Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Floor Plan A101
��N���� NO��� I. i�LAN DIM�N510N5 AR� TAK�N TO �INISH �AGE O� NEW Wf�LL OR FAG� O� �X15TINC� �IN15H1=D WP�LL SUR�AG� (f�5 APPLIGABLE) UNL�55 NOT�D OTH�RW15�=. 2. �tLL DOOR ROUGH OPEN INC�S SHf�LL BE �Rl�MED 6° FiZOM ,4DJAG�NT Wf�LL GORN�R UNL�55 OTH�RWIS� NOT�D. 3. PRO�/IDE FIRE TR�,4TED f3LOGKIN6 IN WALLS FOR GRAB BARS, WALL STOPS, �TG. 4. V�RI�Y THAT �X15TINC� WALL AT TOIL�T ROOM H�5 INT�RN?�L BLOGKIN6 I� BLOGKINC� 15 NOT EXISTING, R�MOVE PORTION O� EXISTIN6 C�YPSUM BOP�RD AS R�QUti�ED TO INST,�L N�W BLOGKING. PRO�/ID� AND INSTALL N�W BLOGKIN6. PATGf-f B,4GK iNALL SURF/�GE �5 N�G�55f�RY. �. (NOT US�D) 6. S�E Wf�LL TYP� SGH�DUL� THIS SH��T �OR f�LL N�W INT�RIOR WP�LL GONSTRUGTION. 7. GONTRl�GTORS SHALL B� R�SPON5IBL� �OR �I�LD GH�GKING ALL DIMENSIONS {�ND M�,45URF_MENTS. I� JOB GONDITIONS Pi2��/ENT OBTf�INING DIM�NSIONS OtZ RE�LTS AS 51-tOWN OR SP�GIFIED, GONTRP<GTORS 51-fALL B� RESPONSIBLE �OR IN�ORMIN6 LP�MSON � GONDON, ING. B��OR� ANY GONSTRUGTION IS GOMPLETED. G_ ALL D�T,�ILS, Mf�T�RIALS, ,4ND INST�tLL�4TION5 OF S�M� ARE SUB��GT TO �IN/4L ,4PPROVAL BY Ll�MSON � GONDON, ING. 10. SHOP DR�tWIN65 OR GAT�LO6 GUTS MUST BE SUBMITTED TO L?�MSON � GONDON, ING., ON ALL MATERIALS 02 IT�MS I� THE GONTRl�GTOR GH005E5 TO DEUI/�TE �ROM THl�T St-fOWN ON THEDRl�WIN65 OR IF THE DRAWING DO�S NOT INDIGATE A SPEGI�IG MANU�f�GTUR�R OR MODEL NUMB�i2. II. GONTRP.GTORS TO VERI�Y SIZE RND LOG,ATION O� ROO� GUTOUTS �OR f�NY �QU I PMENT THf�T P�NETRATES TH� ROO�. �LL ROO� GUTOUTS f�ND �LI�SHING MUST B� GOORDINf�TED WITH L1�NDLDRD'S ROO�INC7 GONTRAGTOR. 12. GONTRAGTORS SHf�LL EXi��DIT� PREP�Rf�TION AND SUBMITT{�L O� ALL SHOP DRI�WINC�S TO /�LLOW SU�FIGIENT TIME �OR GHEGKIN6 �P�BRIGATION I�ND/OR ORD�iZINC� �ND U�LIVERY OF MATERIP�LS �ND EQUIPMENT. I�. TH� GONTRAGTORS Sf-IL�LI__ B� RESPONSIBLE �OR O�/ERSEEING Tt-fAT ?�LL MATERI AL AND LABOR, SHALL BE I N P�GGORDf�NGE W I TH THE BEST QUf�L I TY STAND�RDS OF THE R�SP�GTED TRf�D�. THE GONTRf�GTORS SHRLL B� RE5PON51BL� �OR OV�R�;E�IN6 TF-fI�T �lLL WORK SHALL BE IN �GGDi�DANG� WITH THE STAT� UNI�ORM BUILDING GOD�S ,4ND ST/�NDARDS �OR f�LL G�NERf�L GONSTRUGTION, MEGHl�NIGf�L, f�ND EL�GTRIG/�L WORK I�ND LOG,�L >4ND��D�RA1_ GOD�S �ND STf�ND/�RDS. 14. ALL TRAD� GONTR�GTORS SHf�LL WARRANTY ALL M�T�RIl�LS f�ND WORKMANSHIP FOR �i MINIMUM O� ON� YEf�R �ROM Df�T� O� GONSTRUGTION GOMPLETION. 0 �-------� i i i � i �-------� � •• 10152'-O" 156'-5 3/4" 230'-5 I/8" I56'-5 �/4" � � � � 0 N 56'-3 �/8'1 IG2'-2 I/2" 0�� 104 �---T i� �i „ i ,"� i �--y 1 �� I . i -- \�I -� � � N i � N �- � `r � � o � � � �/8" �q.6�_���� j � � TROOM � o �` / t � 103 / � � _ , ,• F� --------� F�-----�� � . . i �'� i i �>c� i WI yy� i �`�, i i.� `. i I�--------- ��! 4�-----�J �� 7 2 TOIL�T �OOM �L�N AIOI ��: I/4" = I'-O" TOIL�T PARTITION L-SHAPED 6Rf�B BftR 8-6813�.QQ VERTIGAL GRAB BAR B-6806 x 18.GG iOILET T�55UE DISPENS�R 8-2�40 Ifl,"v`Jd." Mli��?�� TOI�.�T i�00M A�o� �L���T I �N S�AL.�: 114 = I -O' �OOM � I I�l I��i 4- GOLOi� SGH�DUL� GONG. BARE GONGR�TE ������ G� I L I NC� R�j�?A.{�K�=, �GT-I VINYL TIL�, L,hNDLORD'S NO. �OOM I��MF FLC� ��, ��`�E NOi�TH �AST SOUTH W��T - sT�N��� nP�. 100 HALL GPT-I VB-I P-I P-I P-I P-I G�� VB-I 4° GOV�D VINYL BAS�, 10'-O" AF� LANDLORD'S STANDARD TYPE. G- I 101 OFFIGE AR�A GPT-I VB-I P-I P-I P-1 P-I �_ �� F P-I PAINT, I GO,�T PRIM�R. �XP05ED �INAL �INt5HE5 I 102 V�tGf�NT GONG. NON� T55 TSS TSS T55 STRUGTUR� BY OTH�RS G-I 2x� LAY-IN GEILINC� PP�NELS � GRID, LANDLORD'S 5T{tNDl�{ZD TYP�. 103 TOILET ROOM VGT-I VB-I P-I P-I P-I P-I 8�_��� ��� SEE SI-fEET E101 �C)R L�YOUT. 104 FUTUR� TOILET GONG. NONE T55 T55 TSS T55 �XP05�D �INAL �INISHES TOILET PARTITION: STRUGTUR� BY OT+�+ERS �LOOR MOUNTED, OV�Rt-+Ef�D BRRGED, 105 JANITOR VGT-I VB-I P-I P-I P-I P-I G-� PR��IN151-f�D METP�L 8'-O" A�� G- I 106 UTILITY VGT-I VB-t P-I P-I P-I P-I �_ �� � EXPOSED �INAL FINISH�S I IOi VAGP�NT GONG. NONE TSS T55 T55 TSS STRUGTURE 8Y OTHERS NUMB�RS R�FERENGE TO BOBRIGK PRODUGTS Wf�ST� 2EG�PTf�GLE, 50f�P ,4ND TOINEL D15PEN5ER5 AR� BY TEN,4NT SEE 4/MIOI �OR MOUNTINC� HEIC�HTS 1700�'. �G���UL.� No ROOM D I MEN51 ON5 101 I I 3'-O" '_ "xl- / " 102 102 3'-O"xb'-8"xl-3/4" 10 103 3'-O"xb'-8"x1-314 104 104 3'-O"xb'-8"xl-3/4" 105 I O� 3'-O "xb'-8"x I-3/4" 106 106 3'-O"xb'-8"xl-3/4" 10� 10� 3'-D"xb'-8"xl-3/4" �00�, �N� �fi��M� N�fi��: I. HOLLOW M�Tf�L DDOR �RAMES TO B� 51-tOP PRIM�D. WOOD DOORS TO B� ST,41N 6Rf�D� BIi�GH. Pf41NT DOORS /�ND FR�M�S TO Mf�TGH ?�D�P�G�NT W{�LL SUR�AGE. 2. ALL N�W LOGK5�T5, L,�TGH5ET5 AND THRESHOLDS TO 8� O� A TYP� I N GON�ORMANG� WITH TI-f� PRO�/ISIONS O� TH� 'f�M�RIGt�NS WITH DISABILITIES' ,4GT (ADA). 3. P�BBR�VIATIONS: H. M. = HOLLOW M�TP�L, S.G. WOOD = 50LID GORE WOOD l-1'P� �� � �� � � � � � I I , N�Y� �L00� �'L� AIOI �qLE: U8" = I'-O" DOOR MATERIAL S.G. WOOD S.G. WDOD S.G. WOOD S.G. WOOD S.G. WOOD FINIStf 5� STAIN 5� STAIN STAIN STAIN STAIN ��L.1� TY�� SG#��I�U�.� WI �X15TINC7 M�Tf�L STUD �RAMED 6YPSUM BOARD WALL TO REMAIN. PATGH �S R�QUIRED WHER� NEW W�tLLS ABUT EX I 5TI NG. W2 N�W �ULL +-fEI6HT INTERIOR PARTITION. PROVIDE 3-5/8" M�TAL STUDS f�T 16" O.G. WITti 50UND B�TT INSULATION AND �/8" GYPSUM BOARD UP TO UNDER5IDE O� D�GK ABOVE. TAPE, SPAGKLE ,4ND SAND AS NE�D�D R�f�DY TO AGGEPT NEW �IN15H�S BY OTH�f25. W3 N�W G�ILIN6 HEI6HT INT�RIOR PARTITION. Pf�OVIDE 3-5/8" M�T/�L STUDS f�T I6" O.G. WITH SOUND B�TT INSULATION AND 5/8" 6YP5UM BOARD UP TO UNDE1Z51DE OF GEILIN6. Tf�P�, SPP�GKL� P�ND Sf�ND ,h5 N�ED�D R�,4DY TO ,�GG�PT N�W �INISHES BY OTHERS. W4 N�W TOIL�T INTERIOR Pf�RTITION. PRO�/IDE 3-5/8" MET/�L STUDS !�T 16" O.G. WITH SOUND Bf�TT INSULATION f�ND 5/8" 6YPSlJM BOf�RD (USE MOISTURE-FZE515Tt�NT 6YPSUM BOf�iZD ON TDIL�T ROOM SOD� O� WALL) UP TO UNDERSIDE OF STRUGTURE. TAPE, SPAGKLE AND Sf�ND P�5 NEED�D READY TO f�GGEPT N�W FINISf-fE5 BY OTH�RS. W5 �X15TING �XTERIOR WALL TO REMAIN. PROVIDE NEW �URRIN6 WITH 5/8" GYPSUM BO�RD TO EITHER 6" ABOV� �INISH GEILIN6. Tf�PE, SP?�GKLE AND SAND f�5 NEED�D R�P�DY TO f�GG�PT NEW FINISHES BY OTHERS. W6 �X15TIN6 �XTERIDR WALL TO REM/-�IN. PRO�/IDE NEW 2-I/2" M�Tf�L STUD �RP�MING WITH 5/8" C�YPSUM 80P�RD TO 6" f�BOVE �IN15H G�ILIN6. TI�PE, SPAGKLE r4ND SP�ND �5 N��DED R�,4DY TO P�GGEPT NEW f=1N15HE5 BY OTHERS. �� 3� 0�� �� �� °N� 2" x 5 3/4" H.M. �— � ���� ���� 41 I � �00� �Y��� 5/8" 6YPSUM WALLBORRD 3 5/8" h'�TAL 5TUD5 �I6"o.c. DOUBLE 1�TAL 57UD HEADER WITH RUNNER TRhGKS ALON6 TOP AND BOTTOM 2��xs �/e° i-iowow METAL DDOR FRAME DOOR - RE� TO SGHEUULE HEAD D TA�I H-I gcfd..e. � v�. = r-0. �RAME DETAILS Tl'PE MAT�RIAL FIN15H t+�AD �AMB� F-I H. M. PAINT �-I H. M. Pf�INT F-I H. M. PAINT �-I H. M. Pf�INT �-I H. M. PAINT �-I H. M. PAINT H-I H-I H-I H-I H-I ����Y ���� ���� HARDWA�RE SET #OI HARDY�IARE SET #02 OP�NINGS #100, 102 � 10�1 OPENINC�S #103 � 104 3 HIN6� BUTTS 3 HINGE BUTTS I LOGKSET (ENTRflNGE �UNGTION) I LATGHSET (f'RI1(ftGY FUNGTION) I GL05�R I GL05ER I WALL STOP I W/kLL STOP 51LL � � .� �� � ��I � � � � HDWR 5ET � m m m m � � �� �L��� �R�L I N6 5/8' GYP��1M WALLBOARD 3 5/8' METAL 5TUD5 OI6" O.G. DOUBLE 5TUD5 � JAMB TO SUPPORT HEADER n 2"� 7/8° +io�ow METAL DOOR �RAME O V � d ANGf-IORS- 3 PER � JAi�, MIN. DOOR - f2EPER 70 SGHEDULE J�MB DETAI J-I sc�, � vr = r-o� ... REMARKS I No ENTRfINGE DDOR I 102 TDILET ROOM DOOR 104 JANITOR ROOM DOOR 10� UTILITY RDOM DOOR 10� �NTRANGE DOOR 10� HARDWARE SET �03 OPENING #105 3 HIN6E BUTTS I LOGKS�T (STDREROOM �UNGTIOI�U I GL05ER I KIGK PLAT� I WftLL STOP HARDWARE SET �04 OPENIN6 #101-A 3 �IIN6E BUTTS 1 LATGtiS�T (PA55R6E FUPIGTION) I l�RMOR PLATE I KIGK PLf�Tf I WALL STOP