HomeMy WebLinkAbout05080186-Sq. Ft. k. All sidewalks and driveways
L Sewer and water lines, septic system, (tanks & filed system) and/or well locations
m. Drainage flow arrows
n. All drainage swales and subsurface facilities (retention / detention areas, etc...)
o. Sump pu~p -- Show sump pump pit(s) and discharge I ne locations
p Geotherr~ral heat pump discharge locations
*NOTE: If land is not within a platted subdiViSiOn, a legal description is required.
FURTHER NOTES / NOTICES'
~. CARMEL ZONING ORDINANCE Z-289, SECTION 29.04.02 (3): The Director shall approve or deny the Improvement
Location Permit within five (5) working days of the receipt of the wdtten application form and accompanying
materials. The Improvement Location Permit sha I b,,e issued When the proposed structure, improvement, or use and
its location conform in all respects to this ordinance.
> IN ADDITION TO THE ABOVE-LISTED SUBMITTAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED
WITH ANYINFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY
INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEFT. OF
COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED,
~ ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF
THE SUBMITTED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL~ TO INDICATE THE NATURE AND EXTENT
OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES.
SUBMITTAL OF ADDITIONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBMIITAL~ WILL
EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVIEW.
~ THE OFFICE OF BUILDING & ,(;,ODE ENFORC,E,M, ENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON
CONSTRUCTION PLANS AS A BONUS ROOM TO BE SPACE. IF AN AREA SO
LABELED IS TO BE A FINISHED SPACE,,, CONSTRUCTI,O, N PLANS MUST BE LABELED ACCORDINGLY. Ii: IT IS
DETERMINED THAT AN UNFINISHED, BONUS ROOM AREA IS TO BECOME A FINISHED AREA AFTER THE_
THE PLANs AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING &
4FORCEMENT.
ECT TO F/ELD INSPECTZON, AND SHOULD NOT BEGIN PP~OR TO THE
ISSUANCE OF THE BUILDING PERMIT. ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED,
INSULATED/COVERED, AND/OR OCCUPIED PRIOR TO THE APPROPRIATE iNSPECTION. Beginning pdor to or'raining
a building permit and/or proceeding with COnstruction beyond the stage of a required inspection without approval
constitutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29.06.08.
BUILDING & CODE ENFORCEMENT; CITY OF CARMEL One Civic Sq,; C.a~mel, IN 46052. Ph. (517) 571-2444.
I further