HomeMy WebLinkAbout05090054-Sq. Ft. k. All sidewalks and driveways
. sewer and water nes, sept c system, (tanks & filed system) and/or well locations
m Drainage flow arrows
n, AIl drainage swales and subsurface facilities (retention / detention areas, etc...)
o. Sump pump -- Show sump pump pit(s) and d Scharge line locations
p Geothermal heat p.ump discharge locations
*NOTE: If land is not WRhin a platted subdivision, a legal description is required.
FURTHER NOTES / OTICES:
> CARMEL ZONING ORDINAN II approve or deny the Improvement
Location Permit within five (5) working days of the receipt of the written application form and accompanying
materials. The Improvement Location Permit shatl b,,e issued when the proposed structure, improvement, or use and
its location conform in ail respects to this ordinance.
IN ADDITION TO THE ABOVE-LISTED SUBMITTAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED
WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY
INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF
COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED.
ADDITIONAL INFORMATION MAY BE REQUESTED By, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF
THESUBMITTED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE NATUREAND EXTENT
OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES.
SUBMITTAL OF ADDITIONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBMITTAL, WILL
EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW.
> THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON
i~BNSTRUCTiON PLANS AS A "BONUS ROOM" TO BE -.~ ,-UPIABLE UNFINI . :SPACE. IFANAREASC
ELED IS TO BE A FINISHED SPA(~E,,, CONSTRU ACCORDINGLY. IF IT IS
DETERMINED THAT AN uNFINISHED, BONUS ROOM AREA IS TO BECOME A FINISHED AREA ~
IS UANCE - E PERMIT. THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING &
CODE ENFORCEMENT.
ALL CONSTRUCTION IS SUB3ECT TO F~ELD ZNSPECTZON~ AND SHOULD NOT BEGZN PP~OR TO THE
ISSUANCE OF THE BUZLDI'NG PERHZT ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED,
INSuLATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE iNSPECTION. Beginning prior to obtaining
a building perm t and/or proceeding with construction beyond the stage of a required inspection without approval
constitutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and
BUILDING & CODE ENFORCEMENT; CITY OF CARMEL, One Civic 5q.; Carmel, IN 460~52. Ph.