Loading...
HomeMy WebLinkAbout05090050-Correspondence Ochs, James A From: Sent: To: Cc; Subject: Ochs, James A Wednesday, September 13, 2006 10:36 AM 'billy. rose@opusnorth.com' 'jason. rusk@opusnorth.com' 05090050,12911 Meridian Street, Carmel, Indiana Inspection conducted by Jim Ochs on Tues. 9.12.06 a $ 100.00 re-inspection fee is applied. NOTES FOR: 05090050 08 1 - PI DATE TIME NOTE TEXT 2006-09-13 10:32:30 1 Shower stalls shall have a seat providing accessibility as regulated in the Indiana Accessibility Code section 4.21.3. 2 Shower stalls shall have grab bars as regulated in lAC section 4.21.4. 3 Shower stalls greater than 36 inches by 36 inches are not permitted to have curbs. lAC 4.21.7 4 Door opening force may not exceed 5 Ibf on all accessible doors. lAC 4.13.11. 5 All accessible doors shall have hardware for opening the door, toilet stalls, both sides. lAC 4.13.9. 6 All recptacles within 6 feet of a bar sink must be GFI protected, vending area. 7 Guards are required on all stairways to a min. height of 42 inches. lBC 1003.2.12, 1003.2.12.1. 8 Provide copy of state approval for the elevators. James Ochs, C.B.O. ,-lL- 6 ty 2~ 1M/) r L- ~ 1 OPERATOR jochs These 15. 16. process. current set of consu'uction and reviews, e review revisions. Duncan, Gary R Wednesday, September 07, 2005 10:26 AM L Ilard Sarah N Conn, Angelina V Hill Dick B; Hoyt Gary A; Blanchard, Jim E Kendall, Jeff A; Brewer, Scott I; Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.imus; 'john- s(~uth@ aswcd.org'; 'Candy Fe trier'; 'mbm@co.ham ton..[1 us' Fo ey Amanda J Gr ff n Matt L 'aleisha.jaeger@opusnorth.com RE: Pre-Submittal meeting for Opus Landmark at Meridian Phase I B dg a few issues to work out with the Owner but they can schedule their pre-submittal meeting. Jim E; Kendall, Jeff A; ,; I Bldg HOURS, IF YOU DING ~ubmittal. PENDING Waivers Page .Rusk@opusnorm,com] ~ay, September 07, 2005 10:48 AM :his morning we would like to schedule the "Pre-submittal" meeting with soil? may we proceed with installation Lillard, Sarah N Duncan, Gary R ~riday, September, 02, 2005 11:03 AM McCroskey, Ryan 'Jaeger, Aleisha'; Hill, Dick B; Redden, Nick; Lillard, Sarah N; Greg Ilko (E-mail) Opus Landmark at Meridian Phase I Ryan. Department's issues with the folloWing exceptions: The current plans. e INDOT r is a Curb spacing, Lillard, Sarah N To: Cc: Subject: Duncan, Gary R Monday, August 22 2005 9:11 AM Lillard, Sarah N Hill, Dick B; Redden, Nick; Greg ltko (E-mail) RE: Opus Landmark building I Sarah, aThis will not need to go back to TAC. We are hoping to review the plans this week. They have hopefully submitted plans nd calculations for drainage review by the City's subconsultant as well. This project had gone to TAC under various guises in the past. Formal approval of the plans was never obtained by the petitioner. At the time that the project went to TAC, the petitioner never provided revised sets of drawings, mainly for what they were consider ng Phase One at the time, for final review and approval. No one on our side has dropped the ball on th S one. AS is the case with many projects right now projects just are not following the City's procedures and then all of a sudden, they want to get started arid ride us until they get all of their approvals, we will try to get this reviewed ASAP to take some of the pressure off you and your office. Gary ..... Odgina~ Message ..... From: Lillard Sarah N Sent: Monday, August 22, 2005 09:05 To: Hill, Dick B; Duncan, Gary R; Redden, Nick Subject: Opus Landmark ~)uilding 1 Gentlemen, Could you please give me an update on the status of the Opus Landmark building revie~v. There had been sterne emails regarding w~ether or not this needed to go back to TAC, or ~vhether they just needed to submit to you for review. Also Dick, you said their BPW approval happened some time ago, and may be expired. Have you been able to find out anything further? If you could all let me know--I would appreciate it. They would really like to come in for their submittal meeting. Thank you, Sarah £. Lillard, Sarah N Hill, Dick B Tuesday, August 16, 2005 9:15 AM Lillard, Sarah N; Duncan, Gary R; Redden, Nick RE: Opus Landmark I need to go back and reseach the fees. It is Carmel sewer but Indianapolis water. They did obtain BPWS approval for Commerc a Curb Cut and Sanitary Sewer Availability but the approval ~vas from 2000 a~d normally, BPWS ~pprovals are good for a year and if construct on has not commenced the project has to be resubm tted to the Board. ..... Odginal Message- .... From= Lillard Sarah N sent Monday, August 15 2005 4:39 PM To: Duncan, Gary R; Hill, DEck B; Redden, Nick Subject= Opus Landmark Gentlemen. Could any of you let me know what the status is for the review/approval of the Opus Landmark Phase 1 b~ildi~g is? (12911 N, Meridian St.) This is status for the plan review, and also the status of any fees due for sewer and/or water connection. (It is not CTRVVT) sewer) Thank you, Sarah N 2005 10:56 AM ; Redden, Nick Hill, Dick B I for Opus Landmark at Meridian Phase 1 BIdg bmitta know if you as not schedule on TAC, o go through TAC just Sorry for this .IN 46290 p:317-705-0444 f:317-705-1444 at Meridian Phase 1 Bldg Brewer, Scott I; Dolan, Veronica A; Foley, Amanda 3; Griffin, Page [his yet. this is placed on a TAC apo og ze for anv inconvenience 3riffin Matt L dmark at Meridian Phase I Bldg ng =LEASE"REPLY TO ;north.com> affect the issuance of this N R: Kendall, Jeff A; Brewer, at Meridian Phase I Bldg th s is placed on a 'FAC agenda before inconvenience or problem this may ~; Blanchard, JimE; dg PENDING IG docket numbers: 51-00 DP/ADLS 151-00A-E Zoning Waivers m that might affect the issuance of this permit, please IS e-ma Hoyt, Gary A Tuesday, August 02, 2005 2:13 PM L Iard Sarah N Conn Ange ina V; Hill, Dick B; Duncan, Gary R; B anchard J m E ,Kendall, Jeff A; Brewer, Scott Dolan Veron ca A; Akers, Will am P; ~rh@co.hamilton.in us 'john- south@iaswcd.0rg' 'Candy Feltner' 'mbm@co.hamilton.in.u~'; Foley, Amanda J; Griffin, Matt L 'aleisha,jaeger@opusnorth,com RE: Pre-Submittal meeting for Opus Landmark at Meridian Phase 1 Bldg connection caps for the Siamese ,rdered at www.knoxbox.com y R; Hoyt, Gary A; Blanchard, .]im E; Kendall, .]eft ~ilton.i~.us'; 'john-south@iaswcd org'; Candy Feltner'; 'Ii n Phase 1 Bldg Lillard, Sarah N Tuesday, August 02, 2005 9:09 AM Lillard Sarah N; Conn, Angelina V; Hi, Dick B; Duncan, Gary R; Hoyt, Gary A; Blanchard Jim E Kendall JeffA Brewer Scott I; Dolan, Veronica A; Akers, Will?m P; grh@co ham Iron.in.us; 'john-south@iaswcd org' 'Candy Feltner; 'mbm@co.hamilton.in.us'; ,F_oley, Amanda J; Griffin Matt L a eisha.jaeger@opusnorth.com RE: Pre-Submitta meet ng for Opus Landmark at Meridian Phase I Bldg complete S. One Civic divisio obtain Brewer, Scott Monday, August 01, 2005 5:19 PM Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Duncan,, Gary R; Hoyt, Gary A;,.B!anchard, Jim E; Kendall, Jeff A; ,.D,o, lan, Veronica,.Ai Akers, William P; 'grh~co.hamilton.i~,us; ~john- south@ aswcd.org Candy Fe trier mbm@co.hamilton.in.us; Foley, Amanda J; Griffin, Matt L 'aleisha,jaeger@opusnorth.com' RE: Pre-Submittal meeting for Oous Landmark at Meridian Phase 1 BIdg ronmental Planner - DOCS, One Ciwc 9mail when your cop~es are ready to be picked up from the .left A; Brewer, Scott I; Felt, ned: )U HAVE received building Lillard, Sarah N aleisha, Opus Landmark at Meridian Phase1 Bldg !iaswcd.org A; with this project If you have any bmittal. OUTSTANDING ISSUES, 2005 >>> s received a request to that time. we may proceed OPUS LANDMARK g' MERIDIAN Phase i Bldg 12911 N L,com _- concerns that might affect the issuance of this permit, please REPLY TO ALL on this for Opus Page 1 of 2 [Candy. Feltner@ctrwd,org] :22 PM Gary A; Blanchard, Jim E; [or Opus Landmark at Meridian Phase 1 BIdg an. which is out of our service area. District Griffin, Matt L andmark at Meridian Phase 1 Bldg · .]eft ; Candy division, has E "REPLY TO ALL" WITHIN 48 PENDING "NDING docket n , Sarah N Hill, Dick B Monday, August 01, 2005 Lillard, Sarah N Out of Office AutoReply: Pre-Submittal meeting for Opus Landmark at Meridian Phase 1 Btdg ,ffice until Monday, August 8, 2005. Thank you. .illard, Sarah N liam P Crockett, Terry N; Daley, Penny J; Duffy, John M; Gray, Pat A; H II Dick B; Hoyt, Gary A; Kempa, Lisa L; Krueskamp, Theresa A; Lillard. Sarah N; McCoy, David W Spears Jack J; Zale, Elva A Cc: bject: Opus Landmark ( permits for suite number assignment for each tenant space being Phone ~ 571-2577 553-1919 N JSt 01, 2005 5:02 PM ~sMoved?** n St, 1 Bld§ an Phase I Bldg Jmber are below. Please include this · Matt L Meridian Phase I Bldg has PENDING ENDING Phase 1 Bldg numbers: 48 HOL Nith the Date: PENDING ; 151-00 DP/ADLS Waivers might affect the issuanCe of this permit, please