HomeMy WebLinkAbout0008 L303 Stormwater Pollution Prevention Planr,
0 20' 40'
SCALE: 1' = 20'
-- _ —V= Existing Storm Sewer
0
N
r�
x— x —x —x-
Existing Sanitary Sewer
New Sanitary Sewer
(Latmde am sham for ro%mve ally
See smfty PI1 k ftft for LoarUM)
Sanitary Structure Number
Existing Contour
Existing Elevation
Existing Fire Hydrant
Existing Water Valve
Existing Utility Pole
Existing Trees
Silt Fence. See Sheet 1-803.
1. EARTH MOVING MAY NOT COMMENCE UNTIL ITEMS 2-4 OF "PRECoNsTRucnoN ACTImnEs* ON SHEET
C301 HAVE BEEN COMPLETED IN ADDITION TO ITEMS DEPICTED ON PLAN.
2. RULE 5 REQUIRES ALL DISTURBED AREAS THAT WALL POTENTIALLY BE IDLE FOR 15 DAYS OR MORE TO
BE STABILIZED (SEEDED, MULCHED, ETC.) IMMEDIATELY.
3. ADDITIONAL STORM WATER POLLUTION PREVENTION MAY BE REQUIRED IN THE FIELD BY CITY OF CARMEL
4. THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIALS IN THE STREETS.
5. APPROXIMATE CONSTRUC110N SCHEDULE:
START DATE SEPTEMBER 1, 2013
COMPLETION DATE: ,ANNE 1, 2014
6. RECEIVING WATER = WHITE RIVER
7. LATITUDE 395700' N
LONGITUDE 86'08'24' W
8. CONTACT PERSON:
CARMEL -CLAY PARK & RECREATION
MARK WESTERMEIER, DIRECTOR
1411 EAST 1161H STREET
CARMEL, INDIANA 46032
PH: (317) 848 -7275
10. WARNING:
THIS SHEET TO BE USED FOR STORM WATER POLLUTION PREVENTION PURPOSES ONLY. FOR ANY OTHER
INFORMATION SEE SHEETS L101 -L102
It. SEE SHEETS L801 -LB03 FOR ALL STORM WATER POLLUTION PREVENTION PLAN DETAILS & NOTES
1. Repair or replace silt fence installed during mass earthwork phase.
2, Repair construction entrance installed in mass grading phase.
3. Install or repair concrete washout basin as indicated on plans.
4. Repair Construction Staging area originally set up during mass grading.
5. Complete and/or repair earthwork and compaction for pavement subgrades
and install pavement subbase material.
6. Complete earthwork and finish grading for seeded areas. Apply seed and
mulch within 30 hours of seedbed preparation.
7. Permanently seed, and mulch where indicated on plans.
10. Stabilization of a project site is considered achieved when all land disturbing
activities have been completed and a uniform perennial vegetative cover with
a density of seventy percent (707.) has been established on all unpaved areas
and areas not covered by permanent structures, or equivalent permanent
stabilization measures have been employed.
11. The contractor shall maintain erosion control measures and devices during
construction and until siltation will not longer occur.
12. After contractor has removed temporary erosion control measures any
disturbed areas shall be re— seeded as required.
Ji
z
0
v1
S
w
`�`"0 \ \\
X11 \ \ \i1116111illlll / / / /, /j "' /�'
� �l R..isR°SS��;
r f LA20700037 i
STATE OF ' ~s
�y0'' �NDIpNP' :'`wo
DATE: 07.25.2013
THIS DRAWING AND THE IDEAS, DESIGNS AND
CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF THE SCHNEIDER
CORPORATION. AND ARE NOT TO BE USED OR
REPRODUCED, IN WHOLE OR IN PART, WITHOUT
THE WRITTEN CONSENT OF THE SCHNEIDER
CORPORATION.
Q COPYRIGHTED BY THE SCHNEIDER CORP. (2013)
DATE: PROJECT NO.:
7/26/13 4377.006
DRAWN BY: CHECKED BY:
ZB MK
SHEET TRE:
STORMWATER POLLUTION
PREVENTION PLAN
DRAWING FILES:
SHEET NO.:
.1:303
•
a.
e
e
11
1
DATE: PROJECT NO.:
7/26/13 4377.006
DRAWN BY: CHECKED BY:
ZB MK
SHEET TRE:
STORMWATER POLLUTION
PREVENTION PLAN
DRAWING FILES:
SHEET NO.:
.1:303