Loading...
HomeMy WebLinkAbout05090168-Sq. Ft. ~(. All sidewalks and driveways I. Sewer and water lines, septic system, (tanks & filed system) and/or well locations m. Drainage flow arrows n. All drainage swales and subsurface facilities (retention / detention areas, etc...) o. Sump pump -- Show sump pump pit(s) and discharge line locations ~), Geothermal heat pump discharge locations NOTE: If land is not within a platted subdivision, a legal description is required. FURTHER NOTES / NOTICES CARMEL ZONING ORDINANCE Z-289, SECTION 29.04.02 (3): "The Director shall approve or deny the Improvement Location Permit within five (5) working days of the receipt of the written application form and accompanying materials. The Improvement Location Permit shall be issued when the proposed structure, improvement, or use and its location conform in all respects to this ordinance." IN ADDITION TO THE ABOVE-LISTED SUBMITTAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED WITH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OF ZONING APPEALS, AND/OR DEPT. OF COMMUNITY SERVICES ADMINISTRATIVE APPROVALS REQUIRED. ADDITIONAL INFORMATION MAY BE REQUESTED BY, AND WILL BE PROVIDED TO THE BUILDING INSPECTOR, IF THE SUBMITTED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES. SUBMTITAL OF ADDITIONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INITIAL SUBM1TFAL, WILL EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REVlE~N. > THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON CONSTRUCTION PLANS AS A "BONUS ROOM"TO BE~ N. P - - NFINISHEDSPACE. IFANAREASO LABELED IS TO BE A FINISHED SPACE, CONSTRUCT[ON PLANS MUST BE LABELED ACCORDINGLY. IF IT IS DETERMINED THAT AN UNFINISHED, "BONUS ROOM" AREA IS TO BECOME A FINISHED AREA AFTE_R THE IS · N · F C F MIT THE PLANS AND PERM[T RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING & CODE ENFORCEMENT. > ALL CONSTRUC'r~oN IS SUB]ECr TO F~ELD INSPECTZONt AND SHOULD NOT BEGIN PRZOR TO THE ~ ISSUANCE OF THE BUILDING PERMZT, ONCE THE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED, [~l~ll.J INSULATED/COVERED, AND/OR OCCUPIED PR[OR TO THE APPROPRIATE iNSPECT[ON. Beginning prior to obtaining ~ a building permit and/or proceeding with construction beyond the stage of a required inspection without approval I c~nstituteskateFeepena~ties~perZ-289~ftheCarme~[C~ayZ~n~ng~rdinance;2~~~6~~7~and29~6.~8~ BUILDING & CODE ENFORCEMENT; CITY OF CARMEL. One Civic Scl.; Carmel, IN 46032. Ph. (317) 571-2444. I, I all of the above listed information is shown completely and accurately on the attached pot or s te plan(s), construction plans, and any other submitted documentation, submitted with the building Permit applicaUon to the City of Carmel / Clay 'l;ownship Department of Community Services. I further certify that the joining of water supply piping shall be made with lead-free solders and fluxes. Failure to comply will result in a replacement of the system. (Plumbing Code P-509-5) Under the penalties of PedurY (Indiana Code 35-44-2-:t), ! also hereby affirm, under oath, that all of the information I have provided in the table below is true and accurate, to the best of my knowledge and belief, and that T have not knowingly or intentionally prov ded or omitted any information that would tend to hide, obscure, or otherwise mislead the Dept. of Community Services l:egarding the truth of the matters addressed therein. Rear -- ~ Porch or Ft, of sunroom Garages DATE S;Perrnits[FORMS/RESIDENTIAL PROCEDURES 2 of 2