HomeMy WebLinkAbout05090179-Sq. Ft. k. All sidewalks and driveways
I. Sewer and water lines, septic system, (tanks & filed system) and/or well locations
m. Drainage flow arrows
n, Al drainage swales and subsurface facil ties (retention / detention areas, otc...)
o. Sump pump -- Show sump pump pit(s) and discharge line locations
p. Geothermal heat pump di
*NOTE: If land is not ~
FURTHER NOTES / NOTICES:
CARMEL ZONING ORDINANCE Z-289, SECTION 29,04,02 (3): 'The Director shall approve or deny the Improvement
Location Permit within five (5) working days of the receipt of the written application form and accompanying
mater als, The Improvement Location Permit shall be issued when the proposed structure, improvement, or use and
its location conform in all respects to this ordinance."
IN ADDIT[ON TO THE ABOVE-LISTED SUBMITTAL REQUIREMENTS, THE BUILDING INSPECTOR WILL BE PROVIDED
WlTH ANY INFORMATION RELATIVE TO COMMITMENTS MADE IN THE ZONING PROCESS FOR THE PROPERTY
INVOLVED. THIS WOULD INCLUDE ANY PLAN COMMISION, BOARD OFZONING APPEALS, AND/OR DEPT. OF
COMMUNITY SERVICES ADMINISTRAT[VEAPPROVALS REQUIRED.
ADDITIONAL INFORMATZON MAY BE REQUESTED BY, AND WILL BE PROVZDED TO THE BUILDING INSPECTOR, IF
THE SUBMITTED PLANS ARE NOT OF SUFFICIENT CLARITY OR DETAIL, TO INDICATE THE NATURE AND EXTENT
OF THE WORK PROPOSED AND TO DETERMINE COMPLIANCE WITH ALL APPLICABLE CODES AND ORDINANCES.
SUBMITTAL OF ADDi-rZONALLY REQUESTED/REQUIRED INFORMATION, AFTER THE INTrZAL SUBMITTAL, WILL
EXTEND THE TIME IT TAKES COMPLETE THE PERMIT REV[EW.
THE OFFICE OF BUILDING & CODE ENFORCEMENT RECOGNIZES ANY ROOM/AREA DESIGNATED ON
CONSTRUCTION PLANS ASA"BONUS ROOM"TO BE NOCCUP[ABLE UNFINISHED SPACE. IFAN AREA SO
LABELED IS TO BE A FINISHED SPACE, CONSTRUCT[ON PLANS MUST BE LABELED ACCORDINGLY. IF I'r IS
DETERMINEDTHAT AN UNFINISHED, "BONUS ROOM"AREA IS TO BECOME A FINISHED AREA~
IS--UANZE OF THE PERMIT THE PLANS AND PERMIT RECORDS MUST BE UPDATED AT THE OFFICE OF BUILDING &
CODE ENFORCEMENT,
ALL CONSTRUCTION IS SUB~IECT TO F~ELD INSPECTZON, AND SHOULD NOT BEGIN PI~ORTO THE
ISSUANCE OFTHE BUILDING PERMIT. ONCETHE PERMIT IS ISSUED, WORK SHOULD NOT BE POURED,
INSULATED/COVERED AND/OR OCCUPIED PR[OR TO THE APPROPRIATE INSPECT[ON Beginning prior to ol~taining
a bui ding permit and/or proceed ng with construction beyond the Stage of a required inspection without approval
constitutes Late Fee penalties, per Z-289 of the Carmel/Clay Zoning Ordinance; 29.06.07, and 29.06.08.
Sq.; C~rme], IN 46052. Ph. ¢317) 571-2444.
attached
completely and accurately on the
. submitted with the
~ply
penalties of Perjury (Indiana
of the information ! have provided in the table below is
and belief, and that I have not knowingly or intentionally
hide, obscure, or otherwise mislead the Dept. of
therein.
Porch
Porch or
Sunroom
Total Sq.
Ft. of
_Garages
TOTAL
DATE
S:Permits/FORMS/RESZDENT~L PROCEDURES 2 of 2