Loading...
HomeMy WebLinkAbout0006 L301 Pre - Construction Stormwater Pollution Prevention PlanIro O I I t Ii zir Existing Storm Sewer — — Existing Sanitary Sewer New Sanitary Sewer ( see sml vy ft s Pro for i oo Lim) Sanitary Structure Number ___ -- Existing Contour Existing Elevation Y7' Existing Fire Hydrant Existing Water Valve k Existing Utility Pale Existing Trees x— x —x —x— Silt Fence. See Sheet 1-803. 1. EARTH MOVING MAY NOT COMMENCE OF ._ C301 HAVE BEEN COMPLETED IN ADDITION TO ITEMS DEPICTED ON PLAN. 2. RULE 5 REQUIRES ALL DISTURBED AREAS THAT WILL POTENTIALLY BE IDLE FOR 15 DAYS OR MORE TO BE STABILIZED (SEEDED, MULCHED, ETC.) IMMEDIATELY. 3. ADDITIONAL STORM WATER POLLUTION PREVENTION MAY BE REWIRED IN THE FIELD BY CITY OF CARMEL 4. THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIALS IN THE STREETS 5. APPROXIMATE CONSTRUCTION SCHEDULE: START DATE SEPTEMBER 1, 2013 COMPLETION DATE JUNE 1, 2014 6. RECEIVING WATER = VINITE RIVER 7. LATITUDE 3957'00' N LONGITUDE 86'08'24' W B. CONTACT PERSON: CARMEL -CLAY PARK & RECREATION MARK WESTERMSER, DIRECTOR 1411 EAST 116TH STREET CARMEL. INDIANA 46032 PH: (317) 846 -7275 10. WARNING: THIS SHEET TO BE USED FOR STORM WATER POLLUTION PREVENTION PURPOSES ONLY. FOR ANY OTHER INFORMATION SEE SHEETS L101. 11. SEE SHEETS LBO1 -L803 FOR ALL STORM WATER POLLUTION PREVENTION PLAN DETAILS & NOTES PRE-CONSTRUCTION ACTIVITIES 1. Earthmoving activities may not begin until after items 2 -4 have been completed. 2. Install temporary stone access drive off of 116th Street. 3. Construct staging area near construction entrance as shown sheet 1-301. Also construct Rule 5 information posting box, install trash dumpster, and place port —o —let as shown on L803. 4. Install silt fencing as shown on sheet 1-301 °1-302. 5. Strip topsoil or organic matter from Construction area. 6. If work on site will stop for two weeks or more after completion of mass grading, install temporary seed as indicated on charts located on Sheet L803. 7. Maintain all inlet protection and silt fencing in this project by cleaning out every week and after every storm event. 9 0 20' 40' SCALE 1" = 20' • • WFq • _ t Cal boore you cin Z 0 s �ua«<RIaKRQ rirrrUraa �aV�P�� LA20700037 °= C STATE OF °ayg�sL'!NDIANA. \IN a aaaMPEunNY . `�lwo DATE: 07.25.2013 THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION, AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. © COPYRIGHTED BY THE SCHNEIDER CORP.(2013) DATE: PROJECT NO.: 7/25/13 4377.006 DRAWN BY: CHECKED BY: ZB MK SHEET TITLE: PRE — CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN DRAWING FILES: SHEET NO.: IL:30n 1' i- 1 • li J M DATE: PROJECT NO.: 7/25/13 4377.006 DRAWN BY: CHECKED BY: ZB MK SHEET TITLE: PRE — CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN DRAWING FILES: SHEET NO.: IL:30n