HomeMy WebLinkAboutC200-Site Development Plan-C2006
7
2
(
3
3
(
/
:
(
5
7
+
$
/
:
$
<
6
2
1
(
D
V
W
W
K
6
W
U
H
H
W
)
L
V
K
H
U
V
,
1
SK
R
Q
H
I
D
[
Know what's
R
&
2
+
6
'
5
)
'
'
1
65 4
2
4
6
'
9
.'
&
'
*
8#
&+4
,
#&0+0#+''
)0+
4
'01+.#05
(
'
2
4
1
56#6'1(
5
STORM SEWER FOR THIS PROJECT WILL BE PUBLIC.
ALL STORM SEWERS WITHIN PUBLIC
RIGHT-OF-WAY SHALL BE RCP CLASS III.
FLOOD STATEMENT
THIS SITE DOES NOT LIE WITHIN A
FLOODWAY OR FLOOD PLAIN PER FIRM
MAP 18057CO205F DATED FEB 19, 2003.
VEGETATIVE COVER
EXISTING SITE CONSIST MOSTLY OF
GRASS AND WEEDS WITH WOODS ON
THE SITE.
ADJACENT PROPERTIES
NORTH: RESIDENTIAL
EAST: RESIDENTIAL
SOUTH: RESIDENTIAL
WEST: RESIDENTIAL
NOTES TO CONTRACTOR:
ALL PADS SHOULD BE TESTED TO ASSURE A COMPACTION OF AT
LEAST 95 PERCENT OF THE MAXIMUM DRY DENSITY USING THE
STANDARD PROCTOR TEST METHOD.
ANY PRIVATE TILES LOCATED ON THIS SITE WILL NEED TO BE
LOCATED; BREATHERS SET AT THE DOWNSTREAM PROPERTY LINE
AND CRUSHED OR REMOVED ACROSS THIS SITE. IF ANY OF THESE
TILES EXTEND BEYOND THE LIMITS OF THIS PROJECT, THEY WILL
NEED TO BE PROVIDED A POSITIVE OUTLET AND ALLOWED TO
CONTINUE TO FUNCTION, AS IT IS ILLEGAL TO BLOCK OFF A PRIVATE
"MUTUAL" TILE.
CONTRACTOR SHALL VERIFY DEPTHS OF ALL EXISTING ONSITE
UTILITIES PRIOR TO CONSTRUCTION TO CONFIRM THERE IS NOT ANY
CONFLICTS WITH OTHER UTILITIES, STORM SEWERS OR STREETS.
CONFLICTS AFTER CONSTRUCTION BEGINS ARE SOLELY THE
CONTRACTOR'S RESPONSIBILITY.
CONTRACTOR SHALL CONTACT THE DEPARTMENT OF ENGINEERING
TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE
DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF
NOTIFICATION REQUIREMENTS, REQUIRED INSPECTIONS FOR
CERTAIN STAGES OF WORK TO REVIEW THE AUTHORITY OF THE
DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND
PROPOSED CITY R/W.
EXISTING PAVEMENT TO BE SAW CUT TO A CLEAN EDGE ADJACENT
TO ANY WIDENING, AUXILIARY LANES, ETC.
NO EARTH DISTURBING ACTIVITY MAY TAKE PLACE WITHOUT AN
APPROVED STORM WATER MANAGEMENT PERMIT.
THERE IS TO BE NO DRIVEWAY ENCROACHMENTS INTO EASEMENTS
BETWEEN LOTS.
UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE
RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS
REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH
PROPOSED DEVELOPMENT SHALL BE THE RESPONSIBILITY OF THE
DEVELOPER TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES
REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED
RIGHT-OF-WAY LINE.
744.7
EXISTING CONTOUR
EXISTING SANITARY SEWER
EXISTING STORM SEWER
PROPOSED GRADE
PROPOSED CONTOUR
PROPOSED SANITARY SEWER
PROPOSED STORM SEWER
PROPOSED WATER LINE
PROPOSED SWALE
PROPOSED 5' SIDEWALK (BY HOME BUILDER)
(DEVELOPER SHALL INSTALL SIDEWALKS ALONG ALL COMMON AREAS)
LOT NUMBER
PAD ELEVATION
PROPOSED 6" DUAL WALL HANCOR HI-Q TYPE 4
UNDERDRAINS
MIN. FINISH FLOOR ELEV. IS BASED OFF OF THE BELOW
CRITERIA, WHICHEVER IS HIGHER:
1. (1) FOOT ABOVE THE NEAREST UPSTREAM
OR DOWNSTREAM SANITARY MANHOLE
WHICH EVER IS LOWEST.
2. 15" (1.25') ABOVE THE ROAD ELEVATION
3. 6" (0.5') ABOVE THE M.L.A.G
MINIMUM FLOOD PROTECTION GRADE
MINIMUM LOWEST ADJACENT GRADE
LEGEND
RISER TC
6" DUAL WALL,
HANCOR HI-Q
TYPE 4 SSD
4" SSD TO LOT
CONSTRUCTION LIMITS
VOLUME DETENTION REQUIRED
LAKE #1 =IWñ
LAKE #2 =IWñ
VOLUME DETENTION PROVIDED
LAKE #1 =IWñ
LAKE #2 =IWñ
LAKE #1 OFFSITE DRAINAGE:
100 YR. cfs = 14.479 (PER VOWC
SEC 6001 DRAINAGE REPORT)
LAKE #2 OFFSITE DRAINAGE:
THERE IS NO OFFSITE TO LAKE #2
PRE DEVELOPED ONSITE ACREAGE
OUTLET 1 =18.18
OUTLET 2 =14.38
POST DEVELOPED ONSITE ACREAGE
LAKE #1 =16.93
LAKE #2 =15.56
DRAINAGE SUMMARY
29(5$//6,7($&5($*( $&
6(&7,21& $&
ALLOWABLE RATE CALCULATION:
0.1 cfs/acre = 10-yr 0.24 cfs/acre = 100-yr
Restricted rates based on the J.W. Brendle Drain
RELEASE RATE (WITH 8" ORIFICE)
LAKE #1 10 YR.100 YR.
ALLOWABLE 1.818cfs 4.363cfs
POST DEV.1.806cfs 4.302cfs
RELEASE RATE (WITH 7" ORIFICE)
LAKE #2
ALLOWABLE 1.438cfs 3.451cfs
POST DEV.1.403cfs 3.428cfs
EARTHWORK:
1. EXCAVATION
A. Excavated material that is suitable may be used for fills. All unsuitable material and
all surplus excavated material not required shall be removed from the site.
B. Provide and place any additional fill material from offsite as may be necessary to
produce the grades required on plans. Fill obtained from offsite shall be of quality as
specified for fills herein and the source approved by the Developer. It will be the
responsibility of the Contractor for any costs for fill needed.
2. REMOVAL OF TREES
A. All trees and stumps shall be removed from areas to be occupied by a road surface or
structure area. Trees and stumps shall not be buried on site.
3. PROTECTION OF TREES
A. The Contractor shall, at the direction of the Developer, endeavor to save and protect
trees of value and worth which do not impair construction of improvements as designed.
B. In the event cut or fill exceeds 0.5 foot over the root area, the Developer shall be
consulted with respect to protective measure to be taken, if any, to preserve such trees.
4. REMOVAL OF TOPSOIL
A. All topsoil shall be removed from all areas beneath future pavements or building.
Topsoil removal shall be to a minimum depth of 6 inches or to the depth indicated in the
geotechnical report provided by the Developer to be excavated or filled. Topsoil should
be stored at a location where it will not interfere with construction operations. The
topsoil shall be free of debris and stones.
5. UTILITIES
A. Rules and regulation governing the respective utility shall be observed in executing all
work under this section.
B. It shall be the responsibility of the Contractor to determine the location of existing
underground utilities 2 working days prior to commencing work. For utility locations to
be marked call Toll Free 1-800-382-5544 within Indiana or 1-800-428-5200 outside
Indiana.
6. SITE GRADING
A. Do all cutting, filling, compacting of fills and rough grading required to bring entire
project area to subgrade as shown on the drawing.
B. The tolerance for paved areas shall not exceed 0.05 feet above established subgrade.
All other areas shall not exceed 0.05 feet plus or minus the established grade. Provide
roundings at top and bottom of banks and other breaks in grade.
C. The Engineer shall be notified when the Contractor has reached the tolerance as stated
above, so that field measurements and spot elevations can be verified by the Engineer.
The Contractor shall not remove his equipment from the site until the Engineer has
verified that the job meets the above tolerance.
FORM\EARTHWRK
FOR WATER LOCATES
CONTACT: CARMEL UTILITIES
(317) 571-2648
FOR SANITARY SEWER LOCATES
CONTACT: CLAY TOWNSHIP
REGIONAL WASTE DISTRICT
(317) 844-9200
EXISTING TREES
EXISTING TREE LINE
S:
\
5
5
9
6
0
P
U
L
-
S
3
\
D
W
G
\
C
2
0
0
-
S
i
t
e
D
e
v
e
l
o
p
m
e
n
t
P
l
a
n
.
d
w
g
,
8
/
2
/
2
0
1
3
8
:
2
2
:
5
7
A
M
,
K
G
i
l
s
o
n
,
1
:
1