HomeMy WebLinkAbout1338.98.10Ct!
b Prov� dW�t�u,�at r�ang��a and �ns�ns ea reqwred by epp��cabb
codes fo� ce�ling installation.
7. Ha�ng indsp�nd�ntly of wslts, oolumns, ducts, qpea and oonduit.
Where carrymg memb�rs ans spl�cvd, aw�d visible diaplaoement
of the bng�dmal ax�s or tace plan of ad�ec,ont members.
8 L�ghting �xturea shall not bs suppo�sd from o� on main runners
o� cross runners rf we�ght of the fixture causes the �ofal dead bad
t� exceed cieflecbon capab�lity.
a Where fixture bads ars supported by auPP�ementary
hangers IocaLs hangsrs Mnthin 6' of each corner, or
support fixturea i�dependsntly.
g Do not inatall fixturss such tt►aR me►� runners and croaa mm�era
may be ecce�tncally loeidsd. Where fi�cture mstallation would
produce rotation of runners, prowde stab�l�zer bars.
10 Install edge mddings aR in�srsec,�tion of ce�ling and vertical
surfa�ces, us�ng maximum lenc,�ths, straight, tn�e to line and level.
M�Ler comers.
� 1 Prov�de edge moldings at junctions with other ce+l+ng finishea.
12. Install units level, in uniforrn p18�e and free from tw+st, warp ano
dents
13 Ad�ust any sags or twists wh�ch develop in oe�ting sys�ems and
replace any pa►rt wh►ch is damaged or faulty.
Extra Ma�ena! Provide iour full boxes �n onginal co�ta��ers of eact�
type ot ce�l�ng ble for fuhire use by Store Manager
i
SECTION 09680 - CARPETING
A Contractor ahall inatall carpet fumished by The Gap, where shown and
no�ted on Drawings
1 Gontractor shall prov�de inatallapon maLenals and accessones.
CORPORATE ARCHITECTURE
901 CHERRY AVENUE
SAN BRUNO, CAL IFORNIA 94066
(650) 952-4400
�
0
C
�
E
F
S�aming Plans: Submit oomplsE� layout plana including locations of
s�ama and method of s�err�ng for Arc;�►itect'a review.
sa
Si� Ca�►drtions:
� po �at commencs carp�t installation until painting and finiahing
work is complete and ceiling and o�hsr overt►ead work haa bsen
�s�ed. aPProved and oompleted.
2. Maintain roan t�np�retu�s at minimum 60 dsg�+s�s F for at Isast
24 houro pnor to installation and approximate relative hum�drty
ane ia to maintain.
3. Prov�ds sufficient lighti�g as hcorm��ended bY manu�'ech�re�.
Matenels:
1. Cerpet: Shaw Industnea Style No NSP 27408.
a. Conatn�ction: PCVC.
b Fiber: 100°�'o DuPoM Sdution Dyed B�F Nybn.
c. Gauge� 1/8'.
d Sti�hes 7 67 per m
e Tuf�ed Pile He+ght N�gh 291 Low 219
f Tufted Yam We�ght 30 oZ per sq yd
9 Pnmary Back Polypropyler►e
h Secondary Back Polypropytene
i 1Kidth 12 ft
j Yem Ply 1235/4.
k Fleme Spread ASTM E84 Flame Spread 75 or Isss.
I Flammability: ASTM E648 cRtical radient Aux .45
watts/pn� or grester
m Smoke Density� ASTM E662 Smolce Dena�ty rating of 450
or less �n flaming rrade
n Me�thenam�ns Pill Test FF 1-70, passed
2. Pad 50 oz. pad with rubb�nzed coeting, �udow Corporation
'Mo�arch'; provide pad at cust�orr�er aervice cashwrap only.
3 Adheaivea: The 1�olbwing ad�esivss are acosptable 1or uae in
direct glue down o�f carpet: Henryra +If356, Robert's #�3100, Taylor
#t295, Chaptoo +1�310, AIH #�55 'Supreme'.
4. Ssam Ssalsr: O�on 'CT-3' tape, Robsrt Company 'Golde�
Touch', or L.D. Bnnkman #�55'Supreme'.
5. Z Bar Cob�trym CM501, Mscldanburg Duncsn Z Ber or squal
carpe�t trans�tion � wood fbonng to be wrapped and firnshed with
Zber Carpet to be snug againat edge of wood and 1/8' higher
than finished wood floor.
6. Ba,,ss: Provide 4' toeless base as noted on Drawinga.
Manufac�urer: Roppe, Rubber Baae #f50, Color� 'Dar1c GreY.
7. Edge Guard:
e. Provide Carpet edc,�s gua►d at ca�t/concrste t►ansitiona
as noted on drawings. Manufacturer: Johnson�te - EG
X-X-L, C.dor: Charooal.
prepdretio�: Clsan floors of duat, dirt, solvents, oil, groase, pairrt,
plasber and other aubatances detnmerrtd to proper pertormance of
a�esive and carpet. Albw floora eo thoroughiy dry.
t. Ensure concret� Aoors ers fne No^'� sc���ng �d irregulantiea
and exhibit neutrality relative b� acidity and alkalinity.
2. Use an a�p►avsd osmentitioua fi��er to patch cracks and small
hdes, and for leveting. Ensur� floora are levot, wAh maximum
surtace variatic� of 1/8' in 10'-0', no�cumulative.
3 Comrr�sr�cemsnt of carpet instsllation shall signity aoceptance of
sabsfectory oondR�ona.
Installation
1. Gensral: Cabine�Mrorlc shall bs inafalled ov�sr finish flooring;
schedule Woric ao rrrnimum vf pairiting and graphics woric occurs
ovsr carpet and assure carpst is pro�ected from damage from
any source.
2. Inat�aJl atair carpst notinga at stairs and special sdging sVips
where carpet tsrm�nated at oRhsr Aoor covenngs unless
othervviae shown.
a. Use h�ll Isnglt� peces o�y. 8utt tight to vs�tical aurfaoss.
rU
Where splicing cannat be avoided, butt enda tight and
flush.
3. At frttinq rooms carpet shal� be hooked to P�ns of carpet stnp and
tudced securety behind.
f. Ptumbing fixtures end �oilet room accosaonea.
. .: • ., . . -.. . ..... : : �.
A.
n
4. Fill stnps shdl not be leas tnan y' m vmdtt► and at leaat 36' m
Iength. Fili stnps ahall bo kopt �o a minimum Fill stnp locabons
to be approved by The Gap.
5. Meir►tain f�niahed carpet inatallation free trom tacks, scraps,
c,�upst npplea, scalbpa, puckers, and other defects.
6. ARer inatallation ia comp�e�, clean dirt and debris and ctean
spota with proper spot remover. Remove loose threads and
vacuum.
09700 - CLEAR EPDXY FLOOR COATING
Gensral :
1. Provide atl materiala, labor, equ�pment, end aoceaaonee
neceasary and incidental to the oomplet�or� of the Epoxy Floor
Syatem as ahown o� the drawinge and as specrfied here�n.
2. Responsibilities of tt►e Applicator/Inataller bidding thia secOon
not unrelated �o the General Specifications and requirement of
tt►e enbre project, and require correlation with pr ct
manufacturers Data Sheeta and MSDS Sheets
3 Inataller is required to visit a�te and venfy conditions ior to
b�ddi ng
Conault wRt� manutach�rer for apec►f�c �ob cond na and
additional technical aupport
David St. Lawre�ce
Conrad Sov�g Co
35 Gilbert Street
San Francisco, CA 94103
teI 41 5 863 3808 tax 415 863 38 4
HAZMAT 24-hr Emergency 800 424 9300
a All inatallation sLeps must be perfor d in specrfication
o rde r
b. Vanationa in oonditiona may r ire modificabon to
reparation and installation require nts; failure to vertfy
rficationa may reautt in unacce ble finish
Quality Aasur Provide ma�eria�s for atem produced by one
manufacturer, a licator�inataller to have m�n um five years successful
expenence with e xy floonng and ahot bla ng.
t. &ddsr ia re sible f�or the delive of the material to the �obsits
in the man rera onginal, n , unopened packages and
containers be nng manufach�r s name a�d label m good
condition and on time so to not delay overall store
construc�tion sch ule.
ru
2. Stora matsnals no in actual e in tightly covered containers at
ambient air tempe ture ran af 40 to 90 degrees Farenhe�t.
Storage area ahou be n, free of contamination, and m
accordanoe witfi Data compliance
3 Environmsntal Condrtio . whs�e amb�e�t air temperature does
not fall wtthin the ra of 40 to 90 deg�ees Farenhert, or �n
conditions with extr ly high retabve humidrty, special
application products nd methoda may be required. Contact
manufadurer for s c 10 oonditwns and techn�cal support.
4. Condition af Subst : ve ' that eil jobsi�e conditions are within
t►ie epoxy Aoonng manufactu r's Data Sheet parameters. My
discrepanciea m be repo and clarified with the Fisher
Developme�t Pr ect Manager.
a. Surta ismpsreture vf sl b must be at least 40 degrees
F. an no more tt�an 90 egrees F for crack and �oint
fillers nd coating.
b. Co re�to slab muat be cur for at least 21-28 days
-levelling matenals must cured for at least 3 days.
If ere ar• any indications of a �sture problem, contact
e Fisher Developn'►ent Proje Manager and David
t. Lawror►os et Con rad Sovig �o. r speafic instructio�s
c. For surfac� typ�s oth�r than ooncr e that require a clear
epoxy coating, immedietely oontact Fiaher Development
Project Manager and Conrad vig Co. prior to
installetion.
5. reparation of Substra�s: Project requires eve hing necessary
for complete, scceptab�e installation, but some �tions may not
require rvry step spac�f►ad_ Verify extent of substrate
preparetion widi Fiaher Development Project Man ger. Perto�rn
concrete end s�lf-levslling placeme�rt as early as sible dunng
start af atore constn�ctio� to albw for maximum dryi �me.
a. Nsw slabs prop�rly installed and in premium condition
may nat rsquire patching and levelling.
b. If existing sleb is at different bvels or haa ex aive
depreaaions requinng levelling topping, level slab using
spec;ifieci leveling proceas. Stepped slab oondition may
requiro concrete for levelling.
c. Fill all spalla greatsr than 3 inches in width, aJl voids,
all hdoa witfi the spedfied seff-levelling cementitio
compound.
d. Fill all hdss grea�er than 2 inches in ciepth with a base flll
of fast-set concre�te with specified self-levelling compound
on surtace.
PRO�CT �OCATI��
C
0
Spsci�! Warranty Prov� for correcting failurss �n �poxy fbonng
P
syatem including dela�minabo�, p�el�ng, and blis�enng, werraMy penod
to he twc� yeara.
Products Ac�sptable manufsctursr of �po�cy floori�g producta �o b� The
Conrad Sovig Co , Inc. (415) 863-3808. /
1. Product Summary (as manufac�ured by Conrad Sovig Co., Inc.
a 'ONCC #�2 No�-Sag' - cne►ck. spall and jant filbr.
b 'ONCC #�96' - epoxy coating.
c 'ONCC +�12-14' - dsaner/dsglosasr
d 'ONCC CBI'SL Mo�tat' -setf-level�ing ce Micioua
compound
e 'Con-Sov Citnc Cle�ansr H�' - b�ociegr le general
purpoae cleaner
2 o product subetitutions are allowed.
E Prepara Comply witt� epoxY o�ati�9 menufacturer r nxnendatio�a
and as f ows, p�epared surtace shall be sn�ootli and ee of ndc,�es and
�rregularrb including thoae oocunng in ooncrete and om ma�abca.
1 Exa, �ne substrates and condrtions under ich epoxy fbonr►g
will rformed for compliance with requir nts for applicabo�
of fl ng matenels. Do not proceer ith app��cabon unbl
unsatis ctory conditio�s have bsen corr Start of any of the
epoxy nng wo�ic will be const as the Appl�cator's
0
2
i]
�
acceptan of the noor and e�vironment ndiLons
All sec�io must be pertormed in ificabon order My
deviaUons st be pre-approved by tfie Fisher Develop�nent
Pro�ect Man r
Concrete SI Preparatio�: provide ni0al preparation of co�crete
surfaoe as foll s. ( tn some insta this work may be already
complete; cla pertormance responsib�lity witt� F�sher
Development Pr ect Manager.)
a Surfaoe m st be tree af �rt, oil, soap, grease, mast�c. and
other bond reaWng minants.
b Surfa,oe sho �d be and f�ee of unwanted ndges
fo rmed by e+t r ma cs or conc rete
c &odegradable rt deansrs, ecrap�ng, and gnnding are
the preferred a of oontam�nate removal
Surface Repair� Fill h , spalta, cracks, vo�ds, and joints as
recommended by sya manuta►cturer witt� mmimal residue on
surrounding surface nd s required to provide smooth, level,
even substraLe.
a. All spalla e size a quar�er arxi up to 3 inches in
diameter hould struck Aush w�th 'ONCC +1�2
Non-Sag'.
b All spall larger than inct►ss in diame�sr and areaa
req�inn levelling or re rfacmg are to be filled usmg
'ON C81SL Mortar
c All c dcs the widtt� of a n kel and larger must be filled
and trudc flush with 'ONC #�2 Non-Sag'.
d All conatn�ctio� janta muat be filled w�tt► 'ONCC +1�2
N n-Sag'.
5 Shotbl dng: Shotblaat fbor at ma�chine peed of 40 - 60 feet per
minu using S170 or 5230 shat s�ze th light brush-blast or
clean� method aa folbws and aa requ ed to create suitable
bo g aurtaoe for epoxy ooating. The lean, porous surfaoe
sh Id have a I�ght profile with abraded ro ness of inedium-gnt
sa paper.
Verify floor ia dry, patching and lev ing ma►tanala are
cured, and Aoor is swept dean pnor to s o�tblast.
b Varying shotblasting techniquea may rsqu�red t�o
ensure ma�timum uniformity between ooncre�e and
self-levelling surfaces.
c. Blaating machine applicaRion to run paralle to atore�front
entry doora, unless speafied oRherwise.
d. Provide consis�snt light abrasion ot concr�s/s s b aurtece,
including surfacea required, f�ee of streaks an I+nes, by
ahotblasting procsaa; m�nimize ov�srtap martun ; at no
time shall shotblaating take plac� dunng mach�ne ms.
e. A1tsr blaating is comple�s er►d equipmsnt is rsmo , ths
floor shall be swept mag�ebcal�Y and fdbM►ed bY a
fine-briatled puah broom. AfEer brooming, vacuum ntire
11oor to remove ell duat, shot, and debns.
f Damp mopping anci/or w�st vscuuming may bs requi �o
attain a properly deaned aurface.
g. Subcontrac�r ahall be reaponsibls fo� ths rsmoval
disposal of all shot blasti�g debns.
Product Handing and Storage: Delivsr mn�sriala �o pbaits in
MERCHANT SQUARE
CARMEL, INDIANA
� �r�E AS-IS SPECIFICATIONS
DRAwN D. PAK
' I
SCALE njQP�
CNEC►cED M. LEE
�> 1(�$ NU.
5964,
F
G
H
h Ma�Ma�n slab tree of Uaff:;, betw�n ahotWasting and
apphcation vf sp�cial �poxy co�dng.
App��� APP�Y �xY ��►9 �Ys� in a000�d�r�c� wAh
manufa�ch�rsr's direct�ons; us� applicators and techniques b�st w�
fior substrats and ma�rial bs�ng applwd.
1. Veri�ly that oondRiona of co�creEs slab comply wilh th� spec' �d
pararnef�an br ths condibon of the substrate. Moiaturo in ab
may roault m unaocsptable, milky firnsh
a. Take spec�al additional slsps as �oomm�nded �poxY
coeting manufacturer where pro��ct ichedule not
c
albw suffic�eM bms for cunng. Fin�sh shall r and
nvt tum m�lky.
b. Take spscial care so pro�sc�t floor dunng lication hom
scuffing, marnng and dan�ge; do not dra eqwpm�nt or
tools over finish, wear protective shoe oov t�gs.
2 y each coat i� a000rd�ance � m�enuhsctur�t
r mrn�dabona and ins�llation ina s fo� specfiad
s Lem, two coats roquired.
a. Use roller application of Conrad Epoxy, bNCC
+M96' at rate of 225 square feet pe gaMo� for the first coat
nd 250 square feet per gallor► r the second ooat wnh
ng time be�tween coats af proximaLeiy two Lo four
h rs, coatmg too th�ckiy a ied may result in milky
ar s
e 1) Albw longer dryi time when humidity end
mperature are hi
irculatron
and when there is poor sir
2) ere constn, n maLenaJa might bs stockpiled
p to final rn�g and buffi�g, car►P�Y wRt►
3) Clean\
max�m
Sovig
acco�d
4 ) Buff to
wrth f�
�ts s fied for p�vtecbo�
�d bas fbor afier m�nimum 8 houro,
i houra, cunng by applyi�g Co�rad
CG*12-14' deaner deglo�ser m
wrth manufa�cturers diroctio�s.
e h�gh�baa finish by I�ghtly scrt�b�ng
r chine us�ng 175 rpm machme and
3 F�rnsh F►nish A r us��g ma naJa or systems as reco�'��'�er�ded
by manufacture to prov�de u orm no�shp sab� firnshed surtacv
free of wnnkl , streaks, and �ic,s
e Perto ateps in spec� order, any dev�tions rsquires
pre- proval of The G, Fisher Devebp�-�ent, and
Co ad Sov+g Go as esthebc and pertormence
c ra►ctensbcs vnll be impact
b o substrtutio�s or difterent m nals vinll be allowed.
c. APP�Y Products in stncK acco oe nnth data shest
mstrucbo�s
4. ere ooverage is incomple�te or �at �i1om'i, p�ovids an
�bonal coat or coaRs as required to prov urnbmn �urface.
a Patched Areas Ma�ch adja�ent wrta
CI n-up� Dunng progre�s of worlc, r�ravs from ab d�acerdsd
tenals, rubbish, cans and rags at end of each work
Upon complebon o! woric, dean spattered sutf Reniov�
spattered coabng by proper meM�od o�f washmg scrapng,
usi�g care not to scra�ch or otherwise damage firnsh s rtaces
Pto�ect�on Protect complebed epoxy coabng worlc ageunat
1. P►o�ect epoxy ooating from genefal oor�atruction wher► -tree
wtth 1/4' Maso�rte boarcl, s►noo�th s�de down; vertly wRh tier►a�
manufactu�er; other systems subject to approval.
2. Correct deR�age by cleaning, �epainng or rsplacmg,
refinishing, as acceptable to The Gep's Repraaentabve
3. Prov�de 'Wat PainY aMgns as required bo p�otect n�wly ooaes�
finish�s .
,
SECTION 09900 - PAINTtNG
A. Provide paint as speafied and as mdica�ed on Drawinga, including
p�unbng of milMrorlc suppl�ed by vthero
1. Worlc I�cluded Paint rtema no�t spscficelly s�ocludsd unds�
following para►graph
2 Items not to be pain�ed�
a. Drywall aurfaoea concealed from v�ew.
b Factory finished equ�prr�snt and othe� matenala wRl�
� complete factory firnsh, inc{uding merchand�s�ng shelv�ng
and wrap counbe�.
c. Fin�ah hardware except wh�re pnmsd fv� peint finiah.
d. Acoustical tile and suspsnaion sys�sms.
e. l�ghting fixturss.
manufacturers sealed containers, Isgends and labsb intac.�t.
.��
��s , � -
. ��:
�..
`�
:� .��
,,
CADO FiIE NAn�E
wunr en�oww ►fi►TM
tt6 A1LNlTC AYBl�. �TE U1
KN.eK cK.� �
Ta 5D � �63 FIU( 5ti � �Tt
C►�F 1 Nfl
_
SNEETc
,