HomeMy WebLinkAbout05090065-Sq. Ft. k. All sidewalks and driveways I. Sewer and water lines, septic system, (tanks & filed system) and/or well locations m. Drainage flow arrows n. All drainage swales and subsurface facilities (retention / detention areas, etc...) o. Sump pump -- Show sump pump pit{s) and discharge line locations p. Geothermal heat pump discharge locations *NOTE: If land is not within a platted subdivision, a legal description is required. FURTHER NOTES / NOTICES CARMEL ZONING ORDINANCE Z-289 SECTION 29.04.02 (3): "The Director shall approve or deny the Improvement Location Permit within five (5) working days of the receipt Of the written application form and accompanying materials. The Improvemer~t Location Permit shall be issued when the proposed structure, imorover~en[, or use and ts location conform in all respects to this ordinance." IN ADDITION TO THE ABOVE-LISTED SUBMITTAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED. ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF THE SUBMITTED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT OF THE WORK :ROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES. SUBMITTAL OF ADDITIONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBMITrAL, WILL EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEqN. THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON CONSTRUCTION PLANS AS A "BONUS ROOM" TO BE UNOCCUPIAB E . FINISHED SPACE. IF AN AREA SO LABELED IS TO BE A FINISHED SPACE, CONSTRUCTION PLANS MUST BE LABELED ACCORDINGLY. IF IT IS DETERMINED THAT AN UNFINISHED. "BONUS ROOM"AREA IS TO BECOME A FINISHED AREA ~-~ UANCE; FTH P -'MIT, THE PLANS AND PERMIT RECORDS MUST BE UPDATED ATTHE OFFICE OF BUILDING & CODE ENFORCEMENT. ~ ALL CONSTRUCTION IS SUB3ECT TO FIELD INSPECTION, AND SHOULD NOT BEGIN PRIOR TO THE ~ ISSUANCE OF THE BUILDING PERM1T. ONCE THE PERMIT IS ISSUED, WORK SHOULD N°T BE POURED, 1~1~1~1211'J INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE INSPECTION. Beginning prior to obtaining ~ a building permit and/or proceeding with construction beyond the stage of a required inspection without approval ~ constitutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29.06.08. BUILDING & CODE ENFORCEMENT; CITY Of CARMEL. One Civic Scl.; CarmeJ, IN 460552. Ph. ¢:517) 571-2444. I, the undersigned, certify that all of the above listed information is shown completely and accurately on the attached plot or site plan(s), construction p aris, and any other submitted documentation, submitted with the building permit application to the City of Carmel / Clay Township Department of Community Services. ! further certify that the joining of water supply piping sha I be made with lead-free solders and fluxes, Failure to comply will result in a replacement of the system. (Plumbing Code P-509-5) Under the Dena ties of Peduw (Indiana Cocte 35-44-2-].), I also hereby affirm, under oath, that all of the information I have provided in the table below is true and accurate, to the best of my I~nowledge and belief, and that I have not knowingly or intentionally provided or omitted any information that would tend to hide, obscure, or otherwise misl6ad the Dept. of Community Services regarding the truth of the matters addressed therein. BASEMENT ~ Total Sq, TOTAL Ft. of (Finished and [ Porch or Garages Unfinished) DATE NAHE P~JNTED S:Permits/FOR3flSIRESIDENTIAL PROCEDURES 2 of 2