HomeMy WebLinkAbout05090003-Sq. Ft. k. All sidewalks and driveways
I. Sewer and water lines, septic system, (tanks & filed system) and/or well locations
m. Drainage flow arrows
n. All drainage swales and subsurface facilities (retention / detention areas, etc...)
o. Sump pump -- Show sump pump pit(s) and discharge line locations
p. Geothermal heat pump discharge Iocatio.n.s
*NOTE: ]If land is not within a platted sUbdivision, a legal description is required.
FURTHER NOTES / NOTICES:
CARMEL ZONING ORDINANCE Z-289, SECTION 29.04.02 (3): "The Director shall approve or deny the Improvement
Location Permit within five {5) working days of the receipt of the written application form and accompanying
materials. The Improvement Location Permit snail b,,e issued when the proposed structure, improvement, or use ant
its location conform in all respects to this ordinance.
IN ADDYr~ON TO THE ABOVE-LISTED SUBMITTAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED
WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY
INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT, OF
COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED.
ADDITIONAL INFORMATION MAY BE REQUESTED BY~ AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF
THE SUBMYI'I'ED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT
OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES.
SUBMITTAL OF ADDITIONALLY REQUESTED/REQUIRED INFORMATION~ AFTER THE INITIAL SUBMITTAL, WILL
EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW.
THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON
CONSTRUCTION PLANS AS A "BONUS ROOM" TO BE N: ~PIABLE UNFINISHED_ SPACE. IF AN AREA SO
LABELED IS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS
DETERMINED THAT AN UNFINISHED, "BONUS ROOM" AREA IS TO BECOME A FINISHED AREA ~
ISSUANCE F THE P Pc . THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING &
CODE ENFORCEMENT.
>, ALL CONSTRUCT/ON ZS SUB3ECT TO FLELD INSPECT/ON, AND SHOULD NOT BEGZN PRZOR TO THE
~ ISSUANCE OF THE BUZLDZNG PERHZT. ONCE THE PERMIT IS ISSUED, wORK SHOULD NOT BE POURED,
[~l~l~ll'J INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION. Beginningpdortoobta~ning
~ a building permit and/or proceeding with construction beyond the stage of a required inspection without approval
] consUtutes Late Fee penalties, aer Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29.06.08.
BUILDING & CODE ENFORCEMENT; CITY OF CARMEL One Civic Sci,; Carmel, IN 46032. Ph. C517) 571-2444.
I, the undersigned, certify that a[I of the above listed information is shown completely and accurately on the
attached plot br site plan(s), construction plans, and any other submitted documentat on, submitted with the
building I~ermit appli~..ation to the City of C.~rmel / Clay 'l;ownship Department of Community Services. I further
certify that the joining of water supply piping shall be made with lead-free solders and fluxes. Failure to comply
will result in a replacement of the system. (Plumbing Code P-509-5) Under the penalties of Perjury (Indiana
Code 35-44-2-~t), I also hereby affirm, under oath, that all of the information I have provided in the table below is
true and aCCurate, to the best of my knowledge a~d belief, and that I have not knov~ingly or intentionally
provided or omitted any information that would tend to hide, obscure, or otherWise mislead the Dept. of
Community Services ~e~arding the truth of the matters addressed therein.
Front
~.~ ~ ~_~ Porch Porch or Ft. of
Unfinished)
Sunroom Garages
NAME PRINTED
S:PermRslFORMSIRESZDENTT, AL PROCEDURES 2 of 2