A
From:
Sent:
To:
Subject:
Dobosiewicz, Jon C
Tuesday, October 12, 2004 2:42 ,PM
Babbitt, Pamela A
FW: October 20th Carmel T AC Agenda
Please copy and file.
Jon
-'--'--Original Message-----
From: Mark A. Wood [mailto:mawood@panhandleenergy.com]
S~nt: Tuesday, October 12, 2004 ~:28 PM
To: Dobosiewicz, Jon C
Cc: Teresa M. Magee
Subject: Re: October 20th' Carmel TAC Agenda
panhandle Eastern Pipe Line Company has no conflicts with the items listed
on thi$ months agenda. Thanks for the information.
"Dobosiewicz, Jon
cn
<JDobosiewicz@ci.
carmel.in.us>
To
10/12/2004 10:20
AM
"Adrienne Keelirig"
<AKeeling@ci.carmel.in.us>,
"Blanchard, Jim E"
<JB1anchard@ci.carmel.in.us>,
"Brook Gajownik \ (E-mail\)"
<BMG@CO.HAMILTON.IN.US>, "Chuck
Shupperd" <CShupperd@vectren.com>,
'''Cinthia Klaiber \ (E....mail \) "
<cynthia.l.klaiber@usps.gov>,
nCo.nn,Angelina V"
<AConn@ci.carmel.in.us>, "Connie
Tingley"
<CTingley@ci.carmel.in.us>, "Dawn
Pattyn" <DPattyn@ci.carmel.in.us>,
"DeanGroves" <dgroves@cinergy.com>,
"Dick Hill"
<DHill@ci.carmel.in.us>~ "Greg
Hoyes" <GRH@co.hamilton.in.us >,
"Gregory J. Ilko\(E-mail\)" .
<gilko@crossroadsengineers.com>,
"Griffin, Matt L"
<mgriffin@ci.carmel.in.us>, "Hoyt,
Gary A" <Ghoyt@ci.carmel.in.us>,
nInc.Irwin Computer Services
\(E-mail\)..<webteam@heckweb.net>.
"Jay Alley \ (e-mail\)"
<Jay@ctrwd.org>, "Jeff Kendall"
<JKendall@ci.carmel.in.us>,
"JimFoster"
<JPFoster@ci.carmel.in.us>, "John
~outhn <john-south@iaswcd.org>,
"Krueskamp, Theresa A"
<TKrueskamp@ci.carmel.in.us>,
"LarryCastetter \ (E-mail\)II
<rcastetter@Cinergy.com>, "M
Snyder" .<MSnyder@ci. carmel. in. us>,
"Mark Wood \(E~mail\)"
1
r
~
--
p. 1
Oct 12 04 05:19p
e
I I I
DeBo~, I I
I
I I f --= land Development Services, ;nc.
I I
I
FACSIMILE TRANSMITTAL SHEET
TO~
Jon Dobosiewicz
COMP.-\NY:
City of Catmel- Department of
Community Services
FAX NVMHER:
(317) 571-2426
SENDER~S PHONE NUMBER
(317) 770-1801
FROM:
Stacey Hosler
D1\ TH:
OCTOBER1~2004
TOTAL NO. Or PAGES INCLUDING COVER:
2
SENDER'S REFERENCE NUMBER:
2004-0029
RE:
YOUR REFERENCE NUM8ER:
cc:
The Fineberg Group Retail Shops
Barbara Eden - 843-5975
Davis Coots - 573-5385
Mark - Fineberg - 844-4673
o URGENT X F()R REVIEW
o PLEASE COMMENT 0 PLEASE REPLY
o PLEASE RECYCLE
NOTES/COMMENTS:
501 SOUTH 9TH STREET,. SUITE 200
NOBLESVILLE. IN 46060
317-770-1801 OFFICE 317..770-1821 FACSIMILE
Oct 12 04 05:20p
1","~ ..
--
e
p.2
Land Development Services, Inc.
TRANSMITTAL SHEET'
TO:
FROM;
Mike DeBoy
DATE:
PanhandJe Eastern Pipeline Co.
ADDRESS:
9371 Zionsville Road
Indianapolis, IN 46268
ATIENTH)N:
Teresa. Magee / Matk Wood
SENDHR)S PHONE NUMBER
(317) 770-1801
OCTOBER 6, 2004
SENDER'S REFERENCE NUMBER;
2004-0029
RE:
Plans for TAC Review for The Fineberg Group Retail Shops
o URGENT 0 FOR REVIEW
o PLEASE C()MMENT 0 PLEASE REPLY
o PLEASE RECYCLE
NOTF..s/COMMENTS:
Dear Teresa and Mark,
Please contact at your convenience with any questions. Thanks in advance.
YoutS in Service,
Michael 1.. DeBoy
'"
,,'
. '
.. '. .
.0., _ ........ .......
:~--(irj04
501 SOUTfl 9TH STREET) SUITE 100
NOBJ...ESVILLE, IN 46060
317-770..1801 OFFICE 317-770-1821 FACSIMILE
OCT-07-~004 14:50 FROM:HAMILTON4Ij HWY DEP 3177769814
TO:317 571 2426
e
HAMILTON COUNTY
HIGHWA Y DEPARTMENT
October 7, 2004
Mr. Michael DeBoy
DeBoy Land Deve1opment.
501 South gt" Street
NoblesviUe, Indiana 46060
VIA FACS1MIlE
RE: Fineberg Group 'Retail Shops
SIte Plan
N of 1161:" Street I E of Rangel1ne Road
Clay Township
Dear Mr. DeBoy:
This letter serves to acknowledge rece;pt of a transmittal conta;ning the plans for the above-
ment:loned .projeet. After reviewing the plans the HIghway Department has the following
comments:
1. It appears that- this project lies entirely within the Umits of the City of Carmel.
Therefore, all future comments concerning the construction of the st.reets and utU;ty
installation should be directed toward the City.
If you have any questions or comments concerning this letter, please feel free to contact me at
3nytlme~
:#I'/~L
Steven J. Broermann
Staff Engineer
cc: Jon DOboslewicz
Greg Hayes
G:\USERS\SB\04tac\ 10..07 -04flnef]erg.doc
1 700 South 10'" Street
Noble..4;vi]le, In. 46060
Office (317) 713.."70
Fa2: (317) 776-98J4
www ,co. h lu"ilt~!!J.~~u.J~
P.003/003
e
-
Construction/Stormwater Pollution Prevention Plan
Technical Review and Comment (Form 1)
Project Name: (~:geiine~R()'~(d:~~t~~
Plan Submittal Date: 10/06/04 Hydrologic Unit Code:
Project Location Description: SE comer of Carmel Drive and Rangeline Rd.
Latitude and Longitude: Lat- ? Long.??
Civil ~ -r LY Quarter:
County: Hamilton
5120201090040
=
,.,
""'"
- ...c
~ Project Owner Name: The Fineberg Group
E Contact:
o
~ Address: 116 East Carmel Drive
~
"t City: Carmel
-~ Phone:
~
~
Section:
31
Township:
18N
Range:
4E
State: IN
Zip: 46032
FAX:
E-Mail:
Plan Preparer Name: Michael DeBoy
Affiliation: DeBoy Land Development Services
Address: 501 S. 9th Street
City: Noblesville
Phone: 317 -770-1801
FAX:
State: IN
317-770-1821
Zip: 46060
E-Mail:
Review Date: 10/18/04
:; Principal Plan Reviewer: John B. South P.E. CPESC
QJ
-> Agency: Hamilton County Soil and Water Conservation District
QJ
~ Address: 1108 South 9th Street
; City: Noblesville
~ Phone: 317-773-2181
Assisted By:
FAX:
State: IN
317-776-1101
Zip: 46060
E-Mail: john-south@iaswcd.org
PLAN IS ADEQlTAl-'E: A comprehensive plan review has been completed and it has been determined that the
plan satisfies the minimum requirements and intent of 327 lAC 15-5.
o Please refer to additional information included on the following page(s).
o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NO! to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NOl A NOI must also be senl to the SWCD,
o A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day
review period. The reviewing authority reserves the right to perform a comprehensive review at a later date and
revisions to the plan may be required at that time to address deficiencies.
o Please refer to additional information included on the following page(s).
D Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NO!. A NOI must also be sent to the Reviewing Authority (e.g. SWCD, DNR).
o PIJA.N IS ])EFI(~IENT: Significant deficiencies were identified during the plan review.
o Please refer to additional information included on the following page(s).
o DO NOT file a Notice of Intent for this project.
o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re-
submitted, and notification has been received that the minimum requirements have been satisfied.
Plan Revisions
Deficient Items should be mailed or delivered to the Principal Plan Reviewer identified
in the Plan Review Section above.
DNR, Division of Soil Conservation
Page 1 of 4
Revised 12/09/03, Form 1
~
e
e
Construction/Stormwater Pollution Prevention Plan - Technical Review and Comment (Form 1)
· ij.f.,\.~t (BI~~~~1'-~~6~i3 .ij;\i';;;f;'.1;SfJ,t1.
Project Name: ~3.,.,.~.:...)wk1f'~':~r~angellne:~1N0aL1.';,RU;t;t~i~~1fg
. '~
Date Reviewed: 10/18/04
The technical review and comments are intended to evaluate the completeness of the Construction/Stormwater Pollution
Prevention Plan for the project. The Plan submitted was not reviewed for the adequacy of the engineering design. All
measures included in the plan, as well as those recommended in the comments should be evaluated as to their feasibility
by a qualified individual with structural measures designed by a qualified engineer. The Plan has not been reviewed
Ifor other local, state, or federal permits that may be required to proceed with this project. Additional information,
including design calculations may be requested to further evaluate the Plan.
All proposed storm water pollution prevention measures and those referenced in this review must meet the design criteria
and standards set forth in the "Indiana Stormwater Quality Manual"from the Indiana Department of Natural
Resources, Division of Soil Conservation or similar Guidance Documents.
Please direct questions and/or comments regarding this plan review to:
John B. South P.E. CPESC
Please refer to the address and contact information identified in the Plan Review Section on page 1.
AsSessment of Construction Plan Elements (Section A)
The Construction Plan Elements are adequately represented to complete a plan review:
o Yes D No
The items checked below are deficient and require submittal to meet the requirements of the rule.
A
D 1 Index showing locations of required Plan Elements
o 2 11 by 17 inch plat showing building lot
numbers/boundaries and road layout/names
D 4 Vicinity map showing project location
D Narrative describing the nature and purpose of the
3 .
project
o Legal Description of the Project Site
5 (Include Latitude and Longitude - NOI Requirement)
D Locations, size and dimensions of proposed stormwater D
19 (. d h
systems e..g. pIpes, swales an c annels)
D " Locations of proposed soil stockpiles and! or
21 borrow! disposal areas
D Proposed final topography at an interval appropriate to
23 . d. d.
In Icate raInage patterns
D 6 Location of all lots and proposed site
improvements (roads, utilities, structures, etc.)
D 8 Notation of any State or Federal water quality
permits
D 9 Specific points where stormwater discharge will leave D Location and name of all wetlands, lakes and
h . 10 d d. h.
t e sIte water courses on an a Jacent to t e sIte
D Identification of potential discharges to ground
12 water (abandoned wells, sinkholes, etc.)
'0 13 100 year floodplains, floodways, and floodway fringes 0 14 pre-kco~struhction and post construction estimate of
Pea DISC arge (1 0 Year storm event)
D 6 Locations and approximate boundaries of all
1 disturbed areas (Construction Limits)
o 8 Soils map including soil descriptions and
1. limitations
20 Plans. for an~ off-~ite co.nstruction activities
assocIated wIth thIS proJ ect (sewer/water tie- ins)
D 22 Existing site topography at an interval appropriate
to indicate drainage patterns
D 7 Hydrologic unit code (14 Digit)
D 11 Identification of all receiving waters
D 15 Adjacent landuse, including upstream watershed
D 17 Identification of existing vegetative cover
DNR, Division of Soil Conservation
Page 2 of 4
Revised 12/09/03, Form 1
e
e
Construction/Stormwater Pollution Prevention Plan - Technical Review and Comment (Form 1)
Project Name: 1301 S. Rangeline Road Building
D.ate Reviewed: 10/18/04
Assessment of Storm water Pollution Prevention Plan (Sections B & C)
~ .~
~ =
::: ~
0'" .. ~
<iJ f-
"t:J ~
~ ~
The construction component of the Stormwater Pollution Prevention Plan includes stormwater quality
measures to address erosion, sedimentation, and other pollutants associated with land disturbance and
construction activities. Proper implementation of the plan and inspections of the construction site are
necessary to minimize the discharge of pollutants. The Project Site Owner should be aware that
unforeseen construction activities and weather conditions may affect the performance of a practice or the
effectiveness of the plan. The plan must be a flexible document, with provisions to modify or substitute
B practices as necessary.
Description of potential pollutant sources associated with construction activities
Sequence describing stormwater quality measure implementation relative to land disturbing
activities
Stable construction entrance locations and specifications (at all points of ingress and egress)
Sediment control measures for sheet flow areas
5 Sediment control measures for concentrated flow areas
6 Storm sewer inlet protection measure locations and specifications
7 Runoff control measures (e.g. diversions, rock check dams, slope drains, etc.)
8 Storm water outlet protection specifications
9 Grade stabilization structure locations and specifications
10 Location, dimensions, specifications, and construction details of each stormwater quality measure
1.1 Temporary surface stabilization methods appropriate for each season (include sequencing)
12 Permanent surface stabilization specifications (include sequencing)
13 Material handling and spill prevention plan
14 Monitoring and maintenance guidelines"for each proposed stormwater quality measure
15 Erosion & sediment control specifications for individual building lots
The post construction component of the Stormwater Pollution Prevention Plan includes the
implementation of stormwater quality measures to address pollutants that will be associated with the
znallanduse. Post construction storm water quality measures should be functional upon completion of
the project. Long term functionality of the measures are critical to their performance and should be
monitored and maintained.
Description of pollutants and their sources associated with the proposed land use
Sequence describing stormwater quality measure implementation
Description of proposed post construction stormwater quality measures
(Include a written description of how these measures will reduce discharge of expected pollutants)
Location, dimensions, specifications, and construction details of each stormwater quality measure
Description of maintenance guidelines for post construction stormwater quality measures
DNR, Division of Soil Conservation
Page 3 of 4
Revised 12/09/03, Form 1
e
e
Construction/Stormwater Pollution Prevention Plan - Technical Review and Comment
Project Name: 1301 S. Rangeline Road Building
Date Reviewed: 10/18/04
A 18- Soil descriptions could include other traits not mentioned like poor bearing strength and moderate frost heave. Your
narrative should include how you plan on overcoming the soil limitations.
B2- A construction sequence is needed.
B6. Strawbales are poor inlet protection and not adequate after the pavement is installed. Consider mulch or stone bags
around the inlets after pavement is establsihed or commercially available practices.
B 11,12,13- Information is needed.
C3,4,5- Show stormwater filter system on the plans and provide details and specifications. Operation and maintenance
plan requires more detail.
cc: Carmel, Surveyor, File
DNR, Division of Soil Conservation
Page 4 of 4
Revised 12/09/03
.
.
Lal1dDevelopment Services,. h,'c~
TRANSMITTAL SHEET
.,~L~'i~:X;~2 ,.~.
TO:
FROM:
Mike DeBoy
DATE:
Department of Community Service
ADDRESS:
One Civic Square
Carme~ IN 46032
OCTOBER 6, 2004
ATTENTION:
Staff
SENDER'S PHONE NUMBER
(317) 770-1801
SENDER'S REFERENCE NUMBER:
2004-0029
RE:
Plans for TAC Review for The Fineberg Group Retail Shops
o URGENT 0 FOR REVIEW
o PLEASE COMMENT 0 PLEASE REPLY
o PLEASE RECYCLE
NOTES/COMMENTS:
Dear Sirs:
Please contact at your convenience with any questions. Thanks in advance.
Yours in Service,
Michael L. DeBoy
SO 1 S OUTI-I 9TH STREET, SUITE 100
NOBLESVILLE, IN 46060
317=770=1801 OFFICE 317=770=1821 FACSIMILE
e
tit
City of: Carmel
VIA FAX: 573-5385
Original by mail
October 1, 2004
E. Davis Coots
Coots, Henke & Wheeler
255 E. Carmel Drive
Carmel, IN 46032
RE: 1301 S Range Line Rd - Commercial Building'(#04090039 DP/ADLS): Development Plan /ADLS Application
Dear Mr. Coots:
This letter is in response to your DP/ADLSApplication for 1301 SRange Line Rd - Commercial Building.
Members at the TAC Meeting will make additional corrnnents on October 20.. Please complete the following
items after you,have received additional comments' at the TAC Meeting. More comments may be delivered to
you during the T AC meeting.
1. lfnot done already, please send copies of the plans to TAC Members for review, by October 5.
2. Please label the existing half road right ,of way for Range Line Rd & Carmel Dr.
3. ProVide a drainage plan.
4. PrQvidean area location map.
5. Please provide 'a photometric (lighting) plan.
6. Please provide lighting cut sheets/detail that show 90-degree cut off and flat lenses.
7. Please show the 'trash enclosure screening/details.
8. Showthe location of (rooftop), mechanical equipment with screening and details.
9. Please 'submit a Findings of Fact form (for the development plan) that came with the application
10. Landscape plan: provide the planting details and the plating legend; work with Scott Brewer, Urban
Forester.
11. Please forWard a copy of Urban Forester's Approval Letter/E-mail for the landscape plan.
12. Provid~ wall sign details (such as materials, colors, returns, illumination, font style) and'maximum
square ,footage fore each sign area.
13. Please show/label buffer yards setbacks, per ~ection 26.04.05: Buffer D (15-ft front yard buffer)
along Range Line & Carmel Dr., Buffer A {5-ft side yard) along south property line, and Buffer A
(S..ft side yard) along the eastproperty line. '
14. Pleas show/label the 25..ft ~nt yard setback, the 10-ft side and rear yard setbacks.
15. Please dedicate necessary road right-of-way to the City (prepare a certificate of dedication which
calls out the half right of way widths, per the A~temative Transportation Plan).
16. Board of Public Works approval will be needed to have landscape encroach in right-of way.
17. Please provid~ pavement/curb details and specs.
18. 'Provide a site plan showing/labeling the utility main locations.
, 19. Show drive thru canopy on the site plan.
20. Provide a diagram to illustrate truck tum-arounds on the site..
Page 1
ONE CIVIC SQUARE
CAR11EL, INDIANA 46032
317/571-2417
;~;
e
e
21. ' Provide a color building elevation with dimensions and label materials.
22. South building elevation: why is the design broken up with the massive bricked area?
23. Awnings: show a rendering/detail of.
24. Provide drive-thru details, such as ATM renderings and car stacking diagram.
25. Feel free to bring color/material' samples to tlje PI8:n Commission meeting.
26. See sign'ordinance for address number size (Chart C of Chapter 25,.07).
27. Sign size is based on tenant frontage and distance from the proposed road right of way; please
provide the allowed sign square footage for each tenant. (See Chart A of the Sign Ordinance,
Chapter 25.07).
28. Development Standards Variance approvals (through the BZA) will be needed for:
a. Reduction.ofbuffer yard setbacks
b. Reduction affront building setbacks
29. T~e Department requests the provision of cross access from your site to the parcel to the south.
If you have any questions, please feel free to call Jon Dobosiewicz or me.
Sincerely,
.An~~
Angelina (Butler) Conn
Planning Administrator
1301 SRangeLine-DP ,ADLS
Page ,2
ONE CIVIC'SQUARE
CARMEL" INDIANA 46032
317/571-2417