HomeMy WebLinkAbout05090048-Carmel Plan Comm.
g matched for consistency.
petition; no one appeared and the public
I certain items to the
two items. While the
:r than three
asphaR pathway along
that a second connector
hows the
af the utility easement. If
would agree to provide the
entire business park and
site from southbound Hazel Dell Parkway.
Mark Rattermann's concern regarding access, especially southbound on Hazel Dell Parkway.
seem really excessive and unnecessary.
~ would provide adequate access for stacking and will prevent a back up.
he Committee focus on ingress/egress as Well as the color windows, the drive through lanes,
PUD was
drive-through
sted that further review be done at the committee level; the petitioner should bring sample boards
Docket No. 05020033 DP/ADLS, Riverview Medical Park, Lot 3 - Fifth Third Bank was referred to the Special
StUdy committee for further review on May 3, 2005 at 6:00 PM in the Caucus Rooms of City Hall,
2h. Docket No. 05020034 DP/ADLS: Carmel Townhomes
The applicant seeks to create 56 single family attached units on 4.4 acres and seeks the following
to 20 feet. The site is located at
CAPdMEL, INDIANA 46032
317/571~2417
Tuesday May 3, 2005 in the Caucus Rooms of
Wayne Haney; Mark Rattermarm; Steve Stromquist;
is located
TABLED
well as an
ONE CIVIC SQUARE
CARMEL, INDIANA 46032
317/571-2417
indicated that they wanted to maintain the roof shingle "diamond" pattern.
hruaS been included in the site plan. The traffic flow is
ns along Hazel Dell past the entrance to the Bank
isbein
variance would be necessary,
' machine. The sign
signage and drive
was asked to
a
dumpster is located at
2
ONE CIVIC SQUARE CARMEL, INDIANA 4-6032 317/571-2417
Adrienne Keeling commented that the Department is recommending suspension of the Rules of
Procedure in order to bring this item to a vote this evening.
motion to suspend the Rules of Procedure, seconded by Rick
9-0.
recommendation, seconded
, the meeting continued with the business at hand.
on with associated parking
146th St. and Hazel
Traei Preble, GPD Associates, 2547Waterfront Parkway, Indianapolis appeared before the
Commission representing the applicant. The revised plan now allows for 4 drive through lanes
rather than 5. The roof d~sign matches the other bUil~lings in the development and the parking
meets the requirements.
tDepartment Comments, Jon Dobosiewicz. The petitioner has addressed those issues brought up at
he public hearing and discussed at Connnittee. The committee voted unanimously for approval.
Jerry Chomanczuk reported for the Special Study Committee. The access points were reviewed, the
drive through requirement was reduced, the design is attractive-looking, and the roof design matches
the other buildings in the business park. The co~unittee voted 5-0 for ~pproval
2i. Docket No. 05020036 DP/ADLS: Indiana Members' Credit Union
The aPplicant seeks Development Plan and ADLS approval to construct a financial
institt~tion. The site is locaied at 4790 E. 96th Street and is zoned B3 (Business).
Filed by E. Davis Coots for Indiana Members Credit Union.
Dave Coots, Coots Henke & Wheeler, 255 East Carmel Drive, Carmel, Indiana appeared before the
Commission representing the applicant. The applicant appeared before the Special Study
Committee on May 3, 2005 for further and received a favorable recommendation.
S:/PlanComrmssion/Minutes/2OO5/pc-2OO5mayl7 16
ONE CIVIC SQUARE CARMEL. INDIANA 46032 317/571~241-
Lillard, Sarah N
Sent: Friday, August 26.2005 t2:22 PM
To: Liliard, Sarah N
Subject: RE: Rlverview rvledical park address changes
Sarah.
There are current y two bud ngs on Lot one They are us ng the same aa(~ress of 14535 but with Building "A" or
Fifth Third bank will be going up on Lot 3 which is on the corner of 146th and Hazel Dell and is addressed as
14585. 1 Pk
Lot 2...which has nothing there I don t think wiilbe using 4555 Hazel De wy
address changes
uildings that are already built? I am
3 Bank nilding?
..... Original Message
Fro~:' Akers, Wil ,~m P
Sent: Friday, August 26, 2005 11:17
To:'Crockett, Terry N; Daley, Penny .]; Duffy, .John M; Gray, Pat A; Hill, Dick B; Hoyt, Gary A;
Kempa~ Lisa L; Krueskamp, Theresa A; Lillard, Sarah N; McCoy~ David W," Spears, .]ack .]; Zale, Elva
A
Cc: BROOKE GA]OWNIK (E-mail)
Subject: P,[verview Medical perk
Please
Haqzel
lesville.
ical park located on the corner of
Parkway so they could be known as
will be addressed as 14535 Hazel Dell Parkway with buildings
Lot 2 will be given an address of 14555 Hazel Dell Parkway(Future Building).
My request was by ,Jay Ebert of Riverview Hospital.
09/08/2005
Lillard, Sarah N
Sent:
To:
C.
c
Subject:
Duncan, Gary R
Friday, September 02, 2005 8:23 AM
Li ard, Sarah N; Bla, nchard, Jim E; Hoyt, G_a, ry A; Brewer, Scott ~; Griffin, Matt L; Hill, Dick B;
Dolan Veronica A; john-south@ aswcd.org; Akers, William P; Corm Angelina V; McBride,
Mike T Kendall JeffA
'tpreb e@gpdgroup.com'
RE: Pre-Submittal for Fifth Third Bank @ Lot 3 Riverview Medical Park
las no further issues with this project,
..... Original Message .....
Lillard Sarah N
Wednesday, July 27, 2005 14:06
Lilla~d Sarah N Blanchard ,J. im E Hoyt GaryA Brewer Scott I Griffin, Matt L; Hill, Dick B; Dolan, Veronica A;
john-south@ aswcd erg Akers V(/ lam P Conn Ar~getina ~/ McBride Mike T; Kendall, Jeff A; Duncan, Gary
R
Cc: itpreble@gpdgroup.com
Subject: RE: Pre-Submittal for Fifth Third Bank @ Lot 3 R verview Medical Park
Traci.
The following requests for copies of certain parts of the approved plan come from members of our
Planning and Zo~ng office '~ou will notice that these reqhests pertain to item numbers 5 ~ 6 of the
submittal requirem~hts listed on the permitting procedures sheet I sent you.
P ease subm t four (4) copies of the approved site plan to Scott Brewer. DOCS. One Civic Square. Carmel. IN. 46032.
You will be notified when your copies are ready for pickup.
Scott Brewer
City Forester/Env ronmental Planner
One Civic Square
Carme. IN 46032
(3:[7) 57t-2478
FAX (3:[7) 571-2426
Please submit three (3) cop es of the architectural elevation drawings for the structure to Matt Griffin. DOCS, One Civic
Square, Carmel. IN. 46032. You will be notified when your copies are ready for pickup.
Matt Griffin
Planning Administrator
One Civic Square
Carmel. IN ;~6032
(317) 571-2417
FAX (317) 571-2426
Thank you.
..... Original Message .....
Fro~= Lillard, Sarah N
Sent= Wednesday, ~]uly 27, 2005 1:24 PM
To.' Lillard Sarah N; Blanch,a. rd, Jim E; Hoyt, Gary A; Brewer Scott I; Griffin Matt L; Hill, Dick B; Dolan, Veronica A; john-
south@iaswcd.0rg Akers, William P; Conn, Angelina V; McBride, Mike T; Kendall, ]eft A: Duncan, Gary R
Cc: 'tpreble@gpdgroup,com
Vledical Park ;
'lAVE
~we
ittal,
RiverView Medical Park
PENDING
PENDING
numbers:
Duncan, Gary R
Wednesday, July 27, 2005 3 50 PM
Lillard, Sarah N; Blanchard, Jim E; Hoyt, G.a, ry A; Brewer, Scott I; Griffin, Matt L; Hill, Dick B;
Dolan, Veronica A; 'john-south@iaswcd.org; Akers, William P Corm, Angel na V; McBride~
,,M. ike T; Kendall, Jeff A
tprebte@gpdgr0up.com
RE: Pre-Submittal for Fifth Third Bank @ Lot 3 Riverview Medical Park
or provided revised drawings, The DOE cannot
William
Scott I; Griffin Matt L; Hill, Dick B; Dolan, Veronica A;
gelina V; McBride, Mike T; Kendall, Jeff A; Duncan, Gary
Riverview Medical Park
3 RiverView Medical Park
I Date: PENDING
Plannil
& Zoning docket numbers:
To:
Griffin, Matt L
Monday, August 08, 2005 6:54 PM
Lillard, Sarah N
RE: Pre-Submittal for Fifth Third Bank @ Lot 3 Riverview Medical Park
..... Or. iginal Message
From: Lillard, Sarah N
Se.lit: Wednesday, 3uly 27, 2005 1.2__4. PM ·
ToI Lillard, Sarah N; Blanc.hard, 3ira E; Hoyt, Gary A; Brewer, Scott I; Griffin, Matt L, Hill, Dick B, Dolan, Veronica
A; j.o. hn-south@ aswcd.org; Akers, William P; Corm, Ange ina V; McBride, Mike T; Kendall, 3eff A; Duncan, Gary R
Cc: tpre.ble@gpdgroup.com
Subject: Pre-Submittal for Fifth Th rd Bank @ Lot 3 Riverview Medical Park
,ilding & Code Enforcement division, has
ing for the purpose of
liN 48 HOURS,
that time, we may proceed with the
Project:
Jical Park
Meeting Date: PENDING
Time: PENDING
Related P
docket numbers:
le
(317) 299-2996
please __
affect the issuance of this permit~
Sarah N
Liilard, Sarah N
Wednesday, July 27, 2005 2:06 PM
Lillard, Sarah N; Bla, nchard, Jim E; Hoyt, G.a, ry A; Brewer, Scott I; Griffin, Matt L; Hill, Dick B;
Dolan Veronica A john-south@iaswcd.org Akers William P Conn Angelina V; McBride,
Mike T Kendall, Jeff A; ,Duncan Gary R
'tpreble@gpdgroup.com
RE: Pre-Submittal for Fifth Third Bank @ Lot 3 Riverview Medical Park
)f our
item numbers 5 ~ 6 of the
copse
DOCS. One Civic Square, Carmel. IN. 46032.
(317) 575-2478
(3) Copies of the architectural elevation drawings for the structure to Matt Griffin. DOCS, One Civic
46032. You will be notified when your cop es ~'e ready for pickup,
Lillard, Sarah N
WedneSday, .luly 27, 2005 1:24 PM
To: Lil an:t Sarah N Blanch,a. rd Jim E; Hoyi:, Gary A; Brewer Scott I; Gdffin, Matt L; Hill, Dick B;. Dolan, Veronica A; 'john-
south@iaswcd.org Akers W I lam P Conn Angelina V; HcBride Nike T; Kendall, Jeff A; Duncan, Gary R
Cc: tpreble@gpdgmup.com
Subject= Pre-Submittal for Filth T~ird Bank @ Lot 3 Riven4ew Medica~ Park
The
Kendall,
e( ica! Park
il
~g a building
IF YOU HAVE
Project:
RiverView Medical Park
PENDING
PENDING
~p.com
issuance of this permit,
Greg Hoyes [grh@co.hamilton.in.us]
Wednesday, July 27, 2005 3:44 PM
Lillard, Sarah N; Michael McBride
tpreble@gpdgroup.com
Re: FW: Pre-Submittal for Fifth Third Bank @ Lot 3 RiverviewMedical Park
Sarah
The Hamilton County Surveyor s Office has not outstanding issues with this project. If you have any
questions, please let me know.
Greg Hoyes
HCSO Plan Reviewer
>>> "Lfllard, Sarah N" <SLillard@carmel.in,gov> 1:55 PM Wednesday, July 27, 2005, 2005 -~
Gentlemen.
Thank you,
Sarah £illard
'ect below
in your response.
ode Enforcement
Hill, Dick B;
P: ( ; McBride. Mike T;
Third Bank @ Lot 3 Riverview Medical Park
> The De t of Community Services Buildin & Code Enforcement division has received a request to
P. g
schedule a pre-submittal meeting for the purpose of obtaining a building permit. PLEASE "REPLY TO
ALL" WIT~IIN 48 HOURS IF Y~3U HA~E (SUTSTANDIN~ ISSUES. ,~ter that time. we may proceed
with the meeting and submittal
~ Project:
> FIFTH THIRD BANK @ Lot 3 RiverView Medical Park
> 14585 Hazel Dell Parkway
Fifth Third Bank @ Park
Lillard, Sarah N
iaswcd.org]
27, 2005 1:50 PM
Fifth Third Bank @ Lot 3 Riverview Medical Park
--~--Or. iginal Message .....
Fro~: L lard, Sarah N [ma Ito SLil ard@carmel, mgov]
Se.hr: Wednesday, 3uly 27, 2005 1:2__4. PM
To: Lillard,.Sarah N; Blanchard, 3ira,E; Hoyt, Gary A; Brewer, Scott I; Gr!ffin, Matt L, Hill, Dick B, Dolan, .
Veronica A; john-south@iasWcd.org; Akers, William P; Corm, Angelina V; McBride, Mike T; Kendall, .~eff
Du.ncan, Ga~y R
Cc: tpre.b, le@gpdg roup.com
SUbject: Pre-Submittal for Fifth Third Bank @ Lot 3 Riverview Medica Park
Services
14585 Hazel Dell I
Medical Park
ISSUES. After
Time: PENDING
Related P
numbers:
Lillard, Sarah N
.~rom:
ent:
To:
Subject:
McBride, Mike T
Wednesday, July 27, 2005 1:24 PM
Lillard Sarah N
Out of Office AutoRepty: Pre-Submittal for Fifth Third Bank ~ Lot 3 Riverview Medical Park
I w~ be out of the office the afternoon of July 26th and all day onJu}~ 27th, I ~vill be returning on
Thursday, July 28th. I will respond to your email upon my return. If you need immediate assistance.
please call 317-571~2441 and someone will assist you~
Thank you,
Mike McBride
From
sent
To:
Lillard, Sarah N
Wednesday, July 27, 2005 1:24 PM
Li~lard Sarah N Blanchard Jim E; Hoyt, G.a, ryA Brewer, Scott I; Griffin Mat[ L Hill, Dick B;
Dolan, Veronica A; 'john-south@iasWcd.org; Akers, William P; Conn. Angelina V; McBride,
,,M. ike T; Kendall, JeffA ,Duncan, Gary R
tpreble@gpdgroup.com
Pre-Submittal for F fth Third Bank @ Lot 3 RivervieTM Medical Park
nay proceed with the meeting and submittal.
has received a
ng
lNG
Medical Park
PENDING
Time: PENDING
2996
hat might affect the issuance of this permit, please
Lillard, Sarah N
From: Traci Preble [tprebte@gpdgmup.com]
Sent: Wednesday, July 20, 2005 12:53 PM
To: Lillard, Sarah N
Subject: Fifth Third Bank
Sarah,
I am requesting a meeting with you concerning the building permit and ILP for the proposed Fifth Third Bank
Project located at 14585 Hazel Dell Parkway. It is at the southwest comer of 146th Street and Hazel Dell
Parkway. Please contact me at the numbers below to set up a time that would be convenient for you to discuss the
project.
Thanks.
Traci
Traci Preble
Project Manager
GPD Group
2647 Waterfront Parkway, Suite 150
Indianapolis, Indiana 46214
Mobil (317) 407-5370
Office (317) 299-2996
Direct (317) 295-3164
07/20/2005
Lillard, Sarah N
Wednesday, July 27, 2005 1 t :09 AM
'tpreble@gpdgroup.com'
Commercial Info
two is
approvals and want
COM-INS New Add or Acc
Procedu...