HomeMy WebLinkAbout1360.98.19S U P E R V I S O R W t� R K S H E E T �YVAI�I p
FOUNDATION CHECKLIST FRAME PUNCH-�UT CHECK LIST
BASEMENT SLAB ,. QARA(iE
CsARAiCsE pOOfi OPENING FRAMED TO CORFcEGT SIZE: 1' HT., 8' OR I6' WIDS.
PROJECT INFORMATION PROJECT INFORMATION �Q,L��s� ar71a�i. �cca�E�s ��A °r�e ����iu� ND �ocaT�oK
CsARACsE STEp FRAMED AND iCIGfC PLATE UNDER DOOR
BOW S'NDS
HOUS�E NAME / ELEV. HOUSE NAME / ELEV. STRAP ANGHOR NAILED COR}2EGTLY
EQUAL RISER I-IEICsNT AT CsAR.4CzE STEPS C8 V4" MAX.)
SET INUMBER SET NUMBER PR�N7 HUNCs ON NAIL IN CsARACsE
CHECK. FOR LOAp-6EAF21NCs POINTS AND PROPER LOAD TRANSFER
PLAN / JOB NUMBER PLAN / JOB NUMBER 2• BASEMENT AND NOUSE
C?-IECiC SASEhIEN7 STAli2 AND 2nd PLOOR STAiR INSTALLATIDN
NALF-WALL 42" PROM FLOOR ANp SAME PITGH AB STAli25 I 1/2" PASt STRINGER
RIGH'� HAND OR LEFT HAND RIGHT HAND OR LEFT HAND CB pAMELS HAVE BLOC'..ICS ON ENA8
GHEGK FOR LOAD-BEAR�NCs POIN7S AND PROPER LOAD TRANSFER
ANY NON-STD. CHANGES? ANY NON-STD. CHANGES? STRAP ANGNORS SECURED IN HOt15E
StAIRUAY S!-tIMMED (MAX. I/2" CsAP EAGH SIDE)
NANpRAIL BLOCKB MSTALLED 32" FROM STAIR N051NG ANP LOFt NEWELL POS75
bAPETY BOGTS AND R41LS INSTALLEp 3 1/2" �ROM STRIA1rsER
FRONT OR SIDE I.OAD GARAGE FRONT OR SIDE LOAD GARAGE BAf�ICADE BAGC DOOR IF STEP IS GI2�AT�R TNAN 18"
SQLIASH BLOCKS INS7ALLED PER PLAN ANP T,J.I. DBTA�L SHEET
CRAWL SPAGE AND BASEMENt CLEANED OU7
&TD., ENLARGED, OR FULL BSMT. ALL SIDING OR BRICK FRONT F�LL CsAPS W/ PLYIUp. WHPRE TJ.I:s MEET IN CORNERS AND FlREPLAGE GANT.�s
CIN SE? •) (OP?. 293� (OPt. 295) N .3, HOUSE
CIN SE7 ) (OP7. d90J CHECK FOR 80W S7llDS
GHEGK FOR NAILERS
ALL :�IDING OR BRICpC FRONT MARK D00�2 SWING l71RECTION .4ND SIXE
(IN :iET �) COP7. 49fdJ MASONRY �� pp� CASINCs ROOM (MIN. 2" ON EAGH SIPE)
BSM7'. WINDOW OPT� (�TY. F��EPLACE 4PT. PRf-FaB GNEGK GENTERLINE OF KITCHEN WINDOW
NOTE: INSTALL BRIGiC LEDCsE ON MAvONRY FIREF'LACE9 GHEGK BULfGHEAD DIMENSIONS C2" LONGER AND 2" U1IIJER 7HAN GA61NET5)
(M,4sIC LOGATION(51 ON pR�NT CI-tECK UJALL 51ZES IN �LATION TO CABINE7 SPAGP
FRON'T PORCH WALL HT. TO BE
BUILDtNG PERMIT NUMBER CHECK vANITY SIZES IN RELATION TO WALL SPACE
CHEGK YANITT DEPT1-1 TO DOOR OFENINCs (MIN. 24 12")
ABOV'E TOP OF FTN. W ALL GHECK DOOR OPERATION AND fNSTALLATION
2" qBO�E W' 1/g" 1et FLt2 TJ.f:e 6" A60V� W/ 14" 1et FLR. 7.1.i:s L4T ADDRESS CHECK WINDOW OP�RATION AND MSTALLATION
MASONRY PITCN R41L WAL� 1NSTALLED 1/2" BELOIU &tRINCsER ANP 1 I/2" SNORT
Tl1B PLATFOl�th BUILT CORRECtLT 16 1/2" HT., 38" X 5'1" INSf�E
FIREPLACE OPT. PRE-FAB '� NAILERS FOR PIBERCsLASS TUBS ANp GA51NCs AROUND TUBS INSTALLED.
NOTE: IN°TALL BRICK iED@6 ON MASONRY PI�pLAGES , MEASURE VINYL AREAS FOR �' ARE
let AND �nd FLOORS LINE UP IN STAIR IUELL
BUILC►ING PERMIT NUMBER NO GAPS ABOVE STAIRWAY DRAF7570P
STAIRWAY pROP GE(LINCs DONE GORRECTLY (CHECfC PRINTS)
LOT ,ADDRESS CHECKLIST PLOOR SHEATHING NAlLED PER °vPEG.'a
FALL PR07ECTION ItJ57ALLED AT STAIR WALL OPENINGS
TOWIVSHIP MARK 011T ALL HAUNGNES h10T IFSED EYEBOLt ANp ANCHOf2 PO�N7 IN PLAGE
GHECICLIST MAi�G IN FRONT PORGH WALLS IF NO7 ON PRI1Vt5 AI-L DR1+FT STOP INSTALLED ON GHASE AND BANp JOISTS
PERIMEI'E12 ANp PANELS GLUED
WATER SLEEvE �OCAtION MARKED IN7ERIOR WALLS GLUED DOUJ�I
3Ur7P PUMP LOCATION MARKED SEUlEi2 ANp WATER SLEEYE
— HIfsNLIGNT ALI. THIGKENEp 6LA8 FOOTING9 fNTER�OR AND EXTERIOR WALLS NAILED INTO I-JDISTS BELOW
EJE:G'OR PIT ,.pGATION MARKED �OCATIONS M�`4�IGED f3' W! 4" 9ElLER NIGNLICsHT ALL PAD POOTING LOGATIONS 3ET TU89 IN70 ROOM AND WIPE-OUT
C0IJPLER, 5' W/ I I/2" SLEEVE) �EAM TAKE-OFF SHEET COMPLI'E A,'�Ip TURNED IN ATTIC AGCESS INSTALLED IN HOU3E PER PRINT, 12" 9(DES
MA�fC OU? AL� H,AUNGHES N07 USED HIGF1LICsF4T ALL BEAM f'OCKE75 TO fOUNpA710N SUPERVISOR JO�ST NANGERS NAILEO fiRONT ANp S�DES
MA�IC IN FRONT POI�GN WALL CTO BE GOMPL7ED EvEN IF NO SEAMS REGXiIRED)
If r10T ON PRIN?S 4dICsyLIGNt ALL f'Ap FTCs. LOGAT�ONS
MARK ONE OR 7W0 GARACsE DOOR3 ALL GIRDER TRUSSEB NAILED PER ENGINEERINrs
PR?-STARt GNECKLIg7 TURNED IN MARK ONE OR TlUO GARACxE DOORS 4. EXTERIOR
AT1'A�,H SEL£GtION ��ET tp WA{.L ATTACN PLOT PLAN AND STA.KE SHEET
CO�TRAGTOR pRINT& B�`�"�7- BAtN ROUGH-IN LOGATION9 TO EXGAYAtOR PRINT. MAKE SU� 7NEY MATGN ALL 7YVECK 87APLED IN-PLACE EXTERIOR
ATiAGN PLOT PLAN ,d,Np &TAKE 9HEET p0 NOT INTE1a�ERE WITH Rl�IACE OR EACH OTI-IER ANP SELECTION SNEET ALL NOLES PATGHED IN IN511L.AtiON BOARD
STANtION pOS7 LOGATIONS tA. STANDARD OR I�VERSED ,cV„� 7��M IN8TALLED fER PRIN7
TO EXCAVATOR i Rlty?. M,4KE SURE TNE7
MATCN EAGN 07�IER AND 9ELECTION GNEGY. LOT LI571NCs AfsAINST A7TACN SELECTION bl-IEET TO BLOGK 3 1/2" RlpS I/2 SHEATF41h1Cs �NbTALLED ON GORNERS
SHE:E?, t.e, STANpARD oR RE�D SEL�CTION 6HEE7, t.e. STANDARD GONTR4GTOR PRINTS
MAiK-UP ALL riON-6TD. CNANCvEB, 1-IpU$E ����p �g�LD MATC4-U ALL tllINDOWS TAPED ON TOP ANp fsLUEp ON FOUR S(pES
Ex'ENSIONS, AND GA�� EX7EN&IONS MARK-UP ALL hION-STANDARD GFIANGE9, NOUSE ,4LL DooR3 TAPED ABOVE
BE.QP1 TAKE-Of� P�NEET GOMPLETE AND TURNED IN
EXTEN810NS, AND GARACsE EXTENSIONS ALL WINDOW5 INSt,4LLED PER PRINT, ELEvATION AND S7AUG
TO FOUNDA?ION SIiPERVISOR
G COMPLTED EVEN IF NO BEAMB REQl11REp)
PR�-START GH£CfCLlBt TURNED IN SITE P�GCED UP ,4ND PU7 IN P�LE EACH DAY
2X4 AROUND TOP OF GFIIMNET, I I/2" PAST G{-fiMNET FLAT
AD7 i" TO �?. STEEL 6EAM9 ON WALiG-OUt CI-IEGK LOT LIS71NCs ACsAINST SELEGTION °vHEEt
SA3EhfENTS IF SiDE UTALLS STEP t70tLtd ia. STANpARp OR �vERSED ISHOt1LD MATCN) ALL GIRDER TRUSSES NAILED f'ER ENGINEERINCs
BA3EMENT WINDqll L pGATIONS DO NOT INTERFER� IX4 EXTENSIONS INSTALLED AT PRONT DOOR AND WINDOW SURROUNDS
WiTla FIREPLACES, DECKS, pR SAY WINPOUI6 REVISED 5/29/98 pLASHING MSTALLED UNDER FRONT DOOR AND fsARfY_sE RETURN WALL
C�\PR�JECTS\OEiAIIS\SUPVWRV CS/29/Se �9.0