Loading...
HomeMy WebLinkAbout34-96.7N M L K J H G F E L C L I1 4 t t 1 , 2 I 3 I tt 4 1 5 1 6 1 7 41/m i TOP SOIL 1 10 iv 14� LOW POINT TOP OF `n CURB o III .4%' - :.:.� .... ...: iv II EARTH I II co Cn ' BACKFILL ± - O • p •O•0••0 • •O • O •O • 0. °0 • o •OY• p ° o °O.o O•o• •o•o•o °O•o °O•o °o• #53 COMPACTED -" •" •" -.0- •0.0.0.O °0.O' °�•` °�• °�• . • STONE BASE �•�•� 0• e0 �•� �• °•�• ° ° . e e e0• e0• 0• 0• e J3- 6" 2' -0" 2' CONCRETE ROLL CURB & GUTTER ol~ 4 al~ o at � tt 4 1 5 1 6 1 7 I $ i 9 1 10 3" OF TOP', EARTH BACKFILL #53 COMPACTED STONE BASE- I 1 PREPARED SUBGRADE R/W LINE TYPICAL SIDEWALK SECTION NOT TO SCALE THE SPACE BEHIND THE CURB SHALL BE FILLED WITH SUITABLE MATERIAL TO THE REQUIRED ELEVATION AND COMPACTED IN LAYERS NOT TO EXCEED 6" IN DEPTH. SUBGRADE UNDER ALL CURB, SIDEWALK, AND DRIVES SHALL BE COMPACTED IN ACCORDANCE WITH SECTION 207.02 OF THE STANDARD SPECIFICATIONS. X31 (n lb -Z °i �'' O- Z N� Z 6' -0" BETWEEN Z it TRANSVERSE JOINTS -0" BETWEEN EXPANSION JOINTS (MAX. CONCRETE SIDEWALK NOT TO SCALE SIDEWALK DETAIL Z .- ••e -.. e• •- e•e- ..•- w *e- ...- e•e- e•e -e•e -. . e •.e e. e.e e.e e.e e.e'�4 a e.e e.e e.e e e •••e•O• •O•e•O•e•e•e•O ••O•e•I•••e•e•O•• O •• •• O•• O•e ••• e•e ••• O • O•e O•e O•• °•• e• 2' CONCRETE CHAIRBACK CURB (WITHOUT GUTTER) CONCRETE CURB TAPERED DOWN TO GRADE AT RAMP 6' -0" ! A 1.1:10 4' -Dw 1:10 `SLOPE SLOPE PLAN VIEW Flow LINE TT'HRRUU RAMP MAINTAIN GUTTER FLOW LINE THRU RAMP MAX. 1:12 PAVEMENT - - - - - - - 2' CONC. ROLL CURB SECTION A -A WHEELCHAIR RAMP DETAIL 50' RIGHT OF WAY 10' *30' BACK TO BACK 10' 12' 26' BACK TO BACK 12' 1' 4' 5' 2' *13' 13' 2' 5'* 4' 1' 7' 11' 11' 7' CONC. 2' ROLL CURB PROFILE GRADE 2' ROLL CURB CONC. WALK SLOPE 1 /4" PER FOOT MIN I SLOPE 1/4" PER FOOT MIN WALK '�:' _ • i i• i i i ij i• i• H i• ih, •N •i• •i• •i• �i• Y �i• �i• •i• •i• �i• •i• ji• 'Y ji• •i i j j : • : j : • •i' •i' •i• •i• •i• :i• •i• •i• •i• �i• �i'•�i• ;i• �i• •i• •i •i i• ij .i..i.:i..i..i..i.. ... . ...... .. . . ... . . . .i..i. Si.:i.._. •i• •ij PERTAINS TO 30' STREET 1" #11 HAC SURFACE 3" #9 HAC BINDER PIPE UNDERDRAIN (TYP) • PREPARED SUBGRADE PER INDIANA DEPARTMENT SEE DETAIL 9" #53 COMPACTED STONE BASE OF TRANSPORTATION SPECS. No. 707 TYPICAL STREET SECTION 90' RIGHT OF WAY 13' 17' r . . 1' 4' g' 22 16 22 8 8 1 CONC. 2, 2, ISLAND 2' 0 ASPHALT PATH WALK 2' CHAIRBACK CURB 2' CHAIRBACK CURB k SLOPE 1/4* PER FOOT MIN ` r` SLOPE 1/4* PER FOOT MIN �. .• \� 1" HAC SURFACE �- 3" HAC BINDER 9" COMPACTED STONE BASE PIPE UNDERDRAIN (TYP) SEE DETAIL • PREPARED SUBGRADE PER INDIANA DEPARTMENT OF TRANSPORTATION SPECS. No. 207 TYPICAL STREET SECTION AT ENTRANCE OF RIVER ROAD DRAINAGE, UTILITY & SEWER ESMT D 0 PROPOSED FINISHED GRADE ELEVATIONS AT BACK - - - - - CORNERS (VARIES) I M I I NO N I I ( DRAINAGE, UTILITY & SEWER ESMT I o o I PROPOSED SIDE YARD ELEV VARIES FROM 5.0% 0 21.0 %) I o 0 Z I I I MIN PAD ELEV & I FIN GRADE ELEV AT BLDG) DRAINAGE, UTILITY I I BUILDING LINE NOTE: & SEWER ESMT I I ADDITIONAL 8' OF DRIVE WAY SPACE REQUIRED FOR UNITS WITH MORE THAN 3 BEDROOMS. Ib °im I PROPOSED FINISHED GRADE e ELEVATIONS AT FRONT I o z R/W LINE CORNERS (VARIES) N 2 SIDEWALK � BACK OF CURB CL THE LOCATION OF HOUSE (DEPICTED BY RECTANGLES) AND THE "FINISH GROUND GRADE" CONNECTED THERETO, ARE INTENDED AS GUIDE -LINES ONLY, SHOWING HOW EACH LOT MAY BE GRADED TO DRAIN EFFECTIVELY. THE FINISH GROUND GRADE SHOULD HOWEVER, BE TREATED AS A MINIMUM ELEVATION, AND THE SAME DRAINAGE PATTERN SHOULD BE MAINTAINED BUT ADAPTED TO THE PARTICULAR HOUSE SELECTED FOR EACH LOT. TYPICAL LOT 1 2 3 4 5 D GRADE (NEW OR EXISTING)\ Wheat or Rye Oats Annual Ryegross Non - Irrigated* Irrigated Dormant Seeding ** VARIES TYPICAL SWALE SECTION Temporary Seeding Dates GRADE VEW OR EXISTING) MCImo0mva2. 212a Permanent Seeding Irrigation needed during this period. To control erosion at times other than In the shaded areas, use mulch. * Late summer seeding dates may be extended 5 days If mulch is applied. ** Increase seeding application by 50R FIGURE 5 -3 - Temporary Seedings - Kind of Seed 1000 Sq. Ft- Acre Remarks - Wheat or Rye 3.5 lbs. 2 bu. Cover seed 1" to 1 1/2" deep Spring Oats 2.3 lbs. 3 bu. Cover seed 1" deep Annual ryegrass 1 lb. 40 lbs. Cover seed 1/4 "deep* * Not necessary where mulch is applied. 2 stakes (typ) per bale bindings to be placed parallel to ground flow ,straw bale Plan (n.t.s.) stake (typ) straw bale 3 " -6 "undertoe Profile (n.t.s.) SEDIMENT FILTER DETAIL 1. 3-BEDROOM UNITS SHALL HAVE 2- ONSiTE SPACES PLUS 1/2 AVAILABLE OFFSITE SPACES. 2. 4- BEDROOM UNITS SHALL HAVE 3- ONSITE SPACES PLUS 1/2 AVAILABLE OFFSITE SPACES. PARKING PLAN 7 1 8 t 4 4 11 ( 12 I 13 55 GALLON DRUM 6 -1 "x6" SLOTS TO BE EQUALLY SPACED. to 3 -1 "x6" SLOTS TO BE EQUALLY SPACED. 10 • N (TO BE PLACED OVER ALL BEEHIVE CASTINGS DURING CONSTRUCTION) SLOTTED RISER FOR SEDIMENT RETENTION Seedbed Preparation Apply lime to raise the pH to the level needed for species being seeded. Apply 23 pounds of 12 -12 -12 analysis fertilizer (or equivalent) per 1000 sq. ft. (approximately 1000 pounds per acre) or fertilize according to test. Application of 150 lbs. of ammonium nitrate on areas low in organic matter and fertility will greatly enhance vegetative growth. Work the fertilizer and lime into the soil to a depth of 2 -3 inches with a harrow, disk or rake operated across the slope as much as possible. Seeding Select a seed mixture based on projected use of the area (Figure 5 -2), while considering best seeding dates. See Figure 5-3 this sheet. If toler- ances are a problem, such as salt tolerance of seedings adjacent to streets and highways, see Figure 5 -4 this sheet before final selection. Figure 5 -2: Permanent Seed Mixtures Species Seeding Rate Suitable pH Site Suitability* lbs /acre Ib3/1000 well - sq. ft. Droughty Drained Wet Level and Sloping, Open Areas 1. Tail Fescue 35 .8 5.5 -8.3 2 1 2 2. Tall Fescue 25 .6 5.5 -8.3 1 Red Clover** 5 .12 3. Kentucky Bluegrass 15 .4 5.5 -7.5 2 1 Creeping Red Fescue 15 .4 Steep Banks and Cuts 4. Tall Fescue 15 .4 5.8 -7.5 2 1 2 Kentucky Bluegrass 25 .6 5. Tall Fescue 35 .8 5.5 -8.3 2 1 Emerald Crownvatch** 10 .25 Lawns and High Maintenance Areas 6. Kentucky Bluegrass 40 .9 5.8 -7.5 2 1 Creeping Red Fescue 40 .9 7. Perennial Ryegrass 170 4.0 5.0 -7.5 1 (Turf Type) B. Tall Fescue 170 4.0 5.5 -8.3 2 1 2 * 1 - Preferred 2 - Will Tolerate ** Inoculate with specific Inoculant. i SOIL S a E Salt CONDITION g Elf, f fi 8 Tolerance Wet o Dry +• I- ►- u. z x I- a s Gen. Soil Isproy Creepo..g Red Fescue Festuca rubra 2 1 2 1 1 1 Med. 1 20-25 12 -18 7 -21 S Kentucky Bluegrass 2 1 2 1 1 1 Mad. 1 25 -35 12 -18 10 -20 Poo paratinsis MT Tall Fescue 2 1 1 1 1 1 Low 1 24 -35 24 -36 5 -14 T Festuca L arundinacea Pere�.?iai ryegross 2 1 2 - 1 2 Mod 2 15 -20 12 -18 5 -10 MT Loliurn perenne High Crownvetch - 1 1 2 - - Low 1 5 -10 24 14-21 T Coronilla varia Red Clover - 1 - 2 - - Med 1 7 -10 18 5 -10 S S Trifolium protense Ranking: Salt Tolerance (to both soil salts dk spray): 1 Good T Tolerance 2 Medium MT Medium Tolerance - Not tolerant S Slight Tolerance FIGURE 5 -4 EROSION CONTROL AND SEQUENCING 1 CONTRACTOR SHALL INSTALL ALL REQUIRED SILT 5 PERMANENT AND FINAL VEGETATION OR STRUCTURAL HOLEY HOLEY SAYS FENCES, SILT TRAPS, TREE PROTECTION AND INLET EROSION CONTROL DEVICES SHALL BE INSTALLED AS DONT PROTECTION FOR EXISTING INLETS PRIOR TO THE SOON AS PRACTICAL UNDER THE CIRCUMSTANCES. START OF ANY EARTH MOVING OR STRIPPING. 6 THE DURATION OF TIME WHICH MI AREA REMAINS 2 CONTRACTOR SHALL INSTALL A STONE CONSTRUCTION EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM DIG ENTRANCE OR SOME OTHER DEVICE PRIOR TO THE DEPENDING UPON THE WEATHER. IF CONSTRC11ON START OF EARTHWORK AS NECESSARY TO PREVENT ACTIVITY IS TO CEASE FOR MORE THAN TWO WEEKS, BLIND" SOIL FROM BO SHALL BE TRACKED OR WASHED INTO EXISTING THE DISTURBED AREAS SH BE TEMPORARILY SEEDED. ROADWAYS. 7 ALL STORM SEWER INLET PROTECTION DEVICES SHALL 3 LAND ALTERATIONS WHICH STRIP THE LAND OF BE PUT IN PLACE AT THE TIME EACH INLET IS VEGETATION, INCLUDING REGRADING, SHALL BE DONE. CONSTRUCTED. IN A WAY THAT WILL MINIMIZE EROSION. WHENE`;_'R l FEASIBLE, NATURAL VEGETATION SHALL BE RETA;n: J 8 CONTRACTOR SHALL MAINTAIN EROSION CONTROL AND PROTECTED. AS GRADING IS DONE, INSTALL WLT MEASURES AND DEVICES DURING CONSTRUCTION AND TRAPS, SILT FENCES ,SLOPE DRAINS, TEMPORARY UNTIL SILTATION OF THE STREETS AND STORM SEWERS DIVERSIONS AND OTHER RUNOFF CONTROL MEASURES WILL NO LONGER OCCUR. AT APPROPRIATE LOCATIONS TO KEEP SEDIMENT 9 ONCE ONSITE EROSION AND SILTATION OF THE STREETS CONTAINED ON SITE. AND STORM SEWERS WALL NO LONGER OCCUR, THE 4 ALL DISTURBED AREAS SHALL BE SEEDED AND STRAW CONTRACTOR SHALL REMOVE AND DISPOSE OF THE 1- 800 =$82=6644 MULCHED AS SHOWN ON THE PLANS IMMEDIATEL" TEMPORARY EROSION CONTROL DEVICES CALL TOLL FREE AFTER COMPLETION OF GROUND ACTIVITY. FOR LARGE 10 THESE GENERAL PROCEDURES MAY NOT COVER ALL 1�8OO�4Z8�6ZOO PROJECTS, THIS SEEDING SHOULD BE COMPLETED IN SITUATIONS. REFER TO EROSION CONTROL PLANS FOR PHASES AS THE DIFFERENT AREAS OF THE SITE ARE SPECIFIC NOTES AND ADDITIONAL DETAILS. FOR CALLS OUTSIDE OF INDIANA COMPLETED. PER INDIANA STATE LAW IS-69 -1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORIONG DAYS BEFORE COMMENCING WORK. EROSION CONTROL SCHEDULE EROSION CONTROL MEASURE MAINTENANCE INSTALLATION SEQUENCE STONE ENTRANCE AS NEEDED PRIOR TO CLEARING AND GRADING SILT FENCE WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING EXISTING INLET PROTECTION WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING PROTECTION TREE W%EKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING TEMPORARY DIVERSIONS WEPEKLY AFTER STORM EVENTS AND AS NEEDED ALONG WITH ROUGH GRADING TEMPORARY SEEDING WATER AS NEEDED AFTER ROUGH GRADING PERMANENT SEEDING WATER AS NEEDED AFTER FINISH GRADING EROSION CONTROL MATTING MEEKLY AFTER STORM EVENTS AND AS NEEDED AFTER FINISH GRADING STRAW BALES WEEKLY AFTER STORM EVENTS AND AS NEEDED AFTER FINISH GRADING INLET PROTECTION WEEKLY AFTER STORY EVENTS AND AS NEEDED AFTER EACH INLET IS PLACED SEED, SOD do LANDSCAPE AROUND WATER AS NEEDED AFTER FINISHED GRADING AROUND FINISHED UNITS UNITS I REMOVAL OF STRAW BALES N A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF INLET PROTECTION I N A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF SIT FENCE I N/A AFTER ALL AREAS DRAINING A ARE S A ILL 9 ( 10 I 11 I 12 1 13 14 I 15 I 16 I 17 I 18 r 23 S I S.I 27 2 6 , 1 0 Db 0 i iJl, i '7•. r, :; t,. �. t :t 1 ,p ` . } ..s, ai r .� I�' t• �. LJ Li :ri•'% ••7 _ �M4� . �•1.�M .f 4. ;. x.- {, b ..'ti it �` 1 � _. �, l�y� vy" ��,�!�.• " n . l AREA /ZONING MAP 14 I ._I,. FxC3 J s� vn 15 SOILS MAP 16 - Ro y12.11/ r• cA • 12 -- 17 18 � 4 4 Revisions P n N M L K J H G F E CERTIfiED BY iM ORAWNG AND THE IOM DESIGNS AND OMACfPTS CONTANED 1 301 ARE THE DIMUSK NTEIIECNAL PROPERTY OF SCH EW ENCIiIEW COR M71ON AND ARE NOT TO BE USED OR FEPRODlM N *K LE OR N PART, WiHOUT THE VIM COINWNT OF S"CDER ENGNEFRNG CORPORAii K 01996, Schneider Engineering Corporat'Nxt D &bncid(x e e CO porafiofi 3020 North Post Road Engineering C Indianapolis, Indiana Surveying 46226 -0068 Landscape Architecture 317- 898 -8282 GIS • US 317 -899 -8010 Fax Geology A Partnered Entity with Bohlen, Meyer, Gibson do Associates, Incorporated BRENIIICK DEVEIAPMM CO., INC. kD PRAIRIE VIEW B CAR11iEI, INDIANA id 0 GENERAL DETAILS Date Project No. Drawn Approv. 4 -15 -96 1065 D.T.R. Computer Idles Sheet No. A ,k \100\D*;S \1MDET.DWG a 0 in aF � CD 0 Z o o -0" BETWEEN EXPANSION JOINTS (MAX. CONCRETE SIDEWALK NOT TO SCALE SIDEWALK DETAIL Z .- ••e -.. e• •- e•e- ..•- w *e- ...- e•e- e•e -e•e -. . e •.e e. e.e e.e e.e e.e'�4 a e.e e.e e.e e e •••e•O• •O•e•O•e•e•e•O ••O•e•I•••e•e•O•• O •• •• O•• O•e ••• e•e ••• O • O•e O•e O•• °•• e• 2' CONCRETE CHAIRBACK CURB (WITHOUT GUTTER) CONCRETE CURB TAPERED DOWN TO GRADE AT RAMP 6' -0" ! A 1.1:10 4' -Dw 1:10 `SLOPE SLOPE PLAN VIEW Flow LINE TT'HRRUU RAMP MAINTAIN GUTTER FLOW LINE THRU RAMP MAX. 1:12 PAVEMENT - - - - - - - 2' CONC. ROLL CURB SECTION A -A WHEELCHAIR RAMP DETAIL 50' RIGHT OF WAY 10' *30' BACK TO BACK 10' 12' 26' BACK TO BACK 12' 1' 4' 5' 2' *13' 13' 2' 5'* 4' 1' 7' 11' 11' 7' CONC. 2' ROLL CURB PROFILE GRADE 2' ROLL CURB CONC. WALK SLOPE 1 /4" PER FOOT MIN I SLOPE 1/4" PER FOOT MIN WALK '�:' _ • i i• i i i ij i• i• H i• ih, •N •i• •i• •i• �i• Y �i• �i• •i• •i• �i• •i• ji• 'Y ji• •i i j j : • : j : • •i' •i' •i• •i• •i• :i• •i• •i• •i• �i• �i'•�i• ;i• �i• •i• •i •i i• ij .i..i.:i..i..i..i.. ... . ...... .. . . ... . . . .i..i. Si.:i.._. •i• •ij PERTAINS TO 30' STREET 1" #11 HAC SURFACE 3" #9 HAC BINDER PIPE UNDERDRAIN (TYP) • PREPARED SUBGRADE PER INDIANA DEPARTMENT SEE DETAIL 9" #53 COMPACTED STONE BASE OF TRANSPORTATION SPECS. No. 707 TYPICAL STREET SECTION 90' RIGHT OF WAY 13' 17' r . . 1' 4' g' 22 16 22 8 8 1 CONC. 2, 2, ISLAND 2' 0 ASPHALT PATH WALK 2' CHAIRBACK CURB 2' CHAIRBACK CURB k SLOPE 1/4* PER FOOT MIN ` r` SLOPE 1/4* PER FOOT MIN �. .• \� 1" HAC SURFACE �- 3" HAC BINDER 9" COMPACTED STONE BASE PIPE UNDERDRAIN (TYP) SEE DETAIL • PREPARED SUBGRADE PER INDIANA DEPARTMENT OF TRANSPORTATION SPECS. No. 207 TYPICAL STREET SECTION AT ENTRANCE OF RIVER ROAD DRAINAGE, UTILITY & SEWER ESMT D 0 PROPOSED FINISHED GRADE ELEVATIONS AT BACK - - - - - CORNERS (VARIES) I M I I NO N I I ( DRAINAGE, UTILITY & SEWER ESMT I o o I PROPOSED SIDE YARD ELEV VARIES FROM 5.0% 0 21.0 %) I o 0 Z I I I MIN PAD ELEV & I FIN GRADE ELEV AT BLDG) DRAINAGE, UTILITY I I BUILDING LINE NOTE: & SEWER ESMT I I ADDITIONAL 8' OF DRIVE WAY SPACE REQUIRED FOR UNITS WITH MORE THAN 3 BEDROOMS. Ib °im I PROPOSED FINISHED GRADE e ELEVATIONS AT FRONT I o z R/W LINE CORNERS (VARIES) N 2 SIDEWALK � BACK OF CURB CL THE LOCATION OF HOUSE (DEPICTED BY RECTANGLES) AND THE "FINISH GROUND GRADE" CONNECTED THERETO, ARE INTENDED AS GUIDE -LINES ONLY, SHOWING HOW EACH LOT MAY BE GRADED TO DRAIN EFFECTIVELY. THE FINISH GROUND GRADE SHOULD HOWEVER, BE TREATED AS A MINIMUM ELEVATION, AND THE SAME DRAINAGE PATTERN SHOULD BE MAINTAINED BUT ADAPTED TO THE PARTICULAR HOUSE SELECTED FOR EACH LOT. TYPICAL LOT 1 2 3 4 5 D GRADE (NEW OR EXISTING)\ Wheat or Rye Oats Annual Ryegross Non - Irrigated* Irrigated Dormant Seeding ** VARIES TYPICAL SWALE SECTION Temporary Seeding Dates GRADE VEW OR EXISTING) MCImo0mva2. 212a Permanent Seeding Irrigation needed during this period. To control erosion at times other than In the shaded areas, use mulch. * Late summer seeding dates may be extended 5 days If mulch is applied. ** Increase seeding application by 50R FIGURE 5 -3 - Temporary Seedings - Kind of Seed 1000 Sq. Ft- Acre Remarks - Wheat or Rye 3.5 lbs. 2 bu. Cover seed 1" to 1 1/2" deep Spring Oats 2.3 lbs. 3 bu. Cover seed 1" deep Annual ryegrass 1 lb. 40 lbs. Cover seed 1/4 "deep* * Not necessary where mulch is applied. 2 stakes (typ) per bale bindings to be placed parallel to ground flow ,straw bale Plan (n.t.s.) stake (typ) straw bale 3 " -6 "undertoe Profile (n.t.s.) SEDIMENT FILTER DETAIL 1. 3-BEDROOM UNITS SHALL HAVE 2- ONSiTE SPACES PLUS 1/2 AVAILABLE OFFSITE SPACES. 2. 4- BEDROOM UNITS SHALL HAVE 3- ONSITE SPACES PLUS 1/2 AVAILABLE OFFSITE SPACES. PARKING PLAN 7 1 8 t 4 4 11 ( 12 I 13 55 GALLON DRUM 6 -1 "x6" SLOTS TO BE EQUALLY SPACED. to 3 -1 "x6" SLOTS TO BE EQUALLY SPACED. 10 • N (TO BE PLACED OVER ALL BEEHIVE CASTINGS DURING CONSTRUCTION) SLOTTED RISER FOR SEDIMENT RETENTION Seedbed Preparation Apply lime to raise the pH to the level needed for species being seeded. Apply 23 pounds of 12 -12 -12 analysis fertilizer (or equivalent) per 1000 sq. ft. (approximately 1000 pounds per acre) or fertilize according to test. Application of 150 lbs. of ammonium nitrate on areas low in organic matter and fertility will greatly enhance vegetative growth. Work the fertilizer and lime into the soil to a depth of 2 -3 inches with a harrow, disk or rake operated across the slope as much as possible. Seeding Select a seed mixture based on projected use of the area (Figure 5 -2), while considering best seeding dates. See Figure 5-3 this sheet. If toler- ances are a problem, such as salt tolerance of seedings adjacent to streets and highways, see Figure 5 -4 this sheet before final selection. Figure 5 -2: Permanent Seed Mixtures Species Seeding Rate Suitable pH Site Suitability* lbs /acre Ib3/1000 well - sq. ft. Droughty Drained Wet Level and Sloping, Open Areas 1. Tail Fescue 35 .8 5.5 -8.3 2 1 2 2. Tall Fescue 25 .6 5.5 -8.3 1 Red Clover** 5 .12 3. Kentucky Bluegrass 15 .4 5.5 -7.5 2 1 Creeping Red Fescue 15 .4 Steep Banks and Cuts 4. Tall Fescue 15 .4 5.8 -7.5 2 1 2 Kentucky Bluegrass 25 .6 5. Tall Fescue 35 .8 5.5 -8.3 2 1 Emerald Crownvatch** 10 .25 Lawns and High Maintenance Areas 6. Kentucky Bluegrass 40 .9 5.8 -7.5 2 1 Creeping Red Fescue 40 .9 7. Perennial Ryegrass 170 4.0 5.0 -7.5 1 (Turf Type) B. Tall Fescue 170 4.0 5.5 -8.3 2 1 2 * 1 - Preferred 2 - Will Tolerate ** Inoculate with specific Inoculant. i SOIL S a E Salt CONDITION g Elf, f fi 8 Tolerance Wet o Dry +• I- ►- u. z x I- a s Gen. Soil Isproy Creepo..g Red Fescue Festuca rubra 2 1 2 1 1 1 Med. 1 20-25 12 -18 7 -21 S Kentucky Bluegrass 2 1 2 1 1 1 Mad. 1 25 -35 12 -18 10 -20 Poo paratinsis MT Tall Fescue 2 1 1 1 1 1 Low 1 24 -35 24 -36 5 -14 T Festuca L arundinacea Pere�.?iai ryegross 2 1 2 - 1 2 Mod 2 15 -20 12 -18 5 -10 MT Loliurn perenne High Crownvetch - 1 1 2 - - Low 1 5 -10 24 14-21 T Coronilla varia Red Clover - 1 - 2 - - Med 1 7 -10 18 5 -10 S S Trifolium protense Ranking: Salt Tolerance (to both soil salts dk spray): 1 Good T Tolerance 2 Medium MT Medium Tolerance - Not tolerant S Slight Tolerance FIGURE 5 -4 EROSION CONTROL AND SEQUENCING 1 CONTRACTOR SHALL INSTALL ALL REQUIRED SILT 5 PERMANENT AND FINAL VEGETATION OR STRUCTURAL HOLEY HOLEY SAYS FENCES, SILT TRAPS, TREE PROTECTION AND INLET EROSION CONTROL DEVICES SHALL BE INSTALLED AS DONT PROTECTION FOR EXISTING INLETS PRIOR TO THE SOON AS PRACTICAL UNDER THE CIRCUMSTANCES. START OF ANY EARTH MOVING OR STRIPPING. 6 THE DURATION OF TIME WHICH MI AREA REMAINS 2 CONTRACTOR SHALL INSTALL A STONE CONSTRUCTION EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM DIG ENTRANCE OR SOME OTHER DEVICE PRIOR TO THE DEPENDING UPON THE WEATHER. IF CONSTRC11ON START OF EARTHWORK AS NECESSARY TO PREVENT ACTIVITY IS TO CEASE FOR MORE THAN TWO WEEKS, BLIND" SOIL FROM BO SHALL BE TRACKED OR WASHED INTO EXISTING THE DISTURBED AREAS SH BE TEMPORARILY SEEDED. ROADWAYS. 7 ALL STORM SEWER INLET PROTECTION DEVICES SHALL 3 LAND ALTERATIONS WHICH STRIP THE LAND OF BE PUT IN PLACE AT THE TIME EACH INLET IS VEGETATION, INCLUDING REGRADING, SHALL BE DONE. CONSTRUCTED. IN A WAY THAT WILL MINIMIZE EROSION. WHENE`;_'R l FEASIBLE, NATURAL VEGETATION SHALL BE RETA;n: J 8 CONTRACTOR SHALL MAINTAIN EROSION CONTROL AND PROTECTED. AS GRADING IS DONE, INSTALL WLT MEASURES AND DEVICES DURING CONSTRUCTION AND TRAPS, SILT FENCES ,SLOPE DRAINS, TEMPORARY UNTIL SILTATION OF THE STREETS AND STORM SEWERS DIVERSIONS AND OTHER RUNOFF CONTROL MEASURES WILL NO LONGER OCCUR. AT APPROPRIATE LOCATIONS TO KEEP SEDIMENT 9 ONCE ONSITE EROSION AND SILTATION OF THE STREETS CONTAINED ON SITE. AND STORM SEWERS WALL NO LONGER OCCUR, THE 4 ALL DISTURBED AREAS SHALL BE SEEDED AND STRAW CONTRACTOR SHALL REMOVE AND DISPOSE OF THE 1- 800 =$82=6644 MULCHED AS SHOWN ON THE PLANS IMMEDIATEL" TEMPORARY EROSION CONTROL DEVICES CALL TOLL FREE AFTER COMPLETION OF GROUND ACTIVITY. FOR LARGE 10 THESE GENERAL PROCEDURES MAY NOT COVER ALL 1�8OO�4Z8�6ZOO PROJECTS, THIS SEEDING SHOULD BE COMPLETED IN SITUATIONS. REFER TO EROSION CONTROL PLANS FOR PHASES AS THE DIFFERENT AREAS OF THE SITE ARE SPECIFIC NOTES AND ADDITIONAL DETAILS. FOR CALLS OUTSIDE OF INDIANA COMPLETED. PER INDIANA STATE LAW IS-69 -1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORIONG DAYS BEFORE COMMENCING WORK. EROSION CONTROL SCHEDULE EROSION CONTROL MEASURE MAINTENANCE INSTALLATION SEQUENCE STONE ENTRANCE AS NEEDED PRIOR TO CLEARING AND GRADING SILT FENCE WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING EXISTING INLET PROTECTION WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING PROTECTION TREE W%EKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING TEMPORARY DIVERSIONS WEPEKLY AFTER STORM EVENTS AND AS NEEDED ALONG WITH ROUGH GRADING TEMPORARY SEEDING WATER AS NEEDED AFTER ROUGH GRADING PERMANENT SEEDING WATER AS NEEDED AFTER FINISH GRADING EROSION CONTROL MATTING MEEKLY AFTER STORM EVENTS AND AS NEEDED AFTER FINISH GRADING STRAW BALES WEEKLY AFTER STORM EVENTS AND AS NEEDED AFTER FINISH GRADING INLET PROTECTION WEEKLY AFTER STORY EVENTS AND AS NEEDED AFTER EACH INLET IS PLACED SEED, SOD do LANDSCAPE AROUND WATER AS NEEDED AFTER FINISHED GRADING AROUND FINISHED UNITS UNITS I REMOVAL OF STRAW BALES N A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF INLET PROTECTION I N A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF SIT FENCE I N/A AFTER ALL AREAS DRAINING A ARE S A ILL 9 ( 10 I 11 I 12 1 13 14 I 15 I 16 I 17 I 18 r 23 S I S.I 27 2 6 , 1 0 Db 0 i iJl, i '7•. r, :; t,. �. t :t 1 ,p ` . } ..s, ai r .� I�' t• �. LJ Li :ri•'% ••7 _ �M4� . �•1.�M .f 4. ;. x.- {, b ..'ti it �` 1 � _. �, l�y� vy" ��,�!�.• " n . l AREA /ZONING MAP 14 I ._I,. FxC3 J s� vn 15 SOILS MAP 16 - Ro y12.11/ r• cA • 12 -- 17 18 � 4 4 Revisions P n N M L K J H G F E CERTIfiED BY iM ORAWNG AND THE IOM DESIGNS AND OMACfPTS CONTANED 1 301 ARE THE DIMUSK NTEIIECNAL PROPERTY OF SCH EW ENCIiIEW COR M71ON AND ARE NOT TO BE USED OR FEPRODlM N *K LE OR N PART, WiHOUT THE VIM COINWNT OF S"CDER ENGNEFRNG CORPORAii K 01996, Schneider Engineering Corporat'Nxt D &bncid(x e e CO porafiofi 3020 North Post Road Engineering C Indianapolis, Indiana Surveying 46226 -0068 Landscape Architecture 317- 898 -8282 GIS • US 317 -899 -8010 Fax Geology A Partnered Entity with Bohlen, Meyer, Gibson do Associates, Incorporated BRENIIICK DEVEIAPMM CO., INC. kD PRAIRIE VIEW B CAR11iEI, INDIANA id 0 GENERAL DETAILS Date Project No. Drawn Approv. 4 -15 -96 1065 D.T.R. Computer Idles Sheet No. A ,k \100\D*;S \1MDET.DWG a 0 in aF � CD 0 1' 4' g' 22 16 22 8 8 1 CONC. 2, 2, ISLAND 2' 0 ASPHALT PATH WALK 2' CHAIRBACK CURB 2' CHAIRBACK CURB k SLOPE 1/4* PER FOOT MIN ` r` SLOPE 1/4* PER FOOT MIN �. .• \� 1" HAC SURFACE �- 3" HAC BINDER 9" COMPACTED STONE BASE PIPE UNDERDRAIN (TYP) SEE DETAIL • PREPARED SUBGRADE PER INDIANA DEPARTMENT OF TRANSPORTATION SPECS. No. 207 TYPICAL STREET SECTION AT ENTRANCE OF RIVER ROAD DRAINAGE, UTILITY & SEWER ESMT D 0 PROPOSED FINISHED GRADE ELEVATIONS AT BACK - - - - - CORNERS (VARIES) I M I I NO N I I ( DRAINAGE, UTILITY & SEWER ESMT I o o I PROPOSED SIDE YARD ELEV VARIES FROM 5.0% 0 21.0 %) I o 0 Z I I I MIN PAD ELEV & I FIN GRADE ELEV AT BLDG) DRAINAGE, UTILITY I I BUILDING LINE NOTE: & SEWER ESMT I I ADDITIONAL 8' OF DRIVE WAY SPACE REQUIRED FOR UNITS WITH MORE THAN 3 BEDROOMS. Ib °im I PROPOSED FINISHED GRADE e ELEVATIONS AT FRONT I o z R/W LINE CORNERS (VARIES) N 2 SIDEWALK � BACK OF CURB CL THE LOCATION OF HOUSE (DEPICTED BY RECTANGLES) AND THE "FINISH GROUND GRADE" CONNECTED THERETO, ARE INTENDED AS GUIDE -LINES ONLY, SHOWING HOW EACH LOT MAY BE GRADED TO DRAIN EFFECTIVELY. THE FINISH GROUND GRADE SHOULD HOWEVER, BE TREATED AS A MINIMUM ELEVATION, AND THE SAME DRAINAGE PATTERN SHOULD BE MAINTAINED BUT ADAPTED TO THE PARTICULAR HOUSE SELECTED FOR EACH LOT. TYPICAL LOT 1 2 3 4 5 D GRADE (NEW OR EXISTING)\ Wheat or Rye Oats Annual Ryegross Non - Irrigated* Irrigated Dormant Seeding ** VARIES TYPICAL SWALE SECTION Temporary Seeding Dates GRADE VEW OR EXISTING) MCImo0mva2. 212a Permanent Seeding Irrigation needed during this period. To control erosion at times other than In the shaded areas, use mulch. * Late summer seeding dates may be extended 5 days If mulch is applied. ** Increase seeding application by 50R FIGURE 5 -3 - Temporary Seedings - Kind of Seed 1000 Sq. Ft- Acre Remarks - Wheat or Rye 3.5 lbs. 2 bu. Cover seed 1" to 1 1/2" deep Spring Oats 2.3 lbs. 3 bu. Cover seed 1" deep Annual ryegrass 1 lb. 40 lbs. Cover seed 1/4 "deep* * Not necessary where mulch is applied. 2 stakes (typ) per bale bindings to be placed parallel to ground flow ,straw bale Plan (n.t.s.) stake (typ) straw bale 3 " -6 "undertoe Profile (n.t.s.) SEDIMENT FILTER DETAIL 1. 3-BEDROOM UNITS SHALL HAVE 2- ONSiTE SPACES PLUS 1/2 AVAILABLE OFFSITE SPACES. 2. 4- BEDROOM UNITS SHALL HAVE 3- ONSITE SPACES PLUS 1/2 AVAILABLE OFFSITE SPACES. PARKING PLAN 7 1 8 t 4 4 11 ( 12 I 13 55 GALLON DRUM 6 -1 "x6" SLOTS TO BE EQUALLY SPACED. to 3 -1 "x6" SLOTS TO BE EQUALLY SPACED. 10 • N (TO BE PLACED OVER ALL BEEHIVE CASTINGS DURING CONSTRUCTION) SLOTTED RISER FOR SEDIMENT RETENTION Seedbed Preparation Apply lime to raise the pH to the level needed for species being seeded. Apply 23 pounds of 12 -12 -12 analysis fertilizer (or equivalent) per 1000 sq. ft. (approximately 1000 pounds per acre) or fertilize according to test. Application of 150 lbs. of ammonium nitrate on areas low in organic matter and fertility will greatly enhance vegetative growth. Work the fertilizer and lime into the soil to a depth of 2 -3 inches with a harrow, disk or rake operated across the slope as much as possible. Seeding Select a seed mixture based on projected use of the area (Figure 5 -2), while considering best seeding dates. See Figure 5-3 this sheet. If toler- ances are a problem, such as salt tolerance of seedings adjacent to streets and highways, see Figure 5 -4 this sheet before final selection. Figure 5 -2: Permanent Seed Mixtures Species Seeding Rate Suitable pH Site Suitability* lbs /acre Ib3/1000 well - sq. ft. Droughty Drained Wet Level and Sloping, Open Areas 1. Tail Fescue 35 .8 5.5 -8.3 2 1 2 2. Tall Fescue 25 .6 5.5 -8.3 1 Red Clover** 5 .12 3. Kentucky Bluegrass 15 .4 5.5 -7.5 2 1 Creeping Red Fescue 15 .4 Steep Banks and Cuts 4. Tall Fescue 15 .4 5.8 -7.5 2 1 2 Kentucky Bluegrass 25 .6 5. Tall Fescue 35 .8 5.5 -8.3 2 1 Emerald Crownvatch** 10 .25 Lawns and High Maintenance Areas 6. Kentucky Bluegrass 40 .9 5.8 -7.5 2 1 Creeping Red Fescue 40 .9 7. Perennial Ryegrass 170 4.0 5.0 -7.5 1 (Turf Type) B. Tall Fescue 170 4.0 5.5 -8.3 2 1 2 * 1 - Preferred 2 - Will Tolerate ** Inoculate with specific Inoculant. i SOIL S a E Salt CONDITION g Elf, f fi 8 Tolerance Wet o Dry +• I- ►- u. z x I- a s Gen. Soil Isproy Creepo..g Red Fescue Festuca rubra 2 1 2 1 1 1 Med. 1 20-25 12 -18 7 -21 S Kentucky Bluegrass 2 1 2 1 1 1 Mad. 1 25 -35 12 -18 10 -20 Poo paratinsis MT Tall Fescue 2 1 1 1 1 1 Low 1 24 -35 24 -36 5 -14 T Festuca L arundinacea Pere�.?iai ryegross 2 1 2 - 1 2 Mod 2 15 -20 12 -18 5 -10 MT Loliurn perenne High Crownvetch - 1 1 2 - - Low 1 5 -10 24 14-21 T Coronilla varia Red Clover - 1 - 2 - - Med 1 7 -10 18 5 -10 S S Trifolium protense Ranking: Salt Tolerance (to both soil salts dk spray): 1 Good T Tolerance 2 Medium MT Medium Tolerance - Not tolerant S Slight Tolerance FIGURE 5 -4 EROSION CONTROL AND SEQUENCING 1 CONTRACTOR SHALL INSTALL ALL REQUIRED SILT 5 PERMANENT AND FINAL VEGETATION OR STRUCTURAL HOLEY HOLEY SAYS FENCES, SILT TRAPS, TREE PROTECTION AND INLET EROSION CONTROL DEVICES SHALL BE INSTALLED AS DONT PROTECTION FOR EXISTING INLETS PRIOR TO THE SOON AS PRACTICAL UNDER THE CIRCUMSTANCES. START OF ANY EARTH MOVING OR STRIPPING. 6 THE DURATION OF TIME WHICH MI AREA REMAINS 2 CONTRACTOR SHALL INSTALL A STONE CONSTRUCTION EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM DIG ENTRANCE OR SOME OTHER DEVICE PRIOR TO THE DEPENDING UPON THE WEATHER. IF CONSTRC11ON START OF EARTHWORK AS NECESSARY TO PREVENT ACTIVITY IS TO CEASE FOR MORE THAN TWO WEEKS, BLIND" SOIL FROM BO SHALL BE TRACKED OR WASHED INTO EXISTING THE DISTURBED AREAS SH BE TEMPORARILY SEEDED. ROADWAYS. 7 ALL STORM SEWER INLET PROTECTION DEVICES SHALL 3 LAND ALTERATIONS WHICH STRIP THE LAND OF BE PUT IN PLACE AT THE TIME EACH INLET IS VEGETATION, INCLUDING REGRADING, SHALL BE DONE. CONSTRUCTED. IN A WAY THAT WILL MINIMIZE EROSION. WHENE`;_'R l FEASIBLE, NATURAL VEGETATION SHALL BE RETA;n: J 8 CONTRACTOR SHALL MAINTAIN EROSION CONTROL AND PROTECTED. AS GRADING IS DONE, INSTALL WLT MEASURES AND DEVICES DURING CONSTRUCTION AND TRAPS, SILT FENCES ,SLOPE DRAINS, TEMPORARY UNTIL SILTATION OF THE STREETS AND STORM SEWERS DIVERSIONS AND OTHER RUNOFF CONTROL MEASURES WILL NO LONGER OCCUR. AT APPROPRIATE LOCATIONS TO KEEP SEDIMENT 9 ONCE ONSITE EROSION AND SILTATION OF THE STREETS CONTAINED ON SITE. AND STORM SEWERS WALL NO LONGER OCCUR, THE 4 ALL DISTURBED AREAS SHALL BE SEEDED AND STRAW CONTRACTOR SHALL REMOVE AND DISPOSE OF THE 1- 800 =$82=6644 MULCHED AS SHOWN ON THE PLANS IMMEDIATEL" TEMPORARY EROSION CONTROL DEVICES CALL TOLL FREE AFTER COMPLETION OF GROUND ACTIVITY. FOR LARGE 10 THESE GENERAL PROCEDURES MAY NOT COVER ALL 1�8OO�4Z8�6ZOO PROJECTS, THIS SEEDING SHOULD BE COMPLETED IN SITUATIONS. REFER TO EROSION CONTROL PLANS FOR PHASES AS THE DIFFERENT AREAS OF THE SITE ARE SPECIFIC NOTES AND ADDITIONAL DETAILS. FOR CALLS OUTSIDE OF INDIANA COMPLETED. PER INDIANA STATE LAW IS-69 -1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORIONG DAYS BEFORE COMMENCING WORK. EROSION CONTROL SCHEDULE EROSION CONTROL MEASURE MAINTENANCE INSTALLATION SEQUENCE STONE ENTRANCE AS NEEDED PRIOR TO CLEARING AND GRADING SILT FENCE WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING EXISTING INLET PROTECTION WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING PROTECTION TREE W%EKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING TEMPORARY DIVERSIONS WEPEKLY AFTER STORM EVENTS AND AS NEEDED ALONG WITH ROUGH GRADING TEMPORARY SEEDING WATER AS NEEDED AFTER ROUGH GRADING PERMANENT SEEDING WATER AS NEEDED AFTER FINISH GRADING EROSION CONTROL MATTING MEEKLY AFTER STORM EVENTS AND AS NEEDED AFTER FINISH GRADING STRAW BALES WEEKLY AFTER STORM EVENTS AND AS NEEDED AFTER FINISH GRADING INLET PROTECTION WEEKLY AFTER STORY EVENTS AND AS NEEDED AFTER EACH INLET IS PLACED SEED, SOD do LANDSCAPE AROUND WATER AS NEEDED AFTER FINISHED GRADING AROUND FINISHED UNITS UNITS I REMOVAL OF STRAW BALES N A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF INLET PROTECTION I N A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF SIT FENCE I N/A AFTER ALL AREAS DRAINING A ARE S A ILL 9 ( 10 I 11 I 12 1 13 14 I 15 I 16 I 17 I 18 r 23 S I S.I 27 2 6 , 1 0 Db 0 i iJl, i '7•. r, :; t,. �. t :t 1 ,p ` . } ..s, ai r .� I�' t• �. LJ Li :ri•'% ••7 _ �M4� . �•1.�M .f 4. ;. x.- {, b ..'ti it �` 1 � _. �, l�y� vy" ��,�!�.• " n . l AREA /ZONING MAP 14 I ._I,. FxC3 J s� vn 15 SOILS MAP 16 - Ro y12.11/ r• cA • 12 -- 17 18 � 4 4 Revisions P n N M L K J H G F E CERTIfiED BY iM ORAWNG AND THE IOM DESIGNS AND OMACfPTS CONTANED 1 301 ARE THE DIMUSK NTEIIECNAL PROPERTY OF SCH EW ENCIiIEW COR M71ON AND ARE NOT TO BE USED OR FEPRODlM N *K LE OR N PART, WiHOUT THE VIM COINWNT OF S"CDER ENGNEFRNG CORPORAii K 01996, Schneider Engineering Corporat'Nxt D &bncid(x e e CO porafiofi 3020 North Post Road Engineering C Indianapolis, Indiana Surveying 46226 -0068 Landscape Architecture 317- 898 -8282 GIS • US 317 -899 -8010 Fax Geology A Partnered Entity with Bohlen, Meyer, Gibson do Associates, Incorporated BRENIIICK DEVEIAPMM CO., INC. kD PRAIRIE VIEW B CAR11iEI, INDIANA id 0 GENERAL DETAILS Date Project No. Drawn Approv. 4 -15 -96 1065 D.T.R. Computer Idles Sheet No. A ,k \100\D*;S \1MDET.DWG a 0 in aF � CD 0 2 stakes (typ) per bale bindings to be placed parallel to ground flow ,straw bale Plan (n.t.s.) stake (typ) straw bale 3 " -6 "undertoe Profile (n.t.s.) SEDIMENT FILTER DETAIL 1. 3-BEDROOM UNITS SHALL HAVE 2- ONSiTE SPACES PLUS 1/2 AVAILABLE OFFSITE SPACES. 2. 4- BEDROOM UNITS SHALL HAVE 3- ONSITE SPACES PLUS 1/2 AVAILABLE OFFSITE SPACES. PARKING PLAN 7 1 8 t 4 4 11 ( 12 I 13 55 GALLON DRUM 6 -1 "x6" SLOTS TO BE EQUALLY SPACED. to 3 -1 "x6" SLOTS TO BE EQUALLY SPACED. 10 • N (TO BE PLACED OVER ALL BEEHIVE CASTINGS DURING CONSTRUCTION) SLOTTED RISER FOR SEDIMENT RETENTION Seedbed Preparation Apply lime to raise the pH to the level needed for species being seeded. Apply 23 pounds of 12 -12 -12 analysis fertilizer (or equivalent) per 1000 sq. ft. (approximately 1000 pounds per acre) or fertilize according to test. Application of 150 lbs. of ammonium nitrate on areas low in organic matter and fertility will greatly enhance vegetative growth. Work the fertilizer and lime into the soil to a depth of 2 -3 inches with a harrow, disk or rake operated across the slope as much as possible. Seeding Select a seed mixture based on projected use of the area (Figure 5 -2), while considering best seeding dates. See Figure 5-3 this sheet. If toler- ances are a problem, such as salt tolerance of seedings adjacent to streets and highways, see Figure 5 -4 this sheet before final selection. Figure 5 -2: Permanent Seed Mixtures Species Seeding Rate Suitable pH Site Suitability* lbs /acre Ib3/1000 well - sq. ft. Droughty Drained Wet Level and Sloping, Open Areas 1. Tail Fescue 35 .8 5.5 -8.3 2 1 2 2. Tall Fescue 25 .6 5.5 -8.3 1 Red Clover** 5 .12 3. Kentucky Bluegrass 15 .4 5.5 -7.5 2 1 Creeping Red Fescue 15 .4 Steep Banks and Cuts 4. Tall Fescue 15 .4 5.8 -7.5 2 1 2 Kentucky Bluegrass 25 .6 5. Tall Fescue 35 .8 5.5 -8.3 2 1 Emerald Crownvatch** 10 .25 Lawns and High Maintenance Areas 6. Kentucky Bluegrass 40 .9 5.8 -7.5 2 1 Creeping Red Fescue 40 .9 7. Perennial Ryegrass 170 4.0 5.0 -7.5 1 (Turf Type) B. Tall Fescue 170 4.0 5.5 -8.3 2 1 2 * 1 - Preferred 2 - Will Tolerate ** Inoculate with specific Inoculant. i SOIL S a E Salt CONDITION g Elf, f fi 8 Tolerance Wet o Dry +• I- ►- u. z x I- a s Gen. Soil Isproy Creepo..g Red Fescue Festuca rubra 2 1 2 1 1 1 Med. 1 20-25 12 -18 7 -21 S Kentucky Bluegrass 2 1 2 1 1 1 Mad. 1 25 -35 12 -18 10 -20 Poo paratinsis MT Tall Fescue 2 1 1 1 1 1 Low 1 24 -35 24 -36 5 -14 T Festuca L arundinacea Pere�.?iai ryegross 2 1 2 - 1 2 Mod 2 15 -20 12 -18 5 -10 MT Loliurn perenne High Crownvetch - 1 1 2 - - Low 1 5 -10 24 14-21 T Coronilla varia Red Clover - 1 - 2 - - Med 1 7 -10 18 5 -10 S S Trifolium protense Ranking: Salt Tolerance (to both soil salts dk spray): 1 Good T Tolerance 2 Medium MT Medium Tolerance - Not tolerant S Slight Tolerance FIGURE 5 -4 EROSION CONTROL AND SEQUENCING 1 CONTRACTOR SHALL INSTALL ALL REQUIRED SILT 5 PERMANENT AND FINAL VEGETATION OR STRUCTURAL HOLEY HOLEY SAYS FENCES, SILT TRAPS, TREE PROTECTION AND INLET EROSION CONTROL DEVICES SHALL BE INSTALLED AS DONT PROTECTION FOR EXISTING INLETS PRIOR TO THE SOON AS PRACTICAL UNDER THE CIRCUMSTANCES. START OF ANY EARTH MOVING OR STRIPPING. 6 THE DURATION OF TIME WHICH MI AREA REMAINS 2 CONTRACTOR SHALL INSTALL A STONE CONSTRUCTION EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM DIG ENTRANCE OR SOME OTHER DEVICE PRIOR TO THE DEPENDING UPON THE WEATHER. IF CONSTRC11ON START OF EARTHWORK AS NECESSARY TO PREVENT ACTIVITY IS TO CEASE FOR MORE THAN TWO WEEKS, BLIND" SOIL FROM BO SHALL BE TRACKED OR WASHED INTO EXISTING THE DISTURBED AREAS SH BE TEMPORARILY SEEDED. ROADWAYS. 7 ALL STORM SEWER INLET PROTECTION DEVICES SHALL 3 LAND ALTERATIONS WHICH STRIP THE LAND OF BE PUT IN PLACE AT THE TIME EACH INLET IS VEGETATION, INCLUDING REGRADING, SHALL BE DONE. CONSTRUCTED. IN A WAY THAT WILL MINIMIZE EROSION. WHENE`;_'R l FEASIBLE, NATURAL VEGETATION SHALL BE RETA;n: J 8 CONTRACTOR SHALL MAINTAIN EROSION CONTROL AND PROTECTED. AS GRADING IS DONE, INSTALL WLT MEASURES AND DEVICES DURING CONSTRUCTION AND TRAPS, SILT FENCES ,SLOPE DRAINS, TEMPORARY UNTIL SILTATION OF THE STREETS AND STORM SEWERS DIVERSIONS AND OTHER RUNOFF CONTROL MEASURES WILL NO LONGER OCCUR. AT APPROPRIATE LOCATIONS TO KEEP SEDIMENT 9 ONCE ONSITE EROSION AND SILTATION OF THE STREETS CONTAINED ON SITE. AND STORM SEWERS WALL NO LONGER OCCUR, THE 4 ALL DISTURBED AREAS SHALL BE SEEDED AND STRAW CONTRACTOR SHALL REMOVE AND DISPOSE OF THE 1- 800 =$82=6644 MULCHED AS SHOWN ON THE PLANS IMMEDIATEL" TEMPORARY EROSION CONTROL DEVICES CALL TOLL FREE AFTER COMPLETION OF GROUND ACTIVITY. FOR LARGE 10 THESE GENERAL PROCEDURES MAY NOT COVER ALL 1�8OO�4Z8�6ZOO PROJECTS, THIS SEEDING SHOULD BE COMPLETED IN SITUATIONS. REFER TO EROSION CONTROL PLANS FOR PHASES AS THE DIFFERENT AREAS OF THE SITE ARE SPECIFIC NOTES AND ADDITIONAL DETAILS. FOR CALLS OUTSIDE OF INDIANA COMPLETED. PER INDIANA STATE LAW IS-69 -1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORIONG DAYS BEFORE COMMENCING WORK. EROSION CONTROL SCHEDULE EROSION CONTROL MEASURE MAINTENANCE INSTALLATION SEQUENCE STONE ENTRANCE AS NEEDED PRIOR TO CLEARING AND GRADING SILT FENCE WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING EXISTING INLET PROTECTION WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING PROTECTION TREE W%EKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING TEMPORARY DIVERSIONS WEPEKLY AFTER STORM EVENTS AND AS NEEDED ALONG WITH ROUGH GRADING TEMPORARY SEEDING WATER AS NEEDED AFTER ROUGH GRADING PERMANENT SEEDING WATER AS NEEDED AFTER FINISH GRADING EROSION CONTROL MATTING MEEKLY AFTER STORM EVENTS AND AS NEEDED AFTER FINISH GRADING STRAW BALES WEEKLY AFTER STORM EVENTS AND AS NEEDED AFTER FINISH GRADING INLET PROTECTION WEEKLY AFTER STORY EVENTS AND AS NEEDED AFTER EACH INLET IS PLACED SEED, SOD do LANDSCAPE AROUND WATER AS NEEDED AFTER FINISHED GRADING AROUND FINISHED UNITS UNITS I REMOVAL OF STRAW BALES N A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF INLET PROTECTION I N A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF SIT FENCE I N/A AFTER ALL AREAS DRAINING A ARE S A ILL 9 ( 10 I 11 I 12 1 13 14 I 15 I 16 I 17 I 18 r 23 S I S.I 27 2 6 , 1 0 Db 0 i iJl, i '7•. r, :; t,. �. t :t 1 ,p ` . } ..s, ai r .� I�' t• �. LJ Li :ri•'% ••7 _ �M4� . �•1.�M .f 4. ;. x.- {, b ..'ti it �` 1 � _. �, l�y� vy" ��,�!�.• " n . l AREA /ZONING MAP 14 I ._I,. FxC3 J s� vn 15 SOILS MAP 16 - Ro y12.11/ r• cA • 12 -- 17 18 � 4 4 Revisions P n N M L K J H G F E CERTIfiED BY iM ORAWNG AND THE IOM DESIGNS AND OMACfPTS CONTANED 1 301 ARE THE DIMUSK NTEIIECNAL PROPERTY OF SCH EW ENCIiIEW COR M71ON AND ARE NOT TO BE USED OR FEPRODlM N *K LE OR N PART, WiHOUT THE VIM COINWNT OF S"CDER ENGNEFRNG CORPORAii K 01996, Schneider Engineering Corporat'Nxt D &bncid(x e e CO porafiofi 3020 North Post Road Engineering C Indianapolis, Indiana Surveying 46226 -0068 Landscape Architecture 317- 898 -8282 GIS • US 317 -899 -8010 Fax Geology A Partnered Entity with Bohlen, Meyer, Gibson do Associates, Incorporated BRENIIICK DEVEIAPMM CO., INC. kD PRAIRIE VIEW B CAR11iEI, INDIANA id 0 GENERAL DETAILS Date Project No. Drawn Approv. 4 -15 -96 1065 D.T.R. Computer Idles Sheet No. A ,k \100\D*;S \1MDET.DWG a 0 in aF � CD 0 Ranking: Salt Tolerance (to both soil salts dk spray): 1 Good T Tolerance 2 Medium MT Medium Tolerance - Not tolerant S Slight Tolerance FIGURE 5 -4 EROSION CONTROL AND SEQUENCING 1 CONTRACTOR SHALL INSTALL ALL REQUIRED SILT 5 PERMANENT AND FINAL VEGETATION OR STRUCTURAL HOLEY HOLEY SAYS FENCES, SILT TRAPS, TREE PROTECTION AND INLET EROSION CONTROL DEVICES SHALL BE INSTALLED AS DONT PROTECTION FOR EXISTING INLETS PRIOR TO THE SOON AS PRACTICAL UNDER THE CIRCUMSTANCES. START OF ANY EARTH MOVING OR STRIPPING. 6 THE DURATION OF TIME WHICH MI AREA REMAINS 2 CONTRACTOR SHALL INSTALL A STONE CONSTRUCTION EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM DIG ENTRANCE OR SOME OTHER DEVICE PRIOR TO THE DEPENDING UPON THE WEATHER. IF CONSTRC11ON START OF EARTHWORK AS NECESSARY TO PREVENT ACTIVITY IS TO CEASE FOR MORE THAN TWO WEEKS, BLIND" SOIL FROM BO SHALL BE TRACKED OR WASHED INTO EXISTING THE DISTURBED AREAS SH BE TEMPORARILY SEEDED. ROADWAYS. 7 ALL STORM SEWER INLET PROTECTION DEVICES SHALL 3 LAND ALTERATIONS WHICH STRIP THE LAND OF BE PUT IN PLACE AT THE TIME EACH INLET IS VEGETATION, INCLUDING REGRADING, SHALL BE DONE. CONSTRUCTED. IN A WAY THAT WILL MINIMIZE EROSION. WHENE`;_'R l FEASIBLE, NATURAL VEGETATION SHALL BE RETA;n: J 8 CONTRACTOR SHALL MAINTAIN EROSION CONTROL AND PROTECTED. AS GRADING IS DONE, INSTALL WLT MEASURES AND DEVICES DURING CONSTRUCTION AND TRAPS, SILT FENCES ,SLOPE DRAINS, TEMPORARY UNTIL SILTATION OF THE STREETS AND STORM SEWERS DIVERSIONS AND OTHER RUNOFF CONTROL MEASURES WILL NO LONGER OCCUR. AT APPROPRIATE LOCATIONS TO KEEP SEDIMENT 9 ONCE ONSITE EROSION AND SILTATION OF THE STREETS CONTAINED ON SITE. AND STORM SEWERS WALL NO LONGER OCCUR, THE 4 ALL DISTURBED AREAS SHALL BE SEEDED AND STRAW CONTRACTOR SHALL REMOVE AND DISPOSE OF THE 1- 800 =$82=6644 MULCHED AS SHOWN ON THE PLANS IMMEDIATEL" TEMPORARY EROSION CONTROL DEVICES CALL TOLL FREE AFTER COMPLETION OF GROUND ACTIVITY. FOR LARGE 10 THESE GENERAL PROCEDURES MAY NOT COVER ALL 1�8OO�4Z8�6ZOO PROJECTS, THIS SEEDING SHOULD BE COMPLETED IN SITUATIONS. REFER TO EROSION CONTROL PLANS FOR PHASES AS THE DIFFERENT AREAS OF THE SITE ARE SPECIFIC NOTES AND ADDITIONAL DETAILS. FOR CALLS OUTSIDE OF INDIANA COMPLETED. PER INDIANA STATE LAW IS-69 -1991. IT IS AGAINST THE LAW TO EXCAVATE WITHOUT NOTIFYING THE UNDERGROUND LOCATION SERVICE TWO (2) WORIONG DAYS BEFORE COMMENCING WORK. EROSION CONTROL SCHEDULE EROSION CONTROL MEASURE MAINTENANCE INSTALLATION SEQUENCE STONE ENTRANCE AS NEEDED PRIOR TO CLEARING AND GRADING SILT FENCE WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING EXISTING INLET PROTECTION WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING PROTECTION TREE W%EKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING TEMPORARY DIVERSIONS WEPEKLY AFTER STORM EVENTS AND AS NEEDED ALONG WITH ROUGH GRADING TEMPORARY SEEDING WATER AS NEEDED AFTER ROUGH GRADING PERMANENT SEEDING WATER AS NEEDED AFTER FINISH GRADING EROSION CONTROL MATTING MEEKLY AFTER STORM EVENTS AND AS NEEDED AFTER FINISH GRADING STRAW BALES WEEKLY AFTER STORM EVENTS AND AS NEEDED AFTER FINISH GRADING INLET PROTECTION WEEKLY AFTER STORY EVENTS AND AS NEEDED AFTER EACH INLET IS PLACED SEED, SOD do LANDSCAPE AROUND WATER AS NEEDED AFTER FINISHED GRADING AROUND FINISHED UNITS UNITS I REMOVAL OF STRAW BALES N A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF INLET PROTECTION I N A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF SIT FENCE I N/A AFTER ALL AREAS DRAINING A ARE S A ILL 9 ( 10 I 11 I 12 1 13 14 I 15 I 16 I 17 I 18 r 23 S I S.I 27 2 6 , 1 0 Db 0 i iJl, i '7•. r, :; t,. �. t :t 1 ,p ` . } ..s, ai r .� I�' t• �. LJ Li :ri•'% ••7 _ �M4� . �•1.�M .f 4. ;. x.- {, b ..'ti it �` 1 � _. �, l�y� vy" ��,�!�.• " n . l AREA /ZONING MAP 14 I ._I,. FxC3 J s� vn 15 SOILS MAP 16 - Ro y12.11/ r• cA • 12 -- 17 18 � 4 4 Revisions P n N M L K J H G F E CERTIfiED BY iM ORAWNG AND THE IOM DESIGNS AND OMACfPTS CONTANED 1 301 ARE THE DIMUSK NTEIIECNAL PROPERTY OF SCH EW ENCIiIEW COR M71ON AND ARE NOT TO BE USED OR FEPRODlM N *K LE OR N PART, WiHOUT THE VIM COINWNT OF S"CDER ENGNEFRNG CORPORAii K 01996, Schneider Engineering Corporat'Nxt D &bncid(x e e CO porafiofi 3020 North Post Road Engineering C Indianapolis, Indiana Surveying 46226 -0068 Landscape Architecture 317- 898 -8282 GIS • US 317 -899 -8010 Fax Geology A Partnered Entity with Bohlen, Meyer, Gibson do Associates, Incorporated BRENIIICK DEVEIAPMM CO., INC. kD PRAIRIE VIEW B CAR11iEI, INDIANA id 0 GENERAL DETAILS Date Project No. Drawn Approv. 4 -15 -96 1065 D.T.R. Computer Idles Sheet No. A ,k \100\D*;S \1MDET.DWG a 0 in aF � CD 0 EROSION CONTROL SCHEDULE EROSION CONTROL MEASURE MAINTENANCE INSTALLATION SEQUENCE STONE ENTRANCE AS NEEDED PRIOR TO CLEARING AND GRADING SILT FENCE WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING EXISTING INLET PROTECTION WEEKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING PROTECTION TREE W%EKLY AFTER STORM EVENTS AND AS NEEDED PRIOR TO CLEARING AND GRADING TEMPORARY DIVERSIONS WEPEKLY AFTER STORM EVENTS AND AS NEEDED ALONG WITH ROUGH GRADING TEMPORARY SEEDING WATER AS NEEDED AFTER ROUGH GRADING PERMANENT SEEDING WATER AS NEEDED AFTER FINISH GRADING EROSION CONTROL MATTING MEEKLY AFTER STORM EVENTS AND AS NEEDED AFTER FINISH GRADING STRAW BALES WEEKLY AFTER STORM EVENTS AND AS NEEDED AFTER FINISH GRADING INLET PROTECTION WEEKLY AFTER STORY EVENTS AND AS NEEDED AFTER EACH INLET IS PLACED SEED, SOD do LANDSCAPE AROUND WATER AS NEEDED AFTER FINISHED GRADING AROUND FINISHED UNITS UNITS I REMOVAL OF STRAW BALES N A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF INLET PROTECTION I N A AFTER ALL AREAS DRAINING TO THESE AREAS ARE STABILIZED REMOVAL OF SIT FENCE I N/A AFTER ALL AREAS DRAINING A ARE S A ILL 9 ( 10 I 11 I 12 1 13 14 I 15 I 16 I 17 I 18 r 23 S I S.I 27 2 6 , 1 0 Db 0 i iJl, i '7•. r, :; t,. �. t :t 1 ,p ` . } ..s, ai r .� I�' t• �. LJ Li :ri•'% ••7 _ �M4� . �•1.�M .f 4. ;. x.- {, b ..'ti it �` 1 � _. �, l�y� vy" ��,�!�.• " n . l AREA /ZONING MAP 14 I ._I,. FxC3 J s� vn 15 SOILS MAP 16 - Ro y12.11/ r• cA • 12 -- 17 18 � 4 4 Revisions P n N M L K J H G F E CERTIfiED BY iM ORAWNG AND THE IOM DESIGNS AND OMACfPTS CONTANED 1 301 ARE THE DIMUSK NTEIIECNAL PROPERTY OF SCH EW ENCIiIEW COR M71ON AND ARE NOT TO BE USED OR FEPRODlM N *K LE OR N PART, WiHOUT THE VIM COINWNT OF S"CDER ENGNEFRNG CORPORAii K 01996, Schneider Engineering Corporat'Nxt D &bncid(x e e CO porafiofi 3020 North Post Road Engineering C Indianapolis, Indiana Surveying 46226 -0068 Landscape Architecture 317- 898 -8282 GIS • US 317 -899 -8010 Fax Geology A Partnered Entity with Bohlen, Meyer, Gibson do Associates, Incorporated BRENIIICK DEVEIAPMM CO., INC. kD PRAIRIE VIEW B CAR11iEI, INDIANA id 0 GENERAL DETAILS Date Project No. Drawn Approv. 4 -15 -96 1065 D.T.R. Computer Idles Sheet No. A ,k \100\D*;S \1MDET.DWG a 0 in aF � CD 0 9 ( 10 I 11 I 12 1 13 14 I 15 I 16 I 17 I 18 r 23 S I S.I 27 2 6 , 1 0 Db 0 i iJl, i '7•. r, :; t,. �. t :t 1 ,p ` . } ..s, ai r .� I�' t• �. LJ Li :ri•'% ••7 _ �M4� . �•1.�M .f 4. ;. x.- {, b ..'ti it �` 1 � _. �, l�y� vy" ��,�!�.• " n . l AREA /ZONING MAP 14 I ._I,. FxC3 J s� vn 15 SOILS MAP 16 - Ro y12.11/ r• cA • 12 -- 17 18 � 4 4 Revisions P n N M L K J H G F E CERTIfiED BY iM ORAWNG AND THE IOM DESIGNS AND OMACfPTS CONTANED 1 301 ARE THE DIMUSK NTEIIECNAL PROPERTY OF SCH EW ENCIiIEW COR M71ON AND ARE NOT TO BE USED OR FEPRODlM N *K LE OR N PART, WiHOUT THE VIM COINWNT OF S"CDER ENGNEFRNG CORPORAii K 01996, Schneider Engineering Corporat'Nxt D &bncid(x e e CO porafiofi 3020 North Post Road Engineering C Indianapolis, Indiana Surveying 46226 -0068 Landscape Architecture 317- 898 -8282 GIS • US 317 -899 -8010 Fax Geology A Partnered Entity with Bohlen, Meyer, Gibson do Associates, Incorporated BRENIIICK DEVEIAPMM CO., INC. kD PRAIRIE VIEW B CAR11iEI, INDIANA id 0 GENERAL DETAILS Date Project No. Drawn Approv. 4 -15 -96 1065 D.T.R. Computer Idles Sheet No. A ,k \100\D*;S \1MDET.DWG a 0 in aF � CD 0