Loading...
HomeMy WebLinkAboutEngineering Dept Rev #2, 8-22-2013®0 r m NM l� °a I all d M . August 22, 2013 JANIES BRAII\ARD, MAYOR Mr. Andy Taylor American Structurepoint, Inc. 7260 Shadeland Station Indianapolis, IN 46526 RE: Butler Hyundai- Project Review ##2 Dear Mr. Taylor: The City received your construction plans on June 12, 2013, in response to the Engineering Department's comment letter dated April 2, 2013. We offer the following comments: CONSTRUCTION DRAWING REVIEW COMMENTS I . Previous Comment 1 of a letter dated April 2, 2013. Thoroughfare Plan Compliance: Section 2.09 of Chapter 2, Article 1 of Chapter 10 of the Carmel City Code requires that all projects and Improvements or authorizations under the jurisdiction of the zoning ordinance that adjoin, include, are served by or affect existing streets bearing a designation on the Thoroughfare Plan shall conform to the requirements of the Thoroughfare Plan in regards to (1) the dedication of public Rights -of -way; (2) design and construction of the improvements indicated by the Thoroughfare Plan across the roadway frontage of the project; (3) Setback; and (4) any other affected development standards. Section 2.09 further states that the petitioner may elect to provide a monetary commitment equal to the value to otherwise design and construct the improvements indicated by the Thoroughfare Plan across the roadway frontage. The value of the commitment shall be equal to the difference in the value to otherwise design and construct the improvements indicated by the Thoroughfare Plan across the roadway frontage, minus the cost to design and construct those improvements indicated by the Thoroughfare Plan across the roadway frontage that will be installed by the petitioner. The values established above shall be approved by the department of Engineering. Section 2.09 further states that conformance with the Thoroughfare Plan as outlined above shall be in addition to any improvements deemed necessary by: (1) Chapter 5, Sections 5.03.05 and 5.05.02(3); (2) Statements per Chapter 24, Section 24.02(B)(5)(e); and (3) Other applicable standards. Per meeting with Mike McBride, the Thoroughfare Plan commitment that is required for this portion of the development will be $10,424.00. 2. Previous Comment 3 of a letter dated April 2, 2013. Provide all current and proposed easements for this project. An easement is necessary for the storm sewer run that parallels the existing Randall Drive. This right -of -way may eventually be vacated. Please provide the City with a copy of the easement agreement for this drainage easement. 3. Previous Comment 4 of a letter dated April 2, 2013. Are any offsite easements required? The proposed detention pond shall be located entirely within a drainage easement. 4. Previous Comment 7 of a letter dated April 2, 2013. Please clearly mark the construction limits on all plan sheets. Please include the limits of the proposed floodplain mitigation. 5. Previous Comment 8 of a letter dated April 2, 2013. Depressed curb and City standard commercial concrete entrances shall be provided for all entrances in public right -of -way. Please indicate the locations of the depressed curb on C200. The commercial entrance on 96th Street and the south entrance on Randall Bypass shall have depressed curb. DE=PARTMENT OF ENGINEERING ONE CIVIC SQUARE, CARNIEI, IN 46032 OFFICE 317.571,2441 FAx 317.571.2439 ENJmI. enginecring,07c�rmel,in.gw Mr. Andy Taylor August 22, 2013 RE: Butler Hyundai - Project Review #2 Page 2 of 4 6. Previous Comment 13 of a letter dated April 2, 2013. The roundabout on Randall Bypass indicates a 4 inch curb. No details were included for this type of curb. Please amend the standard provided to include an overall curb depth of 22- inches. 7. Previous Comment 15 of a letter dated April 2, 2013. Please indicate subsurface drain under any planned stone shoulders. The referenced note in the response letter could not be found on Site Plan. 8. Previous Comment 22 of a letter dated April 2, 2013. Please ensure the pedestrian facility along 96`x' Street is ADA compliant where it crosses the west driveway off of 96`h Street and Randall Bypass. Areas where the multi -use path and sidewalks cross vehicle access drives shall be ADA compliant. If a curb ramp is not necessarily required, the transition must meet ADA standards and include a detectable warning element. It is not clear or readily apparent that the multi -use path crossings of Randall Bypass and the westernmost commercial entrance conform to ADA scope requirements. 9. Previous Comment 23 of a letter dated April 2, 2013. Please include a separate Entrance Plan. The Entrance Plan shall be a larger scale plan with more detail then provided on the Site Plan. Please refer to the Entrance Plans you provided for "The Bridges" project. 10. Previous Comment 26 of a letter dated April 2, 2013. Please provide a Maintenance of Traffic Plan, The Department repeats this comment. Please provide a Maintenance of Traffic Plan during construction that meets the INDOT Work Zone Safety Manual current edition. 11. Previous Comment 27 of a letter dated April 2, 2013. Please provide a Traffic Control Plan and separate pavement marking plan for right -of -way installations. All pavement markings shall be shown on the Entrance Plan. The Traffic Control Plan shall include all items required by the MUTCD for post construction traffic control, including pavement markings and signage. 12. Previous Comment 28 of a letter dated April 2, 2013. Please provide the following note on the Traffic Control Plan, "ALL REGULATORY SIGNS ARE INSTALLED BY THE CITY AND REQUIRE AN ORDINANCE." It does not appear that this note was included on the Pavement Marking Plan as indicated in the response letter. 13. Previous Comment 34 of a letter dated April 2, 2013. Please provide a drainage summary in the plans as required by Chapter 100 of the Stormwater Technical Standards Manual. Please include: a. The 10 year allowable release rate. b. The 10 year and 100 year post developed release rate using a reduced orifice. 14. Previous Comment 36 of a letter dated April 2, 2013. Note 17 on C400 states that "All proposed storm sewer is private storm sewer." Is this correct? Portions of the storm sewer system are located within City right -of -way. Note 17 on C400 still states that all proposed storm sewer is private storm sewer. Please provide a note in the plans indicating that all storm sewer located within the proposed right -of -way of Randall Bypass will be public, and all other storm sewer will be private. 15. Previous Comment 37 of a letter dated April 2, 2013. Please provide storm sewer plan and profiles for the public drainage system. It does not appear that a plan and profile was provided for the storm run between Structures ##50451. 16. Previous Comment 43 of a letter dated April 2, 2013. An angled right -of -way chamfer shall be provided at the intersection of Randall Bypass and 96`h Street. Per a meeting with Mike McBride, please provide 20 -foot right -of -way chamfers at Randall Bypass and 96`h Street. 17. Previous Comment 44 of a letter dated April 2, 2013. Please indicate who designed the roundabout and if City design practices /standards were followed. Please ensure the pavement markings within the roundabout meet the requirements in the MUTCD. 18. Previous Comment 46 of a letter dated April 2, 2013. Mitigation of any fill in the floodplain will need to be provided. Detention facilities are considered fill by virtue of the fact that Mr. Andy Taylor August 22, 2013 RE: Butler Hyundai- Project Review #2 Page 3 of 4 when full, they displace floodplain. Please provide construction plans for the floodplain mitigation area. This project will not be approved until the compensation plan is approved. 19. Previous Comment 47 of a letter dated April 2, 2013. PIease provide an update on the IDNR approval of the floodway /floodplain revisions. The Department repeats this comment. 20. Previous Comment 49 of a letter dated April 2, 2013. Please incorporate all entrance and roadway improvements recommended in the A &F traffic study. The A &F traffic study states, "The existing westbound right -turn lane at the intersection of 96th Street and Delegates Row should be extended east to serve the access drive." and also, "The westbound right -turn lane at Delegates Row should be extended back to serve the access drives serving this development." Please incorporate these recommendations into the construction plans for this project. 21. Previous Comment 50 of a letter dated April 2, 2013. `NiIl the storm run between structures 51 and 52 be reconsidered? Is an easement required for this installation? Per a meeting with Mike McBride on 8/21/13, please shift this storm sewer run onto this development's property, and tic into the storm sewer along 96th Street at the already proposed location. In addition, please make efforts to accommodate the existing storm sewer on Randall Drive and direct this storm sewer to the storm sewer run between structures 51 and 52. 22. Previous Comment 52 of letter dated April 2, 2013. More detail is needed for the striping in 96`x' Street right -of -way. a. All striping details shall be included with the Entrance Plan. b. Please provide all dimensions for the auxiliary lanes on 96th Street. c. Please stripe the center turn lane on 96" Street as a 2-way left turn lane from the eastern limits of the westbound Delegates Row left turn lane to the western limits of the eastbound Randall Bypass left turn lane. d. Please provide the correct dimensions for the Randall Bypass left turn lane, per City standards. e. Please provide the correct dimensions for the HH Gregg left turn lane, per City standards. L Please label the edge line for the recovery lane on 96`h Street at Randall Bypass (just west of Randall Bypass). 23. There are no grades shown for the path on 96`h Street, 24. The FFE shall be 15- inches above the elevation of 96`h Street and Randall Bypass. 25. The FFE shall be 6- inches above the MLAG. 26. A &F manages the signal timing information for the traffic signals in the City. Please obtain the current timing for the signal at the proposed Randall Bypass and 96th Street. The proposed signal modifications need to be reviewed and approved by A &F. Please provide this Traffic Signal Plan to the City. 27. Please modify the curbing at the westernmost driveway to extend to the northern edge of the asphalt shoulder, not to the northern edge of the travel lane. 28. A note on C200 refers to a detail for the "colored concrete retaining wall with fence" on 0704. This detail was not found on C704. 29. Storm structures #50B and #50C were not included on the Storm Sewer Structure Data Table. 30. Is the island in the center of the roundabout proposed to be asphalt or concrete? If you have questions, please contact me at 571 -2441. Mr. Andy Taylor August 22, 2013 RE: Butler Hyundai - Project Review #2 Page 4 of 4 Sincerely, � iNV Gary R. 're , P.E. Assistant City Engineer yyy Department of Engineering cc: Angelina Conn, Department of Community Services Rachel Boone, Department of Community Services John Duffy, Carmel Utilities Paul Pace, Carmel Utilities Paul Arnone, Carmel Utilities Greg Hoyes, Hamilton County Surveyor's Office Greg Ilko, Crossroad Engineers, PC issvrappsluser datalz:lshared\Development Reviews�PROJREV 131BUTLERHY NDAIREV #2