Loading...
HomeMy WebLinkAbout05080287-Sq. Ft. k. All sidewalks and driveways I, Sewer and water lines, septic system, (tanks & filed system) and/or well locations m. Drainage flow arrows n. AI drainage swales and subsurface facilities (retention / detention areas etc...) o. Sump pur~p -- Show sump pump pit(s) and discharge line locations p. Geothermal heat pump discharge locations *NOTE: Zf land is not within a platted subdivision, a legal description is required. FURTHER NOTE / NOTICES CARMEL ZONING ORDINANCE Z-289, SECTION 29.04.02 (3): "The Director shall approve or deny the Improvement Location Permit within five (5) working days of the receipt of the written application form and accompanying materials. The Improvement Location Permit shall be issued when the proPosed structure, improvement, or use and its location conform in all respects to this ordinance.* IN ADDITION TO THE ABOVE-LISTED SUBMII-fAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FORTHE PROPERTY INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEFT, OF COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED. ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF THE SUBMITTED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT OF THE WORK PROPOSED AND TODETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES. SUBMITTAL OF ADDITIONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBMITTAL, WILL EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW. THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON CONSTRUCTIONPLANSASA"BONUSROOM'TOBE N P ' NFI I HEDSPACE. [FAIN AREASO LABELED IS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS DETERMINED THAT AN UNFINISHED, "BONUS ROOM"AREA IS TO BECOME A FINISHED AREA AFTE_R THE _--N ,F Ti P MIT, THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING & CODE ENFORCEMENT. ALL CONSTRUCT[ON IS SUB3ECT TO F~ELD INSPEC1/ON, AND SHOULD NOT BEGIN PRZOR TO THE ISSUANCE OF THE BUILDZNG PERI4IT, ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED, INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION, Beginning prior to obtaining a building permit and/or proceeding with construction beyond the stage of a required inspection without approval constitutes Late Fee penates, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06,07, and 29,06.08. BLqLDING & CODE ENFOKCEMENT~ 57i-244~. on the Communl penalties of Pedury (Indiana table Delow is Dept. of lENT Total Sq. (Finished and Porch or Ft. of Unfinished) Sunroom Garages S:Permits/FORHS/RESIDENT~ PROCEDURES 2 of Z