Loading...
HomeMy WebLinkAbout05090048-Carmel Plan Comm. g matched for consistency. petition; no one appeared and the public I certain items to the two items. While the :r than three asphaR pathway along that a second connector hows the af the utility easement. If would agree to provide the entire business park and site from southbound Hazel Dell Parkway. Mark Rattermann's concern regarding access, especially southbound on Hazel Dell Parkway. seem really excessive and unnecessary. ~ would provide adequate access for stacking and will prevent a back up. he Committee focus on ingress/egress as Well as the color windows, the drive through lanes, PUD was drive-through sted that further review be done at the committee level; the petitioner should bring sample boards Docket No. 05020033 DP/ADLS, Riverview Medical Park, Lot 3 - Fifth Third Bank was referred to the Special StUdy committee for further review on May 3, 2005 at 6:00 PM in the Caucus Rooms of City Hall, 2h. Docket No. 05020034 DP/ADLS: Carmel Townhomes The applicant seeks to create 56 single family attached units on 4.4 acres and seeks the following to 20 feet. The site is located at CAPdMEL, INDIANA 46032 317/571~2417 Tuesday May 3, 2005 in the Caucus Rooms of Wayne Haney; Mark Rattermarm; Steve Stromquist; is located TABLED well as an ONE CIVIC SQUARE CARMEL, INDIANA 46032 317/571-2417 indicated that they wanted to maintain the roof shingle "diamond" pattern. hruaS been included in the site plan. The traffic flow is ns along Hazel Dell past the entrance to the Bank isbein variance would be necessary, ' machine. The sign signage and drive was asked to a dumpster is located at 2 ONE CIVIC SQUARE CARMEL, INDIANA 4-6032 317/571-2417 Adrienne Keeling commented that the Department is recommending suspension of the Rules of Procedure in order to bring this item to a vote this evening. motion to suspend the Rules of Procedure, seconded by Rick 9-0. recommendation, seconded , the meeting continued with the business at hand. on with associated parking 146th St. and Hazel Traei Preble, GPD Associates, 2547Waterfront Parkway, Indianapolis appeared before the Commission representing the applicant. The revised plan now allows for 4 drive through lanes rather than 5. The roof d~sign matches the other bUil~lings in the development and the parking meets the requirements. tDepartment Comments, Jon Dobosiewicz. The petitioner has addressed those issues brought up at he public hearing and discussed at Connnittee. The committee voted unanimously for approval. Jerry Chomanczuk reported for the Special Study Committee. The access points were reviewed, the drive through requirement was reduced, the design is attractive-looking, and the roof design matches the other buildings in the business park. The co~unittee voted 5-0 for ~pproval 2i. Docket No. 05020036 DP/ADLS: Indiana Members' Credit Union The aPplicant seeks Development Plan and ADLS approval to construct a financial institt~tion. The site is locaied at 4790 E. 96th Street and is zoned B3 (Business). Filed by E. Davis Coots for Indiana Members Credit Union. Dave Coots, Coots Henke & Wheeler, 255 East Carmel Drive, Carmel, Indiana appeared before the Commission representing the applicant. The applicant appeared before the Special Study Committee on May 3, 2005 for further and received a favorable recommendation. S:/PlanComrmssion/Minutes/2OO5/pc-2OO5mayl7 16 ONE CIVIC SQUARE CARMEL. INDIANA 46032 317/571~241- Lillard, Sarah N Sent: Friday, August 26.2005 t2:22 PM To: Liliard, Sarah N Subject: RE: Rlverview rvledical park address changes Sarah. There are current y two bud ngs on Lot one They are us ng the same aa(~ress of 14535 but with Building "A" or Fifth Third bank will be going up on Lot 3 which is on the corner of 146th and Hazel Dell and is addressed as 14585. 1 Pk Lot 2...which has nothing there I don t think wiilbe using 4555 Hazel De wy address changes uildings that are already built? I am 3 Bank nilding? ..... Original Message Fro~:' Akers, Wil ,~m P Sent: Friday, August 26, 2005 11:17 To:'Crockett, Terry N; Daley, Penny .]; Duffy, .John M; Gray, Pat A; Hill, Dick B; Hoyt, Gary A; Kempa~ Lisa L; Krueskamp, Theresa A; Lillard, Sarah N; McCoy~ David W," Spears, .]ack .]; Zale, Elva A Cc: BROOKE GA]OWNIK (E-mail) Subject: P,[verview Medical perk Please Haqzel lesville. ical park located on the corner of Parkway so they could be known as will be addressed as 14535 Hazel Dell Parkway with buildings Lot 2 will be given an address of 14555 Hazel Dell Parkway(Future Building). My request was by ,Jay Ebert of Riverview Hospital. 09/08/2005 Lillard, Sarah N Sent: To: C. c Subject: Duncan, Gary R Friday, September 02, 2005 8:23 AM Li ard, Sarah N; Bla, nchard, Jim E; Hoyt, G_a, ry A; Brewer, Scott ~; Griffin, Matt L; Hill, Dick B; Dolan Veronica A; john-south@ aswcd.org; Akers, William P; Corm Angelina V; McBride, Mike T Kendall JeffA 'tpreb e@gpdgroup.com' RE: Pre-Submittal for Fifth Third Bank @ Lot 3 Riverview Medical Park las no further issues with this project, ..... Original Message ..... Lillard Sarah N Wednesday, July 27, 2005 14:06 Lilla~d Sarah N Blanchard ,J. im E Hoyt GaryA Brewer Scott I Griffin, Matt L; Hill, Dick B; Dolan, Veronica A; john-south@ aswcd erg Akers V(/ lam P Conn Ar~getina ~/ McBride Mike T; Kendall, Jeff A; Duncan, Gary R Cc: itpreble@gpdgroup.com Subject: RE: Pre-Submittal for Fifth Third Bank @ Lot 3 R verview Medical Park Traci. The following requests for copies of certain parts of the approved plan come from members of our Planning and Zo~ng office '~ou will notice that these reqhests pertain to item numbers 5 ~ 6 of the submittal requirem~hts listed on the permitting procedures sheet I sent you. P ease subm t four (4) copies of the approved site plan to Scott Brewer. DOCS. One Civic Square. Carmel. IN. 46032. You will be notified when your copies are ready for pickup. Scott Brewer City Forester/Env ronmental Planner One Civic Square Carme. IN 46032 (3:[7) 57t-2478 FAX (3:[7) 571-2426 Please submit three (3) cop es of the architectural elevation drawings for the structure to Matt Griffin. DOCS, One Civic Square, Carmel. IN. 46032. You will be notified when your copies are ready for pickup. Matt Griffin Planning Administrator One Civic Square Carmel. IN ;~6032 (317) 571-2417 FAX (317) 571-2426 Thank you. ..... Original Message ..... Fro~= Lillard, Sarah N Sent= Wednesday, ~]uly 27, 2005 1:24 PM To.' Lillard Sarah N; Blanch,a. rd, Jim E; Hoyt, Gary A; Brewer Scott I; Griffin Matt L; Hill, Dick B; Dolan, Veronica A; john- south@iaswcd.0rg Akers, William P; Conn, Angelina V; McBride, Mike T; Kendall, ]eft A: Duncan, Gary R Cc: 'tpreble@gpdgroup,com Vledical Park ; 'lAVE ~we ittal, RiverView Medical Park PENDING PENDING numbers: Duncan, Gary R Wednesday, July 27, 2005 3 50 PM Lillard, Sarah N; Blanchard, Jim E; Hoyt, G.a, ry A; Brewer, Scott I; Griffin, Matt L; Hill, Dick B; Dolan, Veronica A; 'john-south@iaswcd.org; Akers, William P Corm, Angel na V; McBride~ ,,M. ike T; Kendall, Jeff A tprebte@gpdgr0up.com RE: Pre-Submittal for Fifth Third Bank @ Lot 3 Riverview Medical Park or provided revised drawings, The DOE cannot William Scott I; Griffin Matt L; Hill, Dick B; Dolan, Veronica A; gelina V; McBride, Mike T; Kendall, Jeff A; Duncan, Gary Riverview Medical Park 3 RiverView Medical Park I Date: PENDING Plannil & Zoning docket numbers: To: Griffin, Matt L Monday, August 08, 2005 6:54 PM Lillard, Sarah N RE: Pre-Submittal for Fifth Third Bank @ Lot 3 Riverview Medical Park ..... Or. iginal Message From: Lillard, Sarah N Se.lit: Wednesday, 3uly 27, 2005 1.2__4. PM · ToI Lillard, Sarah N; Blanc.hard, 3ira E; Hoyt, Gary A; Brewer, Scott I; Griffin, Matt L, Hill, Dick B, Dolan, Veronica A; j.o. hn-south@ aswcd.org; Akers, William P; Corm, Ange ina V; McBride, Mike T; Kendall, 3eff A; Duncan, Gary R Cc: tpre.ble@gpdgroup.com Subject: Pre-Submittal for Fifth Th rd Bank @ Lot 3 Riverview Medical Park ,ilding & Code Enforcement division, has ing for the purpose of liN 48 HOURS, that time, we may proceed with the Project: Jical Park Meeting Date: PENDING Time: PENDING Related P docket numbers: le (317) 299-2996 please __ affect the issuance of this permit~ Sarah N Liilard, Sarah N Wednesday, July 27, 2005 2:06 PM Lillard, Sarah N; Bla, nchard, Jim E; Hoyt, G.a, ry A; Brewer, Scott I; Griffin, Matt L; Hill, Dick B; Dolan Veronica A john-south@iaswcd.org Akers William P Conn Angelina V; McBride, Mike T Kendall, Jeff A; ,Duncan Gary R 'tpreble@gpdgroup.com RE: Pre-Submittal for Fifth Third Bank @ Lot 3 Riverview Medical Park )f our item numbers 5 ~ 6 of the copse DOCS. One Civic Square, Carmel. IN. 46032. (317) 575-2478 (3) Copies of the architectural elevation drawings for the structure to Matt Griffin. DOCS, One Civic 46032. You will be notified when your cop es ~'e ready for pickup, Lillard, Sarah N WedneSday, .luly 27, 2005 1:24 PM To: Lil an:t Sarah N Blanch,a. rd Jim E; Hoyi:, Gary A; Brewer Scott I; Gdffin, Matt L; Hill, Dick B;. Dolan, Veronica A; 'john- south@iaswcd.org Akers W I lam P Conn Angelina V; HcBride Nike T; Kendall, Jeff A; Duncan, Gary R Cc: tpreble@gpdgmup.com Subject= Pre-Submittal for Filth T~ird Bank @ Lot 3 Riven4ew Medica~ Park The Kendall, e( ica! Park il ~g a building IF YOU HAVE Project: RiverView Medical Park PENDING PENDING ~p.com issuance of this permit, Greg Hoyes [grh@co.hamilton.in.us] Wednesday, July 27, 2005 3:44 PM Lillard, Sarah N; Michael McBride tpreble@gpdgroup.com Re: FW: Pre-Submittal for Fifth Third Bank @ Lot 3 RiverviewMedical Park Sarah The Hamilton County Surveyor s Office has not outstanding issues with this project. If you have any questions, please let me know. Greg Hoyes HCSO Plan Reviewer >>> "Lfllard, Sarah N" <SLillard@carmel.in,gov> 1:55 PM Wednesday, July 27, 2005, 2005 -~ Gentlemen. Thank you, Sarah £illard 'ect below in your response. ode Enforcement Hill, Dick B; P: ( ; McBride. Mike T; Third Bank @ Lot 3 Riverview Medical Park > The De t of Community Services Buildin & Code Enforcement division has received a request to P. g schedule a pre-submittal meeting for the purpose of obtaining a building permit. PLEASE "REPLY TO ALL" WIT~IIN 48 HOURS IF Y~3U HA~E (SUTSTANDIN~ ISSUES. ,~ter that time. we may proceed with the meeting and submittal ~ Project: > FIFTH THIRD BANK @ Lot 3 RiverView Medical Park > 14585 Hazel Dell Parkway Fifth Third Bank @ Park Lillard, Sarah N iaswcd.org] 27, 2005 1:50 PM Fifth Third Bank @ Lot 3 Riverview Medical Park --~--Or. iginal Message ..... Fro~: L lard, Sarah N [ma Ito SLil ard@carmel, mgov] Se.hr: Wednesday, 3uly 27, 2005 1:2__4. PM To: Lillard,.Sarah N; Blanchard, 3ira,E; Hoyt, Gary A; Brewer, Scott I; Gr!ffin, Matt L, Hill, Dick B, Dolan, . Veronica A; john-south@iasWcd.org; Akers, William P; Corm, Angelina V; McBride, Mike T; Kendall, .~eff Du.ncan, Ga~y R Cc: tpre.b, le@gpdg roup.com SUbject: Pre-Submittal for Fifth Third Bank @ Lot 3 Riverview Medica Park Services 14585 Hazel Dell I Medical Park ISSUES. After Time: PENDING Related P numbers: Lillard, Sarah N .~rom: ent: To: Subject: McBride, Mike T Wednesday, July 27, 2005 1:24 PM Lillard Sarah N Out of Office AutoRepty: Pre-Submittal for Fifth Third Bank ~ Lot 3 Riverview Medical Park I w~ be out of the office the afternoon of July 26th and all day onJu}~ 27th, I ~vill be returning on Thursday, July 28th. I will respond to your email upon my return. If you need immediate assistance. please call 317-571~2441 and someone will assist you~ Thank you, Mike McBride From sent To: Lillard, Sarah N Wednesday, July 27, 2005 1:24 PM Li~lard Sarah N Blanchard Jim E; Hoyt, G.a, ryA Brewer, Scott I; Griffin Mat[ L Hill, Dick B; Dolan, Veronica A; 'john-south@iasWcd.org; Akers, William P; Conn. Angelina V; McBride, ,,M. ike T; Kendall, JeffA ,Duncan, Gary R tpreble@gpdgroup.com Pre-Submittal for F fth Third Bank @ Lot 3 RivervieTM Medical Park nay proceed with the meeting and submittal. has received a ng lNG Medical Park PENDING Time: PENDING 2996 hat might affect the issuance of this permit, please Lillard, Sarah N From: Traci Preble [tprebte@gpdgmup.com] Sent: Wednesday, July 20, 2005 12:53 PM To: Lillard, Sarah N Subject: Fifth Third Bank Sarah, I am requesting a meeting with you concerning the building permit and ILP for the proposed Fifth Third Bank Project located at 14585 Hazel Dell Parkway. It is at the southwest comer of 146th Street and Hazel Dell Parkway. Please contact me at the numbers below to set up a time that would be convenient for you to discuss the project. Thanks. Traci Traci Preble Project Manager GPD Group 2647 Waterfront Parkway, Suite 150 Indianapolis, Indiana 46214 Mobil (317) 407-5370 Office (317) 299-2996 Direct (317) 295-3164 07/20/2005 Lillard, Sarah N Wednesday, July 27, 2005 1 t :09 AM 'tpreble@gpdgroup.com' Commercial Info two is approvals and want COM-INS New Add or Acc Procedu...