HomeMy WebLinkAbout05090050-Correspondence
Ochs, James A
From:
Sent:
To:
Cc;
Subject:
Ochs, James A
Wednesday, September 13, 2006 10:36 AM
'billy. rose@opusnorth.com'
'jason. rusk@opusnorth.com'
05090050,12911 Meridian Street, Carmel, Indiana
Inspection conducted by Jim Ochs on Tues. 9.12.06
a $ 100.00 re-inspection fee is applied.
NOTES FOR: 05090050 08 1 - PI
DATE TIME NOTE TEXT
2006-09-13 10:32:30 1 Shower stalls shall have a seat
providing accessibility as regulated in
the Indiana Accessibility Code section
4.21.3.
2 Shower stalls shall have grab bars
as regulated in lAC section 4.21.4.
3 Shower stalls greater than 36 inches
by 36 inches are not permitted to have
curbs. lAC 4.21.7
4 Door opening force may not exceed
5 Ibf on all accessible doors. lAC
4.13.11.
5 All accessible doors shall have
hardware for opening the door, toilet
stalls, both sides. lAC 4.13.9.
6 All recptacles within 6 feet of a
bar sink must be GFI protected, vending
area.
7 Guards are required on all stairways
to a min. height of 42 inches.
lBC 1003.2.12, 1003.2.12.1.
8 Provide copy of state approval for
the elevators.
James Ochs, C.B.O.
,-lL- 6 ty
2~ 1M/) r L-
~
1
OPERATOR
jochs
These
15.
16.
process.
current set of consu'uction
and reviews,
e review
revisions.
Duncan, Gary R
Wednesday, September 07, 2005 10:26 AM
L Ilard Sarah N Conn, Angelina V Hill Dick B; Hoyt Gary A; Blanchard, Jim E Kendall, Jeff
A; Brewer, Scott I; Dolan, Veronica A; Akers, William P; 'grh@co.hamilton.imus; 'john-
s(~uth@ aswcd.org'; 'Candy Fe trier'; 'mbm@co.ham ton..[1 us' Fo ey Amanda J Gr ff n Matt
L
'aleisha.jaeger@opusnorth.com
RE: Pre-Submittal meeting for Opus Landmark at Meridian Phase I B dg
a few issues to work out with the Owner but they can schedule their pre-submittal meeting.
Jim E; Kendall, Jeff A;
,;
I Bldg
HOURS, IF YOU DING
~ubmittal.
PENDING
Waivers
Page
.Rusk@opusnorm,com]
~ay, September 07, 2005 10:48 AM
:his morning we would like to schedule the "Pre-submittal" meeting with
soil?
may we proceed with installation
Lillard, Sarah N
Duncan, Gary R
~riday, September, 02, 2005 11:03 AM
McCroskey, Ryan
'Jaeger, Aleisha'; Hill, Dick B; Redden, Nick; Lillard, Sarah N; Greg Ilko (E-mail)
Opus Landmark at Meridian Phase I
Ryan.
Department's issues
with the folloWing exceptions:
The current
plans.
e INDOT r
is a
Curb
spacing,
Lillard, Sarah N
To:
Cc:
Subject:
Duncan, Gary R
Monday, August 22 2005 9:11 AM
Lillard, Sarah N
Hill, Dick B; Redden, Nick; Greg ltko (E-mail)
RE: Opus Landmark building I
Sarah,
aThis will not need to go back to TAC. We are hoping to review the plans this week. They have hopefully submitted plans
nd calculations for drainage review by the City's subconsultant as well.
This project had gone to TAC under various guises in the past. Formal approval of the plans was never obtained by the
petitioner. At the time that the project went to TAC, the petitioner never provided revised sets of drawings, mainly for what
they were consider ng Phase One at the time, for final review and approval. No one on our side has dropped the ball on
th S one. AS is the case with many projects right now projects just are not following the City's procedures and then all of a
sudden, they want to get started arid ride us until they get all of their approvals, we will try to get this reviewed ASAP to
take some of the pressure off you and your office.
Gary
..... Odgina~ Message .....
From: Lillard Sarah N
Sent: Monday, August 22, 2005 09:05
To: Hill, Dick B; Duncan, Gary R; Redden, Nick
Subject: Opus Landmark ~)uilding 1
Gentlemen,
Could you please give me an update on the status of the Opus Landmark building revie~v. There had
been sterne emails regarding w~ether or not this needed to go back to TAC, or ~vhether they just
needed to submit to you for review.
Also Dick, you said their BPW approval happened some time ago, and may be expired. Have you been
able to find out anything further?
If you could all let me know--I would appreciate it. They would really like to come in for their
submittal meeting.
Thank you,
Sarah £.
Lillard, Sarah N
Hill, Dick B
Tuesday, August 16, 2005 9:15 AM
Lillard, Sarah N; Duncan, Gary R; Redden, Nick
RE: Opus Landmark
I need to go back and reseach the fees. It is Carmel sewer but Indianapolis water. They did obtain BPWS approval for
Commerc a Curb Cut and Sanitary Sewer Availability but the approval ~vas from 2000 a~d normally, BPWS ~pprovals are
good for a year and if construct on has not commenced the project has to be resubm tted to the Board.
..... Odginal Message- ....
From= Lillard Sarah N
sent Monday, August 15 2005 4:39 PM
To: Duncan, Gary R; Hill, DEck B; Redden, Nick
Subject= Opus Landmark
Gentlemen.
Could any of you let me know what the status is for the review/approval of the Opus Landmark
Phase 1 b~ildi~g is? (12911 N, Meridian St.) This is status for the plan review, and also the status of
any fees due for sewer and/or water connection. (It is not CTRVVT) sewer)
Thank you,
Sarah
N
2005 10:56 AM
; Redden, Nick Hill, Dick B
I for Opus Landmark at Meridian Phase 1 BIdg
bmitta
know if you as
not schedule on TAC,
o go through TAC just
Sorry for this
.IN 46290
p:317-705-0444
f:317-705-1444
at Meridian Phase 1 Bldg
Brewer, Scott I; Dolan, Veronica A; Foley, Amanda 3; Griffin,
Page
[his yet.
this is placed on a TAC
apo og ze for anv inconvenience
3riffin Matt L
dmark at Meridian Phase I Bldg
ng
=LEASE"REPLY TO
;north.com>
affect the issuance of this
N
R: Kendall, Jeff A; Brewer,
at Meridian Phase I Bldg
th s is placed on a 'FAC agenda before
inconvenience or problem this may
~; Blanchard, JimE;
dg
PENDING
IG
docket numbers:
51-00 DP/ADLS 151-00A-E Zoning Waivers
m
that might affect the issuance of this permit, please
IS e-ma
Hoyt, Gary A
Tuesday, August 02, 2005 2:13 PM
L Iard Sarah N Conn Ange ina V; Hill, Dick B; Duncan, Gary R; B anchard J m E ,Kendall,
Jeff A; Brewer, Scott Dolan Veron ca A; Akers, Will am P; ~rh@co.hamilton.in us 'john-
south@iaswcd.0rg' 'Candy Feltner' 'mbm@co.hamilton.in.u~'; Foley, Amanda J; Griffin, Matt
L
'aleisha,jaeger@opusnorth,com
RE: Pre-Submittal meeting for Opus Landmark at Meridian Phase 1 Bldg
connection caps for the Siamese
,rdered at www.knoxbox.com
y R; Hoyt, Gary A; Blanchard, .]im E; Kendall, .]eft
~ilton.i~.us'; 'john-south@iaswcd org'; Candy Feltner';
'Ii n Phase 1 Bldg
Lillard, Sarah N
Tuesday, August 02, 2005 9:09 AM
Lillard Sarah N; Conn, Angelina V; Hi, Dick B; Duncan, Gary R; Hoyt, Gary A; Blanchard Jim
E Kendall JeffA Brewer Scott I; Dolan, Veronica A; Akers, Will?m P;
grh@co ham Iron.in.us; 'john-south@iaswcd org' 'Candy Feltner; 'mbm@co.hamilton.in.us';
,F_oley, Amanda J; Griffin Matt L
a eisha.jaeger@opusnorth.com
RE: Pre-Submitta meet ng for Opus Landmark at Meridian Phase I Bldg
complete
S. One Civic
divisio
obtain
Brewer, Scott
Monday, August 01, 2005 5:19 PM
Lillard, Sarah N; Conn, Angelina V; Hill, Dick B; Duncan,, Gary R; Hoyt, Gary A;,.B!anchard, Jim
E; Kendall, Jeff A; ,.D,o, lan, Veronica,.Ai Akers, William P; 'grh~co.hamilton.i~,us; ~john-
south@ aswcd.org Candy Fe trier mbm@co.hamilton.in.us; Foley, Amanda J; Griffin, Matt
L
'aleisha,jaeger@opusnorth.com'
RE: Pre-Submittal meeting for Oous Landmark at Meridian Phase 1 BIdg
ronmental Planner - DOCS, One Ciwc
9mail when your cop~es are ready to be picked up from the
.left A; Brewer, Scott I;
Felt, ned:
)U HAVE
received
building
Lillard, Sarah N
aleisha,
Opus Landmark at Meridian Phase1 Bldg
!iaswcd.org
A;
with this project If you have any
bmittal.
OUTSTANDING ISSUES,
2005 >>>
s received a request to
that time. we may proceed
OPUS LANDMARK g' MERIDIAN Phase i Bldg
12911 N
L,com
_- concerns that might affect the issuance of this permit, please REPLY TO ALL on this
for Opus Page 1 of 2
[Candy. Feltner@ctrwd,org]
:22 PM
Gary A; Blanchard, Jim E;
[or Opus Landmark at Meridian Phase 1 BIdg
an. which is out of our service area.
District
Griffin, Matt L
andmark at Meridian Phase 1 Bldg
· .]eft
; Candy
division, has
E "REPLY TO ALL" WITHIN 48
PENDING
"NDING
docket n
, Sarah N
Hill, Dick B
Monday, August 01, 2005
Lillard, Sarah N
Out of Office AutoReply: Pre-Submittal meeting for Opus Landmark at Meridian Phase 1 Btdg
,ffice until Monday, August 8, 2005. Thank you.
.illard, Sarah N
liam P
Crockett, Terry N; Daley, Penny J; Duffy, John M; Gray, Pat A; H II Dick B; Hoyt, Gary A; Kempa,
Lisa L; Krueskamp, Theresa A; Lillard. Sarah N; McCoy, David W Spears Jack J; Zale, Elva A
Cc:
bject: Opus Landmark (
permits for suite number assignment for each tenant space being
Phone ~ 571-2577
553-1919
N
JSt 01, 2005 5:02 PM
~sMoved?**
n St,
1 Bld§
an Phase I Bldg
Jmber are below. Please include this
· Matt L
Meridian Phase I Bldg
has
PENDING
ENDING
Phase 1 Bldg
numbers:
48 HOL
Nith the
Date: PENDING
; 151-00 DP/ADLS
Waivers
might affect the issuanCe of this permit, please