Loading...
HomeMy WebLinkAbout1338.98.10Ct! b Prov� dW�t�u,�at r�ang��a and �ns�ns ea reqwred by epp��cabb codes fo� ce�ling installation. 7. Ha�ng indsp�nd�ntly of wslts, oolumns, ducts, qpea and oonduit. Where carrymg memb�rs ans spl�cvd, aw�d visible diaplaoement of the bng�dmal ax�s or tace plan of ad�ec,ont members. 8 L�ghting �xturea shall not bs suppo�sd from o� on main runners o� cross runners rf we�ght of the fixture causes the �ofal dead bad t� exceed cieflecbon capab�lity. a Where fixture bads ars supported by auPP�ementary hangers IocaLs hangsrs Mnthin 6' of each corner, or support fixturea i�dependsntly. g Do not inatall fixturss such tt►aR me►� runners and croaa mm�era may be ecce�tncally loeidsd. Where fi�cture mstallation would produce rotation of runners, prowde stab�l�zer bars. 10 Install edge mddings aR in�srsec,�tion of ce�ling and vertical surfa�ces, us�ng maximum lenc,�ths, straight, tn�e to line and level. M�Ler comers. � 1 Prov�de edge moldings at junctions with other ce+l+ng finishea. 12. Install units level, in uniforrn p18�e and free from tw+st, warp ano dents 13 Ad�ust any sags or twists wh�ch develop in oe�ting sys�ems and replace any pa►rt wh►ch is damaged or faulty. Extra Ma�ena! Provide iour full boxes �n onginal co�ta��ers of eact� type ot ce�l�ng ble for fuhire use by Store Manager i SECTION 09680 - CARPETING A Contractor ahall inatall carpet fumished by The Gap, where shown and no�ted on Drawings 1 Gontractor shall prov�de inatallapon maLenals and accessones. CORPORATE ARCHITECTURE 901 CHERRY AVENUE SAN BRUNO, CAL IFORNIA 94066 (650) 952-4400 � 0 C � E F S�aming Plans: Submit oomplsE� layout plana including locations of s�ama and method of s�err�ng for Arc;�►itect'a review. sa Si� Ca�►drtions: � po �at commencs carp�t installation until painting and finiahing work is complete and ceiling and o�hsr overt►ead work haa bsen �s�ed. aPProved and oompleted. 2. Maintain roan t�np�retu�s at minimum 60 dsg�+s�s F for at Isast 24 houro pnor to installation and approximate relative hum�drty ane ia to maintain. 3. Prov�ds sufficient lighti�g as hcorm��ended bY manu�'ech�re�. Matenels: 1. Cerpet: Shaw Industnea Style No NSP 27408. a. Conatn�ction: PCVC. b Fiber: 100°�'o DuPoM Sdution Dyed B�F Nybn. c. Gauge� 1/8'. d Sti�hes 7 67 per m e Tuf�ed Pile He+ght N�gh 291 Low 219 f Tufted Yam We�ght 30 oZ per sq yd 9 Pnmary Back Polypropyler►e h Secondary Back Polypropytene i 1Kidth 12 ft j Yem Ply 1235/4. k Fleme Spread ASTM E84 Flame Spread 75 or Isss. I Flammability: ASTM E648 cRtical radient Aux .45 watts/pn� or grester m Smoke Density� ASTM E662 Smolce Dena�ty rating of 450 or less �n flaming rrade n Me�thenam�ns Pill Test FF 1-70, passed 2. Pad 50 oz. pad with rubb�nzed coeting, �udow Corporation 'Mo�arch'; provide pad at cust�orr�er aervice cashwrap only. 3 Adheaivea: The 1�olbwing ad�esivss are acosptable 1or uae in direct glue down o�f carpet: Henryra +If356, Robert's #�3100, Taylor #t295, Chaptoo +1�310, AIH #�55 'Supreme'. 4. Ssam Ssalsr: O�on 'CT-3' tape, Robsrt Company 'Golde� Touch', or L.D. Bnnkman #�55'Supreme'. 5. Z Bar Cob�trym CM501, Mscldanburg Duncsn Z Ber or squal carpe�t trans�tion � wood fbonng to be wrapped and firnshed with Zber Carpet to be snug againat edge of wood and 1/8' higher than finished wood floor. 6. Ba,,ss: Provide 4' toeless base as noted on Drawinga. Manufac�urer: Roppe, Rubber Baae #f50, Color� 'Dar1c GreY. 7. Edge Guard: e. Provide Carpet edc,�s gua►d at ca�t/concrste t►ansitiona as noted on drawings. Manufacturer: Johnson�te - EG X-X-L, C.dor: Charooal. prepdretio�: Clsan floors of duat, dirt, solvents, oil, groase, pairrt, plasber and other aubatances detnmerrtd to proper pertormance of a�esive and carpet. Albw floora eo thoroughiy dry. t. Ensure concret� Aoors ers fne No^'� sc���ng �d irregulantiea and exhibit neutrality relative b� acidity and alkalinity. 2. Use an a�p►avsd osmentitioua fi��er to patch cracks and small hdes, and for leveting. Ensur� floora are levot, wAh maximum surtace variatic� of 1/8' in 10'-0', no�cumulative. 3 Comrr�sr�cemsnt of carpet instsllation shall signity aoceptance of sabsfectory oondR�ona. Installation 1. Gensral: Cabine�Mrorlc shall bs inafalled ov�sr finish flooring; schedule Woric ao rrrnimum vf pairiting and graphics woric occurs ovsr carpet and assure carpst is pro�ected from damage from any source. 2. Inat�aJl atair carpst notinga at stairs and special sdging sVips where carpet tsrm�nated at oRhsr Aoor covenngs unless othervviae shown. a. Use h�ll Isnglt� peces o�y. 8utt tight to vs�tical aurfaoss. rU Where splicing cannat be avoided, butt enda tight and flush. 3. At frttinq rooms carpet shal� be hooked to P�ns of carpet stnp and tudced securety behind. f. Ptumbing fixtures end �oilet room accosaonea. . .: • ., . . -.. . ..... : : �. A. n 4. Fill stnps shdl not be leas tnan y' m vmdtt► and at leaat 36' m Iength. Fili stnps ahall bo kopt �o a minimum Fill stnp locabons to be approved by The Gap. 5. Meir►tain f�niahed carpet inatallation free trom tacks, scraps, c,�upst npplea, scalbpa, puckers, and other defects. 6. ARer inatallation ia comp�e�, clean dirt and debris and ctean spota with proper spot remover. Remove loose threads and vacuum. 09700 - CLEAR EPDXY FLOOR COATING Gensral : 1. Provide atl materiala, labor, equ�pment, end aoceaaonee neceasary and incidental to the oomplet�or� of the Epoxy Floor Syatem as ahown o� the drawinge and as specrfied here�n. 2. Responsibilities of tt►e Applicator/Inataller bidding thia secOon not unrelated �o the General Specifications and requirement of tt►e enbre project, and require correlation with pr ct manufacturers Data Sheeta and MSDS Sheets 3 Inataller is required to visit a�te and venfy conditions ior to b�ddi ng Conault wRt� manutach�rer for apec►f�c �ob cond na and additional technical aupport David St. Lawre�ce Conrad Sov�g Co 35 Gilbert Street San Francisco, CA 94103 teI 41 5 863 3808 tax 415 863 38 4 HAZMAT 24-hr Emergency 800 424 9300 a All inatallation sLeps must be perfor d in specrfication o rde r b. Vanationa in oonditiona may r ire modificabon to reparation and installation require nts; failure to vertfy rficationa may reautt in unacce ble finish Quality Aasur Provide ma�eria�s for atem produced by one manufacturer, a licator�inataller to have m�n um five years successful expenence with e xy floonng and ahot bla ng. t. &ddsr ia re sible f�or the delive of the material to the �obsits in the man rera onginal, n , unopened packages and containers be nng manufach�r s name a�d label m good condition and on time so to not delay overall store construc�tion sch ule. ru 2. Stora matsnals no in actual e in tightly covered containers at ambient air tempe ture ran af 40 to 90 degrees Farenhe�t. Storage area ahou be n, free of contamination, and m accordanoe witfi Data compliance 3 Environmsntal Condrtio . whs�e amb�e�t air temperature does not fall wtthin the ra of 40 to 90 deg�ees Farenhert, or �n conditions with extr ly high retabve humidrty, special application products nd methoda may be required. Contact manufadurer for s c 10 oonditwns and techn�cal support. 4. Condition af Subst : ve ' that eil jobsi�e conditions are within t►ie epoxy Aoonng manufactu r's Data Sheet parameters. My discrepanciea m be repo and clarified with the Fisher Developme�t Pr ect Manager. a. Surta ismpsreture vf sl b must be at least 40 degrees F. an no more tt�an 90 egrees F for crack and �oint fillers nd coating. b. Co re�to slab muat be cur for at least 21-28 days -levelling matenals must cured for at least 3 days. If ere ar• any indications of a �sture problem, contact e Fisher Developn'►ent Proje Manager and David t. Lawror►os et Con rad Sovig �o. r speafic instructio�s c. For surfac� typ�s oth�r than ooncr e that require a clear epoxy coating, immedietely oontact Fiaher Development Project Manager and Conrad vig Co. prior to installetion. 5. reparation of Substra�s: Project requires eve hing necessary for complete, scceptab�e installation, but some �tions may not require rvry step spac�f►ad_ Verify extent of substrate preparetion widi Fiaher Development Project Man ger. Perto�rn concrete end s�lf-levslling placeme�rt as early as sible dunng start af atore constn�ctio� to albw for maximum dryi �me. a. Nsw slabs prop�rly installed and in premium condition may nat rsquire patching and levelling. b. If existing sleb is at different bvels or haa ex aive depreaaions requinng levelling topping, level slab using spec;ifieci leveling proceas. Stepped slab oondition may requiro concrete for levelling. c. Fill all spalla greatsr than 3 inches in width, aJl voids, all hdoa witfi the spedfied seff-levelling cementitio compound. d. Fill all hdss grea�er than 2 inches in ciepth with a base flll of fast-set concre�te with specified self-levelling compound on surtace. PRO�CT �OCATI�� C 0 Spsci�! Warranty Prov� for correcting failurss �n �poxy fbonng P syatem including dela�minabo�, p�el�ng, and blis�enng, werraMy penod to he twc� yeara. Products Ac�sptable manufsctursr of �po�cy floori�g producta �o b� The Conrad Sovig Co , Inc. (415) 863-3808. / 1. Product Summary (as manufac�ured by Conrad Sovig Co., Inc. a 'ONCC #�2 No�-Sag' - cne►ck. spall and jant filbr. b 'ONCC #�96' - epoxy coating. c 'ONCC +�12-14' - dsaner/dsglosasr d 'ONCC CBI'SL Mo�tat' -setf-level�ing ce Micioua compound e 'Con-Sov Citnc Cle�ansr H�' - b�ociegr le general purpoae cleaner 2 o product subetitutions are allowed. E Prepara Comply witt� epoxY o�ati�9 menufacturer r nxnendatio�a and as f ows, p�epared surtace shall be sn�ootli and ee of ndc,�es and �rregularrb including thoae oocunng in ooncrete and om ma�abca. 1 Exa, �ne substrates and condrtions under ich epoxy fbonr►g will rformed for compliance with requir nts for applicabo� of fl ng matenels. Do not proceer ith app��cabon unbl unsatis ctory conditio�s have bsen corr Start of any of the epoxy nng wo�ic will be const as the Appl�cator's 0 2 i] � acceptan of the noor and e�vironment ndiLons All sec�io must be pertormed in ificabon order My deviaUons st be pre-approved by tfie Fisher Develop�nent Pro�ect Man r Concrete SI Preparatio�: provide ni0al preparation of co�crete surfaoe as foll s. ( tn some insta this work may be already complete; cla pertormance responsib�lity witt� F�sher Development Pr ect Manager.) a Surfaoe m st be tree af �rt, oil, soap, grease, mast�c. and other bond reaWng minants. b Surfa,oe sho �d be and f�ee of unwanted ndges fo rmed by e+t r ma cs or conc rete c &odegradable rt deansrs, ecrap�ng, and gnnding are the preferred a of oontam�nate removal Surface Repair� Fill h , spalta, cracks, vo�ds, and joints as recommended by sya manuta►cturer witt� mmimal residue on surrounding surface nd s required to provide smooth, level, even substraLe. a. All spalla e size a quar�er arxi up to 3 inches in diameter hould struck Aush w�th 'ONCC +1�2 Non-Sag'. b All spall larger than inct►ss in diame�sr and areaa req�inn levelling or re rfacmg are to be filled usmg 'ON C81SL Mortar c All c dcs the widtt� of a n kel and larger must be filled and trudc flush with 'ONC #�2 Non-Sag'. d All conatn�ctio� janta muat be filled w�tt► 'ONCC +1�2 N n-Sag'. 5 Shotbl dng: Shotblaat fbor at ma�chine peed of 40 - 60 feet per minu using S170 or 5230 shat s�ze th light brush-blast or clean� method aa folbws and aa requ ed to create suitable bo g aurtaoe for epoxy ooating. The lean, porous surfaoe sh Id have a I�ght profile with abraded ro ness of inedium-gnt sa paper. Verify floor ia dry, patching and lev ing ma►tanala are cured, and Aoor is swept dean pnor to s o�tblast. b Varying shotblasting techniquea may rsqu�red t�o ensure ma�timum uniformity between ooncre�e and self-levelling surfaces. c. Blaating machine applicaRion to run paralle to atore�front entry doora, unless speafied oRherwise. d. Provide consis�snt light abrasion ot concr�s/s s b aurtece, including surfacea required, f�ee of streaks an I+nes, by ahotblasting procsaa; m�nimize ov�srtap martun ; at no time shall shotblaating take plac� dunng mach�ne ms. e. A1tsr blaating is comple�s er►d equipmsnt is rsmo , ths floor shall be swept mag�ebcal�Y and fdbM►ed bY a fine-briatled puah broom. AfEer brooming, vacuum ntire 11oor to remove ell duat, shot, and debns. f Damp mopping anci/or w�st vscuuming may bs requi �o attain a properly deaned aurface. g. Subcontrac�r ahall be reaponsibls fo� ths rsmoval disposal of all shot blasti�g debns. Product Handing and Storage: Delivsr mn�sriala �o pbaits in MERCHANT SQUARE CARMEL, INDIANA � �r�E AS-IS SPECIFICATIONS DRAwN D. PAK ' I SCALE njQP� CNEC►cED M. LEE �> 1(�$ NU. 5964, F G H h Ma�Ma�n slab tree of Uaff:;, betw�n ahotWasting and apphcation vf sp�cial �poxy co�dng. App��� APP�Y �xY ��►9 �Ys� in a000�d�r�c� wAh manufa�ch�rsr's direct�ons; us� applicators and techniques b�st w� fior substrats and ma�rial bs�ng applwd. 1. Veri�ly that oondRiona of co�creEs slab comply wilh th� spec' �d pararnef�an br ths condibon of the substrate. Moiaturo in ab may roault m unaocsptable, milky firnsh a. Take spec�al additional slsps as �oomm�nded �poxY coeting manufacturer where pro��ct ichedule not c albw suffic�eM bms for cunng. Fin�sh shall r and nvt tum m�lky. b. Take spscial care so pro�sc�t floor dunng lication hom scuffing, marnng and dan�ge; do not dra eqwpm�nt or tools over finish, wear protective shoe oov t�gs. 2 y each coat i� a000rd�ance � m�enuhsctur�t r mrn�dabona and ins�llation ina s fo� specfiad s Lem, two coats roquired. a. Use roller application of Conrad Epoxy, bNCC +M96' at rate of 225 square feet pe gaMo� for the first coat nd 250 square feet per gallor► r the second ooat wnh ng time be�tween coats af proximaLeiy two Lo four h rs, coatmg too th�ckiy a ied may result in milky ar s e 1) Albw longer dryi time when humidity end mperature are hi irculatron and when there is poor sir 2) ere constn, n maLenaJa might bs stockpiled p to final rn�g and buffi�g, car►P�Y wRt► 3) Clean\ max�m Sovig acco�d 4 ) Buff to wrth f� �ts s fied for p�vtecbo� �d bas fbor afier m�nimum 8 houro, i houra, cunng by applyi�g Co�rad CG*12-14' deaner deglo�ser m wrth manufa�cturers diroctio�s. e h�gh�baa finish by I�ghtly scrt�b�ng r chine us�ng 175 rpm machme and 3 F�rnsh F►nish A r us��g ma naJa or systems as reco�'��'�er�ded by manufacture to prov�de u orm no�shp sab� firnshed surtacv free of wnnkl , streaks, and �ic,s e Perto ateps in spec� order, any dev�tions rsquires pre- proval of The G, Fisher Devebp�-�ent, and Co ad Sov+g Go as esthebc and pertormence c ra►ctensbcs vnll be impact b o substrtutio�s or difterent m nals vinll be allowed. c. APP�Y Products in stncK acco oe nnth data shest mstrucbo�s 4. ere ooverage is incomple�te or �at �i1om'i, p�ovids an �bonal coat or coaRs as required to prov urnbmn �urface. a Patched Areas Ma�ch adja�ent wrta CI n-up� Dunng progre�s of worlc, r�ravs from ab d�acerdsd tenals, rubbish, cans and rags at end of each work Upon complebon o! woric, dean spattered sutf Reniov� spattered coabng by proper meM�od o�f washmg scrapng, usi�g care not to scra�ch or otherwise damage firnsh s rtaces Pto�ect�on Protect complebed epoxy coabng worlc ageunat 1. P►o�ect epoxy ooating from genefal oor�atruction wher► -tree wtth 1/4' Maso�rte boarcl, s►noo�th s�de down; vertly wRh tier►a� manufactu�er; other systems subject to approval. 2. Correct deR�age by cleaning, �epainng or rsplacmg, refinishing, as acceptable to The Gep's Repraaentabve 3. Prov�de 'Wat PainY aMgns as required bo p�otect n�wly ooaes� finish�s . , SECTION 09900 - PAINTtNG A. Provide paint as speafied and as mdica�ed on Drawinga, including p�unbng of milMrorlc suppl�ed by vthero 1. Worlc I�cluded Paint rtema no�t spscficelly s�ocludsd unds� following para►graph 2 Items not to be pain�ed� a. Drywall aurfaoea concealed from v�ew. b Factory finished equ�prr�snt and othe� matenala wRl� � complete factory firnsh, inc{uding merchand�s�ng shelv�ng and wrap counbe�. c. Fin�ah hardware except wh�re pnmsd fv� peint finiah. d. Acoustical tile and suspsnaion sys�sms. e. l�ghting fixturss. manufacturers sealed containers, Isgends and labsb intac.�t. .�� ��s , � - . ��: �.. `� :� .�� ,, CADO FiIE NAn�E wunr en�oww ►fi►TM tt6 A1LNlTC AYBl�. �TE U1 KN.eK cK.� � Ta 5D � �63 FIU( 5ti � �Tt C►�F 1 Nfl _ SNEETc ,