HomeMy WebLinkAboutCorrespondence
o f.{1/~(J()I;>" 7 -Ap(J 4~
Construction/Stormwater Pollution Prevention Plan
Technical Review and Comment (Form 1) .
ProJect Name: Parkwood East Building 9 County: Hamilton
Pla'n Submittal Date: 12/22/04 Hydrologic Unit Code: 5120201090050
Project Location Description: 900 E 96th Street
Latitude and Longitude:
Civil T ~ u~:u.... lY Quarter: Section: 12 .. . 17 Ranpe: 3E
=: v r~ 11.'.1
- ...- -0
0
. ,....
.... Project Owner Name: Duke Construction Limited Partnership
~
S Contact: Blair CarIi1osino
::
~ Address: 600E 96th Street, Suite 100
=
~ 46240
~ City: Indianapolis State: IN Zip:
Q
OJ Phone: 317 808-6179 FAX: 317 808-:-6797 E-Mail:
.~
~
~ Plan Prep'arer Name: Gregory Snelling
Affiliation: W oolpert LLP
Address: 7140 Waldemar Drive
'Ci ty: Indianapolis State: IN Zip: 46268
Phone: 317 29.9-7500 FAX: 317 291~5805 E-Mail:
Review Date:.. 12/23/04
:; Principal Plan Reviewer: John B. South P.E. CPESC
.~ Agency: Hamilton County Soil and Water Conservation District
QJ
~ Address: 1108 South 9th Street
; City: Noblesville
s: Phone: 317-773-2181
Assisted By:
FAX:
State: IN
317 -77 6-1101
Zip: 46060
E-Mail: john-south@iaswcd.org
.j PLAN IS ADEQlTAI'E: A comprehensive plan review has been completed and it has been determined that the
plan satisfies the minimum requirements and intent of 327 lAC 15-5.
o Please refer to additional information included on the following page(s).
D Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NOl A NOI must also be sent to the' SWCD,
D A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day
review p'eriod. The revi~wing authority reserves the right to perform a comprehensive review at a later date and
revisions to the plan may be re.quired at that time to address deficiencies.
D Please refer to additional information included on the following page(s).
D Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NOL A NOI must also be sent to the
D PI.JA.N IS Significant deficiencies were identified during the plan review.
D . Please refer to additional information' included on the following page(s).
D DO NOT file a Notice of Intent for this project.
D DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re-
submitted, and notification has been received that the minimum requirements have been satisfied.
Deficient Items should be mailed or delivered to the Principal Plan Reviewer identified
in the Plan Review Section above.
DNR, Division of Soil Conservation
Page 1 of 1
Revised 12/09/03, Form 1
Construction/Storl11water Pollution Prevention Plan - Technical Review and Comment
Project Name: Alexandria of Carmel tfJif/1J}D.:J.O A1>CJ ~~".
Date Reviewe'd:,.. 01/20/05
I have no issues with the ADLS application. The storm water pollution prevention plan is preliminary and lacks details
and supporting information. The developer will need to submit a completed plan to comply with Rule 5.
cc: Canilel, Surveyor, File
DNR, Division oj SoU. Conservation
Page 1 of 1
Revised 12/09/03
EL
C1
]A1\11ES BRAINARD, Mt\YOR
November 22,2004
Mr. Blair D. Carmosino
Duke Construction
600 E. 96th Street, Suite 100
Indianapolis, IN 46240
RE: Building 9 - Park,vood Crossing East
Dear Mr. Carmosino,
The City has received the two sets of drawings you submitted for the above referenced
project. The only request that we have is that the right-of-way be labeled.
If you agree \vi.th our comment, please make the revision and submit five copies for
approval and \\le \-viII approve the dra\vings.
If you have questio~s, please contact me at 571-2441.
Cc: Jon Dobosiewicz, Department of Community Services
Proj ect File
Engineering Department Revie\v
DEPARTwlENT OF ENGINEERING
ONE CIVIC SQUARE, CARMEL, IN 46032 OFFICE 317.571.2441 FAX 317.571.2439
Elv1AIL e ngi nee ring@ei. earn1 e 1. in. us
November 19, 2004
Mr. Blair D. Carmosino, P.E.
Duke Construction'
600 E.. 96th Street, Suite 1100
Indianapolis, IN 46240
RE: 900 E. 96th Street - Parkwood EAST Building 9
Dear Mr. Carmosino:
I have. received and reviewed the documents for the above mentioned
project.
At the present time, I see nothing in the plans that would hamper law
enforcement efforts.
If we can be of any further assistance to you, please contact us.
Sincerely,
~b~c44
Michael D. Fogarty
Chief of Police
MDF:vb
cc:v6ept. of Community Services
Agency
(317) 571-2500
A Nationally Accredit
Fax (317) 571...2512
11/18/2004 16:43
3177769628
HAMILTON CO SURVEYOR
PAGE 01/01
November 18,. 2004
Suiff' 7 &tf\
()Ilt' J(amJ'lfon C01rl1~} ...'quart'
..'''/Vob'r.s1Jillt:j 1 naia 1111 4 (;0 L~(J-.2:1J t")
Duke Constnlction Limited ,Partnership
A TTN: Blair Cannosino
600 East 96th Street, Suite 100
Indianapolis, IN 46240
VIA FACSIMILE: 808-6797
~"" ~t.
t\Ql,
" ).. ~
000
~\
o
Re: Nine Parlavood - Par-kwood Crossing :East
Dear Mr. Carlnosino;
We llave reviewed the construction plarls subn1itted to the HaJnilton Cowlty Stttveyor"s Office on
November 17, 2004 for this project and have the following comments;
l. This project falls "vithin the jurisdiction of the City of Cat.Ole!.
2~ This proposed project DO.ES NOT t11.11 in a Cannel Watershed Protection. Area.
3.. This project doe~ n,ot fall in ~ regulated drain watershed and this office will have no
Jurisdiction on this project.
4. Piease direct aU future storm sewer questions to the City of Cannel Engineering Department
5. Please note the add] tional C<Hll1nents n1ay be warranted at a later date.
Should you have any quest1ons, I can be reached. at 3 17-776-8495.
S111cerely,
'h :, ·
~~
Greg Hoyes
Plan Reviewer
Cc: Jon Dobosjew,icz ..... Cat"111cI DC)(;j)
John South - I{CSW(~D
Dick Hill- Carlnel Engh1cering
Constructio.n/Stormwater Pollution Prevention' Plan
_Technical Review and Comment (Form 1)
Project Name: Pa~kwood.East Building"9 .
Plan Submittal Datef 11/17/04
Project Location Description: 900 E 96th Street
Latitude and Longitude:
County: Hamilton
Hydro~ogic Unit Code: 5120201090050
=
o.
. ,....
~ Owner Name: Duke
~ Contact: Blair Carmosino.
~ Address: 600 E 96th Street, Suite 100
~
~ City: Indianapolis
.~ Phone: 317 808-6179
~
~
Quarter:
Section:
12
3E
Limited Partnership
FAX:
State: IN
317 808-6797
Zip: 46240
E-Mail:
Plan Preparer'N ame: Gregory Snelling
Affiliation: W oolpert LLP
Address: 7140 Waldemar Drive
City: Indianapo~is
Phone: 317 299-7500
FAX:
State: IN
317 291-5805
Zip: 46268
E-Majl:
Review Date: 11/22/04
:; Principal Plan Reviewer: John B. South P.E. CPESC
~
.~ Agency: Hamilton Coun~ Soil and Water Conservati.on District
QJ
~ Address: 1108 South 9th Street
; City: Noblesville
~ Phone: 317-773-2181
Assisted By:
FAX:
State: IN
317 -77 6-1101
Zip: 46060
E-Mail:. john-south@iaswcd.org
PLAN IS ADEQllAl'E: A comprehensive plan review has been completed and it has been determined that the
plan satisfies the minimum requirements and intent of 327 lAC 15-5.
o Please refer to additional information included on the "following page(s).
o Submit Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Department of Environmental Management. Construction activities may begin 48 hours following the submittal of
the NO!. A NOI must also be sent to the SWCD,
o A preliminary plan review has been completed; a comprehensive review will not be completed within the 28-day
review period.' The reviewing authority reserves the right to perform a comprehensive review at a later date and
revisions to the plan may be required. at that time to address deficiencies.
o Please refer to additional information included on the following page(s).
o Submit-Notice of Intent (NOI): Attach a copy of this cover page when submitting the NOI to the Indiana
Departm~nt-ofF;nvironmental Management. Construction activities may begin 48 hours following the submittal of
the NO!. A NOI also be sen't to the
o PI.JAN IS DEFICIENT: Significant deficiencies were identified during the plan review.
o Please refer to additional information included on the following page(s).
0DO NOT file a Notice of Intent for this project.
o DO NOT commence land disturbing activities until all deficiencies are adequately addressed, the plan re-
'submitted, and notification has been received that the minimum requirements have been satisfied.
Plan Revisions
Deficient Items should be mailed or delivered ~o the Principal Plan Reviewer identified
jn the Plan Review Section above.
DNR, Division of Soil Conservation
Page 1 of 1 .
Revised 12/09/03, Form 1
Date: 11/16/2004
Blair D. Carmosino
Development Services
Duke Realty Corpqration
600 E. 96th Street
Suite J 00
Indianapolis, IN 46240
PH: 3 J 7-808-6 J 79 Fax 808-6797
blair. Carmosino@dukerealty.com
cel ~ ST~ \J CTH)N
Memo
To: T AC Committee Members
Cc: Jon Dobosiewicz, Charlie Frankenberger, Larry Richardson, Jeff Kendall, file
From: Blair D. Carmosino
HE: 900 E. 96th Street - Parkwood EAST Building 9
Please find enclosed construction documents for the above referenced project submitted for your
review and comment. This particular project is being sent to you for your information since it was
previously approved through Carmel TAC on December 19, 2001 as ADLS Docket No. 155-01 -
Parkwood Crossing East (College Hills PUD).
This particular building was included with the above referenced petition and was formally approved by
Carmel Planning Commission at their regularly scheduled meeting of February 19th, 2002.
The initial building of this petition, Bldg. 8 - 800 E. 9ffh Street, was constructed in 2002. It is our desire
to proceed with the construction of the second building of this petition at this time.
Upon review of the enclosed plans, you will find we have adhered to the original design and intent as
approved by Carmel Planning Commission. The original building improved most of the site so that this
construction will involve minor storm sewer improvement to drainage the parking areas to be
constructed and connect to the previ ously constructed storm water management system. There is no
main line sewer or water main construction with this construction and the building pad for this facility
was constructed with the initial building construction.
Should you have any questions, comments or concerns, please direct all correspondences to my
attention at the address listed above. We would ask that any comments be submitted on or before
December 1st, 2004. This project will not be on a regularly schedule TAC agenda since it has already
been approved.
Thank you
Attachments
11/16/2004