5
ALL WATERMAIN SERVICE LINES TO TERMINATE 5
FEET BEHIND SIDEWALK AND MARKED WITH A 4"
PVC PIPE WITH A PAINTED BLUE TOP.
POSI-CAPS OR EQUIVALENT IS REQUIRED ON ALL
WATER VALVE INSTALLATION AND MEGA LUGS
MUST BE INSTALLED AT ALL MECHANICAL
JOINTS.
ALL DUCTILE IRON WATERMAINS SHALL BE
BEDDED IN SAND, FROM THE BOTTOM OF THE
TRENCH TO 12" ABOVE THE PIPE
INSTALL WATERMAIN TRACER WIRE WITH ALL
WATER MAINS LAID AND BLUE REFLECTOR TAPE
MUST BE INSTALLED 12" TO 18" ABOVE ALL
WATERMAINS LAID,
ALL WATERMAINS SHALL BE DUCTILE IRON AND
INSTALLED PER THE CITY OF CARMEL
SPECIFICATIONS
FULL DEPTH GRANULAR BACKFILL PER CITY
STANDARDS SHALL BE PLACED FOR ALL STREET
CROSSINGS
FIRE HYDRANT MARKERS TO BE INSTALLED IN
THE STREET PAVEMENT PERPENDICULAR TO THE
FIRE HYDRANT.
ONLY MUELLER HYDRANTS AND VALVES MAY BE
USED.
PROPOSED HYDRANT
W/6" VALVE
VALVE
BLOW OFF ASSEMBLY
REDUCER
EX. WATER METER
EX. WATER VALVE
EX. FIRE HYDRANT
LEGEND
CONSTRUCTION LIMITS
NOTES:
NO EARTH DISTURBING ACTIVITIES MAY TAKE
PLACE WITHOUT AN APPROVED STORM WATER
MANAGEMENT PERMIT.
FOR INSTALLATION OF STORM, SANITARY, AND
WATER UNDER CITY STREETS AND COVER
REQUIREMENTS, SEE SHEET No. C700 ON THE
TRENCH DETAIL.
THERE ARE TO BE NO WATER VALVES OR
MANHOLES WITHIN THE PAVEMENT, CURB, OR
SIDEWALK WITH THE EXCEPTION OF CURB INLETS.
SEE SHEET C700 FOR WATER DETAILS
S:
\
5
5
9
6
0
P
U
L
-
S
3
\
D
W
G
\
C
7