Loading...
HomeMy WebLinkAbout0008 L303 Stormwater Pollution Prevention Planr, 0 20' 40' SCALE: 1' = 20' -- _ —V= Existing Storm Sewer 0 N r� x— x —x —x- Existing Sanitary Sewer New Sanitary Sewer (Latmde am sham for ro%mve ally See smfty PI1 k ftft for LoarUM) Sanitary Structure Number Existing Contour Existing Elevation Existing Fire Hydrant Existing Water Valve Existing Utility Pole Existing Trees Silt Fence. See Sheet 1-803. 1. EARTH MOVING MAY NOT COMMENCE UNTIL ITEMS 2-4 OF "PRECoNsTRucnoN ACTImnEs* ON SHEET C301 HAVE BEEN COMPLETED IN ADDITION TO ITEMS DEPICTED ON PLAN. 2. RULE 5 REQUIRES ALL DISTURBED AREAS THAT WALL POTENTIALLY BE IDLE FOR 15 DAYS OR MORE TO BE STABILIZED (SEEDED, MULCHED, ETC.) IMMEDIATELY. 3. ADDITIONAL STORM WATER POLLUTION PREVENTION MAY BE REQUIRED IN THE FIELD BY CITY OF CARMEL 4. THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIALS IN THE STREETS. 5. APPROXIMATE CONSTRUC110N SCHEDULE: START DATE SEPTEMBER 1, 2013 COMPLETION DATE: ,ANNE 1, 2014 6. RECEIVING WATER = WHITE RIVER 7. LATITUDE 395700' N LONGITUDE 86'08'24' W 8. CONTACT PERSON: CARMEL -CLAY PARK & RECREATION MARK WESTERMEIER, DIRECTOR 1411 EAST 1161H STREET CARMEL, INDIANA 46032 PH: (317) 848 -7275 10. WARNING: THIS SHEET TO BE USED FOR STORM WATER POLLUTION PREVENTION PURPOSES ONLY. FOR ANY OTHER INFORMATION SEE SHEETS L101 -L102 It. SEE SHEETS L801 -LB03 FOR ALL STORM WATER POLLUTION PREVENTION PLAN DETAILS & NOTES 1. Repair or replace silt fence installed during mass earthwork phase. 2, Repair construction entrance installed in mass grading phase. 3. Install or repair concrete washout basin as indicated on plans. 4. Repair Construction Staging area originally set up during mass grading. 5. Complete and/or repair earthwork and compaction for pavement subgrades and install pavement subbase material. 6. Complete earthwork and finish grading for seeded areas. Apply seed and mulch within 30 hours of seedbed preparation. 7. Permanently seed, and mulch where indicated on plans. 10. Stabilization of a project site is considered achieved when all land disturbing activities have been completed and a uniform perennial vegetative cover with a density of seventy percent (707.) has been established on all unpaved areas and areas not covered by permanent structures, or equivalent permanent stabilization measures have been employed. 11. The contractor shall maintain erosion control measures and devices during construction and until siltation will not longer occur. 12. After contractor has removed temporary erosion control measures any disturbed areas shall be re— seeded as required. Ji z 0 v1 S w `�`"0 \ \\ X11 \ \ \i1116111illlll / / / /, /j "' /�' � �l R..isR°SS��; r f LA20700037 i STATE OF ' ~s �y0'' �NDIpNP' :'`wo DATE: 07.25.2013 THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF THE SCHNEIDER CORPORATION. AND ARE NOT TO BE USED OR REPRODUCED, IN WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF THE SCHNEIDER CORPORATION. Q COPYRIGHTED BY THE SCHNEIDER CORP. (2013) DATE: PROJECT NO.: 7/26/13 4377.006 DRAWN BY: CHECKED BY: ZB MK SHEET TRE: STORMWATER POLLUTION PREVENTION PLAN DRAWING FILES: SHEET NO.: .1:303 • a. e e 11 1 DATE: PROJECT NO.: 7/26/13 4377.006 DRAWN BY: CHECKED BY: ZB MK SHEET TRE: STORMWATER POLLUTION PREVENTION PLAN DRAWING FILES: SHEET NO.: .1:303