Loading...
HomeMy WebLinkAbout05080246-Sq. Ft.k. A I s dewalks and dr veways I. Sewer and water lines, sept c system, (tanks & filed system) and/or well locations m. Drainage flow arrows n. All drainage swales and subsurface facilities (retention / detention areas, etc...) required, FURTHER NOTES / NOTICES CARMEL ZONING ORDINANCE Z-289, SECTION 29,04.02 (3): "The Director shall approve or deny the Improvement Location Permit within five (5) working days of the receipt of the wdtten application form and accompanying materials, The Improvement Location Permit shall b.e issued when the proposed structure, improvement, or use and its location conform in all respects to this ordinance. 3. IN ADDITION TO THE ABOVE-LISTED SUBMITTAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY INVOLVED, THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED. ~ ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF THE SUBMITTED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES. SUBMITTAL OF ADDITIONALLY REQuESTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBMITTAL, WILL EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW. > THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON CONSTRUCTION PLANS AS A "BONUS ROOM" TO BE UN ~, I pi - iL . NFINISHED SPACE, IF AN AREA SO LABELED IS TO BE A FINISHED SPACE,,, CONSTRUCTI,O, N PLANS MUST BE LABELED ACCORDINGLY. IF IT IS DETERMINED THAT AN UNFINISHED, BONUS ROOM AREA IS TO BECOME A FINISHED AREA ~ ISSUANCE OF THE PERM~ THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING & CODE ENFORCEMENT. ~ ALL CONSTRUCTION IS SUB3ECT TO FIELD INSPECT/ON, AND SHOULD NOT BEGIN PR/OR TO THE ~ IssuANcE OF THE BUILDING PERMIT. ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED, ~.~l~llJ INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION. Beginning prior to or'raining ~ a building perm t and/or Pr°ceed ng with construction beyond the stage of a requ red inspection witl~°ut appr°val constitutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29.06,08. BUILDING & CODE ENFORCEMENT; CITY OF CARMEL, One Civic Sq.; Carmel, IN 460]52, Ph. (5'17) 57%24.44.. further the table below is Comml n. BASEMENT TOTAL (Finished and Floor Ft. of Unfinished) Sunroom Garages